ML093270185: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML093270185
| number = ML093270185
| issue date = 11/18/2009
| issue date = 11/18/2009
| title = Crystal River 3 Initial Exam 2009-301 Draft Administrative JPMs
| title = Initial Exam 2009-301 Draft Administrative JPMs
| author name =  
| author name =  
| author affiliation = NRC/RGN-II/DNMS
| author affiliation = NRC/RGN-II/DNMS
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COl NRC 2009 SROONlY DETERMINE.ACTIONS FOR PRIMARY TO SECONDARY lEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20109 (Nuclear Training Supervisor)
{{#Wiki_filter:CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COl         #COI NRC 2009 SROONlY SRO ONLY DETERMINE. ACTIONS FOR PRIMARY TO SECONDARY DETERMINE.ACTIONS lEAKAGE LEAKAGE
CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative) " Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COI NRC 2009 SRO ONLY DETERMINE.
(
ACTIONS FOR PRIMARY TO SECONDARY LEAKAGE PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop I Taylor Date: 07/15/09 APPROVAL BY: Lawrence I Vansicklen Date: 07/20109 (Nuclear Training Supervisor)
PREPARED BY:                 Alan Kennedy                     Date:       07/09/09 VALIDATED BY:               Rop 1I Taylor                     Date:       07/15/09 APPROVAL BY:                 Lawrence 1 I Vansicklen           Date:       07/20109 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative) " Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps ot time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
CONCURRED BY:               Mike Kelly                       Date:       07/20109 (Operations Representative)
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 -NRC 2009 [Bank #3200] Task: Determine actions for primary to secondary leakage. Alternate Path: DYES PRA Top Critical Action: IZI NO DYES IZI NO Safety Function:
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
4 . KIA Rating/Importance:
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps ot or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
G2.1.25 Task Number: Position:
 
035A2.01 1150401010 IZISRO ONLY R03.9 R04.5 DRO/SRO SR04.2 SR04.6 DNLO/RO/SRO Task Standard:
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#:             Admin C01 - NRC 2009 [Bank #3200]         #320D]
Determine actions for primary to secondary leakage Preferred Evaluation Location:
Task:             Determine actions for primary to secondary leakage.
Preferred Evaluation Method: D SIM D PLANT IZI ADMIN IZI PERFORM D SIMULATE  
Alternate Path:           DYES               C8J NO IZI PRA Top Critical Action:                     DYES               IZI NO Safety Function:           4 KIA Rating/Importance:             G2.1.25             R03.9            SR04.2 SRO 4.2 035A2.01            R04.5            SR04.6 SRO 4.6 Task Number:               1150401010 Position:                 IZISRO C8JSRO ONLY                 DRO/SRO               DNLO/RO/SRO Task Standard:             Determine actions for primary to secondary leakage Preferred Evaluation Location:                                           Preferred Evaluation Method:
D SIM           D PLANT IZI   C8J ADMIN                                 C8J PERFORM IZI               D SIMULATE


==References:==
==References:==


CP-152, Rev. 19 Validation Time: 20 minutes Time Critical:
(
DYES IZI NO Candidate:
CP-152, Rev. 19 Validation Time: 20 minutes   mintJtes                                  Time Critical:
_____________
Critical: DYES   IZI C8J NO Candidate:
_ Time Start: Printed Name Time Finish: ---,-------
Candidate: _ _ _ _ _ _ _ _ _ _ _ _ __                                          Time Start:
Performance Rating: D SAT D UNSAT Performance Time: -----Examiner:  
Printed Name Time Finish: ---,-------
---------------
Performance Rating: D SAT                     D UNSAT                           Performance Time: -----
Printed Name Signature Date Comment: ________________________________________________________
Examiner:
__ 112112008 Page 2 of8 Admin CO 1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 -NRC 2009 [Bank #320D] Task: Determine actions for primary to secondary leakage. Alternate Path: DYES PRA Top Critical Action: C8J NO DYES Safety Function:
                  - - - -Printed
4 " KIA Rating/Importance:
                              - - -Name Printed Name Signature               Date Comment ________________________________________________________
G2.1.25 035A2.01 Task Number: 1150401010 Position:
Comment:        __________________________________________________________                                        __
C8JSRO ONLY R03.9 R04.5 DRO/SRO SRO 4.2 SRO 4.6 DNLO/RO/SRO Task Standard:
112112008                                         Page 2 of8                                 Admin CO 1I (NRC 2009)
Determine actions for primary to secondary leakage Preferred Evaluation Location:
H:\NRC - 2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx
Preferred Evaluation Method: D SIM D PLANT C8J ADMIN C8J PERFORM D SIMULATE


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE
(
SIMULATOR OPERATOR SETUP INSTRUCTIONS:
: 1.          NA SIMULATOR OPERATOR INSTRUCTIONS:
: 1.          NA TOOLS / EQUIPMENT / PROCEDURES NEEDED:
: 1.      Calculator
: 2.      Copies ofCP-152, Revision 19
: 3.      ITS available as reference, if needed
(
(
112112008                                            Page 3 of8              CO I (NRC 2009)
Admin COl H:\NRC;, - 2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx I.docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE
(                                              READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300.
The plant is at 100% power.
ARP-1 A is in operation by itself.
RM-G26 is off scale high.
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266.
RM-A 12 conversion factor is 0.0065 per CH-266.
RM-A 12 readings have been the following:
0900            800 cpm 1000            800 cpm 1100            810 cpm 1200            14000 cpm 1300            21500 cpm
(
INITIATING CUES Determine what, if any, actions are required, and list your findings below.
(
112112008                                                0[8 Page 4 of8                Admin COl (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx


CP-152, Rev. 19 Validation Time: 20 mintJtes Time Critical:
ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: _ _ __
DYES C8J NO Candidate:
STEP 1:
Time Start: Printed Name Time Finish: ______ _ Performance Rating: D SAT D UNSAT Performance Time: -----Examiner:
Candidate obtains a copy of CP-152.                                                   SAT STANDARD:                                                                             UNSAT N/A EXAMINER NOTE:
--------------
Provide candidate with a copy of CP-152.
Printed Name Signature Date Comment ________________________________________________________
COMMENTS:
__ 112112008 Page 2 of8 Admin CO I (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS:
STEP 2:
: 1. NA SIMULATOR OPERATOR INSTRUCTIONS:
Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak             SAT rate.
: 1. NA TOOLS / EQUIPMENT
UNSAT STANDARD:
/ PROCEDURES NEEDED: 1. Calculator
(    CP-152, Enclosure 1, may be used due to NOT having a table available for the
: 2. Copies ofCP-152, Revision 19 3. ITS available as reference, if needed 112112008 Page 3 of8 Admin CO I (NRC 2009) H:\NRC;, -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev I.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( SIMULATOR OPERATOR SETUP INSTRUCTIONS:
  " current RM-A 12 conditions.
: 1. NA SIMULATOR OPERATOR INSTRUCTIONS:
: 1. NA TOOLS / EQUIPMENT
/ PROCEDURES NEEDED: 1. Calculator
: 2. Copies ofCP-152, Revision 19 3. ITS available as reference, if needed ( ( 112112008 Page 3 of8 Admin COl (NRC 2009) H:\NRC;, -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx 
( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A 12 readings have been the following:
0900 800 cpm 1000 800 cpm 1100 810 cpm 1200 14000 cpm 1300 21500 cpm INITIATING CUES , Determine what, if any, actions are required, and list your findings below. 112112008 Page 4 0[8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A 12 readings have been the following:
0900 800 cpm 1000 800 cpm 1100 810 cpm 1200 14000 cpm 1300 21500 cpm INITIATING CUES , Determine what, if any, actions are required, and list your findings below. 112112008 Page 4 of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: ___ _ STEP 1: Candidate obtains a copy of CP-152. STANDARD:
N/A EXAMINER NOTE: Provide candidate with a copy of CP-152. COMMENTS:
STEP 2: Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak rate. STANDARD:
CP-152, Enclosure 1, may be used due to NOT having a table available for the current RM-A 12 conditions.
COMMENTS:
COMMENTS:
See the attached key for leak rates associated with each of the given RM-A 12 count rates. STEP 3: Candidate determines that Action Level 3 is applicable.
See the attached key for leak rates associated with each of the given RM-A 12 count rates.
STANDARD:
STEP 3:
Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. COMMENTS:
Candidate determines that Action Level 3 is applicable.                               SAT STANDARD:                                                                             UNSAT Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise.
112112008 Page 5 of8 H:\NRC -2009\JPM\Admin\Admin CO I (NRC 2009) [Bank #320D] Rev I.docx SAT UNSAT SAT UNSAT SAT UNSAT Admin COl (NRC 2009) ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: ___ _ STEP 1: Candidate obtains a copy of CP-152. STANDARD:
N/A EXAMINER NOTE: Provide candidate with a copy of CP-152. COMMENTS:
STEP 2: Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak rate. STANDARD: ( CP-152, Enclosure 1, may be used due to NOT having a table available for the " current RM-A 12 conditions.
\, COMMENTS:
See the attached key for leak rates associated with each of the given RM-A 12 count rates. STEP 3: Candidate determines that Action Level 3 is applicable.
STANDARD:
Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise. COMMENTS:
1/2112008 Page 5 of8 H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev I.docx SAT UNSAT SAT UNSAT SAT UNSAT Admin CO I (NRC 2009) c: ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Candidate determines actions are required.
STANDARD:
Candidate determines that, as a minimum, the following actions are required per section 4.8.1 of CP-152. 4.8.1.1 4.8.1.2 4.8.1.3 4.8.1.4 4.8.1.5 4.8.1.6 4.8.1.7 4.8.1°.8 VERIFY increased leakage using RM-G26 or RM-G27. Evaluate spikes or rapid changes in leak rate. NOTIFY SM, MSO, and PGM of changing primary to secondary leakage conditions.
MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. Reduce power to 50% in 1 hour, and be in Mode 3 in the next 2 hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. NA PERFORM applicable steps of Action Level 1. Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags. EXAMINER NOTE: Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.
COMMENTS:
COMMENTS:
TERMINATION CRITERIA:
\,
Correct Action Level determined per CP-152. END OF TASK ,. Critical Step Basis: Required actions to mitigate a primary to secondary leak. SAT UNSAT STOP TIME: __ 1I2112008 Page 6of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO I (NRC 2009) [Bank #320D] Rev I.docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Candidate determines actions are required.
112112008 1/2112008                                          Page 5 of8                      Admin COl CO I (NRC 2009)
STANDARD:
H:\NRC - 2009\JPM\Admin\Admin COl CO I (NRC 2009) [Bank #320D] Rev I.docx
Candidate determines that, as a minimum, the following actions are required per section 4.8.1 of CP-152. 4.8.1.1 4.8.1.2 4.8.1.3 4.8.1.4 4.8.1.5 4.8.1.6 4.8.1.7 4.8.1'.8 VERIFY increased leakage using RM-G26 or RM-G27. Evaluate spikes or rapid changes in leak rate. NOTIFY SM, MSO, and PGM of changing primary to secondary leakage conditions.
 
MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes. Reduce power to::; 50% in 1 hour, and be in Mode 3 in the next 2 hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr. NA PERFORM applicable steps of Action Level 1. Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags. EXAMINER NOTE: Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4:                                                                                         Critical Step Candidate determines actions are required.                                                     Basis:
Required STANDARD:                                                                                       actions to mitigate a Candidate determines that, as a minimum, the following actions are required                     primary to per section 4.8.1 of CP-152.                                                                   secondary leak.
4.8.1.1           VERIFY increased leakage using RM-G26 or RM-G27.
4.8.1.2            Evaluate spikes or rapid changes in leak rate.                             SAT 4.8.1.3            NOTIFY SM, MSO, and PGM of changing primary to secondary                   UNSAT leakage conditions.
4.8.1.4            MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes.
4.8.1.5            Reduce power to         ~ 50% in 1 hour, and be in Mode 3 in the next 2 to::;
hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr.
4.8.1.6            NA c:( 4.8.1.7            PERFORM applicable steps of Action Level 1.
4.8.1'.8 4.8.1°.8          Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags.
EXAMINER NOTE:
Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.
COMMENTS:
COMMENTS:
TERMINATION CRITERIA:
TERMINATION CRITERIA:
Correct Action Level determined per CP-152. END OF TASK Critical Step Basis: Required actions to mitigate a primary to secondary leak. SAT UNSAT STOP TIME: __ 112112008 Page 60f8 Admin CO 1 (NRC 2009) H:INRC -2009lJPMIAdmin\Admin CO 1 (NRC 2009) [Bank #320D] Rev l.docx c ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY RM-A 12 CONVERSION TO GPD ENCLOSURE 1 (Page 1 of 6) Example: [( 1000 cpm .) -( gpd 30 cpm ) = 970 cpm 1 x (_0= . ..:..00=70...::2:.....-...1)
Correct Action Level determined per CP-152.
= 6.98 Gross Background Net Count Rate Conv. F actor* Leak Rate
END OF TASK STOP TIME: _ _
* RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room. NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged. Time [( 800 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.91 gpd 0900 Gross Background Net Cony. Factor* Leak Rate [( 800 cpm) -( 45 cpm) = ( 765 cpm)] x ( 0.0065 )= 4.91 gpd 1000 Gross Background Net Cony. Factor* Leak Rate [( 810 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.97 gpd 1100 Gross Background Net Cony. Factor* Leak Rate [( 14000 cpm) -( 45 cpm) = ( 13955 cpm)] x ( 0.0065 )= 90.71 gpd 1200 Gross
1I2112008 112112008                                             Page 6of8 60f8                             Admin COl CO 1 (NRC 2009)
* Background Net Cony. Factor* Leak Rate [( 21500 cpm) -( 45 cpm) = ( 21455 cpm)] x ( 0.0065 )= 139.46 gpd 1300 Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd , Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor* Leak Rate 112112008 Page 7 of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO I (NRC 2009) [Bank #320D] Rev I.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY RM-A 12 CONVERSION TO GPD ENCLOSURE 1 (Page 1 of 6) Example: [( 1000 cpm ) -( gpd 30 cpm ) = 970 cpm J x (_=0.-=-00.=....:7'-=2'---')
H:\NRC H:INRC - 2009\JPM\Admin\Admin 2009lJPMIAdmin\Admin CO 1I (NRC 2009) [Bank #320D] Rev I.docx l.docx
= 6.98 Gross Background Net Count Rate Conv.Factor*
Leak Rate
* RM-A12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room. NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged. Time [( 800 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.91 gpd 0900 Gross Background Net Cony. Factor' Leak Rate [( 800 cpm) -( 45 cpm) = ( 765 cpm)] x ( 0.0065 )= 4.91 gpd 1000 Gross Background Net Cony. Factor' Leak Rate [( 810 cpm) -( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.97 gpd 1100 Gross Background Net Cony. Factor' Leak Rate [( 14000 cpm) -( 45 cpm) = ( 13955 cpm)] x ( 0.0065 )= 90.71 gpd 1200 Gross . Background Net Cony. Factor' Leak Rate [( 21500 cpm) -( 45 cpm) = ( 21455 cpm)] x ( 0.0065 ) = 139.46 gpd 1300 Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd , Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate [( cpm) -( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Leak Rate 112112008 Page7of8 Admin COl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx
( ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETpRNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A12 readings have been the following:
0900 800 cpm 1000 800 cpm 1100 810 cpm 1200
* 14000 cpm 1300 21500 cpm INITIATING CUES Determine what, if any, actions are required, and list your findings below. ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300. The plant is at 100% power. ARP-1 A is in operation by itself. RM-G26 is off scale high. Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266. RM-A 12 conversion factor is 0.0065 per CH-266. RM-A12 readings have been the following:
0900 1000 1100 1200 1300 INITIATING CUES 800 cpm 800 cpm 810 cpm
* 14000 cpm 21500 cpm Determine what, if any, actions are required, and list your findings below. 
( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15109 APPROVAL BY: Lawrence 1 Vansicklen Date: 07120109 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07115109 APPROV AL BY: Lawrence 1 Vansicklen Date: 07120109 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. 
( ADMINISTRATIVE JOB PERFORMANCE MEASURE . JPM#: Admin C02 -NRC 2009 [Modified]
Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.
Alternate Path: DYES PRA Top Critical Action: [gJNO DYES Safety Function:
4 K/ A Rating/Importance:
G2.1.23 025AA1.02 Task Number: 1190102001 RO Position:
DSROONLY R04.3 R03.8 [gJRO/SRO SRO 4.4 SRO 3.9 DNLO/RO/SRO Task Standard:
Perform a time to boil/core uncovery calculation.
Preferred Evaluation Location:
Preferred Evaluation Method: D SIM D PLANT [gJ ADMIN [gJPERFORM DSIMULATE


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY                                                                                                                          ENCLOSURE 1 (Page 1 of 6)
RM-A 12 CONVERSION TO GPD Example: [( 1000 cpm .)) - (                  30 cpm ) = 970 cpm 1                  J x (_0=      ...:..00=70...::2:.....-...1)
(_=0.-=-00.=....:7'-=2'---')            =      6.98 gpd Gross            Background          Net Count Rate        Conv.Factor*
Conv. F actor*                  Leak Rate
* RM-A12 RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room.
NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged.
Time
[(  800    cpm) - (    45      cpm) = ( 755        cpm)] x ( 0.0065      )=          4.91                  gpd 0900                Gross            Background                Net              Cony. Factor*
Factor'            Leak Rate
[(  800    cpm) - (    45      cpm) = ( 765        cpm)] x ( 0.0065      )=          4.91                  gpd 1000                Gross            Background                Net              Cony. Factor' Factor*            Leak Rate
[(  810    cpm) - (    45      cpm) = ( 755        cpm)] x ( 0.0065      )=          4.97                  gpd 1100                Gross            Background                Net              Cony. Factor' Factor*            Leak Rate cpm) = ( 13955 cpm)] x ( 0.0065            )=
1200
[( 14000 Gross        .
cpm) - (    45
* Background                Net              Cony. Factor' Factor*
90.71 Leak Rate gpd c(    1300
[( 21500 Gross cpm) - (    45
 
===Background===
cpm)  =(  21455 cpm)] x ( 0.0065 Net
                                                                                                )=
                                                                                                )=
Cony. Factor' Factor*
139.46 Leak Rate gpd
[(          cpm) - (              cpm) = (            cpm)] x (                )=                                gpd
                        , Gross            Background                Net              Cony. Factor' Factor*            Leak Rate Leak
[(          cpm) - (              cpm)  =(            cpm)] x (                )=                                gpd Gross            Background                Net              Cony. Factor' Factor*            Leak Rate
[(          cpm) - (              cpm)  =(            cpm)] x (                )=                                gpd Gross            Background                Net              Cony. Factor' Factor*            Leak Rate
[(          cpm) - (              cpm) = (            cpm)] x (                )=                                gpd Gross            Background                Net              Cony. Factor' Factor*            Leak Rate
[(          cpm) - (              cpm)  =(            cpm)] x (                )=                                 gpd Gross            Background                Net              Cony. Factor' Factor*            Leak Rate
[(          cpm) - (              cpm)  =(            cpm)] x (                )=                                gpd Gross            Background                Net              Cony. Factor' Factor*            Leak Rate
(
112112008                                            Page 7 of8 Page7of8                                                                    Admin COl (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin COCOlI (NRC 2009) [Bank #320D] Rev I.docx l.docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET
(
RET~RNED TO EXAMINER UPON COMPLETION OF TASK)
(TO BE RETpRNED INITIAL CONDITIONS You are the Control Room Supervisor.
The time is now 1300.
The plant is at 100% power.
ARP-1 A is in operation by itself.
RM-G26 is off scale high.
Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.
RM-A 12 background is 45 cpm per CH-266.
RM-A 12 conversion factor is 0.0065 per CH-266.
RM-A12 readings have been the following:
0900          800 cpm 1000          800 cpm 1100          810 cpm 1200
* 14000 cpm
(                1300          21500 cpm INITIATING CUES Determine what, if any, actions are required, and list your findings below.
(
 
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION
(
PREPARED BY:                  Alan Kennedy                        Date:          07/09/09 VALIDATED BY:                  Rop 1 Taylor                        Date:          07/15109 07115109 APPROVAL APPROV      AL BY:            Lawrence 1 Vansicklen                Date:          07120109 (Nuclear Training Supervisor)
CONCURRED BY:                  Mike Kelly                          Date:          07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time
( critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.


OP-103H, Rev. 9 Validation Time: 20 minutes Time Critical:
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#:
D YES [gJ NO Candidate:
Admin C02 - NRC 2009 [Modified]
---------------------------
Task:           Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.
Time Start: _______ _ Printed Name Time Finish: _______ _ Performance Rating: D SAT DUNSAT Performance Time: __________
Alternate Path:           DYES         ~NO
_ Examiner:
[gJNO PRA Top Critical Action:               DYES              ~NO Safety Function:         4 KIA K/A Rating/Importance:           G2.1.23       R04.3          SRO 4.4 025AA1.02     R03.8          SRO 3.9 Task Number:             1190102001   RO Position:               DSROONLY               ~RO/SRO
------------------------
[gJRO/SRO             DNLO/RO/SRO Task Standard:           Perform a time to boil/core uncovery calculation.
Printed Name Signature Date Comment: ------------------------------------------------------------
Preferred Evaluation Location:                                 Preferred Evaluation Method:
7/20/20095/28/20095:39 AM Page 2 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO2 (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE . JPM#: Admin C02 -NRC 2009 [Modified]
D SIM         D PLANT [gJ    ~ ADMIN                           ~PERFORM
Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.
[gJPERFORM        D SIMULATE DSIMULATE
Alternate Path: DYES DYES PRA Top Critical Action: Safety Function:
(
4 KIA Rating/Importance:
G2.1.23 025AA1.02 Task Number: 1190102001 RO R04.3 R03.8 Position:
DSROONLY SRO 4.4 SRO 3.9 DNLO/RO/SRO Task Standard:
Perform a time to boil/core uncovery calculation.
Preferred Evaluation Location:
Preferred Evaluation Method: D SIM D PLANT ADMIN D SIMULATE  


==References:==
==References:==


OP-103H, Rev. 9 Validation Time: 20 minutes Time Critical:
OP-103H, Rev. 9 Validation Time: 20 minutes                                   Time Critical: D YES       ~. NO
D YES NO Candidate:
[gJ Candidate:                                                                 _ _ _ _ _ _ __
Time Start: ----------------
Time Start: ----------------
Printed Name Time Finish: ----------------
Printed Name Time Finish: ----------------
Performance Rating: D SAT DUNSAT Performance Time: -----------
Performance Rating: D SAT               DUNSAT                                     ___________
Examiner:  
Performance Time: -----------
------------------------
Examiner:
Printed Name Signature Date Comment: __________________________________________________________
Printed Name                         Signature                     Date Comment:
__ 7/20/20095/28/20095:39 AM Page 2 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [ModifiedJ.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLS/EQUIPMENTIPROCEDURES NEEDED 1. OP-103H, Rev. 9 Consumable copies 2. Calculator 7120/20095128120095:39 AM Page 3 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE I, SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. OP-I03H, Rev. 9 Consumable copies 2. Calculator ( 7/20/20095/28/20095:39 AM Page 3 of 10 Admin C02 (NRC 2009) H:\NRC -2009\IPM\Admin\Admin C02 (NRC 2009) [Modified].docx
Comment: ____________________________________________________________
( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120 0 F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
(
Time to Boil = Time to Core Uncovery = 7/20/20095128/20095:39 AM Page 4 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief N uc1ear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120 0 F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
7/20/20095/28/20095:39 AM                 Page 2 of 10                       Admin C02 (NRC 2009)
Time to Boil = Time to Core Uncovery = 7/20/20095/28/20095:39 AM Page 4 of 10 Admin CO2 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx
H:\NRC - 2009\JPM\Admin\Admin C02 CO2 (NRC 2009) [Modified].docx
( STEP 1: STANDARD:
[ModifiedJ.docx
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START Locate correct procedure.
 
Candidate obtains a copy of OP-l 03H, Reactor Coolant System and Spent Fuel Pool Decay Heat Tables and Figures. ----SAT ____ _
ADMINISTRATIVE JOB PERFORMANCE MEASURE I, SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLS/EQUIPMENT/PROCEDURES TOOLS/EQUIPMENTIPROCEDURES NEEDED
__ EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.
: 1. OP-103H, Rev. 9 OP-I03H,                Consumable copies
: 2. Calculator
(
7120/20095128120095:39 7/20/20095/28/20095:39 AM                 Page 3 of 10     Admin C02 (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin 2009\IPM\Admin\Admin C02 (NRC 2009) [Modified].docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear uc1ear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120 00 F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil =
(
Time to Core Uncovery ==
(
7/20/20095/28/20095:39 AM 7/20/20095128/20095:39                     Page 4 of 10                   Admin C02 CO2 (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START -      ---
((                                                                                                    --    -
STEP 1:          Locate correct procedure.
SAT ____
STANDARD:                Candidate obtains a copy of OP-1OP-l 03H, Reactor Coolant         UNSAT _ _
UNSAT~    ___
System and Spent Fuel Pool Decay Heat Tables and Figures.
EXAMINER NOTE:                   Provide candidate with a copy of OP-I03H when requested.
COMMENTS:
COMMENTS:
STEP 2: STANDARD:
STEP 2:         Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in        SAT - - - - -
the core and the number of days shutdown. Transfer data to Enclosure
: 1.                                                                        UNSAT ____ ___
STANDARD:                 Candidate accurately transfers data from Cue Sheet to
(                            Enclosure 1.
COMMENTS:
COMMENTS:
STEP 3: STANDARD:
STEP 3:           Step 3.1 SAT _____
Determine the Decay Heat Correction Factor for number of days shutdown.**
shutdown.                                                                  UNSAT _  _____
STANDARD:                 Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16.
Number of days shutdown is 26.
Correction factor is 3.3979. Rounding to 3.4 is acceptable.
COMMENTS:
COMMENTS:
Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT -----the core and the number of days shutdown.
(
Transfer data to Enclosure
7/20/20095/28/20095:39 AM 7/20120095/28/20095:39                     Page 5 of 10                         Admin C02 CO2 (NRC 2009)
: 1. UNSAT ___ _ Candidate accurately transfers data from Cue Sheet to Enclosure
H:\NRC - 2009\JPM\Admin\Admin CO2 C02 (NRC 2009) [Modified].docx
: 1. Step 3.1 Determine the Decay Heat Correction Factor for number of days shutdown.
 
* Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16. Number of days shutdown is 26. Correction factor is 3.3979. Rounding to 3.4 is acceptable.
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4:          Step 3.2
SAT _____ _ UNSAT __ _ 7/20120095/28/20095:39 AM Page 5 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin CO2 (NRC 2009) [Modified].docx ( ( ( STEP 1: STANDARD:
(
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START Locate correct procedure.
SAT Determine the Fuel Assembly Correction Factor.
Candidate obtains a copy of OP-1 03H, Reactor Coolant System and Spent Fuel Pool Decay Heat Tables and Figures. -----SAT ___ _ UNSAT __ _ EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.
UNSAT STANDARD:                 Candidate accurately determines the Fuel Assembly Correction Factor.
177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) == 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable .
COMMENTS:
COMMENTS:
STEP 2: STANDARD:
STEP 5:           Step 3.3 SAT Determine the Overall Correction Factor.
UNSAT STANDARD:                 Candidate accurately determines the Overall Correction Factor.
3.3979 (DH Correction Factor) x 1.77 (fuel assembly
(                          correction factor) == 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.
COMMENTS:
COMMENTS:
STEP 3: STANDARD:
STEP 6:           Step 7.0 SAT Determine*RCS Determine RCS condition.
UNSAT STANDARD:                 Using data from the cue sheet the candidate accurately determines that the RCS is intact and not vented.
COMMENTS:
COMMENTS:
Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT -----the core and the number of days shutdown.
(
Transfer data to Enclosure
7/20/20095/28/20095:39 AM                   Page 6 of 10                       Admin C02 (NRC 2009)
: 1. UNSAT __ _ Candidate accurately transfers data from Cue Sheet to Enclosure
H:\NRC - 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx
: 1. Step 3.1 Determine the Decay Heat Correction Factor for number of days shutdown .* Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16. Number of days shutdown is 26. Correction factor is 3.3979. Rounding to 3.4 is acceptable.
 
SAT ___ _ UNSAT __ _ 7/20/20095/28/20095:39 AM Page 5 of 10 Admin CO2 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor. UNSAT STANDARD:
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7:           Step 7.1
Candidate accurately determines the Fuel Assembly Correction Factor. 177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable . COMMENTS: . , STEP 5: Step 3.3 SAT Determine the Overall Correction Factor. UNSAT STANDARD:
(                                                                                            SAT _ _ __
Candidate accurately determines the Overall Correction Factor. 3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.
Obtain the Time to Boil from Table 3.
UNSAT _  __
STANDARD:                 Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3.
detennines Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.
COMMENTS:
COMMENTS:
STEP 6: Step 7.0 SAT Determine*RCS condition.
STEP 8:           Steps 7.2 and 7.3 SAT _ _ __
UNSAT . STANDARD:
Per the cue sheet these steps are not required.
Using data from the cue sheet the candidate accurately determines that the RCS is intact and not vented. COMMENTS:
UNSAT _ __
7/20/20095/28/20095:39 AM Page 6 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( STEP 4: Step 3.2 SAT Determine the Fuel Assembly Correction Factor. UNSAT STANDARD:
STANDARD:                 NA
Candidate accurately determines the Fuel Assembly Correction Factor. 177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) = 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable . COMMENTS: . , STEP 5: Step 3.3 SAT Determine the Overall Correction Factor. UNSAT STANDARD:
( EXAMINER NOTE:                   There are no adverse consequences if candidate performs these calculations.
Candidate accurately determines the Overall Correction Factor. ( 3.3979 (DH Correction Factor) x 1.77 (fuel assembly correction factor) = 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.
COMMENTS:
COMMENTS:
STEP 6: Step 7.0 SAT Determine RCS condition.
STEP 9:           Step 7.4 SAT _ _ __
UNSAT , STANDARD:
Obtain the Time to Core Uncovery from Table 15.
Using data from the cue sheet the candidate accurately determines that the RCS is intact and not vented. COMMENTS: ( 7/20/20095/28/20095:39 AM Page 6 of 10 Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx STEP 7: STANDARD: , COMMENTS:
UNSAT _ __
STEP 8: ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 7.1 Obtain the Time to Boil from Table 3. Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3. Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.
STANDARD:                Using data from the cue sheet the candidate accurately detennines determines the Time to Core Uncovery from Table 15.
Steps 7.2 and 7.3 Per the cue sheet these steps are not required.
Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.
STANDARD:
NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
COMMENTS:
COMMENTS:
STEP 9: STANDARD:
7/20/20095/28/20095:39 AM 7120/20095128/20095:39                      Page 7 oflO                              CO2 (NRC 2009)
Admin C02 H:\NRC - 2009\JPM\Admin\Admin 'C02 (NRC 2009) [Modified].docx
 
AD MINI STRATIVE JOB PERFORMANCE MEASURE ADMINISTRATIVE STEP 10:         Step 7.5                                                                    Critical Step
(
determine current Time to Apply the Overall Correction Factor to detennine                            Basis: Accurate Boil.                                                                        time that boiling will occur.
STANDARD:                                       determines the current Time to Boil.
Candidate accurately detennines                                    SAT 6.0 I.(Overall Correction Factor) x 26.94 (Time to Boil) ==
6.01.(Overall                                                      UNSAT 161.91 minutes minutes..
Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery) == 162 minutes.
Values between 158 minutes and 165 minutes are acceptable.
(approximately 2% error band)
COMMENTS:
COMMENTS:
Step 7.4 Obtain the Time to Core Uncovery from Table 15. Using data from the cue sheet the candidate accurately determines the Time to Core Uncovery from Table 15. Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.
( STEP 11:         Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.
SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ 7120/20095128/20095:39 AM Page 7 oflO Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin
UNSAT STANDARD:               NA
'C02 (NRC 2009) [Modified].docx ( ( STEP 7: STANDARD: , COMMENTS:
* EXAMINER NOTE:                   There are no adverse consequences if candidate performs these calculations.
STEP 8: ADMINISTRATIVE JOB PERFORMANCE MEASURE Step 7.1 Obtain the Time to Boil from Table 3. Using data from the cue sheet the candidate accurately detennines the Time to Boil from Table 3. Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.
Steps 7.2 and 7.3 Per the cue sheet these steps are not required.
STANDARD:
NA EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
COMMENTS:
COMMENTS:
STEP 9: STANDARD:
7/20/20095/28120095:39 AM 7/20/20095/28/20095:39                      Page 8 oflO                          Admin C02 (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12:         Step 7.8                                                                  Critical Step
((
Apply the Overall Correction Factor to determine current Time to          Basis: Accurate Core Uncovery.                                                            time that core
                                  .*                                                          uncovery will occur.
STANDARD:                 Candidate accurately determines the current Time to Core
        *,                  Uncovery..
Uncovery SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery) = 2182.65 minutes.                                      UNSAT Using rounded values for all calculations:
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery) = 2178 minutes.
Values between 2156 minutes and 2204 minutes are acceptable.
(approximately 1% error band)
COMMENTS:
COMMENTS:
Step 7.4 Obtain the Time to Core Uncovery from Table 15. Using data from the cue sheet the candidate accurately detennines the Time to Core Uncovery from Table 15. Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.
TERMINATION CUE:
SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ SAT ___ _ UNSAT __ _ 7/20/20095/28/20095:39 AM Page 7 oflO Admin CO2 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin
Candidate accurately determines current Time to Boil and Time to Core Uncovery.
'C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to detennine current Time to Basis: Accurate Boil. time that boiling will occur. STANDARD:
END OF TASK TIME STOP
Candidate accurately detennines the current Time to Boil. SAT 6.0 I.(Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes. , Using rounded values for all calculations:
(
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery)
7/20/20095/28/20095:39 AM                     Page 9 of 10 oflO                       Admin C02 CO2 (NRC 2009)
= 162 minutes. Values between 158 minutes and 165 minutes are acceptable. (approximately 2% error band) COMMENTS:
H:\NRC "- 2009\lPM\Admin\Admin 2009\JPM\Admin\Admin C02 CO2 (NRC 2009) [Modified].docx
STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.
 
UNSAT STANDARD:
((
NA * , EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
COMMENTS:
READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core 120 0 F RCS temperature is 120° RCS pressure is 12 psig RCS level is i154 54 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is O~OO on 08/29109
7/20/20095/28120095:39 AM Page 8 oflO Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx AD MINI S TRA TIVE JOB PERFORMANCE MEASURE ( STEP 10: Step 7.5 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Boil. time that boiling will occur. STANDARD:
(
Candidate accurately determines the current Time to Boil. SAT 6.01.(Overall Correction Factor) x 26.94 (Time to Boil) = UNSAT 161.91 minutes . . Using rounded values for all calculations:
INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery)
Time to Boil =.
= 162 minutes. Values between 158 minutes and 165 minutes are acceptable. (approximately 2% error band) COMMENTS: ( STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.
                =
UNSAT STANDARD:
Time to Core Uncovery =   =
NA * . EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.
(
COMMENTS:
 
7/20/20095/28/20095:39 AM Page 8 oflO Admin C02 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Core Uncovery.
CRYSTAL RIVER UNIT 3
time that core uncovery will
(
* occur. STANDARD:
JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison
Candidate accurately determines the current Time to Core
(
* Uncovery . SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery)
PREPARED BY:                 Alan Kennedy                             Date: 07/09/09 VALIDATED BY:                     I Taylor Rop 1                                   Date: 07/15/09 APPROVAL BY:                 Lawrence 1 I Vansicklen                 Date: 07/20109 (Nuclear Training Supervisor)
= 2182.65 minutes. UNSAT Using rounded values for all calculations:
CONCURRED BY:                 Mike Kelly                               Date: 07/20109 (Operations Representative)
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM ?ror individual step changes that do not affect the flow of the JPM.
= 2178 minutes. Values between 2156 minutes and 2204 minutes are acceptable. (approximately 1 % error band) COMMENTS:
("
* , TERMINATION CUE: Candidate accurately determines current Time to Boil and Time to Core Uncovery.
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
END OF TASK TIME STOP 7/20/20095/28/20095:39 AM Page 9 oflO Admin C02 (NRC 2009) H:\NRC " 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( STEP 12: Step 7.8 Critical Step Apply the Overall Correction Factor to determine current Time to Basis: Accurate Core Uncovery.
revision.
time that core uncovery will . occur. STANDARD:
 
Candidate accurately determines the current Time to Core , Uncovery.
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#:              Admin EC1 - NRC 2009 [Bank #286]
SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery)
C( Task:               Perform a Monthly Nllmbalance NI Imbalance Comparison, SP-312BI SRO - Perform safety and technical reviews of plant procedures.
= 2182.65 minutes. UNSAT Using rounded values for all calculations:
Alternate Path:             DYES             [gJ NO IZl PRA Top Critical Action:"                     DYES            IZl NO Safety Safefy Function:           NA KIA Rating/lmportance:
6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery)
Rating/Importance:            G2.2.12             RO 3.7       SRO 4.1 Task Number: 0150202004 I RO                           1190101029 I SRO 1190101029/SRO Position:                 DSROONLY OSRO ONLY                    [gJRO/SRO IZlRO/SRO           DNLO/RO/SRO ONLO/RO/SRO Task Standard:             Perform a Monthly Nllmbalance Comparison, SP-312B SRO - Perform safety and technical reviews of plant procedures.
= 2178 minutes. Values between 2156 minutes and 2204 minutes are acceptable. (approximately 1 % error band) COMMENTS: . , TERMINATION CUE: Candidate accurately determines current Time to Boil and Time to Core Uncovery.
Preferred Evaluation Location:                                       Preferred Evaluation Method o
END OF TASK TIME STOP ( 7/20/20095/28/20095:39 AM Page 9 of 10 Admin CO2 (NRC 2009) H:\NRC -2009\lPM\Admin\Admin CO2 (NRC 2009) [Modified].docx
D SIM           0 PLANT IZl D              [gJ ADMIN                             [gJ PERFORM IZl             0 SIMULATE D
( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120° F RCS pressure is 12 psig RCS level is i 54 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is on 08/29109 , INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
(
Time to Boil =. Time to Core Uncovery = ( ( ( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core RCS temperature is 120 0 F RCS pressure is 12 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is on 08/29109 , INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.
Time to Boil = Time to Core Uncovery =
( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 Vansicklen Date: 07/20109 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM ?r individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( ( (" CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop I Taylor Date: 07/15/09 APPROVAL BY: Lawrence I Vansicklen Date: 07/20109 (Nuclear Training Supervisor)
CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. , Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
JPM#: ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EC1 -NRC 2009 [Bank #286] C Task: Perform a Monthly NI Imbalance Comparison, SP-312BI SRO -Perform safety and technical reviews of plant procedures.
Alternate Path: DYES PRA Top Critical Action:" Safety Function:
NA IZl NO DYES IZl NO KIA Rating/lmportance:
G2.2.12 RO 3.7 SRO 4.1 Task Number: 0150202004 I RO 1190101029 I SRO Position:
DSROONLY IZlRO/SRO DNLO/RO/SRO Task Standard:
Perform a Monthly Nllmbalance Comparison, SP-312B SRO -Perform safety and technical reviews of plant procedures.
Preferred Evaluation Location:
Preferred Evaluation Method D SIM D PLANT IZl ADMIN IZl PERFORM D SIMULATE (  


==References:==
==References:==
.
SP-312B, Rev. 9 Validation Time: 25 I 5 minutes Time Critical:
DYES IZl NO Candidate:
Time Started: _____ _ Printed Name Time Finished:
_____ _ Performance Rating: D SAT D UNSAT Performance Time: ____ _ Examiner:
_______ -___ ----Printed Name Signature Date Comment: l 112115/28/20096:33 AM Page 2 of 11 Admin ECl (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECl (NRC 2009) [Bank #286].docx ( JPM#: ADMINISTRATIVE JOB PERFORMANCE MEASURE Admin EC1 -NRC 2009 [Bank #286] Task: Perform a Monthly Nllmbalance Comparison, SP-312BI SRO -Perform safety and technical reviews of plant procedures.
Alternate Path: DYES PRA Top Critical Action:" Safefy Function:
NA [gJ NO DYES KIA Rating/Importance:
G2.2.12 RO 3.7 SRO 4.1 Task Number: 0150202004 I RO 1190101029/SRO Position:
OSRO ONLY [gJRO/SRO ONLO/RO/SRO Task Standard:
Perform a Monthly Nllmbalance Comparison, SP-312B SRO -Perform safety and technical reviews of plant procedures.
Preferred Evaluation Location:
Preferred Evaluation Method o SIM 0 PLANT [gJ ADMIN [gJ PERFORM 0 SIMULATE (


==References:==
==References:==


SP-312B, Rev. 9 Validation Time: 25 I 5 minutes Time Critical:
SP-312B, Rev. 9 Validation Time: 25 I 5 minutes                                                     0 YES IZl Time Critical: DYES  [gJ NO Candidate:                                                                 Time Started: _ _ _ _ __
0 YES [gJ NO Candidate:
Printed Name Time Finished: _ _ _ _ __
Time Started: -------Printed Name Time Finished:
Performance Rating: D          0 SAT         0 UNSAT D                            Performance Time: _ _ _ __
_____ _ Performance Rating: 0 SAT 0 UNSAT Performance Time: ____ _ Examiner:  
Examiner: _______- ___- - - -
------------
Printed Name                               Signature                       Date Comment:
Printed Name Signature Date Comment: ( 112115128120096:33 AM Page 2 of II Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED: Copy of SP-312B, Rev 9 ITS -Reference Calculator INITIAL CONDITIONS:
l(
You are the Reactor Operator.
112115/28/20096:33 AM 112115128120096:33                                Page 2 of 11 II                                Admin ECI ECl (NRC 2009)
READ TO THE OPERATOR The plant is in normal power operation.
H:\NRC - 2009\JPM\Admin\Admin ECI ECl (NRC 2009) [Bank #286].docx
SP-312B, Monthly Nllmbalance Comparison, is required.
 
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED:
The plant has been at steady state conditions for > 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
( Copy of SP-312B, Rev 9 ITS - Reference Calculator READ TO THE OPERATOR INITIAL CONDITIONS:
Incore imbalance is -4.8% RTP. SP-312D has been completed.
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.
Include applicable time requirements.
D No ITS actions required, or
* Per ITS _______ (ITS number) the actions below must be completed within ______ hours. 112115/28/2009 6:33 AM Page 3 of 11 Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED: ( Copy of SP-312B, Rev 9 ITS -Reference Calculator ( .* READ TO THE OPERATOR INITIAL CONDITIONS:
You are the Reactor Operator.
You are the Reactor Operator.
The plant is in normal power operation.
The plant is in normal power operation.
SP-312B, Monthly Nllmbalance Comparison, is required.
SP-312B, Monthly Nllmbalance Comparison, is required.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
The plant has been at steady state conditions for              for>
Incore imbalance is -4.8% RTP. SP-312D has been completed.
                                                                      > 15 minutes.
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
The plant computer is out of service.
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.
Control Console NI power is as follows: NI 52%
Include applicable time requirements.
NI 53%
D No ITS actions required, or . Per ITS _______ (ITS number) the actions below must be completed within hours. ------112115/28/20096:33 AM Page 3 of 11 Admin EC 1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EC1 (NRC 2009) [Bank #286].docx
NI 53%
( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 1: Provide candidate with copy of SP-312B. STANDARD:
NI 52%
PT-138 has been completed. Incore imbalance is -4.8% RTP.
SP-312D has been completed. Thermal power is 1340 MWT.
(
INITIATING CUE:
You are requested to perform SP-312B (voltage readings are attached).
Return Enclosures 1 & 2 with completed JPM.
SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications. Include applicable time requirements.
D   No ITS actions required, or   .*
Per ITS _ _ _ _ _ _ _ (ITS number) the actions below must be completed within
_ _ _ _ _ _ hours. hours.
~.*
112115/28/2009 6:33 AM 112115/28/20096:33                                 Page 3 of 11                 Admin EC ECI1 (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin ECI EC1 (NRC 2009) [Bank #286].docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 1:
( Provide candidate with copy of SP-312B.
STANDARD:
COMMENTS:
COMMENTS:
STEfS 2: (step 4.2.1 & 4.2.2) Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8. Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure
STEfS 2:             (step 4.2.1 & 4.2.2)
: 2. STANDARD:
Have the craft personnel connect the DVM to the Delta          Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8.       NI-S.
N/A EXAMINER NOTE: Voltage readings are supplied for this JPM. COMMENTS:
Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure 2.
STEP. 3: (step 4.2.3) Using the conversion factors of Enclosure 2, convert the voltage readings to %RTP imbalance.
STANDARD:
STANDARD:
Candidate accurately converts voltages to %RTP imbalance.
N/A EXAMINER NOTE:
Values recorded must agree within +/- 0.25% of the value given on the JPM key. COMMENTS:
Voltage readings are supplied for this JPM.
112115/28/20096:33 AM Page 4 of 11 H:\NRC -2009\JPM\Admin\Admin EC1 (NRC 2009) [Bank #286].docx Critical Step Basis: Accurate calculation required to determine
((
%RTP imbalance.
SAT __ _ UNSAT __ Admin EC1 (NRC 2009) ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 1: ( Provide candidate with copy of SP-312B. ( " ( STANDARD:
COMMENTS:
COMMENTS:
STEfS 2: (step 4.2.1 & 4.2.2) Have the craft personnel connect the DVM to the Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-S. Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure
STER 3:
: 2. STANDARD:
STEP.                (step 4.2.3)                                                               Critical Step Using the conversion factors of Enclosure 2, convert the voltage readings to                   Basis:
N/A EXAMINER NOTE: Voltage readings are supplied for this JPM. COMMENTS:
  %RTP imbalance.                                                                                Accurate calculation STANDARD:                                                                                      required to determine Candidate accurately converts voltages to %RTP imbalance. Values recorded                      %RTP must agree within +/- 0.25% of the value given on the JPM key.                                   imbalance.
STER 3: (step 4.2.3) Using the conversion factors of Enclosure 2, convert the voltage readings to %RTP imbalance.
COMMENTS:                                                                                       SAT_ __
UNSAT_ _
(
112115/28/2009 6:33 AM 112115/28/20096:33                                Page 4 of 11 II                            Admin ECI EC1 (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin EC1 ECI (NRC 2009) [Bank #286].docx
                                                      #286ldocx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4:             (step 4.2.4)
I
\ Record the NI Imbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure           SAT_ __
: 2) on Enclosure 1 under Column A designated "NI Imbalance" (APlo)      (APl o)
UNSAT_ _
STANDARD:
STANDARD:
Candidate accurately converts voltages to %RTP imbalance.
Candidate accurately transfers data from Enclosure 2 to Enclosure 1.
Values recorded must agree within +/- 0.25% of the value given on the JPM key. COMMENTS:
COMMENTS:
112115/28/2009 6:33 AM Page 4 of II H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286ldocx Critical Step Basis: Accurate calculation required to determine
STEP 5:             (step 4.2.5)
%RTP imbalance.
SAT_ __
SAT __ _ UNSAT __ Admin ECI (NRC 2009)
Using PT-138, Hand Axial,Power Axial.Power Imbalance Calculations, determine the In-Core Imbalance.                                                                             UNSAT_ _
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4) Record the NI Imbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT __ _ 2) on Enclosure 1 under Column A designated "NI Imbalance" (APlo) UNSAT __ STANDARD:
STAt-JDARD:
Candidate accurately transfers data from Enclosure 2 to Enclosure  
STAr-lDARD:
: 1. COMMENTS:
N/A EXAMINER NOTE:
STEP 5: (step 4.2.5) SAT __ _ Using PT-138, Hand Axial.Power Imbalance Calculations, determine the In-Core Imbalance.
This information is supplied in the cue.
UNSAT __ STAr-lDARD:
(
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
COMMENTS:
STEP 6: (step 4.2.6) Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (APh)". STANDARD:
STEP 6:             (step 4.2.6)
Candidate accurately transfers data from the initial conditions (supplied) to Enclosure
SAT_ __
: 1. COMMENTS:
Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (APh)".               (API,)".                 UNSAT_ _
112115/28120096:33 AM Page 5 of 11 H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx SAT __ _ UNSAT __ Admin ECI (NRC 2009) I \ ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4) Record the NI Imbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure
STANDARD:
: 2) on Enclosure 1 under Column A designated "NI Imbalance" (APl o) STANDARD:
Candidate accurately transfers data from the initial conditions (supplied) to Enclosure 1.
Candidate accurately transfers data from Enclosure 2 to Enclosure
COMMENTS:
: 1. COMMENTS:
(
STEP 5: (step 4.2.5) SAT __ _ UNSAT __ SAT __ _ Using PT-138, Hand Axial,Power Imbalance Calculations, determine the In-Core Imbalance.
112115/28120096:33 112115/28/2009 6:33 AM                             Page 5 of 11 II                     Admin ECI (NRC 2009)
UNSAT __ STAt-JDARD:
H:\NRC H:INRC - 2009\JPM\Admin\Admin 20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
 
STEP 6: (step 4.2.6) Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (API,)". STANDARD: Candidate accurately transfers data from the initial conditions (supplied) to Enclosure  
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7:             (step 4.2.7)
: 1. COMMENTS:
SAT_ __
112115/28/2009 6:33 AM Page 5 of II H:INRC -20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx SAT __ _ UNSAT __ Admin ECI (NRC 2009)
( Using SP-312D, Backup Heat Balance Calculations, determine the thermal power.                                                                         UNSAT_ _
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7) ( Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. STANDARD:
STANDARD:
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
N/A EXAMINER NOTE:
STEP 8: (step 4.2.8) SAT __ _ UNSAT __ SAT __ _ Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT __ STANDARD:
This information is supplied in the cue.
Candidate accurately transfers data from information supplied in initial ( conditions to enclosure
COMMENTS:
: 1. ( COMMENTS:
STEP 8:             (step 4.2.8)
STEP 9: (step 4.2.9) Complete Enclosure 1 and notify the SSO/CRS of the results.
SAT _ __
* STANDARD:
Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)".                               UNSAT_ _
Candidate accurately calculates values indicated on Enclosure 1 and notifies CRS/SSO of results (completes cue sheet). EXAMINER NOTE: Critical Step Basis: Accurate calculation required to determine Imbalance error. Values recorded must agree within +/- 0.25% of the value given on the JPM SAT __ _ key. UNSAT __ COMMENTS:
112115/2812009 6:33 AM Page 6 of II Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7) ( Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. STANDARD:
N/A EXAMINER NOTE: This information is supplied in the cue. COMMENTS:
STEP 8: (step 4.2.8) SAT __ _ UNSAT __ SAT __ _ Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT __ STANDARD:
Candidate accurately transfers data from information supplied in initial ( conditions to enclosure
: 1. COMMENTS:
STEP 9: (step 4.2.9) Complete Enclosure 1 and notify the SSO/CRS of the results. . STANDARD:
Candidate accurately calculates values indicated on Enclosure 1 and notifies CRS/SSO of results (completes cue sheet). EXAMINER NOTE: Critical Step Basis: Accurate calculation required to determine Imbalance error. Values recorded must agree within +/- 0.25% of the value given on the JPM SAT __ _ key. UNSAT __ COMMENTS:
112115/28/20096:33 AM Page 6 of II Admin EC I (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
Accurate Imbalance error determined.
RO -END OF TASK STEP 10: SRO ONLY (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any NI Channel, then immediately inform the SSO/CRS and refer to ITS SR 3.3.1.3. (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear Instrument Gain Adjustment, is to be used to perform the calibration. (Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.
STANDARD:
STANDARD:
Candidate determines that no result exceeds 2.5% and therefore no ITS Conditions apply. ( COMMENTS:
Candidate accurately transfers data from information supplied in initial
TERMINATION CRITERIA:
( conditions to enclosure 1.
* Correct ITS actions determined.
COMMENTS:
SRO -END OF TASK ( Critical Step Basis: Correct ITS actions required to be determined.
STEP 9:             (step 4.2.9)                                                Critical Step Complete Enclosure 1 and notify the SSO/CRS of the results.
SAT __ _ UNSAT __ 11211512812009 6:33 AM Page 7 of 11 Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
Basis:
Accurate STANDARD:                                                                        calculation required to Candidate accurately calculates values indicated on Enclosure 1 and notifies    determine CRS/SSO of results (completes cue sheet).                                       Imbalance error.
EXAMINER NOTE:
Values recorded must agree within +/- 0.25% of the value given on the JPM          SAT _ __
key.
UNSAT_ _
COMMENTS:
(
112115/2812009 112115/28/20096:33 6:33 AM                             Page 6 of II              Admin EC ECII (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
Accurate Imbalance error determined.
Accurate Imbalance error determined.
RO -END OF TASK STEP 10: SRO ONLY (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any NI Channel, then immediately inform the SSO/CRS and refer to ITS 8R 3.3.1.3. (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear Instrument Gain Adjustment, is to be used to perform the calibration. (Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.
RO - END OF TASK STEP 10:                   SRO ONLY                                                   Critical Step (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any       Basis:
STANDARD:
NI Channel, then immediately inform the SSO/CRS and refer to ITS SR    8R 3.3.1.3. Correct ITS actions (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear       required to Instrument Gain Adjustment, is to be used to perform the calibration.                 be determined.
Candidate determines that no result exceeds 2.5% and therefore no ITS Conditions apply. ( COMMENTS:
(Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed.                                           SAT_ __
STANDARD:                                                                             UNSAT_ _
Candidate determines that no result exceeds 2.5% and therefore no ITS Conditions apply.
( COMMENTS:
TERMINATION CRITERIA:
TERMINATION CRITERIA:
* Correct ITS actions determined.
Correct ITS actions determined.
SRO -END OF TASK ( Critical Step Basis: Correct ITS actions required to be determined.
SRO - END OF TASK
SAT __ _ UNSAT __ 112115/28/2009 6:33 AM Page 7 of 11 Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INCORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIo) (API!) --Lrn A B C D D(NI-x = D(NI-5 = D(NI-6 = D(NI-7) = D(NI-8 = NI-5 -4.88 %RTP -4.8 %RTP 1340 MWth NI-6 -4.63 %RTP -4.8 %RTP 1340 MWth NI-7 -4.25 %RTP -4.8 %RTP 1340 MWth NI-8 -5.00 %RTP -4.8 %RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above) A -B 1 X (2609 / C.) = Imbalance Error, % RTP 1 -4.88 -(-4.8) 1 X (2609 / 1340 ) = 0.16 %RTP 1 -4.63 -(-4.8) 1 X (2609 / 1340 ) = 0.33 %RTP 1 -4.25 -(-4.8) 1 X (2609 / 1340 ) = 1.07 %RTp* 1-5.0 -(-4.8) 1 X (2609 / 1340 ) = 0.39 %RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3. Performed By:
(
Date: (_ Verified By: Date: ---------------------
11211512812009 112115/28/2009 6:33 AM                             Page 7 of 11                   Admin ECI (NRC 2009)
112115/28120096:33 AM Page 8 of 11 H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx Admin ECI (NRC 2009) ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INCORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIo) (API I) ---Lm A NI-5 -4.88 %RTP -4.8 % RTP 1340 MWth B NI-6 -4.63 %RTP -4.8 % RTP 1340 MWth C NI-7 -4.25 %RTP -4.8 % RTP 1340 MWth D NI-8 -5.00 %RTP -4.8 % RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above) D(NI-x = I A -B I X (26091 C ) = Imbalance Error, % RTP D(NI-5 = I -4.88 -(-4.8) I X (2609/1340 ) = 0.16 % RTP D(NI-6 = I -4.63 -(-4.8) I X (2609/1340 ) = 0.33 % RTP D(NI-7) = I -4.25 -(-4.8) I X (2609/1340 ) = 1.07 % RTP D(NI-8 = 1-5.0 -(-4.8) I X (2609/1340 ) = 0.39 % RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3. Performed By: Date: ----------------------
H:\NRC - 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx
Verified By: Date: ----------------------
 
112115/28/2009 6:33 AM Page 8 of 11 H:INRC -20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx Admin ECI (NRC 2009)
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INCORE AXIAL POWER IMBALANCE CORRELATION A                     B               C NI                 INCORE         THERMAL RPS                               IMBALANCE                   IMBALANCE           POWER CHANNEL DETECTOR                         (APIo)                     (API!)
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EOUT" * -..JAM NI-5 0300 -4.61 VDC PM NI-6 0300 -..JAM -4.63VDC PM NI-7 0300 -..JAM -4.66VDC PM NI-8 0300 -..JAM -4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:
(API I )         --Lrn
NI Imbalance  
                                                                                          ---Lm A                NI-5             -4.88 %RTP                 -4.8 %RTP
(%RTP) = (-12.5 %RTPIVDC x VDC) -62.5 %RTP Example: NI-5 DFAM "bOUT" is measured at -2.5 VDC NI-5 Imbalance  
                                                                                % RTP     1340 MWth B               NI-6             -4.63 %RTP                       % RTP
= (-12.5 %RTPIVDC x -2.5VDC) -62.5 %RTP NI-5 Imbalance
                                                                        -4.8 %RTP         1340 MWth C               NI-7             -4.25 %RTP                 -4.8 %%RTPRTP    1340 MWth D               NI-8             -5.00 %RTP                 -4.8 %RTP
= (+31.25 %RTP) -62.5 %RTP NI-5 Imbalance  
                                                                              % RTP      1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above)
= -31.25 %RTP Calculations:
(
NI-5 %RTP = (-12.5 %RTPIVDC x -4.61 VDC) -62.5 %RTP = -4.88 %RTP NI-6 %RTP = (-12.5 %RTPIVDC x -4.63 VDC) -62.5 %RTP = -4.63 %RTP NI-7 %RTP = (-12.5 %RTPIVDC x -4.66 VDC) -62.5 %RTP = -4.25 %RTP NI-8 %RTP = (-12.5 %RTP/VDC x -4.60 VDC) -62.5 %RTP = -5.0 %RTP Date Performed By ------Verified By 1121/5/2&/20096:33 AM Page 9 of 11 H:\NRC -2009\JPM\Admin\Adrnin ECI (NRC 2009) [Bank #286].docx Date ----Admin ECI (NRC 2009) ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EouT" * -VAM NI-S 0300 -4.61 VDC PM NI-6 0300 -VAM -4.63VDC PM NI-7 0300 -VAM 4.66VDC PM NI-8 0300 -VAM -4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:
D(NI-x   =
NI Imbalance
              =     I A - B 1I X (2609    (26091/ C.)C ) == Imbalance Error, %      % RTP D(NI-5   =
(%RTP) = (-12.S %RTP/VDC x VDC) -62.S %RTP Example: NI-S DFAM "bOUT" is measured at -2.S VDC NI-S Imbalance
              =     I1 -4.88 - (-4.8) I1 X (2609   / 1340 ) == 0.16 (2609/1340                      %RTP
= (-12.S %RTP/VDC x -2.SVDC) -62.S %RTP NI-S Imbalance
                                                                            % RTP D(NI-6 =       1I -4.63 - (-4.8) 1I X (2609 (2609/1340
= (+31.2S %RTP) -62.S %RTP NI-S Imbalance
                                                    / 1340 ) = 0.33         %RTP
= -31.2S %RTP Calculations:
                                                                            % RTP D(NI-7) =     1I -4.25 - (-4.8) 1I X (2609 (2609/1340
NI-S %RTP = (-12.S %RTP/VDC x -4.61 VDC) -62.S %RTP = -4.88 %RTP NI-6 %RTP = (-12.S %RTP/VDC x -4.63 VDC) -62.S %RTP = -4.63 %RTP NI-7 %RTP = (-12.S %RTP/VDC x -4.66 VDC) -62.S %RTP = -4.2S %RTP NI-8 %RTP = (-12.S %RTP/VDC x -4.60 VDC) -62.S %RTP = -S.O %RTP Performed By Verified By 112115/2&/2009 6:33 AM Page 9 of II H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx Date Date ----Admin ECI (NRC 2009) c ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPON COMPLETION OF TASK) , INITIAL CONDITIONS:
                                                    / 1340 ) =       1.07   %RTp*
* You are the Reactor Operator.
                                                                              % RTP D(NI-8 =       1-5.0 - (-4.8) 1I X (2609 (2609/1340
                                                  / 1340 )   =     0.39   %RTP
                                                                            % RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3.
Performed By:                   ----------------------                   Date:
                                    ~-------------------
((_ Verified By:                     ----------------------Date:
112115/28/2009 6:33 AM 112115/28120096:33                                  Page 8 of 11                                 Admin ECI (NRC 2009)
H:\NRC    20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx H:INRC - 2009\JPM\Admin\Admin
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel                     Time "EouT" "EOUT" NI-5 NI-S              0300          -..JAM
                                                                          -VAM          -4.61
                                                                                        - 4.61 VDC PM NI-6             0300           -..JAM
                                                                          -VAM          - 4.63VDC PM NI-7             0300           -..JAM
                                                                          -VAM          -~ 4.66VDC PM NI-8             0300           -..JAM
                                                                          -VAM            - 4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:
(                  NI Imbalance (%RTP) == (-12.5         %RTPIVDC x
(-12.S %RTP/VDC                  VDC) - 62.5 62.S %RTP Example: NI-5   NI-S DFAM "bOUT" is measured at -2.5         -2.S VDC NI-S Imbalance = (-12.5 NI-5                          %RTPIVDC x -2.5VDC)
(-12.S %RTP/VDC                -2.SVDC) - 62.5 62.S %RTP NI-S Imbalance == (+31.25 NI-5                 (+31.2S %RTP) - 62.S    62.5 %RTP NI-5 Imbalance = -31.25 NI-S                  -31.2S %RTP Calculations:
NI-S %RTP = (-12.5 NI-5                 (-12.S %RTP/VDC
                              %RTPIVDC x -4.61 VDC) - 62.5           62.S %RTP = =    -4.88 %RTP NI-6 %RTP == (-12.(-12.S %RTP/VDC
                              %RTPIVDC x -4.63 VDC) - 62.5            62.S %RTP =     - 4.63 %RTP NI-7 %RTP = (-12.5          %RTPIVDC x -4.66 VDC) - 62.5
(-12.S %RTP/VDC                               62.S %RTP ==       -4.25
                                                                                          -4.2S %RTP NI-8 %RTP = (-12.5    (-12.S %RTP/VDC x -4.60 VDC) - 62.S           62.5 %RTP =       -5.0
                                                                                          -S.O %RTP Performed By                                                                       Date    ------
(
Verified By                                                                       Date - - - -
1121/5/2&/20096:33 112115/2&/2009 6:33 AM                             Page 9 of 11 II                                   Admin ECI (NRC 2009)
H:\NRC - 2009\JPM\Admin\Adrnin 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE c                (TO BE RETURNED TO THE EXAMINER UPON                     , COMPLETION OF TASK)
UPO,N INITIAL CONDITIONS:
You are the Reactor Operator.
The plant is in normal power operation.
The plant is in normal power operation.
SP-312B, Monthly NI Imbalance Comparison, is required.
SP-312B, Monthly Nllmbalance NI Imbalance Comparison, is required.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console NI power is as follows: NI-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
The plant has been at steady state conditions for> 15 minutes.
Incore imbalance is -4.8% RTP. SP-312D has been completed.
The plant computer is out of service.
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
Control Console NI     N I power is as follows: N          1 52%
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.
NI-5 NI 53%
Include applicable time requirements  
NI 53%
.. o No ITS actions required, or Per ITS _______ (ITS number) the actions below must be completed within ______ hours. 112115/28/20096:33 AM Page 10 ofll Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE (TO BE RETURNED TO THE EXAMINER UPO,N COMPLETION OF TASK) INITIAL CONDITIONS: . You are the Reactor Operator.
NI 52%
The plant is in normal power operation.
PT-138 has been completed. Incore imbalance is -4.8% RTP.
SP-312B, Monthly Nllmbalance Comparison, is required.
SP-312D has been completed. Thermal power is 1340 MWT.
The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.
INITIATING CUE:
The plant has been at steady state conditions for> 15 minutes. The plant computer is out of service. Control Console N I power is as follows: N 1-5 -52% NI-6 -53% NI-7 -53% NI-8 -52% PT-138 has been completed.
You are requested to perform SP-312B (voltage readings are attached).
Incore imbalance is -4.8% RTP. SP-312D has been completed.
Return Enclosures 1 & 2 with completed JPM.
Thermal power is 1340 MWT. INITIATING CUE: You are requested to perform SP-312B (voltage readings are attached).
SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications. Include applicable time requirements     requirements...
Return Enclosures 1 & 2 with completed JPM. SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications.
o D    No ITS actions required, or Per ITS _ _ _ _ _ _ _ (ITS number) the actions below must be completed within
Include applicable time requirements.
_ _ _ _ _ _ hours.
D No ITS actions required, or Per ITS _______ (ITS number) the actions below must be completed within ______ hours. 112115/28/2009 6:33 AM Page 10 of II Admin ECI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx
(
( DVMID# Cal Due Date 112115/28/20096:33 AM ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time * "EouT" NI-5 0300 ...JAM -4.61 VDC PM NI-6 0300 ...JAM PM -4.63VDC NI-7 0300 ...JAM -4.66VDC PM NI-8 0300 ...JAM -4.60VDC PM TI-4020 05/09/2010 Page 11 of 11 H:\NRC -2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx Admin ECI (NRC 2009) ( ( ( DVMID# Cal Due Date 112115/2812009 6:33 AM ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT DFAM Channel Time * "EOUT" NI-5 0300 ..JAM -4.61 VDC PM NI-6 0300 ..JAM -4.63VDC PM NI-7 0300 ..JAM -4.66VDC PM NI-8 0300 ..JAM -4.60VDC PM TI-4020 05/09/2010 Page 11 of 11 H:\NRC -2009\JPM\Admin\Admin Eel (NRC 2009) [Bank #286].docx Admin EC1 (NRC 2009)
112115/28/20096:33 112115/28/2009 6:33 AM                           Page 10 ofll of II                         Admin ECI (NRC 2009)
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCl NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREP AREDIREVIEWED BY:
H:\NRC - 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx
Date: 07/09/09 VALIDATED BY: _____
 
__ ,...__--Date: 07115/09 APPROVALBY:
ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT
_____
(
___ __ . Date: 07120109 * (Nuclear Training Supervisor)
DFAM Channel                     Time
CONCURRED BY: ____
                                    *                                       "EouT" "EOUT" NI-5             0300         ...JAM
Date: 07/20109 (Operations Representative)
                                                                      ..JAM  - 4.61 VDC PM NI-6             0300         ...JAM
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS PREPARED/REVIEWED BY:
                                                                      ..JAM   - 4.63VDC
_____ _ Date: 07/09/09 VALIDATED BY: _____ ....:.R=o=p-'-/....:.T=.ay'-='-lo=r'---
                                                                              -4.63VDC PM NI-7             0300         ...JAM
______ _ Date: 07115/09 APPROVALBY:
                                                                      ..JAM   - 4.66VDC PM NI-8             0300         ...JAM
_____
                                                                      ..JAM   - 4.60VDC PM DVMID#                    TI-4020 Cal Due Date              05/09/2010
___ __ . Date: 07120/09 * (Nuclear Training Supervisor)
(
CONCURRED BY: ____
(
______ __ Date: 07/20/09 (Operations Representative)
112115/28/20096:33 112115/2812009 6:33 AM                           Page 11 of 11                               EC1 (NRC 2009)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
Admin ECI H:\NRC - 2009\JPM\Admin\Admin Eel ECI (NRC 2009) [Bank #286].docx
c ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RC1-NRC 2009 [Modified]
 
Task: Comply with plant radiation exposure criteria.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI                              #RCl NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS
Alternate Path: D YES [gj NO PRA Top Critical Action: D YES [gj NO Safety Function:
(
NA KIA Rating/Importance:
PREPARED/REVIEWED PREP                             _---=.A=l=an~K=e=n=n=ed.:.ly'--------
G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008  
AREDIREVIEWED BY: _--=-A=l=an",-,K=en=n=-ed~y,---                    _ _ _ _ __                Date: 07/09/09 VALIDATED BY: _ _ _ _ _~R=o~p...:..../~T.!::!:,ay~l=or'_______'__
-RO Position:
                                        ....:.R=o=p-'-/....:.T=.ay'-='-lo=r'---_ __ _,...__--
DSROONLY [gjRO/SRO DNLOIRO/SRO Task Standard:
_ __              Date:   07115/09 APPROVALBY: _ _ _ _ _~L=a~w~re=n=c~e~/V~a=n=sl=*c=kl=en~
Calculate the maximum permissible stay time within Emergency Dose Limits (+/- 5 minutes) Preferred Evaluation Location:
                                      ~L=a~WT~e=n=ce~/~V~.~==sl=*c=hl=en~_ _ ___                       . Date: 07120109 07120/09
Preferred Evaluation Method: D SIM D PLANT [gj ADMIN [gj PERFORM . D SIMULATE c  
                              * (Nuclear Training Supervisor)
                                    ~M==ik=e~K=e=ll~y~_ _ _ _ _ ___
CONCURRED BY: _ _ _ _~M==ik=e~K=e=ll~y~--------                                                        Date: 07/20109 07/20/09 (Operations Representative)
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.
Operations concurrence is required for new JPMs and                   ~d changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RC1- RC 1- NRC 2009 [Modified]
Task: Comply Comply with plant radiation exposure criteria.
Alternate Path: DYES D YES       [gj
[gJ NO PRA Top Critical Action: D       YES [gj DYES    [gJ NO Safety Function:       NA KIA Rating/Importance:         G2.3.4     RO 3.2     SRO 3.7 Task Number:           1190102008 - RO Position:               DSROONLY               [gjRO/SRO
[gJRO/SRO    DNLOIRO/SRO DNLO/RO/SRO Task Standard:         Calculate the maximum permissible stay time within Emergency Dose Limits
(+/- 5 minutes)
Preferred Evaluation Location:                               Preferred Evaluation Method:
D SIM       D PLANT [gj   [gJ ADMIN ,
[gj PERFORM
[gJPERFORM              .D   SIMULATE DSlMULATE c
c


==References:==
==References:==


EM-202, Rev 85 Validation Time: 5 minutes Time Critical:
EM-202, Rev 85 Validation Time:         5 minutes                         Time Critical:               DYES[gjNO DYES        [gJNO
DYES[gjNO  
    ===========================================================================
============================================================
    ============================================================
Candidate:
Candidate: -------------------------------                                      Time Start:
Time Start: -----------------------------
Printed Name Time Finish: -    _-  __  -_-_-
Printed Name Time Finish: ____ _ Performance Rating: D SAT D UNSAT Performance Time: ____ _ Examiner:  
Performance Rating: D SAT               D UNSAT                       Performance Time: ----------_ _ _ __
------------------------------
Examiner: ------------------------------                    ----------------------~/------
Printed Name Signature Date Comment: ---------------------------------------------------------. 5/28/2009 8:09 AM Page 2 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RC 1-NRC 2009 [Modified]
                                                                - - - - - - - - - - - - - - - - - - - - - - - -/- - - -
Task: Comply with plant radiation exposure criteria.
Printed Name                                             Signature                   Date Comment: ---------------------------------------------------------------
Alternate Path: DYES [gJ NO PRA Top Critical Action: DYES [gJ NO Safety Function:
  . 5/28/2009 8:09 AM 5/28/20098:09                              Page 2 of7                                     Admin RCI (NRC 2009)
NA KIA Rating/Importance:
H:\NRC - 2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx
G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008
-RO Position:
DSROONLY [gJRO/SRO DNLO/RO/SRO Task Standard:
Calculate the maximum permissible stay time within Emergency Dose Limits (+/- 5 minutes) Preferred Evaluation Location:
Preferred Evaluation Method: D SIM D PLANT [gJ ADMIN [gJPERFORM DSlMULATE ,


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE
(
SIMULATOR OPERATOR SETUP INSTRUCTIONS
: 1.      None SIMULATOR OPERATOR INSTRUCTIONS
: 1.      None TOOLS/EQUIPMENT/PROCEDURES NEEDED
: 1.      EM-202, Rev 85        Reference
: 2.      Calculator
(
5/28/20098:09 AM                        Page 3 of7            Admin RCI RC I (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin 2009\JPM\Admin\Adniin RCI (NRC 2009) [Modified].docx


EM-202, Rev 85 Validation Time: 5 minutes Time Critical:
DYES [gJNO ===========================================================================
Candidate:
Time Start: -------------------------------Printed Name Time Finish: -----Performance Rating: D SAT D UNSAT Performance Time: ----------
Examiner:
/ ------------------------------
------------------------
----Printed Name Signature Date Comment: ---------------------------------------------------------------
5/28/20098:09 AM Page 2 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx 
( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS
: 1. None SIMULATOR OPERATOR INSTRUCTIONS
: 1. None TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. 2. EM-202, Rev 85 Calculator 5/28/20098:09 AM Reference Page 3 of7 H:\NRC -2009\JPM\Admin\Adniin RCI (NRC 2009) [Modified].docx Admin RC I (NRC 2009) ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR OPERATOR SETUP INSTRUCTIONS
: 1. None SIMULATOR OPERATOR INSTRUCTIONS
: 1. None TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. 2. EM-202, Rev 85 Calculator 5/28/20098:09 AM Reference Page 3 of7 H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx Admin RCI (NRC 2009)
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.
ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.
An emergency event is in pr.ogress.
An emergency event is in pr.ogress.
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The lise of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.
Emergency Dose Limits (EDL) are in effect.
The PPO has received 1.62 Rem TEDE this year.
The lise use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.
The Emergency Coordinator has approved this evolution.
The Emergency Coordinator has approved this evolution.
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 Rlhr 2 Open DHV-95 7 minutes 19.75 Rlhr 3 Open DHV-126 3.65 Rlhr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? 5/28120098:09 AM Page 4 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\AdminRCI (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.
The following tasks are to be performed to align High Pressure Aux Spray:
An emergency event is in pr.ogress.
      #               TASK                             TIME                   DOSE RATE 1     Open MUV-273                             22 minutes                 5.31 Rlhr 2     OpenDHV-95 Open DHV-95                               7 minutes                 19.75 Rlhr 3     Open DHV-126                                                         3.65 Rlhr
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.
( Note: Assume no dose is received while traveling between tasks.
The Emergency Coordinator has approved this evolution.
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 Rlhr 2 OpenDHV-95 7 minutes 19.75 Rlhr 3 Open DHV-126 3.65 Rlhr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? 5/28/20098:09 AM Page 4 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. Note: Candidate should understand the following:  
  #3 without exceeding his Emergency Dose Limit?
: 1. EDL is 10 Rem for this event (may use EM-202 as a reference).  
(
: 2. Current exposure for the year is not counted toward the EDL. TIME START ___ _ STEP 1: Determine dose received w4ile performing Task #1. , STANDARD:
5/28120098:09 5/28/20098:09 AM                       Page 4 of7                               Admin RCI (NRC 2009)
Candidate determines dose received while performing Task #1. 5.31 Rlhr X 1hr/60 min X 22 min = 1.95 R EXAMINER NOTE: If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.
H:\NRC - 2009\JPM\Admin\Admin 2009\JPM\Admin\AdminRCI RCI (NRC 2009) [Modified].docx
COMMENTS:
 
STEP 2: Determine dose received wItile performing Task #2. STANDARD:
ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order.
Candidate determines dose received while performing Task #2. 19.75 R/hr X 1hr/60 min X 7 min = 2.30 R COMMENTS:
Note: Candidate should understand the following:
SAT UNSAT SAT UNSAT 5128/2009 8:09 AM Page 5 of7 Admin RCI (NRC 2009)  
: 1.       EDL is 10 Rem for this event (may use EM-202 as a reference).
-2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order. Note: Candidate should understand the following:
: 2.       Current exposure for the year is not counted toward the EDL.
: 1. EDL is 10 Rem for this event (may use EM-202 as a reference).
TIME START _ _ __
: 2. Current exposure for the year is not counted toward the EDL. TIME START ___ _ STEP 1: Determine dose received w4ile performing Task #1. e STANDARD:
STEP 1:
Candidate determines dose received while performing Task #1. 5.31 Rlhr X 1hr/60 min X 22 min = 1.95 R EXAMINER NOTE: If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.
SAT Determine dose received w4ile performing Task #1.
COMMENTS:
UNSAT
STEP 2: Determine dose received wHile performing Task #2. STANDARD:
        ,e STANDARD:
Candidate determines dose received while performing Task #2. 19.75 Rlhr X 1hr/60 min X 7 min = 2.30 R COMMENTS:
Candidate determines dose received while performing Task #1.
SAT UNSAT SAT UNSAT 5/28/2009 8:09 AM Page 5 of7 Admin RC I (NRC 2009) H:\NR,C -2009\]PM\Admin\Admin RCI (NRC 2009) [ModifiedJ.docx
5.31 Rlhr X 1hr/60 min X 22 min = 1.95 R EXAMINER NOTE:
( ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: Determine dose remaining for EDL. STANDARD:
If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.
Candidate determines dose remaining for EDL. 10.0 R -1.95 R -
( COMMENTS:
R = 5.75 R COMMENTS: , STEP 4: Determine the time available for the PPO to complete Task #3 without exceeding the EDL. STANDARD:
STEP 2:
Candidate determines
SAT Determine dose received wItile wHile performing Task #2.
(+/- 5 minutes) the time available for the PPO to complete Task #3 without exceeding the EDL. Available Dose = 5.75 R Dose Rate 3.65 R/hr = 1.58 hr X 60 min = 94.8 min 1hr COMMENTS:
UNSAT STANDARD:
TERMINATION CUE: Time limit determined.
Candidate determines dose received while performing Task #2.
END OF TASK TIME STOP SAT UNSAT Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT 5/28/2009 8:09 AM Page 6 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3: ( Determine dose remaining for EDL. ( ( STANDARD:
R/hr X 1hr/60 min X 7 min = 2.30 R 19.75 Rlhr COMMENTS:
Candidate determines dose remaining for EDL. 10.0 R -1.95 R -
(
R = 5.75 R COMMENTS: , STEP 4: Determine the time available for the PPO to complete Task #3 without exceeding the EDL. STANDARD:
5128/2009 5/28/2009 8:09 AM                       Page 5 of7                                   RC I (NRC 2009)
Candidate determines  
Admin RCI H:\N~C H:\NR,C    2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx
(+/- 5 minutes) the time available for the PPO to complete Task #3 without exceeding the EDL. Available Dose = 5.75 R Dose Rate 3.65 Rlhr = 1.58 hr X 60 min = 94.8 min 1 hr COMMENTS:
          - 2009\]PM\Admin\Admin               [ModifiedJ.docx
TERMINATION CUE: Time limit determined.
 
END OF TASK TIME STOP SAT UNSAT Critical Step Basis: Required calculation for maximum stay time. SAT UNSAT 5/28/2009 8:09 AM Page 6 of7 Admin RCI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS
ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3:
* You are the Balance of Plant operator.
SAT
(
( Determine dose remaining for EDL.
UNSAT STANDARD:
Candidate determines dose remaining for EDL.
10.0 R - 1.95 R - 2.~0 R = 5.75 R COMMENTS:
STEP 4:                                                                               Critical Step Determine the time available for the PPO to complete Task #3 without exceeding the     Basis:
EDL.                                                                                   Required calculation for maximum stay STANDARD:                                                                             time.
Candidate determines (+/- 5 minutes) the time available for the PPO to complete Task
  #3 without exceeding the EDL.                                                         SAT UNSAT
(        Available Dose = 5.75 R       =
                                        =   1.58 hr X 60 min == 94.8 min Dose Rate        3.65 R/hr Rlhr                1 hr 1hr COMMENTS:
TERMINATION CUE:             Time limit determined.
END OF TASK TIME STOP
(
5/28/2009 8:09 AM                       Page 6 of7                             Admin RCI (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
INITIAL CONDITIONS
* f You are the Balance of Plant operator.
An emergency event is in progress.
An emergency event is in progress.
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.
Emergency Dose Limits (EDL) are in effect.
The PPO has received 1.62 Rem TEDE this year.
The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.
The Emergency Coordinator has approved this evolution.
The Emergency Coordinator has approved this evolution.
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 R/hr 2 OpenDHV-95 7 minutes 19.75 Rlhr 3 Open DHV-126 3.65 R/hr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit? ( ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) INITIAL CONDITIONS f You are the Balance of Plant operator.
The following tasks are to be performed to align High Pressure Aux Spray:
An emergency event is in progress.
      #               TASK                             TIME                   DOSE RATE 1     Open MUV-273                             22 minutes                 5.31 R/hr Rlhr 2     OpenDHV-95                                 7 minutes                 19.75 Rlhr 3     Open DHV DHV-126
Emergency Dose Limits (EDL) are in effect. The PPO has received 1.62 Rem TEDE this year. The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.
                      -126                                                      3.65 R/hr Rlhr
The Emergency Coordinator has approved this evolution.
(
The following tasks are to be performed to align High Pressure Aux Spray: # TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 Rlhr 2 OpenDHV-95 7 minutes 19.75 Rlhr 3 Open DHV -126 3.65 Rlhr Note: Assume no dose is received while traveling between tasks. INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task #3 without exceeding his Emergency Dose Limit?
Note: Assume no dose is received while traveling between tasks.
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO/SRO Performed in Simulator COMPLETE THE STATE OF FLORIDA NOTIFICATION MESSAGE FORM FOR NUCLEAR POWER PLANTS PREPARED BY: __________
INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task
______ __ Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07115/09 APPROVAL BY: __________
  #3 without exceeding his Emergency Dose Limit?
__ Date: 07/20109 (Nuclear Training Supervisor)
 
CONCURRED BY: __________
CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO/SRO Performed in Simulator COMPLETE THE STATE OF FLORIDA NOTIFICATION MESSAGE
________ __ Date: 07/20109 (Operations Representative)
(                        FORM FOR NUCLEAR POWER PLANTS PREPARED BY: __________~A~la=n~K=e=nn=e=d~y~
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the lPM . . Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time qitical steps of the lPM. Operations concurrence is not required for changes that are required due to a procedure revision. ( CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO/SRO Performed in Simulator COMPLETE THE STATE OF FLORIDA NOTIFICATION MESSAGE FORM FOR NUCLEAR POWER PLANTS PREPARED BY: __________
                                    ~A~la=n~K=e=nn=e~d~y________
________ __ Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07115/09 APPROVAL BY: __________
________      Date:   07/09/09 VALIDATED BY:                         Rop 1 Taylor                       Date:   07115/09
__ Date: 07120109 (Nuclear Training Supervisor)
                                      ~L=a~w~re=n=c=e~/V~an=s=ic=k=le=n~__
CONCURRED BY: __________
APPROVAL BY: __________~L=a~WT==en=c~e~/~V=an=s=ic=k=le=n~                Date:   07/20109 07120109 (Nuclear Training Supervisor)
________ __ Date: 07/20109 (Operations Representative)
CONCURRED BY: __________~M=i=ke~K=el~ly~
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the lPM. Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time steps of the lPM. Operations concurrence is not required for changes that are required due to a procedure revision.
                                        =M=i=ke~K==el~ly~__________        Date: 07/20109 (Operations Representative)
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI -NRC 2009 [BANK] Task:. Complete a notification to the State Warning Point. Alternate Path: [2;J YES D NO PRA Top Critical Action: DYES [2;J NO Safety Function:
Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the lPM.
NA . KIA Rating/Importance:
lPM .
G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position:
Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time c~itical steps of the lPM. Operations concurrence is not required for changes that are required due to a qitical procedure revision.
DSROONLY [2;JRO/SRO DNLO/RO/SRO Task Standard:
 
Complete the State of Florida Notification form and make required notifications per EM-202. Preferred Evaluation Location:
ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI - NRC 2009 [BANK]
Preferred Evaluation Method: D SIM D PLANT [2;J ADMIN [2;J PERFORM D SIMULATE  
Task:. Complete a notification to the State Warning Point.
Task:
[2;J YES Alternate Path: [Sj              D NO PRA Top Critical Action: DYES [Sj      [2;J NO Safety Function:       NA KIA Rating/Importance:
G2.4.43     RO 3.2     SRO 3.8 Task Number:           1150402005 Position:               DSROONLY                 [2;JRO/SRO
[SjRO/SRO    DNLO/RO/SRO Task Standard:         Complete the State of Florida Notification form and make required notifications per EM-202.
Preferred Evaluation Location:                                 Preferred Evaluation Method:
D SIM       D PLANT [Sj    [2;J ADMIN                         [SjPERFORM
[2;J PERFORM         D SIMULATE


==References:==
==References:==


EM-202, Rev 85 Validation Time: 10 minutes Time Critical:  
(
[2;J YES D NO Candidate:
EM-202, Rev 85 Validation Time:         10 minutes                           Time Critical:       [2;J YES DNO
Time Start: ----------------------------
[SjYES  D NO
Printed Name Time Finish: ______________
  =================~==================================================
__ Performance Rating: D SAT D UNSAT Performance Time: _____ _ Examiner:
Candidate: ----------------------------                       Time Start:
_____________________________________________________
Printed Name Time Finish: _________________
/ ____ __ Printed Name Signature Date Comment: __________________________________________________________
Performance Rating: D SAT               D UNSAT                 Performance Time: _____
__ 7/9/2009 10:43 PM Page 2 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI -NRC 2009 [BANK] Task: Complete a notification to the State Warning Point. Alternate Path: [Sj YES D NO PRA Top Critical Action: DYES [Sj NO Safety Function:
Examiner: _____________________________________________________/______
NA , KIA Rating/Importance:
              ----------------------------------------------------~----
G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position:
Printed Name                                         Signature           Date Comment: __________________________________________________________
DSROONLY [SjRO/SRO DNLO/RO/SRO Task Standard:
(
Complete the State of Florida Notification form and make required notifications per EM-202. Preferred Evaluation Location:
7/9/2009 10:43 PM                         Page 2 of 10                 Admin EP EPI1 (NRC 2009)
Preferred Evaluation Method: D SIM D PLANT [Sj ADMIN [SjPERFORM D SIMULATE
H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx I.docx


==References:==
ADMINISTRATIVE JOB PERFORMANCE MEASURE
(
SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS Do not answer the SHRD phone when called.
TOOLS/EQUIPMENT/PROCEDURES NEEDED TOOLS/EQUIPMENTIPROCEDURES
: 1.      EM-202, Rev 85
: 2.      Consumable copies ofEM-202, Enclosure 2 7/9/200910:43 7/9/2009      PM 10:43 PM .    .*              Page 3 of 10                  EP1 (NRC 2009)
Admin EPI EP1 (NRC 2009) [BANK] Rev l.docx H:\NRC - 2009\JPM\Admin\Admin EPI
 
ADMINISTRATIVE JOB PERFORMANCE MEASURE SRO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Senior Rea~tor Operator.
A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW.
No Protective Action Recommendations at this time.
The event has not been terminated.
INITIATING CUES 2.4.5 Using the above information complete Steps 1. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202.                            .
(
This JPM is Time Critical.
7/9/2009 10:43 PM                      Page 4 of 10                    Admin EPI (NRC 2009)
H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx


EM-202, Rev 85 Validation Time: 10 minutes Time Critical:
ADMINISTRATIVE JOB PERFORMANCE MEASURE RO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Reactor Operator.
[SjYES DNO Candidate:
Time Start: ----------------------------
Printed Name Time Finish: ______________
_ Performance Rating: D SAT D UNSAT Performance Time: -----Examiner:
/
Printed Name Signature Date Comment: ____________________________________________________
_ 7/9/2009 10:43 PM Page 2 of 10 Admin EP 1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev I.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE ( SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS Do not answer the SHRD phone when called. TOOLS/EQUIPMENTIPROCEDURES NEEDED 1. EM-202, Rev 85 2. Consumable copies ofEM-202, Enclosure 2 7/9/2009 10:43 PM .
* Page 3 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS Do not answer the SHRD phone when called. TOOLS/EQUIPMENT/PROCEDURES NEEDED 1. EM-202, Rev 85 2. Consumable copies ofEM-202, Enclosure 2 7/9/200910:43 PM. Page 3 of 10 Admin EP1 (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EP1 (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE SRO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Senior Operator.
A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective Action Recommendations at this time. The event has not been terminated.
INITIATING CUES Using the above information complete Steps 1. 2.4.5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. . This JPM is Time Critical.
7/9/2009 10:43 PM Page 4 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ( ADMINISTRATIVE JOB PERFORMANCE MEASURE SRO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Senior Operator.
A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective Action Recommendations at this time. The event has not been terminated.
INITIATING CUES Using the above information complete Steps 1. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. This JPM is Time Critical.
7/9/2009 10:43 PM Page 4 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE RO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Reactor Operator.
A Site Area Emergency has been declared.
A Site Area Emergency has been declared.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.
7/9/2009 10:43 PM Page 5 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE RO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Reactor Operator.
This JPM is Time Critical.
A Site Area Emergency has been declared.
7/9/2009 10:43 PM                     Page 5 of 10               Admin EPI (NRC 2009)
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.
H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx H;\NRC
7/9/2009 10:43 PM Page 5 of 10 Admin EPI (NRC 2009) H;\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx 
 
( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START ___ _ STEP 1 IS SRO ONLY STEP 1: Candidate completes the Florida Nuclear Plant Emergency Notification Form. STANDARD:
ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START _   __  __  _ _ __
EXAMINER NOTE: COMMENTS:
Critical Step STEP 1 IS SRO ONLY                                               (required critical information)
Candidate completes the notification form correctly.
STEP 1:         Candidate completes the Florida Nuclear Plant Emergency Notification Form.
Per the cue only steps 1, 2, 4, 5 and 11 need to be completed.
SAT STANDARD:             Candidate completes the notification form correctly. Per the     UNSAT cue only steps 1, 2, 4, 5 and 11 need to be completed.
Critical information on this form includes sections 4, 5 and 11. Leaving any other section blank does not constitute failure of this step. STEP 2 IS SRO AND RO STEP 2: Candidate makes required notifications.
EXAMINER NOTE:                Critical information on this form includes sections 4,5 4, 5 and 11. Leaving any other section blank does not constitute failure of this step.
STANDARD:
COMMENTS:
EXAMINER NOTE: EXAMINER NOTE: EXAMINER CUE: COMMENTS:
Critical Step STEP 2 IS SRO AND RO                                               (15 minute notification required)
Candidate makes required notifications.
(
When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. When candidate attempts to call SWPT on the commercial line then time critical requirement is met. Terminate the JPM when candidate attempts to call SWPT from the commercial line. Critical Step (required critical information)
STEP 2:         Candidate makes required notifications.
SAT UNSAT Critical Step (15 minute notification required)
SAT STANDARD:             Candidate makes required notifications. When the SHRD             UN SAT phone goes unanswered the candidate will use the commercial telephone system to contact SWPT.
SAT UN SAT 7/9/2009 10:43 PM Page 6 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START ____ _ STEP 1 IS SRO ONLY STEP 1: Candidate completes the Florida Nuclear Plant Emergency Notification Form. STANDARD:
EXAMINER NOTE:                Page 3 of Enclosure 2 contains the instructions for using an alternate communication network.
EXAMINER NOTE: COMMENTS:
EXAMINER NOTE:                When candidate attempts to call SWPT on the commercial line then time critical requirement is met.
Candidate completes the notification form correctly.
EXAMINER CUE:                  Terminate the JPM when candidate attempts to call SWPT from the commercial line.
Per the cue only steps 1, 2, 4, 5 and 11 need to be completed.
( COMMENTS:
Critical information on this form includes sections 4,5 and 11. Leaving any other section blank does not constitute failure of this step. STEP 2 IS SRO AND RO STEP 2: Candidate makes required notifications.
10:43 PM 7/9/200910:43 7/9/2009                                Page 6 of 10                 Admm Admin EPI (NRC 2009)
STANDARD:
H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx
EXAMINER NOTE: EXAMINER NOTE: EXAMINER CUE: COMMENTS:
 
Candidate makes required notifications.
ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
When the SHRD phone goes unanswered the candidate will use the commercial telephone system to contact SWPT. Page 3 of Enclosure 2 contains the instructions for using an alternate communication network. When candidate attempts to call SWPT on the commercial line then time critical requirement is met. Terminate the JPM when candidate attempts to call SWPT from the commercial line. Critical Step (required critical information)
SAT UNSAT Critical Step (15 minute notification required)
SAT UN SAT 7/9/200910:43 PM Page 6 of 10 Admm EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
When candidate attempts notification to SWPT using the commercial phone line this JPM may be terminated.
When candidate attempts notification to SWPT using the commercial phone line this JPM may be terminated.
END OF TASK TIME STOP ____ _ 7/9/2009 10:43PM Page 7 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev I.docx ( ( ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:
END OF TASK TIME STOP _ _ _ __
When candidate attempts notification to SWPT using the commercial phone line this JPM may be terminated.
(
END OF TASK TIME STOP ____ _ 7/912009 10:43 PM Page 7 of 10 Admin EPI (NRC 2009) H:\NRC -2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx
(
( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) SRO ONLY CUE SHEET INITIAL CONDITIONS You are the Senior Reador Operator.
7/9/2009 10:43PM 7/912009 10:43 PM                     Page 7 of 10               Admin EPI (NRC 2009)
A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective ActionRecommendations at this time. The event has not been terminated.
H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx I.docx
INITIATING CUES Using the above information complete Steps 1. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. This JPM is Time Critical.
 
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) SRO ONLY CUE SHEET INITIAL CONDITIONS You are the Senior Reador Operator.
CANDIDATE CUE SHEET
A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW. No Protective Action Recommendations at this time. The event has not been terminated.
(
INITIATING CUES ( Using the above information complete Steps I. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. This JPM is Time Critical. (
(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) RO ONLY CUE SHEET INITIAL CONDITIONS You are the Reactor Operator.
SRO ONLY CUE SHEET INITIAL CONDITIONS You are the Senior Reador Operator.
A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW.
No Protective ActionRecommendations Action Recommendations at this time.
The event has not been terminated.
INITIATING CUES
( Using the above information complete Steps 1.
I. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202.
This JPM is Time Critical.
(
 
CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)
RO ONLY CUE SHEET INITIAL CONDITIONS You are the Reactor Operator.
An Unusual Event has been declared.
An Unusual Event has been declared.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical. ( CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK) RO ONLY CUE SHEET INITIAL CONDITIONS You are the Reactor Operator.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.
An Unusual Event has been declared.
This JPM is Time Critical.
INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202. This JPM is Time Critical.
(
RO ONLY DATA SHEET f"LORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM HIS IS CRYSTAL RIVER UNIT 3. A. 0 This is a Drill B. C8:J This is an Emergency I HAVE A MESSAGE.
0 STATE 0 CITRUS 0 LEVY 0 RADIATION CONTROL -ORLANDO (M-F ONLY) ARE ON LINE. ( ,. 't..ldte:
B. Contact Time: C. Reported By: (Name) _________
_ '. Message Number: __ . 0 Initial' New Classification OR E. Reported From: 0 Control Room 0 TSC 0 EOF o Update ITE: C8:J CR UNIT 3 o SL UNIT 1 o SL UNIT2 o TP UNIT3 o TP UNIT4 MERGENCY CLASSIFICATION:
,. C8:J EMERGENCY DECLARATION:
A. C8:J Notification of Unusual Event C. 0 Site Area Emergency B. 0 EMERGENCY TERMINATION:
B. 0 Alert D. 0 General Emergency Date: __ , __ , __ Time: .EASON FOR EMERGENCY DECLARATION:
A. 0 EAL Number(s):
OR B. 0


== Description:==
RO ONLY DATA SHEET f'LORIDA f"LORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM HIS IS CRYSTAL RIVER UNIT 3.                    0 This is a Drill B. C8:J A. D                      ~ This is an Emergency I HAVE A MESSAGE.
  ,COITIONAL INFORMATION OR UPDATEf A. 0 None OR B. 0
U8~: D URJ;::      0 STATE 0D CITRUS D          0  LEVY 0 D RADIATION CONTROL - ORLANDO (M-F ONLY) ARE ON LINE.
(
..,. 't..ldte: ~~,~
l..Idte: ~,~,~                        B. Contact Time: _ _ __                C. Reported By: (Name) _ _ _ _ _ _ _ _ __
'. Message Number: _ _                                                              E. Reported From: D  0 Control Room D  0 TSC D  0 EOF
.D    0      Initial' New Classification                  OR                   oD  Update ITE:            ~ CRUNIT3 C8:J CR UNIT 3          oD  SL UNIT 1            o D SL UNIT2              o D TP UNIT UNIT3 3          o D TP UNIT4 UNIT 4 MERGENCY CLASSIFICATION:                          A. ~ C8:J Notification of Unusual Event        B. D0 Alert C. D 0 Site Area Emergency                    D. D0 General Emergency
      ~ EMERGENCY DECLARATION:
..,. C8:J                                            B. D0 EMERGENCY TERMINATION:                  Date: _ _,_ _,_ _ Time:
.EASON FOR EMERGENCY DECLARATION:                                0 EAL Number(s):
A. DEAL                                    OR                0


== Description:==
== Description:==


lEATHER DATA: A. Wind direction from ___ degrees B. Downwind Sectors affected _______ _ .ELEASE STATUS: A. 0 None (Go to Item 11) B. 0 In Progress C. 0 Has occurred, but stopped &plEASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
B. D
B. 0 Release is within Normal Operating Limits D. 0 Protective Action Guide Range J Under evaluation C. 0 Non-Significant (Fraction of PAG Range) E. 0 Liquid release (no actions required)
.DDITIONAL
\ UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. C8:J No utility recommended actions at this time. B. 0 Utility recommends the following protective actions; EVACUATEZONES:
,COITIONAL INFORMATION OR UPDATEf        UPDATE~          A. D  0 None                 OR                             0
_________
_ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12. PLANT CONDITIONS:
A. Reactor Shutdown?
C. Containment Intact? DYES DYES o NO o NO B. Core Adequately Cooled? 0 YES o NO D. Core Condition:
0 Stable o Degrading WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ ADDITIONAL RELEASE INFORMATION:
A. 0 Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. _______ mrem D. mrem F. _______ mrem H. _______ mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. _______ mrem G. mrem I. _______ mrem IAGE RECEIVED BY: (Name) ______ _ Date: __ , __ ,__ Time: ___ _ THiS IS CRYSTAL RIVER UNIT 3. o This Is A Drill o This Is An Emergency END OF MESSAGE HIS IS CRYSTAL RIVER UNIT 3. URJ;:: D STATE D CITRUS ( .. l..Idte:
'. Message Number: __ . D Initial' New Classification ITE: CRUNIT3 MERGENCY CLASSIFICATION:
RO ONLY DATA SHEET f'LORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM A. D This is a Drill B. This is an Emergency I HAVE A MESSAGE. D LEVY D RADIATION CONTROL -ORLANDO (M-F ONLY) ARE ON LINE. B. Contact Time: ___ _ OR C. Reported By: (Name) _________
_ E. Reported From: D Control Room D TSC D EOF D Update D SL UNIT 1 D SL UNIT2 D TP UNIT 3 D TP UNIT 4 A. Notification of Unusual Event C. D Site Area Emergency B. D Alert D. D General Emergency
.. EMERGENCY DECLARATION:
B. D EMERGENCY TERMINATION:
Date: __ , __ , __ Time: .EASON FOR EMERGENCY DECLARATION:
A. DEAL Number(s):
OR B. D
 
== Description:==
  .DDITIONAL INFORMATION OR A. D None OR B. D


== Description:==
== Description:==


lEATHER DATA: A. Wind direction from ___ degrees B. Downwind Sectors affected _______ _ .ELEASE STATUS: A. D None (Go to Item 11) B. D In Progress C. D Has occurred, but stopped EASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
B. D lEATHER DATA:                 A. Wind direction from _ _ _ degrees                 B. Downwind Sectors affected _ _ _ _ _ _ __
B. D Release is within Normal Operating Limits D. D Protective Action Guide Range j Under evaluation
.ELEASE STATUS:                     0 A. D   None (Go to Item 11)         B. D0 In Progress       C. 0D Has occurred, but stopped
: c. D Non-Significant (Fraction of PAG Range) E. D Liquid release (no actions required)  
~I EASE SIGNIFICANCE CATEGORY: (at the Site Boundary)
\ UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC: A. No utility recommended actions at this time. B. D Utility recommends the following protective actions; EVACUATEZONES:
&plEASE
__________
~
_ SHELTER ZONES: AND consider issuance of Potassium Iodide (KI). If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12. PLANT CONDITIONS:
~          J Under evaluation j                                                                    B. D0 Release is within Normal Operating Limits c.
A. Reactor Shutdown?
C. D     0    Non-Significant (Fraction of PAG Range)                           D. D0 Protective Action Guide Range
C. Containment Intact? DYES DYES D NO D NO B. Core Adequately Cooled? DYES D NO D. Core Condition:
                                                                                                                  \
D Stable D Degrading WEATHER DATA: A. Wind Speed ___ MPH (m'sec x 2.24 = MPH) B. Stability Class __ ADDITIONAL RELEASE INFORMATION:
E. D     0 Liquid release (no actions required)
A. D Not Applicable (Go to Item 15) Distance 1 Mile (Site Boundary) 2 Miles 5 Miles 10 Miles Projected Thyroid Dose (CDE) for __ Hour(s) B. _______ mrem D. mrem F. mrem H. mrem Projected Total Dose (TEDE) for __ Hour(s) C. mrem E. _______ mrem G. mrem I. mrem r( iAGE RECEIVED BY: (Name) ______ _ Date: __ , __ ,__ Time: ___ _ nils IS CRYSTAL RIVER UNIT 3. D This Is A Drill D This Is An Emergency END OF MESSAGE}}
UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:
A. ~    C8:J No utility recommended actions at this time.                       B. D0 Utility recommends the following protective actions; EVACUATEZONES: _ _ _          ____ ______  __  __
SHELTER ZONES:
AND consider issuance of Potassium Iodide (KI).
If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12.
PLANT CONDITIONS:
A. Reactor Shutdown?                   DYES             o D     NO                 B. Core Adequately Cooled?         0 YES DYES       o D   NO C. Containment Intact?                DYES              oD    NO                D. Core Condition:                 0 Stable D           o D Degrading WEATHER DATA:                   A. Wind Speed _ _ _ MPH (m'sec x 2.24             =MPH)       B. Stability Class _ _
ADDITIONAL RELEASE INFORMATION:                                   0 A. D   Not Applicable (Go to Item 15)
Distance                 Projected Thyroid Dose (CDE) for _ _
Hour(s)                         Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary)                            B. _ _ _ _ _ _ _ mrem                                  C.                     mrem 2 Miles                                          D.                        mrem                        E. _ _ _ _ _ _ _ mrem 5 Miles                                          F.
F. _ _ _ _ _ _ _ mrem      mrem                        G.                     mrem 10 Miles                                          H. _ _ _ _ _ _ _ mrem H.                        mrem                         I. _ _ _ _ _ _ _ mrem I.
r( ~        IAGE iAGE RECEIVED BY: (Name)_ _ _ _ _ __                                Date: _ _,_ _, _ _          Time: _ _ __
THiS IS CRYSTAL RIVER UNIT 3.
nils                                                oD  This Is A Drill       o D This Is An Emergency               END OF MESSAGE}}

Latest revision as of 06:29, 12 March 2020

Initial Exam 2009-301 Draft Administrative JPMs
ML093270185
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 11/18/2009
From:
Division of Nuclear Materials Safety II
To:
Progress Energy Co
References
50-302/09-301
Download: ML093270185 (46)


Text

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #COl #COI NRC 2009 SROONlY SRO ONLY DETERMINE. ACTIONS FOR PRIMARY TO SECONDARY DETERMINE.ACTIONS lEAKAGE LEAKAGE

(

PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1I Taylor Date: 07/15/09 APPROVAL BY: Lawrence 1 I Vansicklen Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps ot or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin C01 - NRC 2009 [Bank #3200] #320D]

Task: Determine actions for primary to secondary leakage.

Alternate Path: DYES C8J NO IZI PRA Top Critical Action: DYES IZI NO Safety Function: 4 KIA Rating/Importance: G2.1.25 R03.9 SR04.2 SRO 4.2 035A2.01 R04.5 SR04.6 SRO 4.6 Task Number: 1150401010 Position: IZISRO C8JSRO ONLY DRO/SRO DNLO/RO/SRO Task Standard: Determine actions for primary to secondary leakage Preferred Evaluation Location: Preferred Evaluation Method:

D SIM D PLANT IZI C8J ADMIN C8J PERFORM IZI D SIMULATE

References:

(

CP-152, Rev. 19 Validation Time: 20 minutes mintJtes Time Critical:

Critical: DYES IZI C8J NO Candidate:

Candidate: _ _ _ _ _ _ _ _ _ _ _ _ __ Time Start:

Printed Name Time Finish: ---,-------

Performance Rating: D SAT D UNSAT Performance Time: -----

Examiner:

- - - -Printed

- - -Name Printed Name Signature Date Comment ________________________________________________________

Comment: __________________________________________________________ __

112112008 Page 2 of8 Admin CO 1I (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE

(

SIMULATOR OPERATOR SETUP INSTRUCTIONS:

1. NA SIMULATOR OPERATOR INSTRUCTIONS:
1. NA TOOLS / EQUIPMENT / PROCEDURES NEEDED:
1. Calculator
2. Copies ofCP-152, Revision 19
3. ITS available as reference, if needed

(

(

112112008 Page 3 of8 CO I (NRC 2009)

Admin COl H:\NRC;, - 2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx I.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE

( READ TO THE OPERATOR INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300.

The plant is at 100% power.

ARP-1 A is in operation by itself.

RM-G26 is off scale high.

Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266.

RM-A 12 conversion factor is 0.0065 per CH-266.

RM-A 12 readings have been the following:

0900 800 cpm 1000 800 cpm 1100 810 cpm 1200 14000 cpm 1300 21500 cpm

(

INITIATING CUES Determine what, if any, actions are required, and list your findings below.

(

112112008 0[8 Page 4 of8 Admin COl (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin COl (NRC 2009) [Bank #320D] Rev l.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE START TIME: _ _ __

STEP 1:

Candidate obtains a copy of CP-152. SAT STANDARD: UNSAT N/A EXAMINER NOTE:

Provide candidate with a copy of CP-152.

COMMENTS:

STEP 2:

Candidate uses CP-152, Enclosure 1, to calculate primary to secondary leak SAT rate.

UNSAT STANDARD:

( CP-152, Enclosure 1, may be used due to NOT having a table available for the

" current RM-A 12 conditions.

COMMENTS:

See the attached key for leak rates associated with each of the given RM-A 12 count rates.

STEP 3:

Candidate determines that Action Level 3 is applicable. SAT STANDARD: UNSAT Candidate determines Action Level 3 is applicable due to primary leakage being greater than 75 gpm, with an increase of greater than 30 gpd in the hour since the initial rise.

COMMENTS:

\,

112112008 1/2112008 Page 5 of8 Admin COl CO I (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin COl CO I (NRC 2009) [Bank #320D] Rev I.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Critical Step Candidate determines actions are required. Basis:

Required STANDARD: actions to mitigate a Candidate determines that, as a minimum, the following actions are required primary to per section 4.8.1 of CP-152. secondary leak.

4.8.1.1 VERIFY increased leakage using RM-G26 or RM-G27.

4.8.1.2 Evaluate spikes or rapid changes in leak rate. SAT 4.8.1.3 NOTIFY SM, MSO, and PGM of changing primary to secondary UNSAT leakage conditions.

4.8.1.4 MONITOR RM-A12 every 15 minutes AND OBTAIN leak rate in gpd within 15 minutes.

4.8.1.5 Reduce power to ~ 50% in 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />, and be in Mode 3 in the next 2 to::;

hours if leakage greater than 75 gpd with the leak rate increasing at greater than 30 gpd/hr.

4.8.1.6 NA c:( 4.8.1.7 PERFORM applicable steps of Action Level 1.

4.8.1'.8 4.8.1°.8 Administratively TAG Aux Steam from Units 1 & 2 by hanging Caution Tags.

EXAMINER NOTE:

Candidate may summarize the actions by stating that the actions of CP-152, Action Level 3, are required.

COMMENTS:

TERMINATION CRITERIA:

Correct Action Level determined per CP-152.

END OF TASK STOP TIME: _ _

1I2112008 112112008 Page 6of8 60f8 Admin COl CO 1 (NRC 2009)

H:\NRC H:INRC - 2009\JPM\Admin\Admin 2009lJPMIAdmin\Admin CO 1I (NRC 2009) [Bank #320D] Rev I.docx l.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY ENCLOSURE 1 (Page 1 of 6)

RM-A 12 CONVERSION TO GPD Example: [( 1000 cpm .)) - ( 30 cpm ) = 970 cpm 1 J x (_0= ...:..00=70...::2:.....-...1)

(_=0.-=-00.=....:7'-=2'---') = 6.98 gpd Gross Background Net Count Rate Conv.Factor*

Conv. F actor* Leak Rate

  • RM-A12 RM-A 12 gpd per cpm conversion factor and average background count rate are recorded on Enclosure 2 of CH-266, Primary to Secondary Leak Rate Monitoring, which a copy is located in Control Room.

NOTE Calculated Primary to Secondary leak rate may be obtained from CH-266 Operator aid posted in Control Room. If leak rate is obtained from Operator aid, then only time, gross cpm, and leak rate need to be logged.

Time

[( 800 cpm) - ( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.91 gpd 0900 Gross Background Net Cony. Factor*

Factor' Leak Rate

[( 800 cpm) - ( 45 cpm) = ( 765 cpm)] x ( 0.0065 )= 4.91 gpd 1000 Gross Background Net Cony. Factor' Factor* Leak Rate

[( 810 cpm) - ( 45 cpm) = ( 755 cpm)] x ( 0.0065 )= 4.97 gpd 1100 Gross Background Net Cony. Factor' Factor* Leak Rate cpm) = ( 13955 cpm)] x ( 0.0065 )=

1200

[( 14000 Gross .

cpm) - ( 45

  • Background Net Cony. Factor' Factor*

90.71 Leak Rate gpd c( 1300

[( 21500 Gross cpm) - ( 45

Background

cpm) =( 21455 cpm)] x ( 0.0065 Net

)=

)=

Cony. Factor' Factor*

139.46 Leak Rate gpd

[( cpm) - ( cpm) = ( cpm)] x ( )= gpd

, Gross Background Net Cony. Factor' Factor* Leak Rate Leak

[( cpm) - ( cpm) =( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Factor* Leak Rate

[( cpm) - ( cpm) =( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Factor* Leak Rate

[( cpm) - ( cpm) = ( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Factor* Leak Rate

[( cpm) - ( cpm) =( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Factor* Leak Rate

[( cpm) - ( cpm) =( cpm)] x ( )= gpd Gross Background Net Cony. Factor' Factor* Leak Rate

(

112112008 Page 7 of8 Page7of8 Admin COl (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin COCOlI (NRC 2009) [Bank #320D] Rev I.docx l.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET

(

RET~RNED TO EXAMINER UPON COMPLETION OF TASK)

(TO BE RETpRNED INITIAL CONDITIONS You are the Control Room Supervisor.

The time is now 1300.

The plant is at 100% power.

ARP-1 A is in operation by itself.

RM-G26 is off scale high.

Due to recent calibrations of RM-A 12, an RM-A 12 conversion table is NOT yet available.

RM-A 12 background is 45 cpm per CH-266.

RM-A 12 conversion factor is 0.0065 per CH-266.

RM-A12 readings have been the following:

0900 800 cpm 1000 800 cpm 1100 810 cpm 1200

  • 14000 cpm

( 1300 21500 cpm INITIATING CUES Determine what, if any, actions are required, and list your findings below.

(

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #C02 NRC 2009 RO&SRO PERFORM A TIME TO BOIL / CORE UNCOVERY CALCULATION

(

PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07/15109 07115109 APPROVAL APPROV AL BY: Lawrence 1 Vansicklen Date: 07120109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time

( critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#:

Admin C02 - NRC 2009 [Modified]

Task: Operate the plant within the guidelines specified for Mode 5 outages and reduced reactor coolant system RCS inventory operations.

Alternate Path: DYES ~NO

[gJNO PRA Top Critical Action: DYES ~NO Safety Function: 4 KIA K/A Rating/Importance: G2.1.23 R04.3 SRO 4.4 025AA1.02 R03.8 SRO 3.9 Task Number: 1190102001 RO Position: DSROONLY ~RO/SRO

[gJRO/SRO DNLO/RO/SRO Task Standard: Perform a time to boil/core uncovery calculation.

Preferred Evaluation Location: Preferred Evaluation Method:

D SIM D PLANT [gJ ~ ADMIN ~PERFORM

[gJPERFORM D SIMULATE DSIMULATE

(

References:

OP-103H, Rev. 9 Validation Time: 20 minutes Time Critical: D YES ~. NO

[gJ Candidate: _ _ _ _ _ _ __

Time Start: ----------------

Printed Name Time Finish: ----------------

Performance Rating: D SAT DUNSAT ___________

Performance Time: -----------

Examiner:

Printed Name Signature Date Comment:

Comment: ____________________________________________________________

(

7/20/20095/28/20095:39 AM Page 2 of 10 Admin C02 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin C02 CO2 (NRC 2009) [Modified].docx

[ModifiedJ.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE I, SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS NA TOOLS/EQUIPMENT/PROCEDURES TOOLS/EQUIPMENTIPROCEDURES NEEDED

1. OP-103H, Rev. 9 OP-I03H, Consumable copies
2. Calculator

(

7120/20095128120095:39 7/20/20095/28/20095:39 AM Page 3 of 10 Admin C02 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin 2009\IPM\Admin\Admin C02 (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief N Nuclear uc1ear Operator Plant is in MODE 5 following a core reload 77 new fuel assemblies were loaded in the core RCS temperature is 120 00 F RCS pressure is 35 psig RCS level is 154 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is 0800 on 08/29/09 INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil =

(

Time to Core Uncovery ==

(

7/20/20095/28/20095:39 AM 7/20/20095128/20095:39 Page 4 of 10 Admin C02 CO2 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START - ---

(( -- -

STEP 1: Locate correct procedure.

SAT ____

STANDARD: Candidate obtains a copy of OP-1OP-l 03H, Reactor Coolant UNSAT _ _

UNSAT~ ___

System and Spent Fuel Pool Decay Heat Tables and Figures.

EXAMINER NOTE: Provide candidate with a copy of OP-I03H when requested.

COMMENTS:

STEP 2: Record RCS temperature, RCS level, shutdown date and time and current date and time. Determine number of burned fuel assemblies in SAT - - - - -

the core and the number of days shutdown. Transfer data to Enclosure

1. UNSAT ____ ___

STANDARD: Candidate accurately transfers data from Cue Sheet to

( Enclosure 1.

COMMENTS:

STEP 3: Step 3.1 SAT _____

Determine the Decay Heat Correction Factor for number of days shutdown.**

shutdown. UNSAT _ _____

STANDARD: Candidate accurately determines number of days shutdown and the Decay Heat Correction Factor from Table 16.

Number of days shutdown is 26.

Correction factor is 3.3979. Rounding to 3.4 is acceptable.

COMMENTS:

(

7/20/20095/28/20095:39 AM 7/20120095/28/20095:39 Page 5 of 10 Admin C02 CO2 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin CO2 C02 (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: Step 3.2

(

SAT Determine the Fuel Assembly Correction Factor.

UNSAT STANDARD: Candidate accurately determines the Fuel Assembly Correction Factor.

177 (total fuel assemblies) divided by 100 (burned fuel assemblies in core) == 1.77 Correction factor is 1.77. Rounding to 1.8 is acceptable .

COMMENTS:

STEP 5: Step 3.3 SAT Determine the Overall Correction Factor.

UNSAT STANDARD: Candidate accurately determines the Overall Correction Factor.

3.3979 (DH Correction Factor) x 1.77 (fuel assembly

( correction factor) == 6.01 Correction factor is 6.01. Rounding to 6.0 is acceptable.

COMMENTS:

STEP 6: Step 7.0 SAT Determine*RCS Determine RCS condition.

UNSAT STANDARD: Using data from the cue sheet the candidate accurately determines that the RCS is intact and not vented.

COMMENTS:

(

7/20/20095/28/20095:39 AM Page 6 of 10 Admin C02 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: Step 7.1

( SAT _ _ __

Obtain the Time to Boil from Table 3.

UNSAT _ __

STANDARD: Using data from the cue sheet the candidate accurately determines the Time to Boil from Table 3.

detennines Time to Boil is 26.94 minutes. Rounding to 27 minutes is acceptable.

COMMENTS:

STEP 8: Steps 7.2 and 7.3 SAT _ _ __

Per the cue sheet these steps are not required.

UNSAT _ __

STANDARD: NA

( EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

STEP 9: Step 7.4 SAT _ _ __

Obtain the Time to Core Uncovery from Table 15.

UNSAT _ __

STANDARD: Using data from the cue sheet the candidate accurately detennines determines the Time to Core Uncovery from Table 15.

Time to Core Uncovery is 363.17 minutes. Rounding to 363 minutes is acceptable.

COMMENTS:

7/20/20095/28/20095:39 AM 7120/20095128/20095:39 Page 7 oflO CO2 (NRC 2009)

Admin C02 H:\NRC - 2009\JPM\Admin\Admin 'C02 (NRC 2009) [Modified].docx

AD MINI STRATIVE JOB PERFORMANCE MEASURE ADMINISTRATIVE STEP 10: Step 7.5 Critical Step

(

determine current Time to Apply the Overall Correction Factor to detennine Basis: Accurate Boil. time that boiling will occur.

STANDARD: determines the current Time to Boil.

Candidate accurately detennines SAT 6.0 I.(Overall Correction Factor) x 26.94 (Time to Boil) ==

6.01.(Overall UNSAT 161.91 minutes minutes..

Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 27.0 (Time to Core Uncovery) == 162 minutes.

Values between 158 minutes and 165 minutes are acceptable.

(approximately 2% error band)

COMMENTS:

( STEP 11: Steps 7.6 and 7.7 SAT Per the cue sheet these steps are not required.

UNSAT STANDARD: NA

  • EXAMINER NOTE: There are no adverse consequences if candidate performs these calculations.

COMMENTS:

7/20/20095/28120095:39 AM 7/20/20095/28/20095:39 Page 8 oflO Admin C02 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin C02 (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 12: Step 7.8 Critical Step

((

Apply the Overall Correction Factor to determine current Time to Basis: Accurate Core Uncovery. time that core

.* uncovery will occur.

STANDARD: Candidate accurately determines the current Time to Core

  • , Uncovery..

Uncovery SAT 6.01 (Overall Correction Factor) x 363.17 (Time to Core Uncovery) = 2182.65 minutes. UNSAT Using rounded values for all calculations:

6.0 (Overall Correction Factor) x 363.0 (Time to Core Uncovery) = 2178 minutes.

Values between 2156 minutes and 2204 minutes are acceptable.

(approximately 1% error band)

COMMENTS:

TERMINATION CUE:

Candidate accurately determines current Time to Boil and Time to Core Uncovery.

END OF TASK TIME STOP

(

7/20/20095/28/20095:39 AM Page 9 of 10 oflO Admin C02 CO2 (NRC 2009)

H:\NRC "- 2009\lPM\Admin\Admin 2009\JPM\Admin\Admin C02 CO2 (NRC 2009) [Modified].docx

((

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

READ TO THE OPERATOR INITIAL CONDITIONS You are the Chief Nuclear Operator Plant is in MODE 5 following a refueling outage 77 new fuel assemblies were loaded in the core 120 0 F RCS temperature is 120° RCS pressure is 12 psig RCS level is i154 54 feet Plant was shutdown at 0800 on 08/03/09 Current date and time is O~OO on 08/29109

(

INITIATING CUES The CRS has directed you to determine the current time to boil AND current time to core uncovery for these conditions.

Time to Boil =.

=

Time to Core Uncovery = =

(

CRYSTAL RIVER UNIT 3

(

JPM COVER SHEET ADMIN JPM #ECI NRC 2009 RO&SRO Perform a Monthly NI Imbalance Comparison

(

PREPARED BY: Alan Kennedy Date: 07/09/09 VALIDATED BY: I Taylor Rop 1 Date: 07/15/09 APPROVAL BY: Lawrence 1 I Vansicklen Date: 07/20109 (Nuclear Training Supervisor)

CONCURRED BY: Mike Kelly Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM ?ror individual step changes that do not affect the flow of the JPM.

("

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM#: Admin EC1 - NRC 2009 [Bank #286]

C( Task: Perform a Monthly Nllmbalance NI Imbalance Comparison, SP-312BI SRO - Perform safety and technical reviews of plant procedures.

Alternate Path: DYES [gJ NO IZl PRA Top Critical Action:" DYES IZl NO Safety Safefy Function: NA KIA Rating/lmportance:

Rating/Importance: G2.2.12 RO 3.7 SRO 4.1 Task Number: 0150202004 I RO 1190101029 I SRO 1190101029/SRO Position: DSROONLY OSRO ONLY [gJRO/SRO IZlRO/SRO DNLO/RO/SRO ONLO/RO/SRO Task Standard: Perform a Monthly Nllmbalance Comparison, SP-312B SRO - Perform safety and technical reviews of plant procedures.

Preferred Evaluation Location: Preferred Evaluation Method o

D SIM 0 PLANT IZl D [gJ ADMIN [gJ PERFORM IZl 0 SIMULATE D

(

References:

References:

SP-312B, Rev. 9 Validation Time: 25 I 5 minutes 0 YES IZl Time Critical: DYES [gJ NO Candidate: Time Started: _ _ _ _ __

Printed Name Time Finished: _ _ _ _ __

Performance Rating: D 0 SAT 0 UNSAT D Performance Time: _ _ _ __

Examiner: _______- ___- - - -

Printed Name Signature Date Comment:

l(

112115/28/20096:33 AM 112115128120096:33 Page 2 of 11 II Admin ECI ECl (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin ECI ECl (NRC 2009) [Bank #286].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TOOLS/EQUIPMENT/PROCEDURES NEEDED:

( Copy of SP-312B, Rev 9 ITS - Reference Calculator READ TO THE OPERATOR INITIAL CONDITIONS:

You are the Reactor Operator.

The plant is in normal power operation.

SP-312B, Monthly Nllmbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for for>

> 15 minutes.

The plant computer is out of service.

Control Console NI power is as follows: NI 52%

NI 53%

NI 53%

NI 52%

PT-138 has been completed. Incore imbalance is -4.8% RTP.

SP-312D has been completed. Thermal power is 1340 MWT.

(

INITIATING CUE:

You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM.

SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications. Include applicable time requirements.

D No ITS actions required, or .*

Per ITS _ _ _ _ _ _ _ (ITS number) the actions below must be completed within

_ _ _ _ _ _ hours. hours.

~.*

112115/28/2009 6:33 AM 112115/28/20096:33 Page 3 of 11 Admin EC ECI1 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin ECI EC1 (NRC 2009) [Bank #286].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 1:

( Provide candidate with copy of SP-312B.

STANDARD:

COMMENTS:

STEfS 2: (step 4.2.1 & 4.2.2)

Have the craft personnel connect the DVM to the Delta Delta Flux Amplifier Module (DFAM) "Eout" jack for NI-5 through NI-8. NI-S.

Measure and record the voltage readings (from the DVMs of step 4.2.1), for each Power Range NI Channel on Enclosure 2.

STANDARD:

N/A EXAMINER NOTE:

Voltage readings are supplied for this JPM.

((

COMMENTS:

STER 3:

STEP. (step 4.2.3) Critical Step Using the conversion factors of Enclosure 2, convert the voltage readings to Basis:

%RTP imbalance. Accurate calculation STANDARD: required to determine Candidate accurately converts voltages to %RTP imbalance. Values recorded %RTP must agree within +/- 0.25% of the value given on the JPM key. imbalance.

COMMENTS: SAT_ __

UNSAT_ _

(

112115/28/2009 6:33 AM 112115/28/20096:33 Page 4 of 11 II Admin ECI EC1 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin EC1 ECI (NRC 2009) [Bank #286].docx

  1. 286ldocx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 4: (step 4.2.4)

I

\ Record the NI Imbalance values for NI-5, NI-6, NI-7, and NI-8 (from Enclosure SAT_ __

2) on Enclosure 1 under Column A designated "NI Imbalance" (APlo) (APl o)

UNSAT_ _

STANDARD:

Candidate accurately transfers data from Enclosure 2 to Enclosure 1.

COMMENTS:

STEP 5: (step 4.2.5)

SAT_ __

Using PT-138, Hand Axial,Power Axial.Power Imbalance Calculations, determine the In-Core Imbalance. UNSAT_ _

STAt-JDARD:

STAr-lDARD:

N/A EXAMINER NOTE:

This information is supplied in the cue.

(

COMMENTS:

STEP 6: (step 4.2.6)

SAT_ __

Record the Incore Imbalance determined in Step 4.2.5 on Enclosure 1 under Column B designated as "Incore Imbalance (APh)". (API,)". UNSAT_ _

STANDARD:

Candidate accurately transfers data from the initial conditions (supplied) to Enclosure 1.

COMMENTS:

(

112115/28120096:33 112115/28/2009 6:33 AM Page 5 of 11 II Admin ECI (NRC 2009)

H:\NRC H:INRC - 2009\JPM\Admin\Admin 20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 7: (step 4.2.7)

SAT_ __

( Using SP-312D, Backup Heat Balance Calculations, determine the thermal power. UNSAT_ _

STANDARD:

N/A EXAMINER NOTE:

This information is supplied in the cue.

COMMENTS:

STEP 8: (step 4.2.8)

SAT _ __

Record the value for the thermal power determined in Step 4.2 7 on Enclosure 1 under Column C designated as "Thermal Power (TP)". UNSAT_ _

STANDARD:

Candidate accurately transfers data from information supplied in initial

( conditions to enclosure 1.

COMMENTS:

STEP 9: (step 4.2.9) Critical Step Complete Enclosure 1 and notify the SSO/CRS of the results.

Basis:

Accurate STANDARD: calculation required to Candidate accurately calculates values indicated on Enclosure 1 and notifies determine CRS/SSO of results (completes cue sheet). Imbalance error.

EXAMINER NOTE:

Values recorded must agree within +/- 0.25% of the value given on the JPM SAT _ __

key.

UNSAT_ _

COMMENTS:

(

112115/2812009 112115/28/20096:33 6:33 AM Page 6 of II Admin EC ECII (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:

Accurate Imbalance error determined.

RO - END OF TASK STEP 10: SRO ONLY Critical Step (Step 5.2.1) If Imbalance Error (Enclosure 1), is greater than 2.5% RTP for any Basis:

NI Channel, then immediately inform the SSO/CRS and refer to ITS SR 8R 3.3.1.3. Correct ITS actions (Step 5.2.2) If NI recalibration is required, then SP-113G, Power Range Nuclear required to Instrument Gain Adjustment, is to be used to perform the calibration. be determined.

(Step 5.2.3) If NI recalibration is required, then reperform this procedure within one hour after the calibration is completed. SAT_ __

STANDARD: UNSAT_ _

Candidate determines that no result exceeds 2.5% and therefore no ITS Conditions apply.

( COMMENTS:

TERMINATION CRITERIA:

Correct ITS actions determined.

SRO - END OF TASK

(

11211512812009 112115/28/2009 6:33 AM Page 7 of 11 Admin ECI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY MONTHLY NI AXIAL POWER IMBALANCE TO INCORE AXIAL POWER IMBALANCE CORRELATION A B C NI INCORE THERMAL RPS IMBALANCE IMBALANCE POWER CHANNEL DETECTOR (APIo) (API!)

(API I ) --Lrn

---Lm A NI-5 -4.88 %RTP -4.8 %RTP

% RTP 1340 MWth B NI-6 -4.63 %RTP  % RTP

-4.8 %RTP 1340 MWth C NI-7 -4.25 %RTP -4.8 %%RTPRTP 1340 MWth D NI-8 -5.00 %RTP -4.8 %RTP

% RTP 1340 MWth Imbalance Error Calculations (Values From Columns A, B, and C above)

(

D(NI-x =

I A - B 1I X (2609 (26091/ C.)C ) == Imbalance Error, %  % RTP D(NI-5

= I1 -4.88 - (-4.8) I1 X (2609 / 1340 ) == 0.16 (2609/1340 %RTP

% RTP D(NI-6 = 1I -4.63 - (-4.8) 1I X (2609 (2609/1340

/ 1340 ) = 0.33 %RTP

% RTP D(NI-7) = 1I -4.25 - (-4.8) 1I X (2609 (2609/1340

/ 1340 ) = 1.07 %RTp*

% RTP D(NI-8 = 1-5.0 - (-4.8) 1I X (2609 (2609/1340

/ 1340 ) = 0.39 %RTP

% RTP IF Imbalance Error for any NI Channel is greater than 2.5% RTP, THEN immediately inform the CRS/SSO AND refer to ITS SR 3.3.1.3.

Performed By: ---------------------- Date:

~-------------------

((_ Verified By: ----------------------Date:

112115/28/2009 6:33 AM 112115/28120096:33 Page 8 of 11 Admin ECI (NRC 2009)

H:\NRC 20091JPMIAdminlAdmin ECI (NRC 2009) [Bank #286].docx H:INRC - 2009\JPM\Admin\Admin

ADMINISTRATIVE JOB PERFORMANCE MEASURE ANSWER KEY NI POWER IMBALANCE MEASUREMENT DFAM Channel Time "EouT" "EOUT" NI-5 NI-S 0300 -..JAM

-VAM -4.61

- 4.61 VDC PM NI-6 0300 -..JAM

-VAM - 4.63VDC PM NI-7 0300 -..JAM

-VAM -~ 4.66VDC PM NI-8 0300 -..JAM

-VAM - 4.60VDC PM NI Power Imbalance Calculations NI Imbalance Equation:

( NI Imbalance (%RTP) == (-12.5 %RTPIVDC x

(-12.S %RTP/VDC VDC) - 62.5 62.S %RTP Example: NI-5 NI-S DFAM "bOUT" is measured at -2.5 -2.S VDC NI-S Imbalance = (-12.5 NI-5 %RTPIVDC x -2.5VDC)

(-12.S %RTP/VDC -2.SVDC) - 62.5 62.S %RTP NI-S Imbalance == (+31.25 NI-5 (+31.2S %RTP) - 62.S 62.5 %RTP NI-5 Imbalance = -31.25 NI-S -31.2S %RTP Calculations:

NI-S %RTP = (-12.5 NI-5 (-12.S %RTP/VDC

%RTPIVDC x -4.61 VDC) - 62.5 62.S %RTP = = -4.88 %RTP NI-6 %RTP == (-12.5 (-12.S %RTP/VDC

%RTPIVDC x -4.63 VDC) - 62.5 62.S %RTP = - 4.63 %RTP NI-7 %RTP = (-12.5 %RTPIVDC x -4.66 VDC) - 62.5

(-12.S %RTP/VDC 62.S %RTP == -4.25

-4.2S %RTP NI-8 %RTP = (-12.5 (-12.S %RTP/VDC x -4.60 VDC) - 62.S 62.5 %RTP = -5.0

-S.O %RTP Performed By Date ------

(

Verified By Date - - - -

1121/5/2&/20096:33 112115/2&/2009 6:33 AM Page 9 of 11 II Admin ECI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Adrnin 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE c (TO BE RETURNED TO THE EXAMINER UPON , COMPLETION OF TASK)

UPO,N INITIAL CONDITIONS:

You are the Reactor Operator.

The plant is in normal power operation.

SP-312B, Monthly Nllmbalance NI Imbalance Comparison, is required.

The Tag Status Verification Sheet has been completed; all instruments are within their allowable calibration frequency.

The plant has been at steady state conditions for> 15 minutes.

The plant computer is out of service.

Control Console NI N I power is as follows: N 1 52%

NI-5 NI 53%

NI 53%

NI 52%

PT-138 has been completed. Incore imbalance is -4.8% RTP.

SP-312D has been completed. Thermal power is 1340 MWT.

INITIATING CUE:

You are requested to perform SP-312B (voltage readings are attached).

Return Enclosures 1 & 2 with completed JPM.

SROs only: Upon completion of the above, evaluate your results and list actions, if any, required per Technical Specifications. Include applicable time requirements requirements...

o D No ITS actions required, or Per ITS _ _ _ _ _ _ _ (ITS number) the actions below must be completed within

_ _ _ _ _ _ hours.

(

112115/28/20096:33 112115/28/2009 6:33 AM Page 10 ofll of II Admin ECI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin ECI (NRC 2009) [Bank #286].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE NI POWER IMBALANCE MEASUREMENT

(

DFAM Channel Time

  • "EouT" "EOUT" NI-5 0300 ...JAM

..JAM - 4.61 VDC PM NI-6 0300 ...JAM

..JAM - 4.63VDC

-4.63VDC PM NI-7 0300 ...JAM

..JAM - 4.66VDC PM NI-8 0300 ...JAM

..JAM - 4.60VDC PM DVMID# TI-4020 Cal Due Date 05/09/2010

(

(

112115/28/20096:33 112115/2812009 6:33 AM Page 11 of 11 EC1 (NRC 2009)

Admin ECI H:\NRC - 2009\JPM\Admin\Admin Eel ECI (NRC 2009) [Bank #286].docx

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #RCI #RCl NRC 2009 RO/SRO CALCULATE THE MAXIMUM PERMISSIBLE STAY TIME WITHIN EMERGENCY DOSE LIMITS

(

PREPARED/REVIEWED PREP _---=.A=l=an~K=e=n=n=ed.:.ly'--------

AREDIREVIEWED BY: _--=-A=l=an",-,K=en=n=-ed~y,--- _ _ _ _ __ Date: 07/09/09 VALIDATED BY: _ _ _ _ _~R=o~p...:..../~T.!::!:,ay~l=or'_______'__

....:.R=o=p-'-/....:.T=.ay'-='-lo=r'---_ __ _,...__--

_ __ Date: 07115/09 APPROVALBY: _ _ _ _ _~L=a~w~re=n=c~e~/V~a=n=sl=*c=kl=en~

~L=a~WT~e=n=ce~/~V~.~==sl=*c=hl=en~_ _ ___ . Date: 07120109 07120/09

  • (Nuclear Training Supervisor)

~M==ik=e~K=e=ll~y~_ _ _ _ _ ___

CONCURRED BY: _ _ _ _~M==ik=e~K=e=ll~y~-------- Date: 07/20109 07/20/09 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the JPM.

Operations concurrence is required for new JPMs and ~d changes that affect the flow, critical steps or time critical steps of the JPM. Operations concurrence is not required for changes that are required due to a procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin RC1- RC 1- NRC 2009 [Modified]

Task: Comply Comply with plant radiation exposure criteria.

Alternate Path: DYES D YES [gj

[gJ NO PRA Top Critical Action: D YES [gj DYES [gJ NO Safety Function: NA KIA Rating/Importance: G2.3.4 RO 3.2 SRO 3.7 Task Number: 1190102008 - RO Position: DSROONLY [gjRO/SRO

[gJRO/SRO DNLOIRO/SRO DNLO/RO/SRO Task Standard: Calculate the maximum permissible stay time within Emergency Dose Limits

(+/- 5 minutes)

Preferred Evaluation Location: Preferred Evaluation Method:

D SIM D PLANT [gj [gJ ADMIN ,

[gj PERFORM

[gJPERFORM .D SIMULATE DSlMULATE c

c

(

References:

EM-202, Rev 85 Validation Time: 5 minutes Time Critical: DYES[gjNO DYES [gJNO

===============================================================
================================================

Candidate: ------------------------------- Time Start:

Printed Name Time Finish: - _- __ -_-_-

Performance Rating: D SAT D UNSAT Performance Time: ----------_ _ _ __

Examiner: ------------------------------ ----------------------~/------

- - - - - - - - - - - - - - - - - - - - - - - -/- - - -

Printed Name Signature Date Comment: ---------------------------------------------------------------

. 5/28/2009 8:09 AM 5/28/20098:09 Page 2 of7 Admin RCI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE

(

SIMULATOR OPERATOR SETUP INSTRUCTIONS

1. None SIMULATOR OPERATOR INSTRUCTIONS
1. None TOOLS/EQUIPMENT/PROCEDURES NEEDED
1. EM-202, Rev 85 Reference
2. Calculator

(

5/28/20098:09 AM Page 3 of7 Admin RCI RC I (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin 2009\JPM\Admin\Adniin RCI (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE READ TO THE OPERATOR INITIAL CONDITIONS You are the Balance of Plant operator.

An emergency event is in pr.ogress.

Emergency Dose Limits (EDL) are in effect.

The PPO has received 1.62 Rem TEDE this year.

The lise use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray:

  1. TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 Rlhr 2 OpenDHV-95 Open DHV-95 7 minutes 19.75 Rlhr 3 Open DHV-126 3.65 Rlhr

( Note: Assume no dose is received while traveling between tasks.

INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task

  1. 3 without exceeding his Emergency Dose Limit?

(

5/28120098:09 5/28/20098:09 AM Page 4 of7 Admin RCI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin 2009\JPM\Admin\AdminRCI RCI (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE Note: Candidate may perform these steps in a different order.

Note: Candidate should understand the following:

1. EDL is 10 Rem for this event (may use EM-202 as a reference).
2. Current exposure for the year is not counted toward the EDL.

TIME START _ _ __

STEP 1:

SAT Determine dose received w4ile performing Task #1.

UNSAT

,e STANDARD:

Candidate determines dose received while performing Task #1.

5.31 Rlhr X 1hr/60 min X 22 min = 1.95 R EXAMINER NOTE:

If JPM is not performed in the simulator then provide candidate with a copy of EM-202, Duties of the Emergency Coordinator.

( COMMENTS:

STEP 2:

SAT Determine dose received wItile wHile performing Task #2.

UNSAT STANDARD:

Candidate determines dose received while performing Task #2.

R/hr X 1hr/60 min X 7 min = 2.30 R 19.75 Rlhr COMMENTS:

(

5128/2009 5/28/2009 8:09 AM Page 5 of7 RC I (NRC 2009)

Admin RCI H:\N~C H:\NR,C 2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx

- 2009\]PM\Admin\Admin [ModifiedJ.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE STEP 3:

SAT

(

( Determine dose remaining for EDL.

UNSAT STANDARD:

Candidate determines dose remaining for EDL.

10.0 R - 1.95 R - 2.~0 R = 5.75 R COMMENTS:

STEP 4: Critical Step Determine the time available for the PPO to complete Task #3 without exceeding the Basis:

EDL. Required calculation for maximum stay STANDARD: time.

Candidate determines (+/- 5 minutes) the time available for the PPO to complete Task

  1. 3 without exceeding the EDL. SAT UNSAT

( Available Dose = 5.75 R =

= 1.58 hr X 60 min == 94.8 min Dose Rate 3.65 R/hr Rlhr 1 hr 1hr COMMENTS:

TERMINATION CUE: Time limit determined.

END OF TASK TIME STOP

(

5/28/2009 8:09 AM Page 6 of7 Admin RCI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin RCI (NRC 2009) [Modified].docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

INITIAL CONDITIONS

  • f You are the Balance of Plant operator.

An emergency event is in progress.

Emergency Dose Limits (EDL) are in effect.

The PPO has received 1.62 Rem TEDE this year.

The use of High Pressure Aux Spray will increase the pressure reduction rate AND is required to protect valuable plant equipment.

The Emergency Coordinator has approved this evolution.

The following tasks are to be performed to align High Pressure Aux Spray:

  1. TASK TIME DOSE RATE 1 Open MUV-273 22 minutes 5.31 R/hr Rlhr 2 OpenDHV-95 7 minutes 19.75 Rlhr 3 Open DHV DHV-126

-126 3.65 R/hr Rlhr

(

Note: Assume no dose is received while traveling between tasks.

INITIATING CUES The PPO has completed tasks 1 and 2 in the times listed above. How long does he have to complete Task

  1. 3 without exceeding his Emergency Dose Limit?

CRYSTAL RIVER UNIT 3 JPM COVER SHEET ADMIN JPM #EPI NRC 2009 ALTERNATE PATH TIME CRITICAL RO/SRO Performed in Simulator COMPLETE THE STATE OF FLORIDA NOTIFICATION MESSAGE

( FORM FOR NUCLEAR POWER PLANTS PREPARED BY: __________~A~la=n~K=e=nn=e=d~y~

~A~la=n~K=e=nn=e~d~y________

________ Date: 07/09/09 VALIDATED BY: Rop 1 Taylor Date: 07115/09

~L=a~w~re=n=c=e~/V~an=s=ic=k=le=n~__

APPROVAL BY: __________~L=a~WT==en=c~e~/~V=an=s=ic=k=le=n~ Date: 07/20109 07120109 (Nuclear Training Supervisor)

CONCURRED BY: __________~M=i=ke~K=el~ly~

=M=i=ke~K==el~ly~__________ Date: 07/20109 (Operations Representative)

Validation is not required for minor enhancements, procedure revisions that do not affect the JPM or individual step changes that do not affect the flow of the lPM.

lPM .

Operations concurrence is required for new JPMs and changes that affect the flow, critical steps or time c~itical steps of the lPM. Operations concurrence is not required for changes that are required due to a qitical procedure revision.

ADMINISTRATIVE JOB PERFORMANCE MEASURE JPM #: Admin EPI - NRC 2009 [BANK]

Task:. Complete a notification to the State Warning Point.

Task:

[2;J YES Alternate Path: [Sj D NO PRA Top Critical Action: DYES [Sj [2;J NO Safety Function: NA KIA Rating/Importance:

G2.4.43 RO 3.2 SRO 3.8 Task Number: 1150402005 Position: DSROONLY [2;JRO/SRO

[SjRO/SRO DNLO/RO/SRO Task Standard: Complete the State of Florida Notification form and make required notifications per EM-202.

Preferred Evaluation Location: Preferred Evaluation Method:

D SIM D PLANT [Sj [2;J ADMIN [SjPERFORM

[2;J PERFORM D SIMULATE

References:

(

EM-202, Rev 85 Validation Time: 10 minutes Time Critical: [2;J YES DNO

[SjYES D NO

===========~============================================

Candidate: ---------------------------- Time Start:

Printed Name Time Finish: _________________

Performance Rating: D SAT D UNSAT Performance Time: - _____

Examiner: _____________________________________________________/______


~----

Printed Name Signature Date Comment: __________________________________________________________

(

7/9/2009 10:43 PM Page 2 of 10 Admin EP EPI1 (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx I.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE

(

SIMULATOR SETUP INSTRUCTIONS NA SIMULATOR OPERATOR INSTRUCTIONS Do not answer the SHRD phone when called.

TOOLS/EQUIPMENT/PROCEDURES NEEDED TOOLS/EQUIPMENTIPROCEDURES

1. EM-202, Rev 85
2. Consumable copies ofEM-202, Enclosure 2 7/9/200910:43 7/9/2009 PM 10:43 PM . .* Page 3 of 10 EP1 (NRC 2009)

Admin EPI EP1 (NRC 2009) [BANK] Rev l.docx H:\NRC - 2009\JPM\Admin\Admin EPI

ADMINISTRATIVE JOB PERFORMANCE MEASURE SRO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Senior Rea~tor Operator.

A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW.

No Protective Action Recommendations at this time.

The event has not been terminated.

INITIATING CUES 2.4.5 Using the above information complete Steps 1. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202. .

(

This JPM is Time Critical.

7/9/2009 10:43 PM Page 4 of 10 Admin EPI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE RO ONLY CUE SHEET READ TO THE OPERATOR INITIAL CONDITIONS You are the Reactor Operator.

A Site Area Emergency has been declared.

INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.

This JPM is Time Critical.

7/9/2009 10:43 PM Page 5 of 10 Admin EPI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx H;\NRC

ADMINISTRATIVE JOB PERFORMANCE MEASURE TIME START _ __ __ _ _ __

Critical Step STEP 1 IS SRO ONLY (required critical information)

STEP 1: Candidate completes the Florida Nuclear Plant Emergency Notification Form.

SAT STANDARD: Candidate completes the notification form correctly. Per the UNSAT cue only steps 1, 2, 4, 5 and 11 need to be completed.

EXAMINER NOTE: Critical information on this form includes sections 4,5 4, 5 and 11. Leaving any other section blank does not constitute failure of this step.

COMMENTS:

Critical Step STEP 2 IS SRO AND RO (15 minute notification required)

(

STEP 2: Candidate makes required notifications.

SAT STANDARD: Candidate makes required notifications. When the SHRD UN SAT phone goes unanswered the candidate will use the commercial telephone system to contact SWPT.

EXAMINER NOTE: Page 3 of Enclosure 2 contains the instructions for using an alternate communication network.

EXAMINER NOTE: When candidate attempts to call SWPT on the commercial line then time critical requirement is met.

EXAMINER CUE: Terminate the JPM when candidate attempts to call SWPT from the commercial line.

( COMMENTS:

10:43 PM 7/9/200910:43 7/9/2009 Page 6 of 10 Admm Admin EPI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx

ADMINISTRATIVE JOB PERFORMANCE MEASURE TERMINATION CRITERIA:

When candidate attempts notification to SWPT using the commercial phone line this JPM may be terminated.

END OF TASK TIME STOP _ _ _ __

(

(

7/9/2009 10:43PM 7/912009 10:43 PM Page 7 of 10 Admin EPI (NRC 2009)

H:\NRC - 2009\JPM\Admin\Admin EPI (NRC 2009) [BANK] Rev l.docx I.docx

CANDIDATE CUE SHEET

(

(TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

SRO ONLY CUE SHEET INITIAL CONDITIONS You are the Senior Reador Operator.

A Site Area Emergency has been declared due to a SGTR concurrent with a loss of condenser vacuum at time NOW.

No Protective ActionRecommendations Action Recommendations at this time.

The event has not been terminated.

INITIATING CUES

( Using the above information complete Steps 1.

I. 2. 4. 5 and 11 of the Florida Nuclear Plant Emergency Notification Form AND make required notifications per EM-202.

This JPM is Time Critical.

(

CANDIDATE CUE SHEET (TO BE RETURNED TO EXAMINER UPON COMPLETION OF TASK)

RO ONLY CUE SHEET INITIAL CONDITIONS You are the Reactor Operator.

An Unusual Event has been declared.

INITIATING CUES Using the Florida Nuclear Plant Emergency Notification Form provided make required notifications per EM-202.

This JPM is Time Critical.

(

RO ONLY DATA SHEET f'LORIDA f"LORIDA NUCLEAR PLANT EMERGENCY NOTIFICATION FORM HIS IS CRYSTAL RIVER UNIT 3. 0 This is a Drill B. C8:J A. D ~ This is an Emergency I HAVE A MESSAGE.

U8~: D URJ;:: 0 STATE 0D CITRUS D 0 LEVY 0 D RADIATION CONTROL - ORLANDO (M-F ONLY) ARE ON LINE.

(

..,. 't..ldte: ~~,~

l..Idte: ~,~,~ B. Contact Time: _ _ __ C. Reported By: (Name) _ _ _ _ _ _ _ _ __

'. Message Number: _ _ E. Reported From: D 0 Control Room D 0 TSC D 0 EOF

.D 0 Initial' New Classification OR oD Update ITE: ~ CRUNIT3 C8:J CR UNIT 3 oD SL UNIT 1 o D SL UNIT2 o D TP UNIT UNIT3 3 o D TP UNIT4 UNIT 4 MERGENCY CLASSIFICATION: A. ~ C8:J Notification of Unusual Event B. D0 Alert C. D 0 Site Area Emergency D. D0 General Emergency

~ EMERGENCY DECLARATION:

..,. C8:J B. D0 EMERGENCY TERMINATION: Date: _ _,_ _,_ _ Time:

.EASON FOR EMERGENCY DECLARATION: 0 EAL Number(s):

A. DEAL OR 0

Description:

B. D

.DDITIONAL

,COITIONAL INFORMATION OR UPDATEf UPDATE~ A. D 0 None OR 0

Description:

B. D lEATHER DATA: A. Wind direction from _ _ _ degrees B. Downwind Sectors affected _ _ _ _ _ _ __

.ELEASE STATUS: 0 A. D None (Go to Item 11) B. D0 In Progress C. 0D Has occurred, but stopped

~I EASE SIGNIFICANCE CATEGORY: (at the Site Boundary)

&plEASE

~

~ J Under evaluation j B. D0 Release is within Normal Operating Limits c.

C. D 0 Non-Significant (Fraction of PAG Range) D. D0 Protective Action Guide Range

\

E. D 0 Liquid release (no actions required)

UTILITY RECOMMENDED PROTECTIVE ACTIONS FOR THE PUBLIC:

A. ~ C8:J No utility recommended actions at this time. B. D0 Utility recommends the following protective actions; EVACUATEZONES: _ _ _ ____ ______ __ __

SHELTER ZONES:

AND consider issuance of Potassium Iodide (KI).

If form is completed in the Control Room, go to Item 15. If completed in the TSC or EOF, CONTINUE with Item 12.

PLANT CONDITIONS:

A. Reactor Shutdown? DYES o D NO B. Core Adequately Cooled? 0 YES DYES o D NO C. Containment Intact? DYES oD NO D. Core Condition: 0 Stable D o D Degrading WEATHER DATA: A. Wind Speed _ _ _ MPH (m'sec x 2.24 =MPH) B. Stability Class _ _

ADDITIONAL RELEASE INFORMATION: 0 A. D Not Applicable (Go to Item 15)

Distance Projected Thyroid Dose (CDE) for _ _

Hour(s) Projected Total Dose (TEDE) for _ _ Hour(s) 1 Mile (Site Boundary) B. _ _ _ _ _ _ _ mrem C. mrem 2 Miles D. mrem E. _ _ _ _ _ _ _ mrem 5 Miles F.

F. _ _ _ _ _ _ _ mrem mrem G. mrem 10 Miles H. _ _ _ _ _ _ _ mrem H. mrem I. _ _ _ _ _ _ _ mrem I.

r( ~ IAGE iAGE RECEIVED BY: (Name)_ _ _ _ _ __ Date: _ _,_ _, _ _ Time: _ _ __

THiS IS CRYSTAL RIVER UNIT 3.

nils oD This Is A Drill o D This Is An Emergency END OF MESSAGE