ML060620564: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 03/02/2006 | | issue date = 03/02/2006 | ||
| title = Issuance of the Core Operating Limits Report for Reload 10, Cycle 11, Revision 4 | | title = Issuance of the Core Operating Limits Report for Reload 10, Cycle 11, Revision 4 | ||
| author name = Cowan P | | author name = Cowan P | ||
| author affiliation = Exelon Nuclear | | author affiliation = Exelon Nuclear | ||
| addressee name = | | addressee name = | ||
Line 23: | Line 23: | ||
Enclosed is a copy of the Core Operating Limits Report (COLR) for Limerick Generating Station, Unit 1, Reload 10, Cycle 11, Revision 4. Revision 4 of this report incorporates changes associated with the implementation of the PANACl 1 based 3D Monicore core monitoring system. This COLR is being submitted to the NRC in accordance with LGS, Unit 1 Technical Specifications (TS) Section 6.9.1.1 2. If you have any questions, please do not hesitate to contact us. Very truly yours, Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Enclosure cc: S. J. Collins, Regional Administrator, Region I, USNRC S. Hansell, USNRC Senior Resident Inspector, LGS T. Valentine, Project Manager [LGS], USNRC Limerick Gnit 1 Cycle 11 COLR COLR Limerick I, Rev. 4 1 Page 1 CORE OPERATIX LIMITS REPORT FOR LIMERICK GENERATING STATION uNrT 1 RELOAD 10, CYCLE 11 Reviewed By: Dace: W. P. Gassmann Independent Reviewer Approved By: | Enclosed is a copy of the Core Operating Limits Report (COLR) for Limerick Generating Station, Unit 1, Reload 10, Cycle 11, Revision 4. Revision 4 of this report incorporates changes associated with the implementation of the PANACl 1 based 3D Monicore core monitoring system. This COLR is being submitted to the NRC in accordance with LGS, Unit 1 Technical Specifications (TS) Section 6.9.1.1 2. If you have any questions, please do not hesitate to contact us. Very truly yours, Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Enclosure cc: S. J. Collins, Regional Administrator, Region I, USNRC S. Hansell, USNRC Senior Resident Inspector, LGS T. Valentine, Project Manager [LGS], USNRC Limerick Gnit 1 Cycle 11 COLR COLR Limerick I, Rev. 4 1 Page 1 CORE OPERATIX LIMITS REPORT FOR LIMERICK GENERATING STATION uNrT 1 RELOAD 10, CYCLE 11 Reviewed By: Dace: W. P. Gassmann Independent Reviewer Approved By: | ||
Limerick Knit 1 Cycie 11 COLR I .O Terms and Definitions | Limerick Knit 1 Cycie 11 COLR I .O Terms and Definitions 2.0 References 3.0 Cenerai Information 4.0 MAJ?LHGR Limits 5.0 MCPR Limits 6.0 7.0 Control Rod Block Setpoints 8.0 Turbine Bypass Valve Parameters 9.0 Stability Protection Setpoints 10.0 Modes of Operation Linear Heat Generation Rate Limits COLR Limerick 1, Rev. 4 I Page 2 Page 5 6 7 8 13 18 1 23 24 25 25 COLR Limerick 1, Rev. 4 I Limerick hit 1 Cycle 11 COLR Table 4- 1 Table 4-2 Table 4-3 Table 4-4 Table 4-5 Table 4-6 Table 4-7 Table 4-8 Table 5-1 Tabk 6-1 Tabte 6-2 Table 7-1 Table 7-2 Table 8-1 Table 8-2 Table 9- 1 lZiZdLPLWGR Versus Average Planar Exposure Bundle Type GE13-P9cTB4 17-13GZ-1 WT- 146-7: (GEi 3) MAPLHGR Versus Average Planar Exposure Bundle Type GE13-P9CT'B4 17- 1 1 GZ- I OOT- 146-T fGE 13) hWLHGR Versus Average Planar Exposure Bundle Type GEI4-PI 0CN~4~7-7G8,O/gG7.0-~~T"l~O-T-2527 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEI4-PI0CNAJ341'7-t3GZ-1OOT-150-T-2528 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEl4-Pl~~~4 17-768.01~G7.0-80~45R-150-T-253 1 (GE14C) WLHGR Versus Average Planar Exposure Bundle Type GE14-P10CNAB417-15GZ-IOOT-iSO-T-2592 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEl4-PIOCNAB4~14-14GZ-1~-150-T-2701 (GEf4C) MAPLHGR Single Loop Operation (SLO) Reduction Factor Operating Limit Minimum Critical Power Ratio Linear Heat Generation Rate Limits LHGR Single Loop Operation (SLO) Reduction Factor Rod Block Monitor Setpoints Reactor Coolant System Recirculation Flow Upscale Trip Turbine Bypass System Response Time ~in~~um Required Bypass Valves To Maintain System Operability OPRM PBDA Trip Setpoints Page 3 Page 9 9 10 10 *1 11 12 I2 14 1s 18 1 23 23 24 24 25 Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 4 f Page Figure 5- 1 Figure 5-2 Figure 5-3 Figure 6- 1 Figure 6-2 Figure 6-3 Figure 6-4 Power Dependent: ,tlCPR Limit Adjustments and ~u~t~p~~~r~ | ||
Information 4.0 MAJ?LHGR Limits 5.0 MCPR Limits 6.0 7.0 Control Rod Block Setpoints | |||
Bypass Valve Parameters | |||
Protection Setpoints 10.0 Modes of Operation Linear Heat Generation Rate Limits COLR Limerick 1, Rev. 4 I Page 2 Page 5 6 7 8 13 18 1 23 24 25 25 COLR Limerick 1, Rev. 4 I Limerick hit 1 Cycle 11 COLR Table 4- 1 Table 4-2 Table 4-3 Table 4-4 Table 4-5 Table 4-6 Table 4-7 Table 4-8 Table 5-1 Tabk 6-1 Tabte 6-2 Table 7-1 Table 7-2 Table 8-1 Table 8-2 Table 9- 1 lZiZdLPLWGR Versus Average Planar Exposure Bundle Type GE13-P9cTB4 17-13GZ-1 WT- 146-7: (GEi 3) MAPLHGR Versus Average Planar Exposure Bundle Type GE13-P9CT'B4 17- 1 1 GZ- I OOT- 146-T fGE 13) hWLHGR Versus Average Planar Exposure Bundle Type GEI4-PI 0CN~4~7-7G8,O/gG7.0-~~T"l~O-T-2527 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEI4-PI0CNAJ341'7-t3GZ-1OOT-150-T-2528 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEl4-Pl~~~4 17-768.01~G7.0-80~45R-150-T-253 1 (GE14C) WLHGR Versus Average Planar Exposure Bundle Type GE14-P10CNAB417-15GZ-IOOT-iSO-T-2592 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEl4-PIOCNAB4~14-14GZ-1~-150-T-2701 (GEf4C) MAPLHGR Single Loop Operation (SLO) Reduction Factor Operating Limit Minimum Critical Power Ratio Linear Heat Generation Rate Limits LHGR Single Loop Operation (SLO) Reduction Factor Rod Block Monitor Setpoints Reactor Coolant System Recirculation Flow Upscale Trip Turbine Bypass System Response Time ~in~~um Required Bypass Valves To Maintain System Operability OPRM PBDA Trip Setpoints Page 3 Page 9 9 10 10 *1 11 12 I2 14 1s 18 1 23 23 24 24 25 Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 4 f Page Figure 5- 1 Figure 5-2 Figure 5-3 Figure 6- 1 Figure 6-2 Figure 6-3 Figure 6-4 Power Dependent: ,tlCPR Limit Adjustments and ~u~t~p~~~r~ | |||
Power Dependent MCPR Limit Adjustments and | Power Dependent MCPR Limit Adjustments and | ||
~ul~~pt~ers - TBVOQS Flow Dependent MCPR Limits MCPR(F) Power Dependent LHGR Muttiplier LHGRFAC(P} Power Dependent LHGR Multiplier LHGRFAC(P) - TBVOOS Flow Dependent LHGR Multiplier LHGRFACF) | ~ul~~pt~ers - TBVOQS Flow Dependent MCPR Limits MCPR(F) Power Dependent LHGR Muttiplier LHGRFAC(P} Power Dependent LHGR Multiplier LHGRFAC(P) - TBVOOS Flow Dependent LHGR Multiplier LHGRFACF) | ||
Line 46: | Line 35: | ||
This report provides the f~lIowin~ | This report provides the f~lIowin~ | ||
cycfe- cifie parametcr limits for Limerick Generating Station Unit i Cycle 1 f : 0 0 0 0 0 e 0 0 0 Maximum Average Planar Linear Heat Generation Rate (WLHGR) Minimum Critical Power Ratio (MCPR) Singfe Loop Operation (SLO) | cycfe- cifie parametcr limits for Limerick Generating Station Unit i Cycle 1 f : 0 0 0 0 0 e 0 0 0 Maximum Average Planar Linear Heat Generation Rate (WLHGR) Minimum Critical Power Ratio (MCPR) Singfe Loop Operation (SLO) | ||
MCPR adjustment ARTS MCPR thermal limit adjustments and multipliers | MCPR adjustment ARTS MCPR thermal limit adjustments and multipliers | ||
{MCPR(P) or MCPR(F)) ARTS LHGR thermal limit multipfiers | {MCPR(P) or MCPR(F)) ARTS LHGR thermal limit multipfiers | ||
~~~~~FA~~P) or ~-~~~~F~~(~)) | ~~~~~FA~~P) or ~-~~~~F~~(~)) | ||
Rod Black Monitor (mM) setpoints MAPLWGR single loop operation reduction factor L*1CK cingie ioop opcmiott ~~~~~~~~~~~ | Rod Black Monitor (mM) setpoints MAPLWGR single loop operation reduction factor L*1CK cingie ioop opcmiott ~~~~~~~~~~~ | ||
fmor Linear Heat Generation Rate (LHGR) Turbine Bypass Valve parameters Reactor Coolant System Recirculation Flow Upscale Trips OPRM. Period Based Detection Algorithm (P3DA) trip setpoints These values have been determined using MC-approved methodoiogy (Reference 9), and are established such that all applicable Iimits of the plant safety analysis are met. This report is prepared in accordance with TechnicaI Specification 6.9.1.9 of Reference | fmor Linear Heat Generation Rate (LHGR) Turbine Bypass Valve parameters Reactor Coolant System Recirculation Flow Upscale Trips OPRM. Period Based Detection Algorithm (P3DA) trip setpoints These values have been determined using MC-approved methodoiogy (Reference 9), and are established such that all applicable Iimits of the plant safety analysis are met. This report is prepared in accordance with TechnicaI Specification 6.9.1.9 of Reference | ||
: 1. Preparation of this report was performed in accordance wirh Exelon Nuclear, Nuclear Fuel Management T&J?%f NF-AB-I 20- 3crcxf. I The data presented in this report is valid for all licensed operating domains on the operating map, including: | : 1. Preparation of this report was performed in accordance wirh Exelon Nuclear, Nuclear Fuel Management T&J?%f NF-AB-I 20- 3crcxf. I The data presented in this report is valid for all licensed operating domains on the operating map, including: | ||
0 Maximum Extended Load Line Limit down to 81% of rated core flow during full power operation Increased Core Flow (ICE) up to 1 f 0% of rated core flow Final Feedwater Temperature Reduction (FFWTR) up to 105OF during cycle extension operation Feedwater Heater Out of Service (FWHOOS) up to 60°F feedwater temperature reduction at any time during the cycle prior to cycle extension. | 0 Maximum Extended Load Line Limit down to 81% of rated core flow during full power operation Increased Core Flow (ICE) up to 1 f 0% of rated core flow Final Feedwater Temperature Reduction (FFWTR) up to 105OF during cycle extension operation Feedwater Heater Out of Service (FWHOOS) up to 60°F feedwater temperature reduction at any time during the cycle prior to cycle extension. | ||
Further information on the cycle specific analyses for Limerick 1 Cycle 11 and the associated operating domains discussed above is available in Reference | Further information on the cycle specific analyses for Limerick 1 Cycle 11 and the associated operating domains discussed above is available in Reference | ||
: 2. | : 2. | ||
Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 1 Page 8 4.Q MAPLZIGR LIMITS HCR limits provided in Tables 4-1 ~rou~h 4-8 are referenced in Technical | Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 1 Page 8 4.Q MAPLZIGR LIMITS HCR limits provided in Tables 4-1 ~rou~h 4-8 are referenced in Technical | ||
~~cifications 3.2.1, The limiting WLHGR value for the most limiting lanice (excluding natural uranium) of each fuel type as a function of average planar exposure is given in Tables 4- I through 4-7 (References 3 and 4). Tables 4- 1 through 4-7 lire used when hand calculations are required as specified in Technical Specification 3.2.1. For single loop operation, a reduction factor is used which is shown in Table 4-5 (Reference 2). | ~~cifications 3.2.1, The limiting WLHGR value for the most limiting lanice (excluding natural uranium) of each fuel type as a function of average planar exposure is given in Tables 4- I through 4-7 (References 3 and 4). Tables 4- 1 through 4-7 lire used when hand calculations are required as specified in Technical Specification 3.2.1. For single loop operation, a reduction factor is used which is shown in Table 4-5 (Reference 2). | ||
Limerick Knit 1 Cycle 11 COLR Avg. Plan Avg. Plan Avg. Plan Tabie 4-1 Exposure I t COLR Limerick 1, Rev. 4 Page 9 MAPLHGR Exposure MAPLHGR Exposure ~1A~L~GR I MAPLHGR Versus Average Planar Exposure Bundle Type GE13-~TB417-1362-100T-f46-T (GE13) (Reference | Limerick Knit 1 Cycle 11 COLR Avg. Plan Avg. Plan Avg. Plan Tabie 4-1 Exposure I t COLR Limerick 1, Rev. 4 Page 9 MAPLHGR Exposure MAPLHGR Exposure ~1A~L~GR I MAPLHGR Versus Average Planar Exposure Bundle Type GE13-~TB417-1362-100T-f46-T (GE13) (Reference | ||
: 4) 0.0 I ! I 1 1 1 1 10.4% 7 .0 1 1.53 25 .o 12.01 0.2 10.54 8.0 f 1.69 30.0 11s9 , 1 I I 1 4.0 f 11.08 I 15.0 1 12.45 I S0.0 1 8.9'7 1 1 .o 10.65 9.0 1 I .85 35.0 10.96 Table 4-2 2.0 10.79 10.0 i 2.02 1 40.0 10.32 3 .O 10.93 12.5 12.26 45.0 9.66 MAPLHGR Versus Average Planar Exposure Bundle Type GEf3-P9CTB417-11G2-100T-lLt6-T fGE13) (Reference | : 4) 0.0 I ! I 1 1 1 1 10.4% 7 .0 1 1.53 25 .o 12.01 0.2 10.54 8.0 f 1.69 30.0 11s9 , 1 I I 1 4.0 f 11.08 I 15.0 1 12.45 I S0.0 1 8.9'7 1 1 .o 10.65 9.0 1 I .85 35.0 10.96 Table 4-2 2.0 10.79 10.0 i 2.02 1 40.0 10.32 3 .O 10.93 12.5 12.26 45.0 9.66 MAPLHGR Versus Average Planar Exposure Bundle Type GEf3-P9CTB417-11G2-100T-lLt6-T fGE13) (Reference | ||
: 4) t - I I I I ! 1 1.0 1 10.93 1 9.0 1 12.06 1 35.0 1 10.96 I 5 '0 11.22 17.5 12.44 55.0 7.43 6.0 11.37 20.0 12.32 I 58.03 6.29 2.0 11.05 12.21 a.0 10.33 i 4.0 11.31 15.0 f 2.55 50.0 I 8.98 I f I 3 .0 1 11.17 f 2.5 I 12.43 45 .0 9.67 5.0 11.45 17.5 f 2.47 55.0 7.49 j 6.0 I 11.59 20.0 12.32 58.2 6.29 Limerick Unit 1 Cycfe 11 COLR 4.0 Table 4-3 10.34 15.0 11.04 50.0 7.87 COLR Limerick 1, Rev. 4 Page 10 1 5.0 10.49 17.0 10.95 55.0 5.89 Table 4-4 t I ,WLI-XGR Versus Average Planar Exposure Bundle Type GE14-P1OCNAB417-13GZ-10OT-150-T-2528 (GEL4C) (Reference | : 4) t - I I I I ! 1 1.0 1 10.93 1 9.0 1 12.06 1 35.0 1 10.96 I 5 '0 11.22 17.5 12.44 55.0 7.43 6.0 11.37 20.0 12.32 I 58.03 6.29 2.0 11.05 12.21 a.0 10.33 i 4.0 11.31 15.0 f 2.55 50.0 I 8.98 I f I 3 .0 1 11.17 f 2.5 I 12.43 45 .0 9.67 5.0 11.45 17.5 f 2.47 55.0 7.49 j 6.0 I 11.59 20.0 12.32 58.2 6.29 Limerick Unit 1 Cycfe 11 COLR 4.0 Table 4-3 10.34 15.0 11.04 50.0 7.87 COLR Limerick 1, Rev. 4 Page 10 1 5.0 10.49 17.0 10.95 55.0 5.89 Table 4-4 t I ,WLI-XGR Versus Average Planar Exposure Bundle Type GE14-P1OCNAB417-13GZ-10OT-150-T-2528 (GEL4C) (Reference | ||
: 4) Avg. Pian Avg. Plan Avg. Plan Exposure MAPLHGR Exposure MAPLHGR Exposure (GWd/ST) (kW/ft) (GWdlST) (kW/ft) (CWdlST) 0.0 10.17 7.0 10.92 25.0 0.2 10.22 8.0 f 1.02 30.0 1 .o I 0.26 9.0 1 f.09 35.0 2.0 10.32 10.0 fl.t.5 40.0 1 3.0 1 10.42 1 12.0 1 11.25 f 45.0 4.0 I0.53 150 I 1.09 50.0 I I I I 5.0 1 10.66 1 17.0 1 20.98 SS.0 10.8 1 20.0 10.78 57.12 [ 6.0 MAPLHGR 10.34 Limerick Unit 1 Cyde 1I COLR Avg. Ptan Exposure Table 4-5 Avg. PIan I Avg. Plan hiIAPLHCR Exposure MAPLHGR Exposure NIAPLHGR COLR Limerick 1, Rev. 4 Page 11 I (GWdlST) 1 (kW/ft) 0.0 I0.00 0.2 10.0 1 ~~L~~~ Versus Average Planar Exposure Bundk Type CJE14-P10CN~417-7G8.0/8G7.0-80~~5R-150-T-2531 (GE14C) (Reference | : 4) Avg. Pian Avg. Plan Avg. Plan Exposure MAPLHGR Exposure MAPLHGR Exposure (GWd/ST) (kW/ft) (GWdlST) (kW/ft) (CWdlST) 0.0 10.17 7.0 10.92 25.0 0.2 10.22 8.0 f 1.02 30.0 1 .o I 0.26 9.0 1 f.09 35.0 2.0 10.32 10.0 fl.t.5 40.0 1 3.0 1 10.42 1 12.0 1 11.25 f 45.0 4.0 I0.53 150 I 1.09 50.0 I I I I 5.0 1 10.66 1 17.0 1 20.98 SS.0 10.8 1 20.0 10.78 57.12 [ 6.0 MAPLHGR 10.34 Limerick Unit 1 Cyde 1I COLR Avg. Ptan Exposure Table 4-5 Avg. PIan I Avg. Plan hiIAPLHCR Exposure MAPLHGR Exposure NIAPLHGR COLR Limerick 1, Rev. 4 Page 11 I (GWdlST) 1 (kW/ft) 0.0 I0.00 0.2 10.0 1 ~~L~~~ Versus Average Planar Exposure Bundk Type CJE14-P10CN~417-7G8.0/8G7.0-80~~5R-150-T-2531 (GE14C) (Reference | ||
: 4) {GWdlST) fkW/ft) (GWd/ST) (kW/ft} 8.0 10.91 '0.0 10.76 9.0 10.99 2s .0 10.34 i M;@LHGR Versus Average Planar Exposure Bundie Type ~~14-P10CNAB417-15GZ-1QOT-fSO-T-2592 (GE14G) (Reference | : 4) {GWdlST) fkW/ft) (GWd/ST) (kW/ft} 8.0 10.91 '0.0 10.76 9.0 10.99 2s .0 10.34 i M;@LHGR Versus Average Planar Exposure Bundie Type ~~14-P10CNAB417-15GZ-1QOT-fSO-T-2592 (GE14G) (Reference | ||
: 3) 1 .0 r i I I I I 1 i 0.03 10.0 11.07 i 30.0 9.87 7.0 5.0 I 10.49 i 14.0 50.0 7.87 1 10.81 I 17.0 10.95 57.06 4.86 ' i 6.0 1 10.64 1 15.0 I 11.04 1 55.0 I 5.89 1 Limerick Unit 1 Cycle 11 COLR Table 4-7 COLR Limerick 1, Rev. 4 Page 12 I iMAPLWGR Versus Average Planar Exposure Bundle Type ~~14-~1U~~41~- | : 3) 1 .0 r i I I I I 1 i 0.03 10.0 11.07 i 30.0 9.87 7.0 5.0 I 10.49 i 14.0 50.0 7.87 1 10.81 I 17.0 10.95 57.06 4.86 ' i 6.0 1 10.64 1 15.0 I 11.04 1 55.0 I 5.89 1 Limerick Unit 1 Cycle 11 COLR Table 4-7 COLR Limerick 1, Rev. 4 Page 12 I iMAPLWGR Versus Average Planar Exposure Bundle Type ~~14-~1U~~41~- | ||
14~~-1~~-15~-~-2701 (GE14C) (Reference | 14~~-1~~-15~-~-2701 (GE14C) (Reference | ||
: 3) I I 2.0 10.24 11.0 1 I25 35.0 9.24 3.0 10.35 12.0 11.28 40.0 8.72 4.0 10.47 13.0 11.21 45 .o 8.24 5.0 10.61 14.0 11.14 50.0 7.76 i I t I I I 6.0 10.73 15.0 I 1 .ox 55.0 5.86 7.0 10.86 17.0 10.96 57.02 4.85 Table 4-8 WLHGR Single Loop Operation (SLO) Reduction Factor (Reference | : 3) I I 2.0 10.24 11.0 1 I25 35.0 9.24 3.0 10.35 12.0 11.28 40.0 8.72 4.0 10.47 13.0 11.21 45 .o 8.24 5.0 10.61 14.0 11.14 50.0 7.76 i I t I I I 6.0 10.73 15.0 I 1 .ox 55.0 5.86 7.0 10.86 17.0 10.96 57.02 4.85 Table 4-8 WLHGR Single Loop Operation (SLO) Reduction Factor (Reference | ||
: 2) | : 2) | ||
Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 f Page 13 The MCPR values provided in Table 5-1 are referenced in Technical Specification | Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 f Page 13 The MCPR values provided in Table 5-1 are referenced in Technical Specification 3.2.3. Table 5-t is derived from the Reference 2 analyses and is valid for at! Cycle i 1 fuel types and operating domains. Table 5-1 includes treatment of these MCPR limits for SLO. Bounding MCPR values are also provided for inoperable Recirculation Pump Trip or inoperable Steam Bypass System. These two options represent the Equipment Out of Service conditions. | ||
5-t is derived from the Reference 2 analyses and is valid for at! Cycle i 1 fuel types and operating domains. Table 5-1 includes treatment of these MCPR limits for SLO. Bounding MCPR values are also provided for inoperable Recirculation Pump Trip or inoperable Steam Bypass System. These two options represent the Equipment Out of Service conditions. | |||
The cycle exposure, which represents EOR, is given in the latest verified and approved Cycle Management Report or associated Engineering Change Request. | The cycle exposure, which represents EOR, is given in the latest verified and approved Cycle Management Report or associated Engineering Change Request. | ||
ARTS provides for power- and flow-dependent thermal limit adjustments and muftipliers, which allow fox a more reliable administration of the MCPR thermal limit. The tlow-dependent adjustment MCPR(F) is sufficiently generic to apply to ail fuel types and operating domains (References 2 and 8). In addition, there are also two sets of pow~r-de~~dei~t MCPR multipliers for use with the Turbine Bypass Valves in service and TBVOOS conditions (Reference 13). Section 8.0 contains the conditions for Turbine Bypass Valve Operability. These adjustments and muhipliers are shown in Figures 5-1 through 5-3 and are referred to by Technical Specification 3.2.3. The MCPR(P) curves are independent of recirculation pump trip operability (Reference 13). | ARTS provides for power- and flow-dependent thermal limit adjustments and muftipliers, which allow fox a more reliable administration of the MCPR thermal limit. The tlow-dependent adjustment MCPR(F) is sufficiently generic to apply to ail fuel types and operating domains (References 2 and 8). In addition, there are also two sets of pow~r-de~~dei~t MCPR multipliers for use with the Turbine Bypass Valves in service and TBVOOS conditions (Reference 13). Section 8.0 contains the conditions for Turbine Bypass Valve Operability. These adjustments and muhipliers are shown in Figures 5-1 through 5-3 and are referred to by Technical Specification 3.2.3. The MCPR(P) curves are independent of recirculation pump trip operability (Reference 13). | ||
Line 78: | Line 64: | ||
* 2.64 .. 0 20 40 60 mwer (% Rated) 80 iao Limerick Unit 1 Cycle If COLR FIGURE 5-3 COLK Limerick 1, Rev. 4 Page 17 1 Flow Dependent iLICPR Limits MCPR(F) This Figure Is Valid For All Operating Domains (References 2 and 8) 2.00 1.90 1.80 2-70 n 1.60 a. 0 z 1.50 ti 1.40 1.30 2.20 1.10 MCPR(F) = The Maximum of EI-FWER 1.25 OR { -0.5784 x (wT/lW) + 1.7073) JvT = 76 Rated Core Flow 30 40 50 60 70 80 90 100 1x0 Core Flow ("a Rated) | * 2.64 .. 0 20 40 60 mwer (% Rated) 80 iao Limerick Unit 1 Cycle If COLR FIGURE 5-3 COLK Limerick 1, Rev. 4 Page 17 1 Flow Dependent iLICPR Limits MCPR(F) This Figure Is Valid For All Operating Domains (References 2 and 8) 2.00 1.90 1.80 2-70 n 1.60 a. 0 z 1.50 ti 1.40 1.30 2.20 1.10 MCPR(F) = The Maximum of EI-FWER 1.25 OR { -0.5784 x (wT/lW) + 1.7073) JvT = 76 Rated Core Flow 30 40 50 60 70 80 90 100 1x0 Core Flow ("a Rated) | ||
Limerick Unit 1 Cycle tl COLR FUEL TYPE GE13 COLR Limerick 1, Rev. 4 I Page *8 MAXIkfVM VALUE 14.4 kW/ft The ma~imum LHGR value for each fuel type for use in Technical Specification 3.2.4 is given in Table 6-1 below. The LHGR is an exposure dependent vatue. Due to the proprietary nature of these values only the maximum LHGR for each fuef type is listed in Table 6- t . GEI4 ARTS provides for power- and flow"dep~~ident thermal limit multipliers, which allow for a more reliable ad~inis~ration of the LHGR thermal limits. There are two sets of flow-dependent LGHR multipliers for duaf-loop and single-loop operation (References 2,s and 8). In addition, there are also two sets of power- dependent LHGR multipliers for use with the Turbine Bypass Valves in service and TBVOOS conditions (Reference 13). Section 8.0 contains the conditions for Turbine Bypass Valve Operability. | Limerick Unit 1 Cycle tl COLR FUEL TYPE GE13 COLR Limerick 1, Rev. 4 I Page *8 MAXIkfVM VALUE 14.4 kW/ft The ma~imum LHGR value for each fuel type for use in Technical Specification 3.2.4 is given in Table 6-1 below. The LHGR is an exposure dependent vatue. Due to the proprietary nature of these values only the maximum LHGR for each fuef type is listed in Table 6- t . GEI4 ARTS provides for power- and flow"dep~~ident thermal limit multipliers, which allow for a more reliable ad~inis~ration of the LHGR thermal limits. There are two sets of flow-dependent LGHR multipliers for duaf-loop and single-loop operation (References 2,s and 8). In addition, there are also two sets of power- dependent LHGR multipliers for use with the Turbine Bypass Valves in service and TBVOOS conditions (Reference 13). Section 8.0 contains the conditions for Turbine Bypass Valve Operability. | ||
The LHGR mu~~ipl~ers are shown in Figures 6-1 through 63 and are referred to by Technical Specification | The LHGR mu~~ipl~ers are shown in Figures 6-1 through 63 and are referred to by Technical Specification 3.2.4. Thermal limit monitoring must be performed with the more limiting LHGR limit resulting from the power- and flow-biased calculation. The LHGRFAQP) curves are independent of recirculation pump trip operabitity (Reference 13). For single loop operation, a reduction factor is used which is shown in Table 6-2 (Reference 2). 13.4 kW/ft TABLE 6-1 Linear Heat Generation Rate Limits (Reference | ||
: 11) SLO reduction factor 0.79 Table 6-2 LHGR Single Loop Operation (SLO) Reduction Factor (Reference | |||
limit monitoring must be performed with the more limiting LHGR limit resulting from the power- and flow-biased calculation. The LHGRFAQP) curves are independent of recirculation pump trip operabitity (Reference 13). For single loop operation, a reduction factor is used which is shown in Table 6-2 (Reference 2). 13.4 kW/ft TABLE 6-1 Linear Heat Generation Rate Limits (Reference | |||
: 11) SLO reduction factor 0.79 Table 6-2 LHGR Single Loop Operation (SLO) Reduction Factor (Reference | |||
: 2) | : 2) | ||
Limerick Unit 1 Cycle 11 COLR 1.0 a.8 & 8 c !i 55 0.4 Y u .E 2 0.6 L;z g ; E 2 0.2 0.0 This Figure Is Valid For the All Operating Domains except TBVOOS) (Reference | Limerick Unit 1 Cycle 11 COLR 1.0 a.8 & 8 c !i 55 0.4 Y u .E 2 0.6 L;z g ; E 2 0.2 0.0 This Figure Is Valid For the All Operating Domains except TBVOOS) (Reference | ||
: 13) at I, t. *I LHGR(P) = LHGRFACIP) | : 13) at I, t. *I LHGR(P) = LHGRFACIP) | ||
* LHGRstd FOR P c 25% . NO THERMAL LIMIT MOPU'ITORING REQU ERED NO ttMITS SPECIRED FOR 25% S; P < 30%: LNCRFAC(P)= | * LHGRstd FOR P c 25% . NO THERMAL LIMIT MOPU'ITORING REQU ERED NO ttMITS SPECIRED FOR 25% S; P < 30%: LNCRFAC(P)= | ||
Line 92: | Line 75: | ||
= 1 .0 i 0.005224(P-100) 60 60 100 Potrr?r(% | = 1 .0 i 0.005224(P-100) 60 60 100 Potrr?r(% | ||
Rated) | Rated) | ||
Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 20 FIGURE 6-2 Power Dependent LHGR ~~u~~i~li~r LHG This Figure Is Valid For The TBVOOS Operating Domain (Reference | Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 20 FIGURE 6-2 Power Dependent LHGR ~~u~~i~li~r LHG This Figure Is Valid For The TBVOOS Operating Domain (Reference | ||
: 13) .. .. '. 0 a0 60 __ ~- ~- LHGRfP) = LHGRFACIR | : 13) .. .. '. 0 a0 60 __ ~- ~- LHGRfP) = LHGRFACIR | ||
* LHGRstd FOR P c 25% FjO THERMAL L&lIT \lOrLKORlNG REQLrRED CO LIMITS SPECIRED FOR 25°C 2 P < 30% LHGRF4C(P) | * LHGRstd FOR P c 25% FjO THERMAL L&lIT \lOrLKORlNG REQLrRED CO LIMITS SPECIRED FOR 25°C 2 P < 30% LHGRF4C(P) | ||
Line 108: | Line 91: | ||
I LHGR(F)= LHGRFAC(F) LHGRstd FOR Single Loop Operation, LHGRFAC!F! | I LHGR(F)= LHGRFAC(F) LHGRstd FOR Single Loop Operation, LHGRFAC!F! | ||
= The Minimum of EITHER 0.79 OR 0.6682 x ~W~/I~~~.~~SS Where WT = 5% Rated Core Flow 7a 84 90 ioa 110 Core How (% Rated) | = The Minimum of EITHER 0.79 OR 0.6682 x ~W~/I~~~.~~SS Where WT = 5% Rated Core Flow 7a 84 90 ioa 110 Core How (% Rated) | ||
Limerick Unit 1 Cycle 11 COLR I 7.0 CONTROL ROD BLOCK SETPOINTS Nominal Trip Setpoint Allowabk Value 1 COLR Limerick I, ~ev. 4 Page 23 1 i LTSP' ESP' Technicaf Specification Limiting Condition for Uperation | Limerick Unit 1 Cycle 11 COLR I 7.0 CONTROL ROD BLOCK SETPOINTS Nominal Trip Setpoint Allowabk Value 1 COLR Limerick I, ~ev. 4 Page 23 1 i LTSP' ESP' Technicaf Specification Limiting Condition for Uperation 3.3.6 requires control rod block in~tr~rn~n~~ion channels shaiil be OPERABLE with their trip setpoints consistent with the values shown in the Trip Setpoint column of Technical Specification Table 3.3.6-2. The Reactor Coolant System Recirculation Flow Upscale Trip is a cycte-specific value and as such is found in Table 7-2 of this COLR. Table 7-2 fists the Nominal Trip Setpoint and Allowable Vatue. These setpoints are set high enough to allow full utifizatton of the enhanced ICF domain up to 1 IO% of rated core flow. Additionatly, the ARTS Rod Block Monitor provides for power-dependent RBM trips. The trip S~t~int~aI~owable vafues and applicable RBM signal filter time constant data are shown in Table 7-1 I These vafues are for use with Technical Specification 3.3.6. 12i.5% 121.5% 116.5% 116.5% TABLE 7-1 Rod Block Ahfanitor Setpoints (References 2 and 10) DTSP' 92.0% 89.0% Nominal Trip Setpoint Allowable Value t I I I Il3.456 115.6% 1. These setpoints (with Rod Block Monitor filter time constant between 0.1 seconds and 0.55 seconds) are based on a cycte-specific rated RWE MCPR hit which is less than or equal to the minimum cycle OL&fCPR (see COIR references 2 and 10). TABLE 7-2 Reactor Coolant System Recirculation Flow Upscale Trip (Reference | ||
: 10) I I 1 Limerick Unit 1 Cycle 11 COLR Reactor Power P 225% COLR Limerick I, Rev. 4 Page 24 I No. of Valves in Service 7 8.0 TtrRBHE BYPASS VALVE ~~R~TERS The operability requirements for the steam bypass system for use in Technical Specifications 3.7.8 and 4.7.8.C are found in Tables 8-1 and 8-2. If these requirements cannot be met, the MCPR, MCPR(P) and MAPFAC(PJ limits for inoperable Steam Bypass System, known as Turbine Bypass Valve Out Of Service, must be used. TABLE 8-1 Turbine Bypass System Response Time (Reference | |||
control rod block in~tr~rn~n~~ion channels shaiil be OPERABLE with their trip setpoints consistent with the values shown in the Trip Setpoint column of Technical Specification Table 3.3.6-2. The Reactor Coolant System Recirculation Flow Upscale Trip is a cycte-specific value and as such is found in Table 7-2 of this COLR. Table 7-2 fists the Nominal Trip Setpoint and Allowable Vatue. These setpoints are set high enough to allow full utifizatton of the enhanced ICF domain up to 1 IO% of rated core flow. Additionatly, the ARTS Rod Block Monitor provides for power-dependent RBM trips. The trip S~t~int~aI~owable vafues and applicable RBM signal filter time constant data are shown in Table 7-1 I These vafues are for use with Technical Specification 3.3.6. 12i.5% 121.5% 116.5% 116.5% TABLE 7-1 Rod Block Ahfanitor Setpoints (References 2 and 10) DTSP' 92.0% 89.0% Nominal Trip Setpoint Allowable Value t I I I Il3.456 115.6% 1. These setpoints (with Rod Block Monitor filter time constant between 0.1 seconds and 0.55 seconds) are based on a cycte-specific rated RWE MCPR hit which is less than or equal to the minimum cycle OL&fCPR (see COIR references 2 and 10). TABLE 7-2 Reactor Coolant System Recirculation Flow Upscale Trip (Reference | |||
: 10) I I 1 Limerick Unit 1 Cycle 11 COLR Reactor Power P 225% COLR Limerick I, Rev. 4 Page 24 I No. of Valves in Service 7 8.0 TtrRBHE BYPASS VALVE ~~R~TERS The operability requirements for the steam bypass system for use in Technical Specifications 3.7.8 and 4.7.8.C are found in Tables 8-1 and 8-2. If these requirements cannot be met, the MCPR, MCPR(P) and MAPFAC(PJ limits for inoperable Steam Bypass System, known as Turbine Bypass Valve Out Of Service, must be used. TABLE 8-1 Turbine Bypass System Response Time (Reference | |||
: 6) Maximum delay time before start of bypass valve opening following generation of the turbine bypass valve Row signal 0.11 sec Maximum time after generation of a turbine bypass valve ffow signal for bypass valve position to reach 80% of fufl Row (includes the above delav time) 0.3f sec Limerick Unit 1 Cycle 11 COLR 9.0 STABILITY PROTECTION SETPQINTS The Limerick 1 Cycle 1 1 Oscillation Poaer Range Monitor (OPRZ.ul) | : 6) Maximum delay time before start of bypass valve opening following generation of the turbine bypass valve Row signal 0.11 sec Maximum time after generation of a turbine bypass valve ffow signal for bypass valve position to reach 80% of fufl Row (includes the above delav time) 0.3f sec Limerick Unit 1 Cycle 11 COLR 9.0 STABILITY PROTECTION SETPQINTS The Limerick 1 Cycle 1 1 Oscillation Poaer Range Monitor (OPRZ.ul) | ||
Period Based Detection A~gori~hm (PBDA} 'Trip Setpoints for the OPRM System for use in Technical Specification 2.2.1 are found in Table 9-t . These vaIues are based on the cycle specific analysis documented in Reference | Period Based Detection A~gori~hm (PBDA} 'Trip Setpoints for the OPRM System for use in Technical Specification 2.2.1 are found in Table 9-t . These vaIues are based on the cycle specific analysis documented in Reference | ||
: 13. Any change to the OLMCPR value andlor ARTS-based power dependent MCPR limits shouid be evaluated for potential impact on the OPRTvf PBDA Trip Setpoints. | : 13. Any change to the OLMCPR value andlor ARTS-based power dependent MCPR limits shouid be evaluated for potential impact on the OPRTvf PBDA Trip Setpoints. | ||
TX 9-1 OPRM PBDA Trip Setpoints Corresponding Maximum Confirmation Count Trip Setpoint PBDA Trip Amplitude 10.0 MODES OF OPERATION Limerick Generating Station has been analyzed to operate with a number of operational flexibility features, including increased Core Ftow, Maximum Extended Load Line Limit, Coastdown, EOC Recirculation Pump Trip and Option A/B MCPR Limits. Limerick Generating Station has also been analyzed to operate with a number of equipment out-of-service conditions, inctuding Turbine Bypass Valves 00% Single Loop Operation, Feedwater Heating OOS, Final Feedwater Temperature Reduction and Safety/Relief Valves 00s (up to 2 of 14 safetyhelief valves 00s). Operation is allowed in any combination of these operational flexibility features and equipment out-of-service conditions, with one EXCEPTION, which is that Limerick may NOT aperate with EOC-Recirculation Pump Trip out-of-service in conjunction with Turbine Bypass Valves 00s.}} | TX 9-1 OPRM PBDA Trip Setpoints Corresponding Maximum Confirmation Count Trip Setpoint PBDA Trip Amplitude 10.0 MODES OF OPERATION Limerick Generating Station has been analyzed to operate with a number of operational flexibility features, including increased Core Ftow, Maximum Extended Load Line Limit, Coastdown, EOC Recirculation Pump Trip and Option A/B MCPR Limits. Limerick Generating Station has also been analyzed to operate with a number of equipment out-of-service conditions, inctuding Turbine Bypass Valves 00% Single Loop Operation, Feedwater Heating OOS, Final Feedwater Temperature Reduction and Safety/Relief Valves 00s (up to 2 of 14 safetyhelief valves 00s). Operation is allowed in any combination of these operational flexibility features and equipment out-of-service conditions, with one EXCEPTION, which is that Limerick may NOT aperate with EOC-Recirculation Pump Trip out-of-service in conjunction with Turbine Bypass Valves 00s.}} |
Revision as of 22:24, 13 July 2019
ML060620564 | |
Person / Time | |
---|---|
Site: | Limerick |
Issue date: | 03/02/2006 |
From: | Cowan P Exelon Nuclear |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
Download: ML060620564 (26) | |
Text
Exelon Nuclear www.exeloncorp.com 200 Exelon Way Kennett Square, PA 19348 TS 6.9.1.12 March 2,2006 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Limerick Generating Station, Unit 1 Facility Operating License No. NPF-39 NRC DQ&& No. 50-35.2
Subject:
Issuance of the Core Operating Limits Report For Reload 10, Cycle 1 1, Revision 4
Dear SirlMadam:
Enclosed is a copy of the Core Operating Limits Report (COLR) for Limerick Generating Station, Unit 1, Reload 10, Cycle 11, Revision 4. Revision 4 of this report incorporates changes associated with the implementation of the PANACl 1 based 3D Monicore core monitoring system. This COLR is being submitted to the NRC in accordance with LGS, Unit 1 Technical Specifications (TS) Section 6.9.1.1 2. If you have any questions, please do not hesitate to contact us. Very truly yours, Director, Licensing and Regulatory Affairs Exelon Generation Company, LLC Enclosure cc: S. J. Collins, Regional Administrator, Region I, USNRC S. Hansell, USNRC Senior Resident Inspector, LGS T. Valentine, Project Manager [LGS], USNRC Limerick Gnit 1 Cycle 11 COLR COLR Limerick I, Rev. 4 1 Page 1 CORE OPERATIX LIMITS REPORT FOR LIMERICK GENERATING STATION uNrT 1 RELOAD 10, CYCLE 11 Reviewed By: Dace: W. P. Gassmann Independent Reviewer Approved By:
Limerick Knit 1 Cycie 11 COLR I .O Terms and Definitions 2.0 References 3.0 Cenerai Information 4.0 MAJ?LHGR Limits 5.0 MCPR Limits 6.0 7.0 Control Rod Block Setpoints 8.0 Turbine Bypass Valve Parameters 9.0 Stability Protection Setpoints 10.0 Modes of Operation Linear Heat Generation Rate Limits COLR Limerick 1, Rev. 4 I Page 2 Page 5 6 7 8 13 18 1 23 24 25 25 COLR Limerick 1, Rev. 4 I Limerick hit 1 Cycle 11 COLR Table 4- 1 Table 4-2 Table 4-3 Table 4-4 Table 4-5 Table 4-6 Table 4-7 Table 4-8 Table 5-1 Tabk 6-1 Tabte 6-2 Table 7-1 Table 7-2 Table 8-1 Table 8-2 Table 9- 1 lZiZdLPLWGR Versus Average Planar Exposure Bundle Type GE13-P9cTB4 17-13GZ-1 WT- 146-7: (GEi 3) MAPLHGR Versus Average Planar Exposure Bundle Type GE13-P9CT'B4 17- 1 1 GZ- I OOT- 146-T fGE 13) hWLHGR Versus Average Planar Exposure Bundle Type GEI4-PI 0CN~4~7-7G8,O/gG7.0-~~T"l~O-T-2527 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEI4-PI0CNAJ341'7-t3GZ-1OOT-150-T-2528 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEl4-Pl~~~4 17-768.01~G7.0-80~45R-150-T-253 1 (GE14C) WLHGR Versus Average Planar Exposure Bundle Type GE14-P10CNAB417-15GZ-IOOT-iSO-T-2592 (GE14C) MAPLHGR Versus Average Planar Exposure Bundle Type GEl4-PIOCNAB4~14-14GZ-1~-150-T-2701 (GEf4C) MAPLHGR Single Loop Operation (SLO) Reduction Factor Operating Limit Minimum Critical Power Ratio Linear Heat Generation Rate Limits LHGR Single Loop Operation (SLO) Reduction Factor Rod Block Monitor Setpoints Reactor Coolant System Recirculation Flow Upscale Trip Turbine Bypass System Response Time ~in~~um Required Bypass Valves To Maintain System Operability OPRM PBDA Trip Setpoints Page 3 Page 9 9 10 10 *1 11 12 I2 14 1s 18 1 23 23 24 24 25 Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 4 f Page Figure 5- 1 Figure 5-2 Figure 5-3 Figure 6- 1 Figure 6-2 Figure 6-3 Figure 6-4 Power Dependent: ,tlCPR Limit Adjustments and ~u~t~p~~~r~
Power Dependent MCPR Limit Adjustments and
~ul~~pt~ers - TBVOQS Flow Dependent MCPR Limits MCPR(F) Power Dependent LHGR Muttiplier LHGRFAC(P} Power Dependent LHGR Multiplier LHGRFAC(P) - TBVOOS Flow Dependent LHGR Multiplier LHGRFACF)
Flow Dependent LHGR Muftiplier LHGRFACIF) -SLO CQLR Limerick I, Rev. 4 f Page 5 ARTS DTSP End of Rated (EOR) FFWTR FWHOOS *ESP XCF ESP LHGR LTSP kWFAC(F) MAPFAC(P)
MAPLHGR MCPR MCPR(P) MCPR(F) MELLLA OPRM PBDA RCF RPTOOS SLMCPR SLO TBVOOS APRM and EU3M Technical Specification Analysis Rod Biuck Monitor Downscale trip setpoint The cycle exposure at which reactor power is equal to 3458 MWth with recirculation system flow equal to 100%, all control rods fully withdrawn, all feedwater heating in service and equilibrium Xenon. Final Feedwater Temperature Reduction Feedwater Heaters Out of Service Rod Block Monitor High trip setpoint Increased Core Ffow Rod Btock Monitor htermediate trip setpoint Linear Heat Generation Rate Rod Biock Monitor Low trip setpoint ARTS MAPLHGR thermal limit flow dependent adjustments and multipliers ARTS MAPLHGR them1 hit power dependent adjustments and multipliers Maximum Average Planar Linear Heat Generation Rate hilinirnum Critical Power Ratio ARTS MCPR thermal limit power dependent adj~s~men~~
and niuitipliers ARTS MCPR thermal limit flow dependent adjustments and multipliers Maximum Extended Load Line Limit Analysis Oscillation Period Range Monitor Period Based Detection Algorithm Rated Core Flow Recirculation Pump Trip Out of Service Safety Limit Minimum Criticat Power Ratio Singie Loop Operation Turbine Bypass Valves Out of Service Limerick Unit 1 Cycle 11 COLR 2.0 RiBERENCES COLR Limerick 1, Rev. 4 Page 6 1 I. 2. 3. 4. 5. 6. 7. 8. 9. 'Technical S~cif~ca~~~ns and Bases for Limerick genera tin^
Station Unit I", Docket No.20-352, License No. NPF-39. ~'SuppIern~~~I Reioad Licensing Report for Limerick Generating Station Unit 1. Reload 10 Cycle 1 l", Global Nuclear Fuel Document No. oo00-0018-24 I 0-SRLR, Revision 0, January 2004. "Lattice Dependent MAPLHGR Report for Limerick Generating Station Wnit 1 Reload 10 Cycle It". Global Nuclear Fuet Document No. ~-0018-~410-~~LHGR, Revision 0, February 2004. ""Lattice Dependent MAPLHGR Report for Limerick Generating Station Unit 1 Reload 9 Cycle lo", Global Nuclear Fuel Document No. Jll-O3984WL, Revision 0, January 2002. "GEI4 Fuel Design CycIe-Independent Analyses for Limerick Generating Station Units 1 and 2", GE-NE- L 12-00885-00-0 IP, March 200 1. "OPL-3 Transient Protection Parameters Verification for Reload Licensing Analyses for Limerick I Reload 10 Cycle I I", Resoived as documented in DRF 201 1 1 (Ll CI 1 Reload Licensing DRF). "Limerick Generating Station Units f and 2 ECCS-LOCA Evaluation for CE14", CE Nuclear Energy Document No. CE-Nl?-J11-03793-09-0tP, February 2001. "ARTS Flow-Dependent Limits with TBVOOS for Peach Bottom Atomic Power Station and Limerick Generating Station", GEhJ Document NEDC-32847P, June 1998. General Electric Standard Application for Reactor Fuel'*, *%DE-24011
$-A- 14, June 2ooO and US. Supplement NEDE-240 1 1-P-A- 14-US, June 2000. 10. "Power Range Neutron Monitoring System Setpoint Calculations Limerick Generating Station, Units I &2 Mod. No. wO224", LE-0107, Rev.
0, March 2W. 1 1. "Fuel Bundfe Information Report for Limerick Generating Station Unit 1 Reload 19 Cycle 1 l", CIobai Nucfear Fuel Document No. 0000-00f 5-2410-R3IR, January 2004. 12, defeted 13. "Limerick 1 and 2 Off-Rated Anaiyses Below the PLU Power Level'", GE Nuclear Document No. GE- ~-~~37~3253-R0.
March 2005 14. "Limerick 1 Cycfe 11 Option III Stability Analysis", GE Nuclear Energy Document Xo. GENE-0000-0033-0728-R0, March 2005. t Limerick Unit 1 Cycle fl CULR CQLR Limerick 1, Rev. 4 Page 7 I 3.0 GENERAL ~~FO~~ATI~~
This report provides the f~lIowin~
cycfe- cifie parametcr limits for Limerick Generating Station Unit i Cycle 1 f : 0 0 0 0 0 e 0 0 0 Maximum Average Planar Linear Heat Generation Rate (WLHGR) Minimum Critical Power Ratio (MCPR) Singfe Loop Operation (SLO)
MCPR adjustment ARTS MCPR thermal limit adjustments and multipliers
{MCPR(P) or MCPR(F)) ARTS LHGR thermal limit multipfiers
~~~~~FA~~P) or ~-~~~~F~~(~))
Rod Black Monitor (mM) setpoints MAPLWGR single loop operation reduction factor L*1CK cingie ioop opcmiott ~~~~~~~~~~~
fmor Linear Heat Generation Rate (LHGR) Turbine Bypass Valve parameters Reactor Coolant System Recirculation Flow Upscale Trips OPRM. Period Based Detection Algorithm (P3DA) trip setpoints These values have been determined using MC-approved methodoiogy (Reference 9), and are established such that all applicable Iimits of the plant safety analysis are met. This report is prepared in accordance with TechnicaI Specification 6.9.1.9 of Reference
- 1. Preparation of this report was performed in accordance wirh Exelon Nuclear, Nuclear Fuel Management T&J?%f NF-AB-I 20- 3crcxf. I The data presented in this report is valid for all licensed operating domains on the operating map, including:
0 Maximum Extended Load Line Limit down to 81% of rated core flow during full power operation Increased Core Flow (ICE) up to 1 f 0% of rated core flow Final Feedwater Temperature Reduction (FFWTR) up to 105OF during cycle extension operation Feedwater Heater Out of Service (FWHOOS) up to 60°F feedwater temperature reduction at any time during the cycle prior to cycle extension.
Further information on the cycle specific analyses for Limerick 1 Cycle 11 and the associated operating domains discussed above is available in Reference
- 2.
Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 1 Page 8 4.Q MAPLZIGR LIMITS HCR limits provided in Tables 4-1 ~rou~h 4-8 are referenced in Technical
~~cifications 3.2.1, The limiting WLHGR value for the most limiting lanice (excluding natural uranium) of each fuel type as a function of average planar exposure is given in Tables 4- I through 4-7 (References 3 and 4). Tables 4- 1 through 4-7 lire used when hand calculations are required as specified in Technical Specification 3.2.1. For single loop operation, a reduction factor is used which is shown in Table 4-5 (Reference 2).
Limerick Knit 1 Cycle 11 COLR Avg. Plan Avg. Plan Avg. Plan Tabie 4-1 Exposure I t COLR Limerick 1, Rev. 4 Page 9 MAPLHGR Exposure MAPLHGR Exposure ~1A~L~GR I MAPLHGR Versus Average Planar Exposure Bundle Type GE13-~TB417-1362-100T-f46-T (GE13) (Reference
- 4) 0.0 I ! I 1 1 1 1 10.4% 7 .0 1 1.53 25 .o 12.01 0.2 10.54 8.0 f 1.69 30.0 11s9 , 1 I I 1 4.0 f 11.08 I 15.0 1 12.45 I S0.0 1 8.9'7 1 1 .o 10.65 9.0 1 I .85 35.0 10.96 Table 4-2 2.0 10.79 10.0 i 2.02 1 40.0 10.32 3 .O 10.93 12.5 12.26 45.0 9.66 MAPLHGR Versus Average Planar Exposure Bundle Type GEf3-P9CTB417-11G2-100T-lLt6-T fGE13) (Reference
- 4) t - I I I I ! 1 1.0 1 10.93 1 9.0 1 12.06 1 35.0 1 10.96 I 5 '0 11.22 17.5 12.44 55.0 7.43 6.0 11.37 20.0 12.32 I 58.03 6.29 2.0 11.05 12.21 a.0 10.33 i 4.0 11.31 15.0 f 2.55 50.0 I 8.98 I f I 3 .0 1 11.17 f 2.5 I 12.43 45 .0 9.67 5.0 11.45 17.5 f 2.47 55.0 7.49 j 6.0 I 11.59 20.0 12.32 58.2 6.29 Limerick Unit 1 Cycfe 11 COLR 4.0 Table 4-3 10.34 15.0 11.04 50.0 7.87 COLR Limerick 1, Rev. 4 Page 10 1 5.0 10.49 17.0 10.95 55.0 5.89 Table 4-4 t I ,WLI-XGR Versus Average Planar Exposure Bundle Type GE14-P1OCNAB417-13GZ-10OT-150-T-2528 (GEL4C) (Reference
- 4) Avg. Pian Avg. Plan Avg. Plan Exposure MAPLHGR Exposure MAPLHGR Exposure (GWd/ST) (kW/ft) (GWdlST) (kW/ft) (CWdlST) 0.0 10.17 7.0 10.92 25.0 0.2 10.22 8.0 f 1.02 30.0 1 .o I 0.26 9.0 1 f.09 35.0 2.0 10.32 10.0 fl.t.5 40.0 1 3.0 1 10.42 1 12.0 1 11.25 f 45.0 4.0 I0.53 150 I 1.09 50.0 I I I I 5.0 1 10.66 1 17.0 1 20.98 SS.0 10.8 1 20.0 10.78 57.12 [ 6.0 MAPLHGR 10.34 Limerick Unit 1 Cyde 1I COLR Avg. Ptan Exposure Table 4-5 Avg. PIan I Avg. Plan hiIAPLHCR Exposure MAPLHGR Exposure NIAPLHGR COLR Limerick 1, Rev. 4 Page 11 I (GWdlST) 1 (kW/ft) 0.0 I0.00 0.2 10.0 1 ~~L~~~ Versus Average Planar Exposure Bundk Type CJE14-P10CN~417-7G8.0/8G7.0-80~~5R-150-T-2531 (GE14C) (Reference
- 4) {GWdlST) fkW/ft) (GWd/ST) (kW/ft} 8.0 10.91 '0.0 10.76 9.0 10.99 2s .0 10.34 i M;@LHGR Versus Average Planar Exposure Bundie Type ~~14-P10CNAB417-15GZ-1QOT-fSO-T-2592 (GE14G) (Reference
- 3) 1 .0 r i I I I I 1 i 0.03 10.0 11.07 i 30.0 9.87 7.0 5.0 I 10.49 i 14.0 50.0 7.87 1 10.81 I 17.0 10.95 57.06 4.86 ' i 6.0 1 10.64 1 15.0 I 11.04 1 55.0 I 5.89 1 Limerick Unit 1 Cycle 11 COLR Table 4-7 COLR Limerick 1, Rev. 4 Page 12 I iMAPLWGR Versus Average Planar Exposure Bundle Type ~~14-~1U~~41~-
14~~-1~~-15~-~-2701 (GE14C) (Reference
- 3) I I 2.0 10.24 11.0 1 I25 35.0 9.24 3.0 10.35 12.0 11.28 40.0 8.72 4.0 10.47 13.0 11.21 45 .o 8.24 5.0 10.61 14.0 11.14 50.0 7.76 i I t I I I 6.0 10.73 15.0 I 1 .ox 55.0 5.86 7.0 10.86 17.0 10.96 57.02 4.85 Table 4-8 WLHGR Single Loop Operation (SLO) Reduction Factor (Reference
- 2)
Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 f Page 13 The MCPR values provided in Table 5-1 are referenced in Technical Specification 3.2.3. Table 5-t is derived from the Reference 2 analyses and is valid for at! Cycle i 1 fuel types and operating domains. Table 5-1 includes treatment of these MCPR limits for SLO. Bounding MCPR values are also provided for inoperable Recirculation Pump Trip or inoperable Steam Bypass System. These two options represent the Equipment Out of Service conditions.
The cycle exposure, which represents EOR, is given in the latest verified and approved Cycle Management Report or associated Engineering Change Request.
ARTS provides for power- and flow-dependent thermal limit adjustments and muftipliers, which allow fox a more reliable administration of the MCPR thermal limit. The tlow-dependent adjustment MCPR(F) is sufficiently generic to apply to ail fuel types and operating domains (References 2 and 8). In addition, there are also two sets of pow~r-de~~dei~t MCPR multipliers for use with the Turbine Bypass Valves in service and TBVOOS conditions (Reference 13). Section 8.0 contains the conditions for Turbine Bypass Valve Operability. These adjustments and muhipliers are shown in Figures 5-1 through 5-3 and are referred to by Technical Specification 3.2.3. The MCPR(P) curves are independent of recirculation pump trip operability (Reference 13).
Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 14 I Operating Limit ~ni~~m Critical Power Ratio (OLninCPR) (References 2 and 5) EOR- 2000 TBV In Service and RPT In Service 1.33 I 1.36 1.38 1 1.41 TBV out of Service (TBVCtoS) 1.38 I 1.41 t .43 I .46 I .4P f .43'3 1.4 1.47 I. When Tau does not equal 0 or 1, determine OLLVCPR via linear interpolation.
RPT Out of Service (RPTOOS) 2. OLMCPR limit set by the Single Loop Operation Recirculation Pump Seizure Analysis (Reference 2.) 3. This tabie is vatid for all Cycle I 1 fuel types.
Limerick Unit 1 Cycle I1 COLR FIGURE 5-1 COLR Limerick 1, Rev. 4 Page 15 I 4.0 3.8 3.6 3.4 @ 3.2 3 2 3 2 3.0 - 2 2.8 ?
- 2.1 I. 2.2 3 a u 2.6 1 M 3 2.0 $ 1.8 2 1.6 1.4 1.2 1.0 Power Dependent MCPR Limit Adjustments And Multipliers This Figure Is Valid For At1 Operating Domains except TBVOOS (References 2 and 13) 2.67 2.45 - c 60% Flow : 1.481 1.3 0 20 40 60 Power(% Rated) 80 100 L,imerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 16 I Power Dependent MCPR Limit Adjustments And Multipliers - TBVOOS This Figure 1s Valid For The TBVOOS Operating Domain (References 2 and 13) 5.0 4.6 4.2 g 3.8 9 0 2 E3-4 9 ? 3.0 $ 6 42 E 3 2.2 & 2.6 J - 1.8 1.4 1.0 - < 60% .- ,. >\ :
- 2.64 .. 0 20 40 60 mwer (% Rated) 80 iao Limerick Unit 1 Cycle If COLR FIGURE 5-3 COLK Limerick 1, Rev. 4 Page 17 1 Flow Dependent iLICPR Limits MCPR(F) This Figure Is Valid For All Operating Domains (References 2 and 8) 2.00 1.90 1.80 2-70 n 1.60 a. 0 z 1.50 ti 1.40 1.30 2.20 1.10 MCPR(F) = The Maximum of EI-FWER 1.25 OR { -0.5784 x (wT/lW) + 1.7073) JvT = 76 Rated Core Flow 30 40 50 60 70 80 90 100 1x0 Core Flow ("a Rated)
Limerick Unit 1 Cycle tl COLR FUEL TYPE GE13 COLR Limerick 1, Rev. 4 I Page *8 MAXIkfVM VALUE 14.4 kW/ft The ma~imum LHGR value for each fuel type for use in Technical Specification 3.2.4 is given in Table 6-1 below. The LHGR is an exposure dependent vatue. Due to the proprietary nature of these values only the maximum LHGR for each fuef type is listed in Table 6- t . GEI4 ARTS provides for power- and flow"dep~~ident thermal limit multipliers, which allow for a more reliable ad~inis~ration of the LHGR thermal limits. There are two sets of flow-dependent LGHR multipliers for duaf-loop and single-loop operation (References 2,s and 8). In addition, there are also two sets of power- dependent LHGR multipliers for use with the Turbine Bypass Valves in service and TBVOOS conditions (Reference 13). Section 8.0 contains the conditions for Turbine Bypass Valve Operability.
The LHGR mu~~ipl~ers are shown in Figures 6-1 through 63 and are referred to by Technical Specification 3.2.4. Thermal limit monitoring must be performed with the more limiting LHGR limit resulting from the power- and flow-biased calculation. The LHGRFAQP) curves are independent of recirculation pump trip operabitity (Reference 13). For single loop operation, a reduction factor is used which is shown in Table 6-2 (Reference 2). 13.4 kW/ft TABLE 6-1 Linear Heat Generation Rate Limits (Reference
- 11) SLO reduction factor 0.79 Table 6-2 LHGR Single Loop Operation (SLO) Reduction Factor (Reference
- 2)
Limerick Unit 1 Cycle 11 COLR 1.0 a.8 & 8 c !i 55 0.4 Y u .E 2 0.6 L;z g ; E 2 0.2 0.0 This Figure Is Valid For the All Operating Domains except TBVOOS) (Reference
- 13) at I, t. *I LHGR(P) = LHGRFACIP)
- LHGRstd FOR P c 25% . NO THERMAL LIMIT MOPU'ITORING REQU ERED NO ttMITS SPECIRED FOR 25% S; P < 30%: LNCRFAC(P)=
0.490 i 0.0010(P-30)
For i 60% Row LNGRFACfP)
= 0 473 i 0 007% P-30) For > 60% Now FOR 30% s P . LHGRFAC(P)
= 1 .0 i 0.005224(P-100) 60 60 100 Potrr?r(%
Rated)
Limerick Unit 1 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 20 FIGURE 6-2 Power Dependent LHGR ~~u~~i~li~r LHG This Figure Is Valid For The TBVOOS Operating Domain (Reference
- 13) .. .. '. 0 a0 60 __ ~- ~- LHGRfP) = LHGRFACIR
- LHGRstd FOR P c 25% FjO THERMAL L&lIT \lOrLKORlNG REQLrRED CO LIMITS SPECIRED FOR 25°C 2 P < 30% LHGRF4C(P)
= 0 $90 + 0 00$.1(P-70)
For 5 609 Row LtfGRFAC(P)
= 0 386 i 0 NkX(P-10)
For > 40% Row FOR 30% 5 P < 509 FOR P ? 50% LHCRFAC(PI
= 0 939 + 0 0052?.t(P-100) LHGRFAC(P)
= 1 0 + 0 005224 P- 100) 60 80 100 Power (Or, Rated)
Limerick Unit 3 Cycle 11 COLR COLR Limerick 1, Rev. 4 Page 21 This Figure Is Valid For All Operating Domains (References S and 8) Excluding Single Loop Operation 1.1 1.0 0.9 % 5 0.8 ii 9 3 0.7 9 ti z U 3 0.6 0.5 5.4 LHGR(F) = LHGWAC(F)
= The Minimum of EITHER 1 .O OR f 0.0268 x [WT-70)/1 0+0.9732 1 FOR Two Loop Operation, 5 70% WT LHGRF;AC(F)
= (0.6682 x WT/100)+0.5055 Where WT = % Rated Core Flow 30 45 50 60 70 80 90 100 110 Core Flow ("a Rated)
Limerick Unit 1 Cyck 11 COLR COLR Limerick 1, Rev. 4 Page 22 I This Figure is Valid For Single hp Operation (Refereaces 2 and 8) 30 40 50 60 " ._." .._, ^^ . " ...._,.,.,x.
I LHGR(F)= LHGRFAC(F) LHGRstd FOR Single Loop Operation, LHGRFAC!F!
= The Minimum of EITHER 0.79 OR 0.6682 x ~W~/I~~~.~~SS Where WT = 5% Rated Core Flow 7a 84 90 ioa 110 Core How (% Rated)
Limerick Unit 1 Cycle 11 COLR I 7.0 CONTROL ROD BLOCK SETPOINTS Nominal Trip Setpoint Allowabk Value 1 COLR Limerick I, ~ev. 4 Page 23 1 i LTSP' ESP' Technicaf Specification Limiting Condition for Uperation 3.3.6 requires control rod block in~tr~rn~n~~ion channels shaiil be OPERABLE with their trip setpoints consistent with the values shown in the Trip Setpoint column of Technical Specification Table 3.3.6-2. The Reactor Coolant System Recirculation Flow Upscale Trip is a cycte-specific value and as such is found in Table 7-2 of this COLR. Table 7-2 fists the Nominal Trip Setpoint and Allowable Vatue. These setpoints are set high enough to allow full utifizatton of the enhanced ICF domain up to 1 IO% of rated core flow. Additionatly, the ARTS Rod Block Monitor provides for power-dependent RBM trips. The trip S~t~int~aI~owable vafues and applicable RBM signal filter time constant data are shown in Table 7-1 I These vafues are for use with Technical Specification 3.3.6. 12i.5% 121.5% 116.5% 116.5% TABLE 7-1 Rod Block Ahfanitor Setpoints (References 2 and 10) DTSP' 92.0% 89.0% Nominal Trip Setpoint Allowable Value t I I I Il3.456 115.6% 1. These setpoints (with Rod Block Monitor filter time constant between 0.1 seconds and 0.55 seconds) are based on a cycte-specific rated RWE MCPR hit which is less than or equal to the minimum cycle OL&fCPR (see COIR references 2 and 10). TABLE 7-2 Reactor Coolant System Recirculation Flow Upscale Trip (Reference
- 10) I I 1 Limerick Unit 1 Cycle 11 COLR Reactor Power P 225% COLR Limerick I, Rev. 4 Page 24 I No. of Valves in Service 7 8.0 TtrRBHE BYPASS VALVE ~~R~TERS The operability requirements for the steam bypass system for use in Technical Specifications 3.7.8 and 4.7.8.C are found in Tables 8-1 and 8-2. If these requirements cannot be met, the MCPR, MCPR(P) and MAPFAC(PJ limits for inoperable Steam Bypass System, known as Turbine Bypass Valve Out Of Service, must be used. TABLE 8-1 Turbine Bypass System Response Time (Reference
- 6) Maximum delay time before start of bypass valve opening following generation of the turbine bypass valve Row signal 0.11 sec Maximum time after generation of a turbine bypass valve ffow signal for bypass valve position to reach 80% of fufl Row (includes the above delav time) 0.3f sec Limerick Unit 1 Cycle 11 COLR 9.0 STABILITY PROTECTION SETPQINTS The Limerick 1 Cycle 1 1 Oscillation Poaer Range Monitor (OPRZ.ul)
Period Based Detection A~gori~hm (PBDA} 'Trip Setpoints for the OPRM System for use in Technical Specification 2.2.1 are found in Table 9-t . These vaIues are based on the cycle specific analysis documented in Reference
- 13. Any change to the OLMCPR value andlor ARTS-based power dependent MCPR limits shouid be evaluated for potential impact on the OPRTvf PBDA Trip Setpoints.
TX 9-1 OPRM PBDA Trip Setpoints Corresponding Maximum Confirmation Count Trip Setpoint PBDA Trip Amplitude 10.0 MODES OF OPERATION Limerick Generating Station has been analyzed to operate with a number of operational flexibility features, including increased Core Ftow, Maximum Extended Load Line Limit, Coastdown, EOC Recirculation Pump Trip and Option A/B MCPR Limits. Limerick Generating Station has also been analyzed to operate with a number of equipment out-of-service conditions, inctuding Turbine Bypass Valves 00% Single Loop Operation, Feedwater Heating OOS, Final Feedwater Temperature Reduction and Safety/Relief Valves 00s (up to 2 of 14 safetyhelief valves 00s). Operation is allowed in any combination of these operational flexibility features and equipment out-of-service conditions, with one EXCEPTION, which is that Limerick may NOT aperate with EOC-Recirculation Pump Trip out-of-service in conjunction with Turbine Bypass Valves 00s.