| {{#Wiki_filter:UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 July 29, 2010 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. 1448 S.R. 333 Russellville, AR 72802 ARKANSAS NUCLEAR ONE, UNIT 2 - | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 29, 2010 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc. |
| REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME3678) | | 1448 S.R. 333 Russellville, AR 72802 |
| | |
| | ==SUBJECT:== |
| | ARKANSAS NUCLEAR ONE, UNIT 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME3678) |
|
| |
|
| ==Dear Sir or Madam:== | | ==Dear Sir or Madam:== |
| By letter dated June 23, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. | | |
| ML102000199), you submitted an affidavit dated June 3,2010, executed by Mr. J. | | By letter dated June 23, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102000199), you submitted an affidavit dated June 3,2010, executed by Mr. J. A. Gresham of Westinghouse Electric Company LLC, requesting that the information contained in the following document (included to the letter as Attachment 5) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: |
| A. Gresham of Westinghouse Electric Company LLC, requesting that the information contained in the following document (included to the letter as ) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390: CN-OA-08-20, Revision 0, "ANO-2 Rod Ejection Dose Analysis Using Alternative Source Terms," dated October 17, 2008 The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure because this information has substantial commercial value that gives Westinghouse competitive advantage over its competitors, disclosure would jeopardize its competitive position, and for the following reasons: These are Westinghouse internal calculation notes. The contents and form are as such proprietary and provided to NRC | | CN-OA-08-20, Revision 0, "ANO-2 Rod Ejection Dose Analysis Using Alternative Source Terms," dated October 17, 2008 The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure because this information has substantial commercial value that gives Westinghouse competitive advantage over its competitors, disclosure would jeopardize its competitive position, and for the following reasons: |
| [Nuclear Regulatory Commission] to aid in their review of Entergy's License Amendment Request. Its use by a competitor would improve his competitive position in the design and licensing of a similar product. The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse. We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. | | (a) These are Westinghouse internal calculation notes. The contents and form are as such proprietary and provided to NRC [Nuclear Regulatory Commission] to aid in their review of Entergy's License Amendment Request. |
| -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 1 03(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions, please contact me at (301) 415-1480 or bye-mail at kaly.kalyanam@nrc.gov. | | (b) Its use by a competitor would improve his competitive position in the design and licensing of a similar product. |
| Sincerely, N. Kaly Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368 cc: Distribution via Listserv J. A. Gresham, Regulatory Compliance and Plant Westinghouse Electric Company P.O. Box Pittsburgh, PA | | (c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse. |
| -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. If you have any questions, please contact me at (301) 415-1480 or bye-mail at kaly.kalyanam@nrc.gov. | | We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure. |
| Sincerely, /raJ N. Kaly Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368 cc: Distribution via Listserv J. A Gresham, Regulatory Compliance and Plant Westinghouse Electric Company Nuclear P.O. Box Pittsburgh, PA DISTRIBUTION:
| | |
| PUBLIC LPLIV Reading RidsAcrsAcnw_MailCTR Resource RidsNrrDraAadb Resource RidsNrrDorlLpl4 Resource RidsNrrLAJBurkhardt Resource RidsNrrPMANO Resource RidsOgcRp Resource RidsRgn4MailCenter Resource ADAMS Accession No ML101810337 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DRNAADB NRR/LPL4/BC NRRlLPL4/PM NAME NKalyanam JBurkhardt TTate for ABoatright MMarkley NKalyanam DATE 7/29/10 7/9/10 7/27/10 7/29/10 7/29/10 OFFICIAL RECORD}}
| | -2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended. |
| | Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information. |
| | If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure. |
| | If you have any questions, please contact me at (301) 415-1480 or bye-mail at kaly.kalyanam@nrc.gov. |
| | Sincerely, N. Kaly Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368 cc: Distribution via Listserv J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company LLC P.O. Box 355 Pittsburgh, PA 15230-0355 |
