ML18192C070: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 2: | Line 2: | ||
| number = ML18192C070 | | number = ML18192C070 | ||
| issue date = 07/21/1975 | | issue date = 07/21/1975 | ||
| title = | | title = Figure 13.2-1, Amendment 9 Staff and Training Program. Sheet 1 of 2 | ||
| author name = | | author name = | ||
| author affiliation = Arizona Nuclear Power Project | | author affiliation = Arizona Nuclear Power Project |
Revision as of 20:27, 26 January 2019
ML18192C070 | |
Person / Time | |
---|---|
Site: | Palo Verde |
Issue date: | 07/21/1975 |
From: | Arizona Nuclear Power Project |
To: | Office of Nuclear Reactor Regulation |
References | |
13.2-1 | |
Download: ML18192C070 (1) | |
Text
YEAR 6 YEAR 5 YEAR 4 YEAR 3 YEAR 2 YEAR 1 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 727170606867666564636261605958575655545352515049484746454443424140393837 363534333231302928272625242322212019181716151413121110 9 8 7 6 5 4 3 2 1 1 2 3 4 5 6 7 8 91011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556 PLANT MANAGER NUMBER OF PERSONNEL IN CL 55 F C TIDNS FOR INITIAL STAFF AND UN T STARTUP CONSTRUCTION PERMIT I PERSONNEL CQUISITION 2 DESIGN FOLLOIN 3 NUCLEAR PLANT OBSERVATION NUCLEAR I PLANT OBSER VATION NUCLEAR FUND 8 THEORY 2.DESIGN IL CONSTR UCTION FOLLOIN CE TECH SUBMIT FEAR ESTABLISH ADMINISTRATIVE 8 PFIOCEOURE SYSTEM 2 STARTUP AND TESTING 3.ASSUMES NORMAL FUNCTION COLD HYDRO UNIT I OPEeATING FUEL pERMIT LOADING UNIT I COMNIERC AL OPERATION UNIT I UNITS OPERATION NUMBER OF PERSONNEL IN CLASSIFICATIONS FOR TING COLD HYDRO UNIT 2 FUEL LOADING UNIT 2 COMMERCIAL OPERATION UNIT 2 NUMBER QF PERSONNEL IN CLASSIFIC4TIONS FOR THREE UNITS OPER ATION COLD HYDRO UNIT 3 FUEL LOADING UN I T 3 CDMMERCIAL OPERATION UNIT 3 ASSISTANT PLANT MANAGER SL I I.PERSONNEL ACQUISITION 2.DESIGN 8 CONSTRUCTION FOLLOW 3.ESTABLISH TRAiNING REQUIRE MENTS&SCHEDULES 5 M TRNG i.PERSONNEL ACQUISITION 8 TRAINING 2 F NAL MANUAL 6 PROCEDURE PREPARATION 3.STARTUP 6 TESTING 4 ASSUME NORMAL FU CTION STARTUP AND TESTING INTENSIVE ONSITE TRAINING FINAL MANUAL PREP4RATION ASSUME NORMAL FUNCTION NOTES NUMBER OF PERSONNEL IN CLASSIFICATION A NUMBER OF ASSISTANTS IN CLASSIFICATION TECHNICAL SUPERVISOR SL I SAME AS ABOVE SAME AS ABOVE SIM TRNGI 5 EASABO E CL OPERATIONS SUPERVISOR SL SAME AS ABOVE SAME AS ABDVE 5 I M~TRNG SAME AS A6OVE CL SL RO CL HL SENIOR REACTOR OPERATOR LICENSE REACTOR OPERATOR LICENSE COLD LICENSE HOT LICENSE MAINTENANCE SUPERVISOR TECHNICAL ASSISTANT SL 1 sAME as aeovE FEAR&TECHNICAL SPECIFICATION PREPARATION 2 DESIGN&CONSTRUCTION FOLLOFI 3.PERSONNEL ACQUISITION SAME AS A6OUE saME as Aeovc 5 I M TANG 5 E 5 E AS 48OVE 1A HEALTH, SAFETY AND CHEMIST R Y I SUPERVISOR I PEASONNEL ACQUISITION 2.FSAe 8 TEC NICAL SPECIFICATION 3 ESTABLIS TRAINING REQUIREMENT5 B SCHEDULES SAME AS A6OVE NUCLEAR ENGINEER ORIENT FUEL MANAGEMENT TRA NING 2 COMPUTER TRAINING 3 CONSTRUCTION FOLLOIN 5 I M TRNG~sAME As&BOY E IA IA MECHANICAL ENGINEER I INSERVICE INSPECTION 2 STARTUPS TESTING 3.FINAL MANUAL PREPARATION 4.ASSUME NORMAL FUNCTION IA ELECTRICAL ENGINEER I PERSONNEL ACQUISITION 2 FINAL MANUALPREPARATION 3.STARTUP&TESTING 4 ASSUME NORMAL F UNCT ON IA IA INSTRUMENT AND CONTROLS ENGINEER 5 ME AS A6QVE SHIFT SUPERVISOR SL 6 I PERSONNEL ACQUISITION 2 PREPARAT ON OF TEST OPERATING PROCEDURES 3 CONSTRUCTION FOLLOW MULATOR RAINING 5 E 5A I OA QUALITY ASSURANCE ENGINEER PREPARE OPERATIONAL MANUAL 2 ASSUME NORMAL FUNCTION 8 HEALTH PHYSICS SUPERVISOR CHEMISTRY SUPERVISOR I.EMERGENCY PLANPREPARATION 2 PREPARATION OF TESTS OPERATI PROCEDURES 3 FINAL MANUAL PREPARATION 4.ASSUME NORMAL FUNCTIDN NG PREPARATION OF TESTS OPERATI PROCEDURES I 2.STARTUP6 TESTING 3 FINAL MANUAL PREPARATION 4.ASSUME NORMAL FUNCTION SENIOR CONTROL OPERATOR RD 5 NUCLEAR PLANT QBSERVA TION~I ORIENT I I I NUCLEAR FUND j*THEORY 2 DESIGN 6 CONSTRUCTION FOLLOW C E TECH IEIM TRNG PREPARATION OF TEST 6 I OPERATING PFIQCEDURES 4 2 CONSTRUCTION FOLLOW I I INTENSIVE QNSITE TRAINING 2 STARTUP 8, TESTING 3 F NAL MANUAL PFIEPARATION 4 ASSUME NORMAL FUNCTION CL 10 14 Arizona Nuclear Power Project Palo Verde Nuclear Generating Station Units 1, 2&3 CHANGE ADMINISTRATIVE SUPERVISOR COMPUTER ENGINEER I I ESTABLIS ADMINISTRATIVE PROCEDURES 2 ASSISTANT SUPERVISION 3 ASSUME NORMAL FUNCTIONS COMPUTER TRAIN NG 2 STARTUP 8 TESTING I 3 ASSUME NORMAL FUNCTION STAFFING AND TRAINING PROGRAIII (Stseet 1 of 2)Figure 13.2-1 10407 I IA TQJLB 216 July 21, 1975 Amendment 9