{{#Wiki_filter:glACCESSION NBR FACIL:50-244 AUTE.NAME MECRgDY,R.C.
{{#Wiki_filter:gl              REGULA     Y INFORMATION DISTRIBUTION           YSTEM (RIDS)
RECIP.NAME VISSING;G.S.REGULA Y INFORMATION DISTRIBUTION YSTEM (RIDS)'I:9906290269 DOC.DATE: 99/06/2X" NOTARIZED:
                                                                  'I ACCESSION NBR :9906290269           DOC.DATE: 99/06/2X" NOTARIZED: NO                   DOCKET 0 FACIL:50-244 .Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester                   G   05000244 AUTE. NAME            AUTHOR AFFILIATION MECRgDY,R.C.          Rochester Gas 8 Electric Corp.
NO DOCKET 0.Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTHOR AFFILIATION Rochester Gas 8 Electric Corp.RECIPIENT AFFILIATION
RECIP.NAME            RECIPIENT AFFILIATION VISSING; G. S.


==SUBJECT:==
==SUBJECT:==
Informs util wishes to amend extent of alternate exams provided for relief request re ISI program ASME Section XI recpxire exams for first 10-Yr interval for containment.
Informs util wishes to amend extent of alternate exams provided for relief request re ISI program ASME Section XI recpxire exams for first 10-Yr interval for containment.
DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE: TITLE: OR Submittal:
DISTRIBUTION CODE: A047D         COPIES RECEIVED:LTR         ENCL       SIZE:
Inservice/Testing/Relief from ASME Code-GL-09-04 NOTES:License Exp'date in accordance with 10CFR2,2.109(9/19/72).
TITLE:   OR Submittal: Inservice/Testing/Relief from               ASME Code GL-09-04 NOTES:License Exp'date       in accordance with 10CFR2,2.109(9/19/72).                 05000244 E RECIPIENT,           COPIES              RECIPIENT            COPIES ID  CODE/NAME        LTTR ENCL          ID CODE/NAME         LTTR ENCL                0 LPD1-1 LA                 1      1      LPD1-1  PD              1    1 VISSING,G.               1      1                                                        R INTERNAL: cRXLE CENTER       01      1      1      NRR/DE/EMEB              1    1 NUDOCS-ABSTRACT           1      1      OGC/HDS3                  1    0 RES/DET/EIB               1     1       RES/DET/EMMEB             1     1 EXTERNAL: LITCO ANDERSON              1     1       NOAC                      1     1 NRC PDR                  1     1 D
05000244 E RECIPIENT, ID CODE/NAME LPD1-1 LA VISSING,G.
PEmR~Lt,~<g~
INTERNAL: cRXLE CENTER 01 NUDOCS-ABSTRACT RES/DET/EIB EXTERNAL: LITCO ANDERSON NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LPD1-1 PD NRR/DE/EMEB OGC/HDS3 RES/DET/EMMEB NOAC COPIES LTTR ENCL 1 1 1 1 1 0 1 1 1 1 0 R D PEmR~Lt,~<g~
                                                                                                    'E NOTE TO ALL "RIDS" RECIPIENTS:
'E NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE."TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR               12   ENCL       11
PLEASE HELP US TO REDUCE WASTE."TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11 AND ROCHESTER GASANDELECl&#xc3;ICCORPORAVON
 
~89EASTAYENUE, ROCHESrER N.Y Id6r19-0001 AREA CODE716&f6-2700 ROBERT C.MECREDY Vice President Nuclear Operations June 21, 1999 U.S.Nuclear Regulatory Commission Document Control Desk Attn: Guy S.Vissing Project Directorate I-1 Washington, D.C.20555  
AND ROCHESTER GASANDELECl&#xc3;ICCORPORAVON ~ 89EASTAYENUE, ROCHESrER N. Y Id6r19-0001     AREA CODE716 &f6-2700 ROBERT C. MECREDY Vice President Nuclear Operations June 21, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555


==Subject:==
==Subject:==
Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)Request for Relief No.40 R.E.Ginna Nuclear Power Plant Docket No.50/244  
Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)
Request for Relief No. 40 R.E. Ginna Nuclear Power Plant Docket No. 50/244
 
==Dear Mr. Vissing:==
 
RG&E provided the NRC with the subject relief request on January 11, 1999. As a result of a telecon with NRC staff on June 16, 1999, RG&E wishes to amend the extent of the alternate examinations provided for in that relief request.
In addition to the testing to be conducted in accordance with 10CFR 50 Appendix J, RGB E will perform an IWE detailed visual examination of the repaired or replaced area (VT-1). A replacement page of the attachment to our January 11, 1999 relief request is provided.
Very truly yours, Robert C. Mecredy 9906290269 990b2'i POR        ADQCK 0500024%i
 
xc: Mr. Guy S. Vissing (Mail Stop 8C2)
Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475  Allendale Road King of Prussia, PA  19406 U.S. NRC Ginna Senior Resident Inspector
 
r T
I h
 
Collection systems, as required during the conduct of a system pressure test. In addition, personnel performing VT-2 examinations are required to be qualified in accordance with Subarticle IWA-2300 of ASME Section XI.
For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction /
Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight.
Table IWE-2500-1, Examination Category E-P, identifies the examination method of 10 CFR 50, Appendix J and does not specifically identify a VT-2 visual examination. 10 CFR 50, Appendix J provides requirements for testing as well as acceptable leakage criteria. These tests are performed by Appendix J "Test" personnel and utilize calibrated equipment to determine acceptability. Additionally, 10 CFR 50.55a (b) (2) (x) (E) requires a general visual examination of the containment each period that would identify any structural degradation that may contribute to leakage. A "VT-2"visual examination willnot provide additional assurance of safety beyond that of current Appendix J practices.
Relief is requested in accordance with 10 CFR 50.55a (a) (3) (I). The proposed alternative (pressure testing in accordance with 10 CFR 50, Appendix J) willprovide and acceptable level of quality and safety.
The reference to paragraph IWA-5240 has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and should be published in 1998.
Alternate Examinations:
Testing shall be conducted in accordance with 10 CFR 50, Appendix J, in lieu of Paragraph IWE-5240 of ASME Section XI, as well as performing an IWE detailed visual examination of the repaired or replaced area (VT-l).
Request for Relief No. 40                                          Attachment Page 2  of 3


==Dear Mr.Vissing:==
4 rr od}}
RG&E provided the NRC with the subject relief request on January 11, 1999.As a result of a telecon with NRC staff on June 16, 1999, RG&E wishes to amend the extent of the alternate examinations provided for in that relief request.In addition to the testing to be conducted in accordance with 10CFR 50 Appendix J, RGB E will perform an IWE detailed visual examination of the repaired or replaced area (VT-1).A replacement page of the attachment to our January 11, 1999 relief request is provided.Very truly yours, Robert C.Mecredy 9906290269 990b2'i POR ADQCK 0500024%i xc: Mr.Guy S.Vissing (Mail Stop 8C2)Project Directorate I-1 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation U.S.Nuclear Regulatory Commission Washington, D.C.20555 Regional Administrator, Region I U.S.Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S.NRC Ginna Senior Resident Inspector r I T h Collection systems, as required during the conduct of a system pressure test.In addition, personnel performing VT-2 examinations are required to be qualified in accordance with Subarticle IWA-2300 of ASME Section XI.For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code)non-destructive examinations (NDE)are performed and must meet the acceptance criteria of the Construction
/Installation Code.In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed.
These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight.
Table IWE-2500-1, Examination Category E-P, identifies the examination method of 10 CFR 50, Appendix J and does not specifically identify a VT-2 visual examination.
10 CFR 50, Appendix J provides requirements for testing as well as acceptable leakage criteria.These tests are performed by Appendix J"Test" personnel and utilize calibrated equipment to determine acceptability.
Additionally, 10 CFR 50.55a (b)(2)(x)(E)requires a general visual examination of the containment each period that would identify any structural degradation that may contribute to leakage.A"VT-2" visual examination will not provide additional assurance of safety beyond that of current Appendix J practices.
Relief is requested in accordance with 10 CFR 50.55a (a)(3)(I).The proposed alternative (pressure testing in accordance with 10 CFR 50, Appendix J)will provide and acceptable level of quality and safety.The reference to paragraph IWA-5240 has been removed in the 1997 Addenda of ASME Section XI.This addenda has been approved by the ASME Main Committee and should be published in 1998.Alternate Examinations:
Testing shall be conducted in accordance with 10 CFR 50, Appendix J, in lieu of Paragraph IWE-5240 of ASME Section XI, as well as performing an IWE detailed visual examination of the repaired or replaced area (VT-l).Request for Relief No.40 Attachment Page 2 of 3 od 4 rr}}

Latest revision as of 16:45, 29 October 2019

Informs That Util Wishes to Amend Extend of Alternate Exams Provided for Relief Request Re ISI Program ASME Section XI Require Exams for First 10-Yr Interval for Containment
ML17265A684
Person / Time
Site: Ginna Constellation icon.png
Issue date: 06/21/1999
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9906290269
Download: ML17265A684 (6)


Text

gl REGULA Y INFORMATION DISTRIBUTION YSTEM (RIDS)

'I ACCESSION NBR :9906290269 DOC.DATE: 99/06/2X" NOTARIZED: NO DOCKET 0 FACIL:50-244 .Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTE. NAME AUTHOR AFFILIATION MECRgDY,R.C. Rochester Gas 8 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSING; G. S.