| | |
| | ML101810337 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DRNAADB NRR/LPL4/BC NRRlLPL4/PM TTate for NAME NKalyanam JBurkhardt ABoatright MMarkley NKalyanam DATE 7/29/10 7/9/10 7/27/10 7/29/10 7/29/10}} |
Letter Sequence Withholding Request Acceptance |
---|
|
|
MONTHYEARML1012506042010-05-0505 May 2010 E-mail Arkansas Nuclear One, Unit 2 - Acceptance Review Email, License Amendment Request, Technical Specification Changes and Analyses Relating to Use of Alternative Source Term Project stage: Acceptance Review ML1014502942010-05-25025 May 2010 Request for Additional Information License Amendment Request for Technical Specification Changes and Analyses Regarding Use of Alternate Source Project stage: RAI 2CAN061004, License Amendment Request Technical Specification Changes and Analyses Relating to Use of Alternative Source Term - Supplemental Information2010-06-23023 June 2010 License Amendment Request Technical Specification Changes and Analyses Relating to Use of Alternative Source Term - Supplemental Information Project stage: Supplement ML1019604922010-07-15015 July 2010 Email, Request for Additional Information License Amendment Request to Implement an Alternative Source Term Project stage: RAI ML1018103452010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-18, Revision 0 Project stage: Withholding Request Acceptance ML1018102182010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-15, Revision 0, TAC No. ME3678 Project stage: Withholding Request Acceptance ML1018102242010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-16, Revision 0, TAC No. ME3678 Project stage: Withholding Request Acceptance ML1018102262010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-17, Revision 0 Project stage: Withholding Request Acceptance ML1018102332010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-57, Revision 0 Project stage: Withholding Request Acceptance ML1018103312010-07-29029 July 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML1018103372010-07-29029 July 2010 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance 2CAN081001, Request for Additional Information, Technical Specification Changes and Analyses Relating to Use of Alternative Source Term2010-08-0909 August 2010 Request for Additional Information, Technical Specification Changes and Analyses Relating to Use of Alternative Source Term Project stage: Request ML1023104312010-08-19019 August 2010 Email, Request for Additional Information, Round 3, License Amendment Request for Technical Specification Changes and Analyses Regarding Use of Alternate Source Term Project stage: RAI 2CAN081007, Request for Additional Information Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-7162010-08-24024 August 2010 Request for Additional Information Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 Project stage: Request 2CAN091002, Request for Additional Information Technical Specification Changes and Analyses Relating to Use of Alternative Source Term2010-09-16016 September 2010 Request for Additional Information Technical Specification Changes and Analyses Relating to Use of Alternative Source Term Project stage: Request ML1109801972011-04-26026 April 2011 Issuance of Amendment No. 293, Technical Specification Changes and Analyses Regarding Use of Alternate Source Term Project stage: Approval ML1115108242011-05-0202 May 2011 Email Correction to the Safety Evaluation (SE) on the Alternate Source Term License Amendment Request, (SE Issued on April 26, 2011) Project stage: Request ML1115110012011-08-0909 August 2011 Correction to Safety Evaluation for Amendment No. 293 Related to Use of Alternate Source Term Project stage: Approval 2010-08-19
[Table View] |
|
---|
Category:Letter
MONTHYEARML23326A0392024-01-24024 January 2024 Issuance of Amendment No. 281 Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24017A1582024-01-17017 January 2024 Submittal of Emergency Plan Revision 50 IR 05000313/20234202024-01-10010 January 2024 Security Baseline Inspection Report 05000313/2023420 and 05000368/2023420 IR 05000313/20234022024-01-0202 January 2024 Security Baseline Inspection Report 05000313/2023402 and 05000368/2023402 ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology Slides and Affidavit for Pre-Submittal Meeting ML23352A0292023-12-13013 December 2023 Entergy - 2024 Nuclear Energy Liability Evidence of Financial Protection ML23340A1592023-12-13013 December 2023 Entergy Operations, Inc. - Entergy Fleet Project Manager Assignment IR 05000313/20234052023-12-12012 December 2023 Security Baseline Inspection Report 05000313/2023405 and 05000368/2023405 ML23341A0832023-12-11011 December 2023 Material Control and Accounting Program Inspection Report 05000313/368/2023404- Cover Letter ML23305A0922023-12-0707 December 2023 Summary of Regulatory Audit Regarding License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times RITSTF Initiative 4b ML23333A1362023-11-29029 November 2023 Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23275A2072023-11-28028 November 2023 Issuance of Amendment No. 280 Removal of Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23325A1412023-11-21021 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000313/20230032023-11-21021 November 2023 Revised - ANO Revised Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/ 2023001 ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23313A0962023-11-13013 November 2023 Integrated Inspection Report 05000313/2023003 and 05000368/2023003 and Independent Spent Fuel Storage Installation Inspection Report 07200013/2023001 ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000313/20230112023-10-10010 October 2023 Commercial Grade Dedication Inspection Report 05000313/2023011 and 05000368/2023011 IR 05000313/20230052023-08-21021 August 2023 Updated Inspection Plan for Arkansas Nuclear One, Units 1 and 2 (Report 05000313/2023005 and 05000368/2023005) - Mid Cycle IR 05000313/20243012023-08-14014 August 2023 Notification of NRC Initial Operator Licensing Examination 05000313/2024301 IR 05000313/20230022023-08-11011 August 2023 Integrated Inspection Report 05000313/2023002 and 05000368/2023002 and Notice of Violation ML23209A6022023-08-0909 August 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk- Informed Completion Times IR 05000416/20230022023-08-0808 August 2023 Integrated Inspection Report 05000416/2023002 and Independent Spent Fuel Storage Installation Inspection Report 07200050/2023001 ML23208A2132023-08-0303 August 2023 Regulatory Audit Summary Concerning Review of License Amendment Request to Remove Technical Specification Condition Allowing Two Reactor Coolant Pump Operation ML23208A2112023-07-27027 July 2023 Entergy Operations Inc., Application to Revise Technical Specifications to Adopt TSTF-205, Revision of Channel Calibration, Channel Functional Test, and Related Definitions ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23142A2022023-06-29029 June 2023 Issuance of Amendment Nos. 279 and 332 Emergency Plan Staffing Requirements IR 05000313/20234032023-06-28028 June 2023 Security Baseline Inspection Report 05000313/2023403 and 05000368/2023403 ML23178A0892023-06-26026 June 2023 August 2023 Emergency Preparedness Program Inspection-Request for Information ML23166B0902023-06-21021 June 2023 Request for Relief ANO1 ISI 036 Regarding Volumetric Examination Requirements ML23180A1082023-06-20020 June 2023 ANO Unit 1 SAR Amendment 31, TRM, TS Bases, 10 CFR 50.59 Report, and Commitment Change Summary Report IR 05000313/20234012023-06-13013 June 2023 Cyber Security Inspection Report 05000313/2023401 and 05000368/2023401 ML23130A2972023-05-17017 May 2023 Notification of Inspection (NRC Inspection Report 05000313/2023003) and Request for Information ML23121A3012023-05-10010 May 2023 Regulatory Audit Plan in Support of License Amendment Request to Revise Technical Specifications to Adopt Risk - Informed Completion Times ML23114A3572023-05-10010 May 2023 Regulatory Audit Summary Concerning Review of Request for Alternative ANO-CISI-002 Regarding Containment Inservice Inspection Frequency ML23130A2732023-05-10010 May 2023 and Waterford 3 Steam Electric Station - Response to Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000313/20230012023-05-0909 May 2023 Integrated Inspection Report 05000313/2023001 and 05000368/2023001 ML23118A3202023-05-0808 May 2023 Notification of Biennial Problem Identification and Resolution Inspection and Request for Information (05000313;05000368/2023010) IR 05000368/20233012023-05-0101 May 2023 NRC Examination Report 05000368/2023301 ML23117A2172023-05-0101 May 2023 Safety Evaluation for Quality Assurance Program Manual Reduction in Commitment ML23108A1362023-04-24024 April 2023 Approval of Request for Half-Nozzle Repair of Reactor Vessel Closure Head Penetration No. 46 ML23110A1122023-04-20020 April 2023 Annual Report for Entergy Quality Assurance Program Manual Changes Under 10 CFR 50.54(a)(3), 10 CFR 71.106, and 10 CFR 72.140(d). Notification of Application of Approved Appendix B to 10 CFR 72 Subpart G 2024-01-24
[Table view] Category:Proprietary Information Review
MONTHYEARML23349A1672023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23354A0022023-12-21021 December 2023 Request for Withholding Information from Public Disclosure ML23243B0452023-11-13013 November 2023 Request for Withholding Information from Public Disclosure ML23188A1732023-07-12012 July 2023 Request for Withholding Information from Public Disclosure ML23066A0472023-04-0505 April 2023 Request for Withholding Information from Public Disclosure ML22305A5632022-11-28028 November 2022 Request for Withholding Information from Public Disclosure ML22070B1282022-03-21021 March 2022 Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2 ML21298A0582021-10-28028 October 2021 Request for Withholding Information from Public Disclosure ML21195A0392021-09-0202 September 2021 Request for Withholding Proprietary Information from Public Disclosure for X-Energy, LLC Regulatory Engagement Plan Update for the XE-100 Reactor ML21145A0042021-06-28028 June 2021 Request for Withholding Information from Public Disclosure ML20293A1842020-11-0404 November 2020 Request for Withholding Information from Public Disclosure ML17032A3902017-02-16016 February 2017 Request for Withholding Information from Public Disclosure ML16321A0862016-11-29029 November 2016 Request for Withholding Information from Public Disclosure ML16039A0202016-02-16016 February 2016 Request for Withholding Information from Public Disclosure ML15148A2022015-05-29029 May 2015 Request for Withholding Information from Public Disclosure - 4/17/15 Affidavit Executed by N. Wilmshurst, Electric Power Research Institute EPRI Report 1015133 Dated March 2014, Relief Request ANO2-ISI-016 ML15139A0022015-05-20020 May 2015 Request for Withholding Information from Public Disclosure, 1/25/15 Affidavit Executed by G. Elliot, Areva Inc. ANP-3281Q1P, Revision 0, Response to NRC Request for Additional Information on Time-Limited Aging Analysis ML15096A0142015-04-20020 April 2015 Request for Withholding Information from Public Disclosure - 3/26/15 Affidavit Executed by G. Elliott, Areva Inc.; ANP-3300Q3P and Document No. 32-9220706-002 RCS Pressure/Temperature Amendment Request ML15072A0772015-04-0202 April 2015 Request for Withholding Information from Public Disclosure - 2/6/15 Affidavit Executed by G. Elliott, Areva Inc. ANP-3300Q1P, February 2015 Related to RCS Pressure/Temperature License Amendment Request ML15072A0792015-03-26026 March 2015 Request for Withholding Information from Public Disclosure - 3/9/15 Affidavit Executed by A. Meginnis, Areva Inc. ANP-3300Q2P, March 2015 Related to RCS Pressure/Temperature License Amendment Request ML15051A4182015-02-24024 February 2015 Request for Withholding Information from Public Disclosure - 2/9/15 Affidavit Executed by G. Elliott, Areva, Inc., ANP-3383P, Revision 0 ML14303A0262014-10-29029 October 2014 Letter to K. Manzione Holtec International Request for Withholding Information from Public Disclosure (TAC No. L24954) ML14169A5092014-08-0707 August 2014 Request for Withholding Information from Public Disclosure, 3/25/14 Affidavit Executed by G. Elliot, Areva Inc. Regarding Time-Limited Aging Analysis ML13129A3462013-06-12012 June 2013 Request for Withholding Information from Public Disclosure - 10/31/12 Affidavit Executed by J. Gresham, Westinghouse Re Calculation Note CN-MRCDA-12-27, Revision 1 ML12314A0602012-12-11011 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 9/4/2012, Executed by Marcos Legaspi Herrera of Structural Integrity Associates, Inc. Re Second RAI Response ML12314A0492012-12-11011 December 2012 Request for Withholding Information from Public Disclosure, Affidavit Dated 8/16/12, Executed by J. Gresham of Westinghouse Electric Company LLC, Re CN-MRCDA-12-27 ML1018103372010-07-29029 July 2010 Request for Withholding Information from Public Disclosure ML1018103452010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-18, Revision 0 ML1018103312010-07-29029 July 2010 Request for Withholding Information from Public Disclosure ML1018102332010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-57, Revision 0 ML1018102262010-07-29029 July 2010 Request for Withholding Information from Public Disclosure - 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-17, Revision 0 ML1018102242010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-16, Revision 0, TAC No. ME3678 ML1018102182010-07-29029 July 2010 Request for Withholding Information from Public Disclosure, 6/3/2010 Affidavit Executed by J. Gresham, Westinghouse Calculation Note CN-OA-08-15, Revision 0, TAC No. ME3678 ML1012604132010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by Gayle Elliott, Areva Np Inc. on April 9, 2010 ML1010406012010-05-13013 May 2010 Request for Withholding Information from Public Disclosure - Affidavit Executed by M. Taylor, Structural Integrity Associates on 4/9/2010 ML0935201042010-01-0505 January 2010 Request for Withholding Information from Public Disclosure - 12/11/2009 Affidavit Executed by G. Elliott, Areva Np Re 12/15/09 Entergy Meeting Slides ML0932004602009-11-23023 November 2009 Request for Withholding Information from Public Disclosure - 8/3/2009 Affidavit Executed by J. Gresham, Westinghouse ML0730502932007-12-0606 December 2007 Request for Withholding Information from Public Disclosure Holtec Report No. HI-2063601 (Tac No. MD4994) ML0725702582007-11-0505 November 2007 Entergy Operations, Inc. Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2, Re LAR to Support Partial Rerack/Revised Loading Patterns, Spent Fuel Pool ML0717603002007-07-0909 July 2007 Entergy Operations, Inc. Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 2 (Tac No. MD4994) ML0711400242007-05-0101 May 2007 (Ano), Unit 2 - Request for Withholding Information from Public Disclosure ML0629100182006-10-31031 October 2006 Request for Withholding Information from Public Disclosure ML0528002642005-09-26026 September 2005 Holtec International, Request for Withholding Information from Public Disclosure for ANO, Unit 2 ML0509605752005-04-0606 April 2005 Framatome Anp, Request for Withholding Information from Public Disclosure for Ano. Unit 2 ML0418902682004-07-0606 July 2004 7/6/04, ANO1 - Framatome Anp (Fanp), Request for Withholding Information from Public Disclosure for Arkansas Nuclear One, Unit 1 ML0404904952004-02-11011 February 2004 Westinghouse Electric Company, Withholding from Public Disclosure, Wesdyne Reports WDI-TJ-001-02-P, Revision 3, WDI-TJ-012-03-P, Revision 2, WDI-TJ-006-03-P, Revision 3 2CAN010402, Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection2004-01-16016 January 2004 Revisions to Wesdyne Proprietary Reports in Support of Relaxation from Performing a Bare Metal Visual Inspection ML0327700102003-10-0202 October 2003 Proprietary Information Review, Material Properties and Modeling Methods Used in ANO Unit 2 Welding Residual Stress Analyses ML0217602842002-07-11011 July 2002 Withholding from Public Disclosure, Wesdyne Report WDI-TJ-007-02-P, (TACs MB4524 & MB4525) 2023-07-12
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 29, 2010 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802
SUBJECT:
ARKANSAS NUCLEAR ONE, UNIT 2 - REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE (TAC NO. ME3678)
Dear Sir or Madam:
By letter dated June 23, 2010 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML102000199), you submitted an affidavit dated June 3,2010, executed by Mr. J. A. Gresham of Westinghouse Electric Company LLC, requesting that the information contained in the following document (included to the letter as Attachment 5) be withheld from public disclosure pursuant to Title 10 of the Code of Federal Regulations (10 CFR), Part 2, Section 2.390:
CN-OA-08-20, Revision 0, "ANO-2 Rod Ejection Dose Analysis Using Alternative Source Terms," dated October 17, 2008 The affidavit stated that the submitted information should be considered exempt from mandatory public disclosure because this information has substantial commercial value that gives Westinghouse competitive advantage over its competitors, disclosure would jeopardize its competitive position, and for the following reasons:
(a) These are Westinghouse internal calculation notes. The contents and form are as such proprietary and provided to NRC [Nuclear Regulatory Commission] to aid in their review of Entergy's License Amendment Request.
(b) Its use by a competitor would improve his competitive position in the design and licensing of a similar product.
(c) The information requested to be withheld reveals the distinguishing aspects of a methodology which was developed by Westinghouse.
We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.390 and, on the basis of the statements in the affidavit, have determined that the submitted information sought to be withheld contains proprietary commercial information and should be withheld from public disclosure.
-2 Therefore, the version of the submitted information marked as proprietary will be withheld from public disclosure pursuant to 10 CFR 2.390(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.
Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.
If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.
If you have any questions, please contact me at (301) 415-1480 or bye-mail at kaly.kalyanam@nrc.gov.
Sincerely, N. Kaly Kalyanam, Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-368 cc: Distribution via Listserv J. A. Gresham, Manager Regulatory Compliance and Plant Licensing Westinghouse Electric Company LLC P.O. Box 355 Pittsburgh, PA 15230-0355
ML101810337 OFFICE NRR/LPL4/PM NRR/LPL4/LA NRR/DRNAADB NRR/LPL4/BC NRRlLPL4/PM TTate for NAME NKalyanam JBurkhardt ABoatright MMarkley NKalyanam DATE 7/29/10 7/9/10 7/27/10 7/29/10 7/29/10