IR 05000335/2009006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML091480773
| number = ML100351155
| issue date = 05/26/2009
| issue date = 02/04/2010
| title = IR 05000335-09-006, & IR 05000389-09-006, for 08/03/2009 - 08/14/2008, and 08/31/2009 - 09/04/2009, St. Lucie, Component Design Bases Inspection
| title = 02/19/2010 Notice of Category 1 Public Meeting with Florida Power and Light Company to Discuss Risk Significance of the Two Preliminary Greater than Green Inspection Report 05000335-09-006 and 05000389-09-006
| author name = Desai B B
| author name = Desai B B
| author affiliation = NRC/RGN-II/DRS/EB1
| author affiliation = NRC/RGN-II/DRS/EB1
Line 10: Line 10:
| license number = DPR-067, NPF-016
| license number = DPR-067, NPF-016
| contact person =  
| contact person =  
| document report number = IR-09-006
| case reference number = IR-09-006
| document type = Letter, Inspection Report
| document type = Letter, Meeting Notice
| page count = 6
| page count = 5
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 May 26, 2009
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 February 4, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O.Box 14000 Juno Beach, FL 33408-0420


Mr. Mano Nazar Senior Vice President and Chief Nuclear Officer Florida Power and Light Company P. O. Box 14000 Juno Beach, FL 33408-0420
SUBJECT: MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 REGULATORY CONFERENCE - ST. LUCIE NUCLEAR PLANT DOCKET NOS. 50-335 AND 50-389


SUBJECT: ST. LUCIE NUCLEAR PLANT - COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000335/2009006 AND 05000389/2009006
==Dear Mr. Nazar:==
This letter confirms the telephone conversation between Mr. Eric Katzman of your staff and Mr. Binoy Desai of the NRC, on February 1, 2010, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for February 19, 2010, from 2 p.m. to 4:00 p.m. (EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system.


Dear Mr. Nazar The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a component design bases inspection at your St. Lucie Nuclear Plant Units 1 and 2 during the weeks of August 3-14, and August 31- September 4, 2009. The inspection team will be led by Mr. S. Rose, a Senior Operations Inspector from the NRC's Region II Office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


The inspection will evaluate the capability of risk significant / low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.
Should you have any questions concerning this meeting, please contact me at (404) 562-4519.


During a telephone conversation on May 13, 2009, Mr. Rose confirmed with Mr. K. Frehafer of your staff, arrangements for an information gathering site visit and the three-week onsite inspection. The schedule is as follows:
Sincerely,/RA: Original signed by Mark Franke for/
* Information gathering visit: Week of July 13-17, 2009.
Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety


* Onsite weeks: August 3-14 and August 31-September 4, 2009.
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16


The purpose of the information gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. W. Rogers, a Region II Senior Reactor Analyst, may accompany Mr. Rose during the information gathering visit to review probabilistic risk assessment data and identify risk significant components which will be examined during the inspection.
===Enclosure:===
As stated


Please provide the information requested in the enclosure to the Region II office by July 6, 2009. The enclosure lists documents that will be needed prior to the information gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for the inspection preparation. Contact Mr. Rose with any questions related to the information request. During the information gathering visit, the team leader will also discuss the following inspection support administrative details: office space; supplemental documents requested to be made available to the team in the Region II office prior to the FP&L 2 inspection preparation week of July 27-31, 2009; arrangements for site access; and the availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection.
cc w/encl: (See page 2)
FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution


Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Rose at (404) 562-4609 or me at (404) 562-4519.
Gene St. Pierre Vice President - Fleet Organizational Support Florida Power & Light Company Electronic Mail Distribution


Sincerely,/RA/
Mark Hicks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16


===Enclosure:===
Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Information Request For St. Lucie Nuclear Plant Units 1 and 2 Component Design Bases Inspection
 
Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
 
McHenry Cornell Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution
 
Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution


cc w/encl: (See page 3)
Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution


FP&L 3 cc w/encl: Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution  
Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution  


Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution  
William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution  


Mark Hicks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution  


Robert J. Hughes Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution  
J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution  


Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution  
Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company Electronic Mail Distribution  


Don E. Grissette Vice President, Nuclear Operations - South Region Florida Power & Light Company Electronic Mail Distribution
Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010


M. S. Ross Managing Attorney Florida Power & Light Company Electronic Mail Distribution  
(Vacant)
Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution  


Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution  
Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution  


Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution  
Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution  


Mano Nazar Senior Vice President and Chief Nuclear Officer Florida Power & Light Company Electronic Mail Distribution
_
x G SUNSI REVIEW COMPLETE /RA M. Thomas/ OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME JHAMMON MSYKES BDESAI DATE 2/4/2010 2/4/2010 2/4/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure


Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Peter Wells Vice President, Safety Assurance Florida Power and Light Company Electronic Mail Distribution Mark E. Warner Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution
SUBJECT: PUBLIC MEETING WITH FLORIDA POWER & LIGHT FACILITY:
ST. LUCIE NUCLEAR PLANT DOCKETS: 05000335 and 05000389 DATE & TIME:
Friday, February 19, 2010 - 2:00 p.m. to 4:00 p.m.


(cc w/encl cont'd - See page 4)
LOCATION:
FP&L 4 (cc w/encl cont'd) Faye Outlaw County Adminstrator St. Lucie County Electronic Mail Distribution
Suite 24T25 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.


Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
CATEGORY:
This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opport unities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRC provides


_________________________ X G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA RA NAME SROSE WROGERS MSYKES BDESAI DATE 5/26/2009 5/26/2009 5/26/2009 5//26/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure INFORMATION REQUEST FOR ST. LUCIE NUCLEAR PLANT UNITS 1 AND 2 COMPONENT DESIGN BASES INSPECTION Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood to someone who has knowledge of pressurized water reactor technology.
reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC
=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.


1. From your most recent probabilistic safety analysis (PSA) excluding external events and fires, please provide: a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance. b. A list of the top 500 cutsets.
NRC OFFICE PARTICIPATING:
Region II OTHER ORGANIZATIONS PARTICIPATING:
None PARTICIPANTS:
NRC (partial list) L. Reyes, Regional Administrator, Region II (RII)
V. McCree, Deputy Regional Administrator for Operations, RII K. Kennedy, Director, Division of Reactor Safety (DRS), RII L. Wert, Director, Division of Reactor Projects (DRP), RII B. Desai, Chief, Engineering Branch 1, DRS, RII W. Rogers, Senior Reactor Analyst


2. From your most recent probabilistic safety analysis (PSA) including external events and fires, please provide: a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance. b. A list of the top 500 cutsets.
LICENSEE (partial list) Richard Anderson, Site Vice President Bob Hughes, Plant General Manager Eric Katzman, Licensing Manager Tom Cosgrove, Engineering Manager Abdy Khanpour, Engineering Support Jim Porter, Engineering Design Manager Cheng Guey, Risk Assessment George Tullidge, Risk Assessment 2 Enclosure MEETING CONTACT:
Binoy Desai 404-562-4519 Binoy.Desai@nrc.gov AUDIO TELE-CONFERENCING Interested members of the public may participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information no later than 4:30 p.m. Wednesday, February 17, 2010.


3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide copies of your human reliability worksheets for these items. 4. Any pre-existing evaluation or list of components and calculations with low design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, MOV risk-margin rankings, etc.). 5. A list of station applicability evaluations/reviews performed and documented in the station corrective action program in the past two years for industry events, critical equipment failures, and safety related equipment vulnerabilities (as communicated by NRC generic communications, industry communications, 10 CFR Part 21 notifications, etc.). 6. A list of operability evaluations completed within the last two years, sorted by associated component or system. 7. A list of common-cause failures of components that have occurred at the St. Lucie Nuclear Plant and have been identified within the last five years. 8. A list of equipment currently on the site's Key Equipment Priorities List, including a description of the reason(s) why each component (i.e. not a programmatic or system level concern) is on that list and summaries (if available) of your plans to address those reasons. 9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1) status. 10. Contact information for a person to discuss PRA information prior to the information gathering trip: name, title, phone number, and e-mail address.
VIDEO TELE-CONFERENCING Not Available
}}
}}

Revision as of 08:11, 14 October 2018

02/19/2010 Notice of Category 1 Public Meeting with Florida Power and Light Company to Discuss Risk Significance of the Two Preliminary Greater than Green Inspection Report 05000335-09-006 and 05000389-09-006
ML100351155
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/04/2010
From: Desai B B
NRC/RGN-II/DRS/EB1
To: Nazar M
Florida Power & Light Co
References
IR-09-006
Download: ML100351155 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 February 4, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O.Box 14000 Juno Beach, FL 33408-0420

SUBJECT: MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 REGULATORY CONFERENCE - ST. LUCIE NUCLEAR PLANT DOCKET NOS. 50-335 AND 50-389

Dear Mr. Nazar:

This letter confirms the telephone conversation between Mr. Eric Katzman of your staff and Mr. Binoy Desai of the NRC, on February 1, 2010, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for February 19, 2010, from 2 p.m. to 4:00 p.m. (EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Should you have any questions concerning this meeting, please contact me at (404) 562-4519.

Sincerely,/RA: Original signed by Mark Franke for/

Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety

Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16

Enclosure:

As stated

cc w/encl: (See page 2)

FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution

Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Gene St. Pierre Vice President - Fleet Organizational Support Florida Power & Light Company Electronic Mail Distribution

Mark Hicks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution

Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420

McHenry Cornell Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution

Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution

Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution

Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution

William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution

Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution

J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution

Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company Electronic Mail Distribution

Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010

(Vacant)

Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution

Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution

Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution

_

x G SUNSI REVIEW COMPLETE /RA M. Thomas/ OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME JHAMMON MSYKES BDESAI DATE 2/4/2010 2/4/2010 2/4/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure

SUBJECT: PUBLIC MEETING WITH FLORIDA POWER & LIGHT FACILITY:

ST. LUCIE NUCLEAR PLANT DOCKETS: 05000335 and 05000389 DATE & TIME:

Friday, February 19, 2010 - 2:00 p.m. to 4:00 p.m.

LOCATION:

Suite 24T25 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.

CATEGORY:

This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opport unities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRC provides

reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC

=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

NRC OFFICE PARTICIPATING:

Region II OTHER ORGANIZATIONS PARTICIPATING:

None PARTICIPANTS:

NRC (partial list) L. Reyes, Regional Administrator, Region II (RII)

V. McCree, Deputy Regional Administrator for Operations, RII K. Kennedy, Director, Division of Reactor Safety (DRS), RII L. Wert, Director, Division of Reactor Projects (DRP), RII B. Desai, Chief, Engineering Branch 1, DRS, RII W. Rogers, Senior Reactor Analyst

LICENSEE (partial list) Richard Anderson, Site Vice President Bob Hughes, Plant General Manager Eric Katzman, Licensing Manager Tom Cosgrove, Engineering Manager Abdy Khanpour, Engineering Support Jim Porter, Engineering Design Manager Cheng Guey, Risk Assessment George Tullidge, Risk Assessment 2 Enclosure MEETING CONTACT:

Binoy Desai 404-562-4519 Binoy.Desai@nrc.gov AUDIO TELE-CONFERENCING Interested members of the public may participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information no later than 4:30 p.m. Wednesday, February 17, 2010.

VIDEO TELE-CONFERENCING Not Available