ML13238A393: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, August 26, 2013 8:15 AM To: Mackaman, Clyde Douglas (cdmackaman@tva.gov)
{{#Wiki_filter:NRR-PMDAPEm Resource From:                       Lingam, Siva Sent:                       Monday, August 26, 2013 8:15 AM To:                         Mackaman, Clyde Douglas (cdmackaman@tva.gov)
Cc: Broaddus, Doug; McMurtray, Anthony; Uribe, Juan; Hoang, Dan; Schrull, Edward D (edschrull@tva.gov)
Cc:                         Broaddus, Doug; McMurtray, Anthony; Uribe, Juan; Hoang, Dan; Schrull, Edward D (edschrull@tva.gov)


==Subject:==
==Subject:==
Sequoyah 1 and 2 - Requests for Additional In formation (RAIs) for License Amendment Request to Revise Updated Final Safety Anal ysis Report for Hydrol ogic Analyses Changes (TAC Nos. ME9238 and ME9239)Please note the following additional official RAIs for the subject LAR. Please provide your responses by September 30, 2013.  
Sequoyah 1 and 2 - Requests for Additional Information (RAIs) for License Amendment Request to Revise Updated Final Safety Analysis Report for Hydrologic Analyses Changes (TAC Nos. ME9238 and ME9239)
 
Please note the following additional official RAIs for the subject LAR. Please provide your responses by September 30, 2013.
REQUEST FOR ADDITIONAL INFORMATION (RAIs)
REQUEST FOR ADDITIONAL INFORMATION (RAIs)
TENNESSEE VALLEY AUTHORITY (TVA)
TENNESSEE VALLEY AUTHORITY (TVA)
SEQUOYAH NUCLEAR (SQN) UNITS 1 AND 2, LICENSE AMENDMENT REQUEST (LAR) TO REVISE THE SQN UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT REGARDING CHANGES TO THE HYDROLOGIC ANALYSIS.
SEQUOYAH NUCLEAR (SQN) UNITS 1 AND 2, LICENSE AMENDMENT REQUEST (LAR) TO REVISE THE SQN UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT REGARDING CHANGES TO THE HYDROLOGIC ANALYSIS.
DOCKET NO. 50-327 AND 50-328 (TAC NO. ME9238 AND ME9239)
DOCKET NO. 50-327 AND 50-328 (TAC NO. ME9238 AND ME9239)
REFERENCES
REFERENCES
: 1. Letter from J.W. Shea, Tennessee Valley Authority to NRC Documents Control Desk, "Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis," August 10, 2012. (ADAMS Accession No.: ML122260684) MECHANICAL AND CIVIL ENGINEERING BRANCH (EMCB) RAIs Section 2.4.2, Floods EMCB RAI 2.4.2-1 As stated in Reference 1, the probable maximum flood at the plant site has increased due to the revised update of the hydrologic analysis for SQN Units 1 and 2. However, the coincident wind wave activity that was predicted to be 4.2 feet (ft) (through to crest) for the original analysis has remained the same under the revised conditions.  
: 1. Letter from J.W. Shea, Tennessee Valley Authority to NRC Documents Control Desk, Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, August 10, 2012.
 
(ADAMS Accession No.: ML122260684)
MECHANICAL AND CIVIL ENGINEERING BRANCH (EMCB) RAIs Section 2.4.2, Floods EMCB RAI 2.4.2-1 As stated in Reference 1, the probable maximum flood at the plant site has increased due to the revised update of the hydrologic analysis for SQN Units 1 and 2. However, the coincident wind wave activity that was predicted to be 4.2 feet (ft) (through to crest) for the original analysis has remained the same under the revised conditions.
Please confirm and provide a technical justification that documents that the coincident wind wave values predicted to be 4.2 ft are still applicable for the revised hydrologic analysis, or provide revised coincident wind wave values.
Please confirm and provide a technical justification that documents that the coincident wind wave values predicted to be 4.2 ft are still applicable for the revised hydrologic analysis, or provide revised coincident wind wave values.
EMCB RAI 2.4.2-2 Reference 1 proposes to change the inputs for defining the antecedent precipitation index (API) using 11 years of historical rainfall records (1997-2007). The SQN Units 1 and 2 Updated Safety Analysis Report (UFSAR)
EMCB RAI 2.4.2-2 Reference 1 proposes to change the inputs for defining the antecedent precipitation index (API) using 11 years of historical rainfall records (1997-2007). The SQN Units 1 and 2 Updated Safety Analysis Report (UFSAR)
Subsection 2.4.3.1 describes the current analysis for precipitation losses. a) What is the range, in terms of years, of the historical data analyzed to determine the median API described in the current UFSAR analysis? If the proposed range of the historical data for the LAR is less than the data in the UFSAR, please provide a justification for using this new proposed range that demonstrates that the range selected for the proposed LAR is representative and relates precipitation excess to the rainfall, week of the year, geographic location and API.
Subsection 2.4.3.1 describes the current analysis for precipitation losses.
2b) Please explain and justify the selection of the year 2007 as the upper range of the revised historical rainfall records, otherwise, justify why the latest rainfall records were not used. Section 2.4.3, Probable Maximum Floods (PMF) on Streams and Rivers EMCB RAI 2.4.3-1 Please provide additional information that clarifies the differences between the runoff model used in the previous analysis to determine the Tennessee River flood hydrograph (45 unit areas) to the proposed analysis (40 units), as described in Reference 1. The response should also include an expanded justification for the acceptability of the differences between the models.
a) What is the range, in terms of years, of the historical data analyzed to determine the median API described in the current UFSAR analysis? If the proposed range of the historical data for the LAR is less than the data in the UFSAR, please provide a justification for using this new proposed range that demonstrates that the range selected for the proposed LAR is representative and relates precipitation excess to the rainfall, week of the year, geographic location and API.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2) Sequoyah Nuclear Plant St. Lucie Plant Robinson Steam Electric Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov
1


