Line 27: |
Line 27: |
| : 3. Duke Energy Letter, First Six-month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), Dated August 26, 2013, (Accession No. ML13242A009) | | : 3. Duke Energy Letter, First Six-month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), Dated August 26, 2013, (Accession No. ML13242A009) |
| : 4. NRC Letter to Oconee Nuclear Station, Interim Staff Evaluation And Request For Additional Information-Oconee Nuclear Station, Units 1, 2 And 3 Regarding Overall Integrated Plan For Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | | : 4. NRC Letter to Oconee Nuclear Station, Interim Staff Evaluation And Request For Additional Information-Oconee Nuclear Station, Units 1, 2 And 3 Regarding Overall Integrated Plan For Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
| Dated November 1, 2013 (Accession No. ML1 3298A696)Ladies and Gentlemen, On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051 (Reference | | Dated November 1, 2013 (Accession No. ML1 3298A696)Ladies and Gentlemen, On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051 (Reference |
| : 1) to Duke Energy which was immediately effective and directed Duke Energy to develop a reliable indication of water level in associated spent fuel storage pools. The Order required that, following NRC's issuance of its final Interim Staff Guidance (ISG), Duke Energy would submit an Overall Integrated Plan (OIP), followed by a status report at six-month intervals following the OIP submittal. | | : 1) to Duke Energy which was immediately effective and directed Duke Energy to develop a reliable indication of water level in associated spent fuel storage pools. The Order required that, following NRC's issuance of its final Interim Staff Guidance (ISG), Duke Energy would submit an Overall Integrated Plan (OIP), followed by a status report at six-month intervals following the OIP submittal. |
| Duke Energy has thus far submitted the OIP (Reference | | Duke Energy has thus far submitted the OIP (Reference |
| : 2) and the first six-month update (Reference | | : 2) and the first six-month update (Reference |
| : 3) for Oconee Nuclear Station. By letter dated November 1, 2013 (Reference 4), | | : 3) for Oconee Nuclear Station. By letter dated November 1, 2013 (Reference 4), |
| United States Nuclear Regulatory Commission ONS Second Six-Month Status Report (Order EA-12-051) | | United States Nuclear Regulatory Commission ONS Second Six-Month Status Report (Order EA-12-051) |
Letter Sequence Other |
---|
|
Results
Other: ML13086A095, ML13246A009, ML14028A512, ML15160A664, ONS-2014-028, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), ONS-2014-117, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051), ONS-2015-022, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), ONS-2015-023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
|
MONTHYEARML13086A0952013-02-28028 February 2013 Overall Integrated Plans in Response to 03/12/2012, Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) Project stage: Other ML13171A3012013-06-21021 June 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI ML13207A4132013-07-19019 July 2013 Response to Requests for Additional Information Concerning Overall Integrated Plan with Regard to Requirements for Spent Fuel Pool Instrumentation Project stage: Response to RAI ML13246A0092013-08-29029 August 2013 First Six-Month Status Report in Response to Letter Dated March 12, 2012 Project stage: Other ML13298A6962013-11-0101 November 2013 Interim Staff Evaluation and Request for Additional Information - Oconee Nuclear Station, Units 1, 2, and 3 Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: RAI ML14028A5122014-02-0404 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Oconee Nuclear Station, Units 1, 2, and 3, TAC Nos.: MF0782, MF0783, and MF0784 Project stage: Other ML13365A2582014-02-10010 February 2014 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) Project stage: Acceptance Review ONS-2014-028, Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2014-02-28028 February 2014 Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ONS-2014-117, Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051)2014-08-27027 August 2014 Third Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) Project stage: Other ONS-2015-022, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) Project stage: Other ONS-2015-023, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)2015-02-27027 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) Project stage: Other ML15160A6642015-06-10010 June 2015 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML15259A3872015-10-0606 October 2015 Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Acceptance Review 2014-02-10
[Table View] |
|
---|
Category:Letter type:ONS
MONTHYEARONS-2018-025, 2017 Annual Radiological Environmental Operating Report (AREOR)2018-05-15015 May 2018 2017 Annual Radiological Environmental Operating Report (AREOR) ONS-2018-024, 2017 Annual Radioactive Effluent Release Report (ARERR)2018-04-30030 April 2018 2017 Annual Radioactive Effluent Release Report (ARERR) ONS-2018-032, Ufsar/Selected Licensee Commitment Changes2018-04-17017 April 2018 Ufsar/Selected Licensee Commitment Changes ONS-2018-029, Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 32018-04-0404 April 2018 Technical Specifications Task Force (TSTF) - 448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 3 ONS-2018-027, Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-0022018-03-28028 March 2018 Oconee, Units 1, 2, and 3, Submittal of Emergency Plan Revision 2018-002 ONS-2018-023, Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency2018-03-20020 March 2018 Response to Nrc'S Request for Additional Information Regarding Relief Request 17-ON-001; Alternative to Extend the Code Case N-770, Inspection Item B, Examination Frequency ONS-2018-017, Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan2018-03-15015 March 2018 Oconee, Units 1, 2, and 3, Submittal of Revised Evaluation to Emergency Plan ONS-2018-021, ISFSI - Submittal of 2017 Annual Effluent Release Report2018-03-0101 March 2018 ISFSI - Submittal of 2017 Annual Effluent Release Report ONS-2018-020, Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2018-02-26026 February 2018 Refuel 28 (O2R28) In-service Inspection (ISI) and Steam Generator In-service Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2018-013, Technical Specification Bases Changes2018-02-22022 February 2018 Technical Specification Bases Changes ONS-2018-015, Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cabl2018-02-19019 February 2018 Duke Energy Response to Request for Additional Information; Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2) Associated with Bronze Tape Wrapped Emergency Power Cables i ONS-2018-014, License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-012018-02-12012 February 2018 License Amendment Request (LAR) for Changes to the Duke Energy Physical Security Plan - License Amendment Request No. 2018-01 ONS-2018-019, Submittal of Emergency Plan, Section B2018-02-0505 February 2018 Submittal of Emergency Plan, Section B ONS-2018-011, Ufsar/Selected Licensee Commitment Changes2018-01-25025 January 2018 Ufsar/Selected Licensee Commitment Changes ONS-2017-087, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ...2017-12-0404 December 2017 Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from ... ONS-2017-083, Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 02017-11-21021 November 2017 Core Operating Limits Report (COLR) for Cycle 29 ONEl-0400-491, Revision 0 ONS-2017-041, Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments2017-11-15015 November 2017 Revision to Tornado/Helb Mitigation Strategies and Regulatory Commitments ONS-2017-085, Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR)2017-11-15015 November 2017 Duke Energy Comments on the October 24, 2017, Public Meeting with NRC Committee to Review Generic Requirements (CRGR) ONS-2017-079, Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-11-13013 November 2017 Supplemental Information to Support NRC Review of Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-078, Emergency Plan Revision 2017-0042017-11-0909 November 2017 Emergency Plan Revision 2017-004 ONS-2017-074, Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-032017-10-20020 October 2017 Proposed Amendment to the Renewed Facility Operating Licenses Regarding Revisions to the Updated Final Safety Analysis Report Section Associated with Tile Standby Shutdown Facility License Amendment Request No. 2017-03 ONS-2017-067, Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 22017-10-16016 October 2017 Response to Request for Additional Information Regarding License Amendment Request for TSTF-448, Revision 3, Control Room Habitability, License Amendment Request No. 2015-03, Supplement 2 ONS-2017-069, (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement2017-10-13013 October 2017 (ONS) - Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement ONS-2017-070, Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0022017-10-0505 October 2017 Transmittal of Oconee, Units 1, 2, and 3, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-002 ONS-2017-072, Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency2017-10-0303 October 2017 Fifth Ten Year Lnservice Inspection Interval, Relief Request No. 17-0N-001; Alternative to Extend the Code Case N-770, Inspection Item B Examination Frequency ONS-2017-066, Registration for Use of General License Spent Fuel Cask Numbers 147 and 1482017-09-20020 September 2017 Registration for Use of General License Spent Fuel Cask Numbers 147 and 148 ONS-2017-061, Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations2017-08-10010 August 2017 Revised Response to NRC Regulatory Issue Summary 2017-03, Preparation and Scheduling of Operator License Examinations ONS-2017-060, Registration for Use of General License Spent Fuel Cask Numbers 145 and 1462017-08-0303 August 2017 Registration for Use of General License Spent Fuel Cask Numbers 145 and 146 ONS-2017-059, Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary2017-07-31031 July 2017 Transmittal of Response to March 12, 2012 Request for Information, Recommendation 2.1 Flooding, Required Response 3, Flooding Focused Evaluation Summary ONS-2017-050, Technical Specification Bases Change 2017-042017-07-21021 July 2017 Technical Specification Bases Change 2017-04 ONS-2017-052, Technical Specification Bases Change 2017-032017-07-20020 July 2017 Technical Specification Bases Change 2017-03 ONS-2017-043, Technical Specification Bases Change 2017-012017-07-20020 July 2017 Technical Specification Bases Change 2017-01 ONS-2017-047, Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 1442017-06-27027 June 2017 Registration for Use of General License Spent Fuel Cask Numbers 142, 143, and 144 ONS-2017-042, Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 22017-06-0101 June 2017 Additional Information Regarding License Amendment Request for Temporary Completion