Line 3: Line 3:
| issue date = 11/02/2009
| issue date = 11/02/2009
| title = PV-2009-11-Draft SRO Operating Test Outlines
| title = PV-2009-11-Draft SRO Operating Test Outlines
| author name = Garchow S M
| author name = Garchow S
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ES-301, Page 22 of 27ES-301Administrative Topics OutlineForm ES-301-1Facility: _______________________________           Date of Examination: _____________Examination Level:   RO          SRO         Operating Test Number:   __________
{{#Wiki_filter:ES-301                             Administrative Topics Outline                                      Form ES-301-1 Palo Verde Facility: _______________________________                                                             11/10/09 Date of Examination: _____________
Administrative Topic (see Note)
Examination Level: RO          SRO                                     Operating Test Number: __________
Type Code*Describe activity to be performed Conduct of Operations Conduct of Operations Equipment Control
Administrative Topic           Type                        Describe activity to be performed (see Note)               Code*
Review Operations Repetitive Task EC003 and determine Required actions.
Conduct of Operations               R,D Determine if operators licenses are active and if staffing requirements are met.
Conduct of Operations                 R,N Tech Spec applicability with HPSI and LPSI.
Equipment Control                   R,D Pre-job brief on REP 9-9999Z R,M Radiation Control Identify who is responsible to classify (Shift Manager unable to return to the control room), classification, and Protective Action R,M l  Emergency Procedures/Plan                      Recommendations.
NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.
* Type Codes & Criteria:          (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (# 3 for ROs; # 4 for SROs & RO retakes)
(N)ew or (M)odified from bank ($ 1)
(P)revious 2 exams (# 1; randomly selected)
ES-301, Page 22 of 27


Radiation Control
ES-301                             Control Room/In-Plant Systems Outline                            Form ES-301-2 Palo Verde Facility: _____________________________                                                           11/10/09 Date of Examination: ______________
 
Exam Level: RO             SRO-I       SRO-U                         Operating Test No.: _______________
Emergency Procedures/Plan lNOTE:All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.* Type Codes & Criteria:(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank ( 3 for ROs;  4 for SROs & RO retakes)(N)ew or (M)odified from bank ( 1)(P)revious 2 exams ( 1; randomly selected)
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
ES-301, Page 23 of 27ES-301Control Room/In-Plant Systems OutlineForm ES-301-2Facility: _____________________________         Date of Examination: ______________Exam Level: RO       SRO-I       SRO-U       Operating Test No.: _______________
System / JPM Title                                    Type Code*           Safety Function
Control Room Systems
: a. SG Level Reduction from LMFRP (Appendix 33) (JS1)                                  S,A,N,L            4 (Pri)
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM TitleType Code*Safety Function a.b.
: b. Reset SIAS (JS3)                                                                    S,D,EN              7 c.
c.
d.
d.
e.
e.
Line 31: Line 39:
g.
g.
h.
h.
In-Plant Systems
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.j.k.@All RO and SRO-I control room (and in-plant) syst ems must be different and serve different safetyfunctions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.* Type Codes lCriteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature l(L)ow-Power / Shutdown(N)ew or (M)odified from bank including 1(A)  
: i. Energize PBB per Appendix E of 40AO-9ZZ19                                          A,E, M              6
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 /  8 /  4 1 /  1 /  1  -  / -  /  1 (control room system) l 1 /  1 /  1 2 /  2 /  1 3 / 3 / 2 (randomly selected) 1 / 1 / 1 ES-301, Page 23 of 27ES-301Control Room/In-Plant Systems OutlineForm ES-301-2Facility: _____________________________         Date of Examination: ______________Exam Level: RO       SRO-I       SRO-U       Operating Test No.: _______________
: j. X-tie EW Train B to Spent Fuel Pool cooling                                        R,D,E                8
Control Room Systems
: k. Operation of AFA-P01 from the Remote Shutdown Panel                                  D,E            4 (sec)
@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF) System / JPM TitleType Code*Safety Function a.b.
@         All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
c.
* Type Codes                                 Criteria for RO / SRO-I / SRO-U                 l (A)lternate path                                                             4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                           #9/#8/#4 (E)mergency or abnormal in-plant                                             $1/$1/$1 (EN)gineered safety feature                                                     - / - / $1 (control room system)    l (L)ow-Power / Shutdown                                                       $1/$1/$1 (N)ew or (M)odified from bank including 1(A)                                 $2/$2/$1 (P)revious 2 exams                                                            # 3 / # 3 / # 2 (randomly selected)
(R)CA                                                                        $1/$1/$1 (S)imulator ES-301, Page 23 of 27
 
ES-301                            Control Room/In-Plant Systems Outline                              Form ES-301-2 Palo Verde Facility: _____________________________                                                           11/10/09 Date of Examination: ______________
Exam Level: RO             SRO-I       SRO-U                         Operating Test No.: _______________
Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
System / JPM Title                                    Type Code*           Safety Function
: a. SG Level Reduction from LMFRP (Appendix 33) (JS1)                                  S,A,N,L            4 (Pri)
: b. Reset SIAS (JS3)                                                                    S,D,EN              7 c.
d.
d.
e.
e.
Line 42: Line 58:
g.
g.
h.
h.
In-Plant Systems
In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.j.k.@All RO and SRO-I control room (and in-plant) syst ems must be different and serve different safetyfunctions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.* Type Codes lCriteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature l(L)ow-Power / Shutdown(N)ew or (M)odified from bank including 1(A)  
: i. Energize PBB per Appendix E of 40AO-9ZZ19                                          A,E, M              6
(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3 9 /  8 /  4 1 /  1 /  1  -  /  -  /   1 (control room system) l 1 /  1 /  1 2 /  2 /  1 3 / 3 / 2 (randomly selected) 1 / 1 / 1}}
: j. X-tie EW Train B to Spent Fuel Pool cooling                                          R,D,E              8
: k. Operation of AFA-P01 from the Remote Shutdown Panel                                  D,E            4 (sec)
@         All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                 Criteria for RO / SRO-I / SRO-U                 l (A)lternate path                                                             4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                           #9/#8/#4 (E)mergency or abnormal in-plant                                             $1/$1/$1 (EN)gineered safety feature                                                     - / - / $1 (control room system)    l (L)ow-Power / Shutdown                                                       $1/$1/$1 (N)ew or (M)odified from bank including 1(A)                                 $2/$2/$1 (P)revious 2 exams                                                            # 3 / # 3 / # 2 (randomly selected)
(R)CA                                                                        $1/$1/$1 (S)imulator ES-301, Page 23 of 27}}

Latest revision as of 13:47, 13 November 2019

PV-2009-11-Draft SRO Operating Test Outlines
ML102460152
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/02/2009
From: Garchow S
Operations Branch IV
To:
Arizona Public Service Co
References
Download: ML102460152 (3)


Text

ES-301 Administrative Topics Outline Form ES-301-1 Palo Verde Facility: _______________________________ 11/10/09 Date of Examination: _____________

Examination Level: RO SRO Operating Test Number: __________

Administrative Topic Type Describe activity to be performed (see Note) Code*

Review Operations Repetitive Task EC003 and determine Required actions.

Conduct of Operations R,D Determine if operators licenses are active and if staffing requirements are met.

Conduct of Operations R,N Tech Spec applicability with HPSI and LPSI.

Equipment Control R,D Pre-job brief on REP 9-9999Z R,M Radiation Control Identify who is responsible to classify (Shift Manager unable to return to the control room), classification, and Protective Action R,M l Emergency Procedures/Plan Recommendations.

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria: (C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (# 3 for ROs; # 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ($ 1)

(P)revious 2 exams (# 1; randomly selected)

ES-301, Page 22 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Palo Verde Facility: _____________________________ 11/10/09 Date of Examination: ______________

Exam Level: RO SRO-I SRO-U Operating Test No.: _______________

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. SG Level Reduction from LMFRP (Appendix 33) (JS1) S,A,N,L 4 (Pri)
b. Reset SIAS (JS3) S,D,EN 7 c.

d.

e.

f.

g.

h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Energize PBB per Appendix E of 40AO-9ZZ19 A,E, M 6
j. X-tie EW Train B to Spent Fuel Pool cooling R,D,E 8
k. Operation of AFA-P01 from the Remote Shutdown Panel D,E 4 (sec)

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U l (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank #9/#8/#4 (E)mergency or abnormal in-plant $1/$1/$1 (EN)gineered safety feature - / - / $1 (control room system) l (L)ow-Power / Shutdown $1/$1/$1 (N)ew or (M)odified from bank including 1(A) $2/$2/$1 (P)revious 2 exams # 3 / # 3 / # 2 (randomly selected)

(R)CA $1/$1/$1 (S)imulator ES-301, Page 23 of 27

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Palo Verde Facility: _____________________________ 11/10/09 Date of Examination: ______________

Exam Level: RO SRO-I SRO-U Operating Test No.: _______________

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code* Safety Function

a. SG Level Reduction from LMFRP (Appendix 33) (JS1) S,A,N,L 4 (Pri)
b. Reset SIAS (JS3) S,D,EN 7 c.

d.

e.

f.

g.

h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. Energize PBB per Appendix E of 40AO-9ZZ19 A,E, M 6
j. X-tie EW Train B to Spent Fuel Pool cooling R,D,E 8
k. Operation of AFA-P01 from the Remote Shutdown Panel D,E 4 (sec)

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U l (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank #9/#8/#4 (E)mergency or abnormal in-plant $1/$1/$1 (EN)gineered safety feature - / - / $1 (control room system) l (L)ow-Power / Shutdown $1/$1/$1 (N)ew or (M)odified from bank including 1(A) $2/$2/$1 (P)revious 2 exams # 3 / # 3 / # 2 (randomly selected)

(R)CA $1/$1/$1 (S)imulator ES-301, Page 23 of 27