SUBJECT:

Informs util wishes to amend extent of alternate exams provided for relief request re ISI program ASME Section XI recpxire exams for first 10-Yr interval for containment.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code GL-09-04 NOTES:License Exp'date in accordance with 10CFR2,2.109(9/19/72). 05000244 E RECIPIENT, COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL 0 LPD1-1 LA 1 1 LPD1-1 PD 1 1 VISSING,G. 1 1 R INTERNAL: cRXLE CENTER 01 1 1 NRR/DE/EMEB 1 1 NUDOCS-ABSTRACT 1 1 OGC/HDS3 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

PEmR~Lt,~<g~

'E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE."TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 12 ENCL 11

AND ROCHESTER GASANDELEClÃICCORPORAVON ~ 89EASTAYENUE, ROCHESrER N. Y Id6r19-0001 AREA CODE716 &f6-2700 ROBERT C. MECREDY Vice President Nuclear Operations June 21, 1999 U.S. Nuclear Regulatory Commission Document Control Desk Attn: Guy S. Vissing Project Directorate I-1 Washington, D.C. 20555

Subject:

Inservice Inspection Program ASME Section XI Required Examinations for First 10-Year Interval for Containment (IWE and IWL)

Request for Relief No. 40 R.E. Ginna Nuclear Power Plant Docket No. 50/244

Dear Mr. Vissing:

RG&E provided the NRC with the subject relief request on January 11, 1999. As a result of a telecon with NRC staff on June 16, 1999, RG&E wishes to amend the extent of the alternate examinations provided for in that relief request.

In addition to the testing to be conducted in accordance with 10CFR 50 Appendix J, RGB E will perform an IWE detailed visual examination of the repaired or replaced area (VT-1). A replacement page of the attachment to our January 11, 1999 relief request is provided.

Very truly yours, Robert C. Mecredy 9906290269 990b2'i POR ADQCK 0500024%i

xc: Mr. Guy S. Vissing (Mail Stop 8C2)

Project Directorate I-1 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector

r T

I h

Collection systems, as required during the conduct of a system pressure test. In addition, personnel performing VT-2 examinations are required to be qualified in accordance with Subarticle IWA-2300 of ASME Section XI.

For repairs, replacements or modifications that are performed under ASME Section XI Code, applicable Construction Code (or Installation Code) non-destructive examinations (NDE) are performed and must meet the acceptance criteria of the Construction /

Installation Code. In addition to the Construction Code NDE, applicable ASME Section XI NDE pre-service NDE are also performed. These Construction Code and Section XI pre-service NDE requirements provide additional assurances that the repairs, replacements or modifications are sound and leak-tight.

Table IWE-2500-1, Examination Category E-P, identifies the examination method of 10 CFR 50, Appendix J and does not specifically identify a VT-2 visual examination. 10 CFR 50, Appendix J provides requirements for testing as well as acceptable leakage criteria. These tests are performed by Appendix J "Test" personnel and utilize calibrated equipment to determine acceptability. Additionally, 10 CFR 50.55a (b) (2) (x) (E) requires a general visual examination of the containment each period that would identify any structural degradation that may contribute to leakage. A "VT-2"visual examination willnot provide additional assurance of safety beyond that of current Appendix J practices.

Relief is requested in accordance with 10 CFR 50.55a (a) (3) (I). The proposed alternative (pressure testing in accordance with 10 CFR 50, Appendix J) willprovide and acceptable level of quality and safety.

The reference to paragraph IWA-5240 has been removed in the 1997 Addenda of ASME Section XI. This addenda has been approved by the ASME Main Committee and should be published in 1998.

Alternate Examinations:

Testing shall be conducted in accordance with 10 CFR 50, Appendix J, in lieu of Paragraph IWE-5240 of ASME Section XI, as well as performing an IWE detailed visual examination of the repaired or replaced area (VT-l).

Request for Relief No. 40 Attachment Page 2 of 3