Time for One Keowee Hydro Unit Inoperable for Generator Stator Replacement, License Amendment Request No. 2015-08, Supplement 2 ONS-2017-040, Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0032017-05-22022 May 2017 Transmittal of Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-003 ONS-2017-037, 2016 Annual Radiological Environmental Operating Report2017-05-15015 May 2017 2016 Annual Radiological Environmental Operating Report ONS-2017-026, Submittal of Ufsar/Selected Licensee Commitment Change2017-04-11011 April 2017 Submittal of Ufsar/Selected Licensee Commitment Change ONS-2017-024, Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program2017-03-16016 March 2017 Revision 028 to ERTG-001, Emergency Response Organization and Emergency Services Training Program ONS-2017-001, Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 0452017-03-0202 March 2017 Submittal of Emergency Plan Program Procedure HP/O/B/1009/001 Rev 045 ONS-2017-017, Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 1, Revision 2017-001 ONS-2017-018, Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-0012017-03-0202 March 2017 Emergency Plan Implementing Procedures Manual Volume 2, Revision 2017-001 ONS-2017-015, End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval2017-02-24024 February 2017 End of Cycle 29 (1 EOC29) Refueling Outage Lnservice Inspection (ISI) and Steam Generator Lnservice Inspection (SG-ISI) Report, Fifth 10-Year ISI Interval ONS-2017-019, Technical Specification Bases Change 2015-092017-02-23023 February 2017 Technical Specification Bases Change 2015-09 ONS-2017-011, Emergency Plan Revised Evaluation2017-02-0202 February 2017 Emergency Plan Revised Evaluation ONS-2017-009, Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events.2017-02-0101 February 2017 Units 1, 2 & 3 - Notification of Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events. ONS-2017-004, Submittal of Core Operating Limits Report2017-01-12012 January 2017 Submittal of Core Operating Limits Report ONS-2017-006, Emergency Plan Revision 2016-0032017-01-12012 January 2017 Emergency Plan Revision 2016-003 ONS-2016-097, Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S)2016-11-17017 November 2016 Emergency Plan/Emergency Plan Implementing Procedures Manual, Revised 10CFR 50.54(q) Evaluation(S) ONS-2016-098, Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors2016-11-14014 November 2016 Special Report Per Technical Specification 5.6.6, Inoperability of Post Accident Monitoring Containment High Range Radiation Monitors ONS-2016-096, Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations2016-11-10010 November 2016 Revised Response to NRC Regulatory Issue Summary 2015-05, Preparation and Scheduling of Operator Licensing Examinations 2018-05-15
[Table view] |
Text
Scott L. Batson DUKE Vice President ENERGY. Oconee Nuclear Station Duke Energy ONO1VP 1 7800 Rochester Hwy Seneca, SC 29672 ONS-2014-028 o: 864.873.3274 f 864.873. 4208 Scott.Batson@duke-energy.com February 28, 2014 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Duke Energy Carolina, LLC (Duke Energy)Oconee Nuclear Station, Units 1, 2 and 3 Docket Numbers 50-269, 50-270, 50-287 Renewed License Numbers DPR-38, DPR-47, and DPR-55
Subject:
Second Six-Month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
References:
- 1. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012, (Accession No. ML1 2054A679)2. Duke Energy Letter, Overall Integrated Plans in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated February 28, 2013, (Accession No. ML13086A095)
- 3. Duke Energy Letter, First Six-month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), Dated August 26, 2013, (Accession No. ML13242A009)
- 4. NRC Letter to Oconee Nuclear Station, Interim Staff Evaluation And Request For Additional Information-Oconee Nuclear Station, Units 1, 2 And 3 Regarding Overall Integrated Plan For Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
Dated November 1, 2013 (Accession No. ML1 3298A696)Ladies and Gentlemen, On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051 (Reference
- 1) to Duke Energy which was immediately effective and directed Duke Energy to develop a reliable indication of water level in associated spent fuel storage pools. The Order required that, following NRC's issuance of its final Interim Staff Guidance (ISG), Duke Energy would submit an Overall Integrated Plan (OIP), followed by a status report at six-month intervals following the OIP submittal.
Duke Energy has thus far submitted the OIP (Reference
- 2) and the first six-month update (Reference
- 3) for Oconee Nuclear Station. By letter dated November 1, 2013 (Reference 4),
United States Nuclear Regulatory Commission ONS Second Six-Month Status Report (Order EA-12-051)
February 28, 2014 Page 2 the NRC staff provided an Interim Staff Evaluation (ISE) of the OIP. The ISE also contained a Request for Additional Information (RAI) which requested that RAI responses be included in upcoming six-month status reports as answers become available, such that all responses are provided by March 31, 2015.The purpose of this letter is to provide the second six-month status report. The enclosure provides updates related to OIP changes, if any, for the six-month period following the first six-month reporting period. The information needed to address the RAI has not been finalized as of the submittal of this letter, and thus no RAI responses are included in this report.This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments.
Should you have any questions regarding this submittal, please contact David Haile with Oconee Regulatory Affairs, at (864) 873-4742.I declare under penalty of perjury that the foregoing is true and correct. Executed on February 28, 2014.Sincerely, Scott L. Batson Vice President Oconee Nuclear Station
Enclosure:
- 1. Oconee Nuclear Station Second Six Month Status Report for Order EA-12-051 (SFPI), Units 1, 2, and 3
'United States Nuclear Regulatory Commission ONS Second Six-Month Status Report (Order EA-12-051)
February 28, 2014 Page 3 cc: Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission
-Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 Mr. Eric Leeds, Director, Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission One White Flint North, Mailstop 13-H16M 11555 Rockville Pike Rockville, MD 20852-2738 Mr. Richard Guzman, Project Manager (ONS)(by electronic mail only)U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop O-8C2 Rockville, MD 20852 Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station ENCLOSURE[3 pages]Oconee Nuclear Station (ONS)Second Six Month Status Report for Order EA-12-051 (SFPI), Units 1, 2, and 3 Encl. Page -1 ENCLOSURE:
ONS SECOND SIX-MONTH STATUS REPORT: ORDER EA-12-051 (SFPI)(Note: The references for this Enclosure are listed in Section 8)Introduction On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Order EA-12-051 (Reference El) to Duke Energy and directs them to develop a reliable indication of water level in associated spent fuel storage pools. The Order required each plant to issue an Overall Integrated Plan (OIP) pursuant to the NRC's Interim Staff Guidance (ISG)(Reference E2) which endorsed, with clarifications and exceptions, the industry guidance document, NEI 12-02 (Reference E3). The Order also required that update reports on progress or change to the OIP be submitted every six months.Oconee Nuclear Station (ONS) developed an Overall Integrated Plan (OIP) (Reference E4), describing how compliance with the requirements in the Order would be achieved.
The OIP was submitted to the NRC on February 28, 2013, followed by the first six-month update (Reference E5) on August 26, 2013. The OIP and six-month status reports follow the guidance of NEI 12-02 (Reference E3) as endorsed by the NRC's Interim Staff Guidance JLD-ISG-2012-03 (Reference E2).This report constitutes the second six-month update of milestones, changes to the compliance method or schedule, or any need for relief/relaxation, and the basis, which occurred during the period from July 31, 2013, to January 28, 2014 (hereafter referred to as"the update period").The NRC provided an Interim Staff Evaluation (ISE) of the OIP to ONS (Reference E7)which also included a Request for Additional Information (RAI) comprised of questions from a previous RAI dated June 21,2013 (Reference E6) and several new questions.
The ISE requested that RAI responses be included in upcoming six-month status reports as answers become available, such that all responses are provided by March 31, 2015. Detailed design is underway for the SFP level channels, however no information needed to address the RAIs has been finalized as of the submittal of this letter, and thus no RAI responses are included in this report.2 Milestone Accomplishments (during the update period)The following milestones were completed during the update period: No milestones were completed during the update period.3 Schedule Status There are no changes to the schedule as reported in the OIP (Reference E4).4 Changes to Compliance Method No changes were made during the update period.5 Need for Relief/Relaxation and Basis for the Relief/Relaxation ONS expects to comply with the order implementation date and no relief/relaxation is required at this time.Encl. Page -2 ENCLOSURE:
ONS SECOND SIX-MONTH STATUS REPORT: ORDER EA-12-051 (SFPI)(Note: The references for this Enclosure are listed in Section 8)6 Open Items from Overall Integrated Plan and Interim Staff Evaluation There are no open items documented in the OIP or in the Interim Staff Evaluation (ISE).This six-month status report contains no RAI responses.
7 Potential Interim Staff Evaluation Impacts No potential impacts to the ISE have been identified.
8 References The following references support the updates to the Overall Integrated Plan described in this enclosure.
El. NRC Order Number EA-1 2-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation, dated March 12, 2012, (Accession No. ML120554A679)
E2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0, dated August 29, 2012, (Accession No. ML12221A339)
E3. NEI 12-02, Revision 1, Industry Guidance for Compliance with NRC Order EA-12-051, "To modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation,", dated August 2012, (Accession No. ML1 2240A307)E4. Duke Energy Letter, Overall Integrated Plans in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-05 1), dated February 28, 2013, (Accession No. ML13086A095).
E5. Duke Energy Letter, First Six-month Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated August 26, 2013 (Accession No.ML13242A009).
E6. NRC Letter to Oconee Nuclear Station, Request For Additional Information Regarding Overall Integrated Plan For Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), Dated June 21, 2013 (Accession No. ML13171A301)
E7. NRC letter, Oconee Nuclear Station, Units 1, 2, and 3 -Interim Staff Evaluation and Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051), dated November 1, 2013, (Accession Number ML13298A696)
Encl. Page -3