{{#Wiki_filter:1 NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Wednesday, July 26, 2017 3:31 PM To: Ryan Sprengel
{{#Wiki_filter:NRR-PMDAPEm Resource From:                             Wiebe, Joel Sent:                             Wednesday, July 26, 2017 3:31 PM To:                               Ryan Sprengel


==Subject:==
==Subject:==
Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, Licens e Amendment Request to Revise Control Room Ventilation Temperature Control System Technical SpecificationRyan, By letter dated June 30, 2017 (Agencywide Document s Access and Management System (ADAMS) Accession No. ML17181A276), Exelon Generation Company, LLC (Exelon), submitted a license amendment request revise Technical Specification (TS) 3.7.11, "Control Room Ventilation (VC) Temperature Control System," to modify the TS Actions for two inoperable VC Temperature Control System trains. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification
: Ryan, By letter dated June 30, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17181A276), Exelon Generation Company, LLC (Exelon), submitted a license amendment request revise Technical Specification (TS) 3.7.11, "Control Room Ventilation (VC) Temperature Control System," to modify the TS Actions for two inoperable VC Temperature Control System trains. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is June, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me at (301) 415-6606.
Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1


The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Hearing Identifier:     NRR_PMDA Email Number:           3625 Mail Envelope Properties     (Joel.Wiebe@nrc.gov20170726153100)
Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours to complete. The NRC staff expects to complete this review in approximately 12 months, which is June, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager. 
 
These estimates are based on the NRC staff's initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me at (301) 415-6606.
 
Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Hearing Identifier: NRR_PMDA Email Number: 3625   Mail Envelope Properties   (Joel.Wiebe@nrc.gov20170726153100)


==Subject:==
==Subject:==
Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification Sent Date:   7/26/2017 3:31:22 PM Received Date: 7/26/2017 3:31:00 PM From:   Wiebe, Joel Created By:   Joel.Wiebe@nrc.gov  
Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification Sent Date:             7/26/2017 3:31:22 PM Received Date:         7/26/2017 3:31:00 PM From:                   Wiebe, Joel Created By:             Joel.Wiebe@nrc.gov Recipients:
 
"Ryan Sprengel" <ryan.sprengel@exeloncorp.com>
Recipients:     "Ryan Sprengel" <ryan.sprengel@exeloncorp.com> Tracking Status: None Post Office:     Files     Size     Date & Time MESSAGE   2771     7/26/2017 3:31:00 PM
Tracking Status: None Post Office:
 
Files                           Size                   Date & Time MESSAGE                         2771                   7/26/2017 3:31:00 PM Options Priority:                       Standard Return Notification:             No Reply Requested:                 No Sensitivity:                     Normal Expiration Date:
Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:}}
Recipients Received:}}

Revision as of 00:32, 30 October 2019

Acceptance Review and Resource Estimate for Braidwood, Units 1 and 2, and Byron, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specifications
ML17207A597
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 07/26/2017
From: Joel Wiebe
Plant Licensing Branch III
To: Sprengel R
Exelon Corp
References
Download: ML17207A597 (2)


Text

NRR-PMDAPEm Resource From: Wiebe, Joel Sent: Wednesday, July 26, 2017 3:31 PM To: Ryan Sprengel

Subject:

Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification

Ryan, By letter dated June 30, 2017 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML17181A276), Exelon Generation Company, LLC (Exelon), submitted a license amendment request revise Technical Specification (TS) 3.7.11, "Control Room Ventilation (VC) Temperature Control System," to modify the TS Actions for two inoperable VC Temperature Control System trains. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed your request and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the request in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is June, 2018. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.

If you have any questions, please contact me at (301) 415-6606.

Joel S. Wiebe, Sr. Project Manager Plant Licensing Branch III-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 1

Hearing Identifier: NRR_PMDA Email Number: 3625 Mail Envelope Properties (Joel.Wiebe@nrc.gov20170726153100)

Subject:

Acceptance Review and Resource Estimate for Braidwood Station, Units 1 and 2, and Byron Station, Unit Nos. 1 and 2, License Amendment Request to Revise Control Room Ventilation Temperature Control System Technical Specification Sent Date: 7/26/2017 3:31:22 PM Received Date: 7/26/2017 3:31:00 PM From: Wiebe, Joel Created By: Joel.Wiebe@nrc.gov Recipients:

"Ryan Sprengel" <ryan.sprengel@exeloncorp.com>

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 2771 7/26/2017 3:31:00 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: