ML091670109: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091670109
| number = ML091670109
| issue date = 06/16/2009
| issue date = 06/16/2009
| title = Cooper Nuclear Station - Acceptance Review for License Amendment Request (TAC ME1388)
| title = Acceptance Review for License Amendment Request
| author name = Lyon C F
| author name = Lyon C
| author affiliation = NRC/NRR/DORL/LPWB
| author affiliation = NRC/NRR/DORL/LPWB
| addressee name = VanDerKamp D
| addressee name = Vanderkamp D
| addressee affiliation = Nebraska Public Power District (NPPD)
| addressee affiliation = Nebraska Public Power District (NPPD)
| docket = 05000298
| docket = 05000298
| license number =  
| license number =  
| contact person = Lyon C F (415-2296)
| contact person = Lyon C (415-2296)
| case reference number = TAC ME1388
| case reference number = TAC ME1388
| document type = E-Mail
| document type = E-Mail
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:From: Lyon, Fred Sent: Tuesday, June 16, 2009 8:54 AM To: 'Van Der Kamp, David' Cc: 'Henry, Shawna L.'  
{{#Wiki_filter:From:                     Lyon, Fred Sent:                     Tuesday, June 16, 2009 8:54 AM To:                       'Van Der Kamp, David' Cc:                       'Henry, Shawna L.'


==Subject:==
==Subject:==
Acceptance Review (TAC No. ME1388)
Acceptance Review (TAC No. ME1388)
By letter dated June 2, 2009, Nebraska Public Power District submitted a license amendment request to (1) delete Technical Specification (TS) Surveillance Requirement (SR) 3.1.3.2 and revise SR 3.1.3.3 in TS 3.1.3, "Control Rod OPERABILITY," and (2) revise Example 1.4-3 in Section 1.4, "Frequency," to clarify the applicability of the 1.25 surveillance test interval extension consistent with the model application provided in 72 FR 63935.  
By letter dated June 2, 2009, Nebraska Public Power District submitted a license amendment request to (1) delete Technical Specification (TS) Surveillance Requirement (SR) 3.1.3.2 and revise SR 3.1.3.3 in TS 3.1.3, "Control Rod OPERABILITY," and (2) revise Example 1.4-3 in Section 1.4, "Frequency," to clarify the applicability of the 1.25 surveillance test interval extension consistent with the model application provided in 72 FR 63935.
 
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.
=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.  
This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
 
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.
E-mail Properties Mail Envelope Properties ()  
E-mail Properties Mail Envelope Properties ()


==Subject:==
==Subject:==
Acceptance Review (TAC No. ME1388)  
Acceptance Review (TAC No. ME1388)
 
Sent Date:     06/16/2009 8:45:40 AM Received Date:        06/16/2009 8:54:00 AM From:           Lyon, Fred Created By:       Fred.Lyon@nrc.gov Recipients:
Sent Date:       06/16/2009 8:45:40 AM Received Date:        06/16/2009 8:54:00 AM From:               Lyon, Fred  
 
Created By:         Fred.Lyon@nrc.gov  
 
Recipients:
dwvande@nppd.com ('Van Der Kamp, David')
dwvande@nppd.com ('Van Der Kamp, David')
Tracking Status: None slhenry@nppd.com ('Henry, Shawna L.')                Tracking Status: None
Tracking Status: None
 
Post Office:
 
Files                Size        Date & Time
 
MESSAGE        9986        06/16/2009
 
Options Expiration Date:
Priority:                        olImportanceNormal ReplyRequested:        False Return Notification:        False


Sensitivity:         olNormal Recipients received:}}
slhenry@nppd.com ('Henry, Shawna L.')
Tracking Status: None Post Office:
Files          Size      Date & Time MESSAGE          9986      06/16/2009 Options Expiration Date:
Priority:              olImportanceNormal ReplyRequested:      False Return Notification:      False Sensitivity:     olNormal Recipients received:}}

Latest revision as of 04:53, 14 November 2019

Acceptance Review for License Amendment Request
ML091670109
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/16/2009
From: Lyon C
Watts Bar Special Projects Branch
To: Vanderkamp D
Nebraska Public Power District (NPPD)
Lyon C (415-2296)
References
TAC ME1388
Download: ML091670109 (2)


Text

From: Lyon, Fred Sent: Tuesday, June 16, 2009 8:54 AM To: 'Van Der Kamp, David' Cc: 'Henry, Shawna L.'

Subject:

Acceptance Review (TAC No. ME1388)

By letter dated June 2, 2009, Nebraska Public Power District submitted a license amendment request to (1) delete Technical Specification (TS) Surveillance Requirement (SR) 3.1.3.2 and revise SR 3.1.3.3 in TS 3.1.3, "Control Rod OPERABILITY," and (2) revise Example 1.4-3 in Section 1.4, "Frequency," to clarify the applicability of the 1.25 surveillance test interval extension consistent with the model application provided in 72 FR 63935.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review (TAC No. ME1388)

Sent Date: 06/16/2009 8:45:40 AM Received Date: 06/16/2009 8:54:00 AM From: Lyon, Fred Created By: Fred.Lyon@nrc.gov Recipients:

dwvande@nppd.com ('Van Der Kamp, David')

Tracking Status: None

slhenry@nppd.com ('Henry, Shawna L.')

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 9986 06/16/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: