Similar Documents at Byron |
---|
Category:License-Operator
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1732021-10-28028 October 2021 Proposed Sim JPM BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A2752021-10-28028 October 2021 ES-301-5 ML21361A3252021-10-28028 October 2021 Scenarios ML21361A3322021-10-28028 October 2021 Written Exam 2024-06-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A3322021-10-28028 October 2021 Written Exam ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A1262021-10-28028 October 2021 ES-301-6 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A3292021-10-28028 October 2021 Sim Job Performance Measure ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A1162021-10-28028 October 2021 ES-301-3 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A2452021-10-28028 October 2021 ES-301-1 ML21361A1352021-10-28028 October 2021 ES-401-6 2024-06-19
[Table view] |
Text
ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/201 6 Exam Level:
RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:
-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function N/A N/A N/A b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long
-term cooling of core.
4.2/4.2 Bank - 2013 NRC S, P , D, EN , L 2 c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3 d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P e. Switch running SX pumps
- with failure to develop pressure (BOP SX-9) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 NEW S, N , A 4S f. Start MDCT fans and align risers w/ shut down of 2 RCFCs 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans.
3.6/3.6 Bank S, D , EN, L, A 5 g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)
. 3.3/3.1 NEW S, N, EN, L 6
- h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N, A 8 In-Plant Systems
-I); (3 or 2 for SRO
-U) i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers.
4.1/4.0 Modified from 2013 NRC M , E, A 1 j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping. 3.7/3.7 Bank D, E 6 k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N , A 8
-I control room (and in
-plant) systems must be different and serve different safety functions; all five SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 6 4-6 / 4-6 / 2-3 5 3 4 3 5 1 1 ES-301 Control Room/In
-Plant Systems Outline Form ES-301-2 Facility: Byron NRC 2016 Date of Examination: 3/14/201 6 Exam Level:
RO SRO-I SRO-U Operating Test No.: Byron 2016301 Control Room Systems:
-I; 2 or 3 for SRO-U System / JPM Title Type Code*
Safety Function N/A N/A N/A b. Switch to Hot Leg Recirculation 011EA1.11 Ability to operate and monitor the following as they apply to a Large Break LOCA: Long
-term cooling of core.
4.2/4.2 Bank - 2013 NRC S, P , D, EN , L 2 c. SI pump ASME startup (with cavitation indication) 006A2.04 Ability to (a) predict the impacts of the following malfunctions or operations on the Emergency Core Cooling System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Improper discharge pressure. 3.4/3.8 Bank S, D, EN, A 3 d. Respond to RCP seal malfunction 015AA1.22 Ability to operate and/or monitor the following as they apply to the Reactor Coolant Pump Malfunctions: RCP seal failure/malfunction. 4.0/4.2 Bank S, D 4P e. Switch running SX pumps
- with failure to develop pressure (BOP SX-9) 076A4.01 Ability to manually operate and/or monitor in the control room: SWS pumps. 2.9/2.9 NEW S, N , A 4S f. Start MDCT fans and align risers w/ shut down of 2 RCFCs 022A4.01 Ability to manually operate and/or monitor in the control room: CCS fans.
3.6/3.6 Bank S, D , EN, L, A 5 g. Supply Non-ESF Bus from ESF Bus (Post-LOCA) 062A4.01 Ability to manually operate and/or monitor in the control room: All breakers (including available switchyard)
. 3.3/3.1 NEW S, N, EN, L 6
- h. CW Pump trip with discharge valve failure to auto close 075A2.02 Ability to (a) predict the impacts of the following malfunctions or operations on the Circulating Water System; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those malfunctions or operations: Loss of circulating water pumps. 2.5/2.7 NEW S, N, A 8 In-Plant Systems
-I); (3 or 2 for SRO
-U) i. Trip Reactor outside the MCR (Open MCC breakers) 029EA1.12 Ability to operate and monitor the following as they apply to an ATWS: M/G set power supply and reactor trip breakers.
4.1/4.0 Modified from 2013 NRC M , E, A 1 j. Transfer instrument bus to CVT supply 057AA1.01 Ability to operate and monitor the following as they apply to the Loss of Vital AC Instrument Bus: Manual inverter swapping. 3.7/3.7 Bank D, E 6 k. Manual makeup to CC surge tank from backup SX system 008K4.02 Knowledge of CCWS design feature(s) and/or interlocks which provide for the following: Operation of the surge tank, including the associated valves and controls. 2.9/2.7 NEW R, E, N , A 8
-I control room (and in
-plant) systems must be different and serve different safety functions; all five SRO
-U systems must serve different safety functions; in
-plant systems and functions may overlap those tested in the control room.
- Type Codes Criteria for RO / SRO
-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in
-plant (EN)gineered safety feature (L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 6 4-6 / 4-6 / 2-3 5 3 4 3 5 1 1