Hearing Identifier: NRR_PMDA Email Number: 814   Mail Envelope Properties   (Siva.Lingam@nrc.gov20130826081500)
b) Please explain and justify the selection of the year 2007 as the upper range of the revised historical rainfall records, otherwise, justify why the latest rainfall records were not used.
Section 2.4.3, Probable Maximum Floods (PMF) on Streams and Rivers EMCB RAI 2.4.3-1 Please provide additional information that clarifies the differences between the runoff model used in the previous analysis to determine the Tennessee River flood hydrograph (45 unit areas) to the proposed analysis (40 units), as described in Reference 1. The response should also include an expanded justification for the acceptability of the differences between the models.
Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)
Sequoyah Nuclear Plant St. Lucie Plant Robinson Steam Electric Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 2
 
Hearing Identifier:     NRR_PMDA Email Number:           814 Mail Envelope Properties     (Siva.Lingam@nrc.gov20130826081500)


==Subject:==
==Subject:==
Sequoyah 1 and 2 - Requests for Additional Information (RAIs) for License Amendment Request to Revise Updated Final Safety Analysis Report for Hydrologic Analyses Changes (TAC Nos. ME9238 and ME9239)
Sequoyah 1 and 2 - Requests for Additional Information (RAIs) for License Amendment Request to Revise Updated Final Safety Analysis Report for Hydrologic Analyses Changes (TAC Nos. ME9238 and ME9239)
Sent Date:   8/26/2013 8:15:24 AM Received Date: 8/26/2013 8:15:00 AM From:   Lingam, Siva Created By:   Siva.Lingam@nrc.gov  
Sent Date:             8/26/2013 8:15:24 AM Received Date:         8/26/2013 8:15:00 AM From:                   Lingam, Siva Created By:             Siva.Lingam@nrc.gov Recipients:
 
"Broaddus, Doug" <Doug.Broaddus@nrc.gov>
Recipients:     "Broaddus, Doug" <Doug.Broaddus@nrc.gov> Tracking Status: None "McMurtray, Anthony" <Anthony.McMurtray@nrc.gov> Tracking Status: None "Uribe, Juan" <Juan.Uribe@nrc.gov> Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov>
Tracking Status: None "McMurtray, Anthony" <Anthony.McMurtray@nrc.gov>
Tracking Status: None "Schrull, Edward D (edschrull@tva.gov)" <edschrull@tva.gov> Tracking Status: None "Mackaman, Clyde Douglas (cdmackaman@tva.gov)" <cdmackaman@tva.gov> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   3297     8/26/2013 8:15:00 AM Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Tracking Status: None "Uribe, Juan" <Juan.Uribe@nrc.gov>
Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov>
Tracking Status: None "Schrull, Edward D (edschrull@tva.gov)" <edschrull@tva.gov>
Tracking Status: None "Mackaman, Clyde Douglas (cdmackaman@tva.gov)" <cdmackaman@tva.gov>
Tracking Status: None Post Office:
Files                           Size                     Date & Time MESSAGE                         3297                   8/26/2013 8:15:00 AM Options Priority:                       Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Recipients Received:}}

Revision as of 15:16, 4 November 2019

Requests for Additional Information (Rais) for License Amendment Request to Revise Updated Final Safety Analysis Report for Hydrologic Analyses Changes (TAC Nos. ME9238 and ME9239)
ML13238A393
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 08/26/2013
From: Siva Lingam
Plant Licensing Branch II
To: Mackaman C
Tennessee Valley Authority
References
ME9238, ME9239
Download: ML13238A393 (3)


Text

NRR-PMDAPEm Resource From: Lingam, Siva Sent: Monday, August 26, 2013 8:15 AM To: Mackaman, Clyde Douglas (cdmackaman@tva.gov)

Cc: Broaddus, Doug; McMurtray, Anthony; Uribe, Juan; Hoang, Dan; Schrull, Edward D (edschrull@tva.gov)

Subject:

Sequoyah 1 and 2 - Requests for Additional Information (RAIs) for License Amendment Request to Revise Updated Final Safety Analysis Report for Hydrologic Analyses Changes (TAC Nos. ME9238 and ME9239)

Please note the following additional official RAIs for the subject LAR. Please provide your responses by September 30, 2013.

REQUEST FOR ADDITIONAL INFORMATION (RAIs)

TENNESSEE VALLEY AUTHORITY (TVA)

SEQUOYAH NUCLEAR (SQN) UNITS 1 AND 2, LICENSE AMENDMENT REQUEST (LAR) TO REVISE THE SQN UNITS 1 AND 2 UPDATED FINAL SAFETY ANALYSIS REPORT REGARDING CHANGES TO THE HYDROLOGIC ANALYSIS.

DOCKET NO. 50-327 AND 50-328 (TAC NO. ME9238 AND ME9239)

REFERENCES

1. Letter from J.W. Shea, Tennessee Valley Authority to NRC Documents Control Desk, Application to Revise Sequoyah Nuclear Plant Units 1 and 2 Updated Final Safety Analysis Report Regarding Changes to Hydrologic Analysis, August 10, 2012.

(ADAMS Accession No.: ML122260684)

MECHANICAL AND CIVIL ENGINEERING BRANCH (EMCB) RAIs Section 2.4.2, Floods EMCB RAI 2.4.2-1 As stated in Reference 1, the probable maximum flood at the plant site has increased due to the revised update of the hydrologic analysis for SQN Units 1 and 2. However, the coincident wind wave activity that was predicted to be 4.2 feet (ft) (through to crest) for the original analysis has remained the same under the revised conditions.

Please confirm and provide a technical justification that documents that the coincident wind wave values predicted to be 4.2 ft are still applicable for the revised hydrologic analysis, or provide revised coincident wind wave values.

EMCB RAI 2.4.2-2 Reference 1 proposes to change the inputs for defining the antecedent precipitation index (API) using 11 years of historical rainfall records (1997-2007). The SQN Units 1 and 2 Updated Safety Analysis Report (UFSAR)

Subsection 2.4.3.1 describes the current analysis for precipitation losses.

a) What is the range, in terms of years, of the historical data analyzed to determine the median API described in the current UFSAR analysis? If the proposed range of the historical data for the LAR is less than the data in the UFSAR, please provide a justification for using this new proposed range that demonstrates that the range selected for the proposed LAR is representative and relates precipitation excess to the rainfall, week of the year, geographic location and API.

1

b) Please explain and justify the selection of the year 2007 as the upper range of the revised historical rainfall records, otherwise, justify why the latest rainfall records were not used.

Section 2.4.3, Probable Maximum Floods (PMF) on Streams and Rivers EMCB RAI 2.4.3-1 Please provide additional information that clarifies the differences between the runoff model used in the previous analysis to determine the Tennessee River flood hydrograph (45 unit areas) to the proposed analysis (40 units), as described in Reference 1. The response should also include an expanded justification for the acceptability of the differences between the models.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)

Sequoyah Nuclear Plant St. Lucie Plant Robinson Steam Electric Plant Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov 2

Hearing Identifier: NRR_PMDA Email Number: 814 Mail Envelope Properties (Siva.Lingam@nrc.gov20130826081500)

Subject:

Sequoyah 1 and 2 - Requests for Additional Information (RAIs) for License Amendment Request to Revise Updated Final Safety Analysis Report for Hydrologic Analyses Changes (TAC Nos. ME9238 and ME9239)

Sent Date: 8/26/2013 8:15:24 AM Received Date: 8/26/2013 8:15:00 AM From: Lingam, Siva Created By: Siva.Lingam@nrc.gov Recipients:

"Broaddus, Doug" <Doug.Broaddus@nrc.gov>

Tracking Status: None "McMurtray, Anthony" <Anthony.McMurtray@nrc.gov>

Tracking Status: None "Uribe, Juan" <Juan.Uribe@nrc.gov>

Tracking Status: None "Hoang, Dan" <Dan.Hoang@nrc.gov>

Tracking Status: None "Schrull, Edward D (edschrull@tva.gov)" <edschrull@tva.gov>

Tracking Status: None "Mackaman, Clyde Douglas (cdmackaman@tva.gov)" <cdmackaman@tva.gov>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 3297 8/26/2013 8:15:00 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: