PV-2009-11-Draft SRO Operating Test Outlines
ML102460152
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 11/02/2009
From: Garchow S
Operations Branch IV
To:
Arizona Public Service Co
References
Download: ML102460152 (3)


Text

ES-301, Page 22 of 27 ES-301 Administrative Topics Outline Form ES-301-1 Facility: _______________________________

Date of Examination: _____________

Examination Level: RO SRO Operating Test Number: __________

Administrative Topic (see Note)

Type Code*

Describe activity to be performed Conduct of Operations Conduct of Operations Equipment Control Radiation Control Emergency Procedures/Plan l

NOTE: All items (5 total) are required for SROs. RO applicants require only 4 items unless they are retaking only the administrative topics, when all 5 are required.

  • Type Codes & Criteria:

(C)ontrol room, (S)imulator, or Class(R)oom (D)irect from bank (# 3 for ROs; # 4 for SROs & RO retakes)

(N)ew or (M)odified from bank ($ 1)

(P)revious 2 exams (# 1; randomly selected)

Palo Verde 11/10/09



Review Operations Repetitive Task EC003 and determine Required actions.

R,D Determine if operators licenses are active and if staffing requirements are met.

R,N Tech Spec applicability with HPSI and LPSI.

R,D Pre-job brief on REP 9-9999Z R,M Identify who is responsible to classify (Shift Manager unable to return to the control room), classification, and Protective Action Recommendations.

R,M

ES-301, Page 23 of 27 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _____________________________

Date of Examination: ______________

Exam Level: RO SRO-I SRO-U Operating Test No.: _______________

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function a.

b.

c.

d.

e.

f.

g.

h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.

j.

k.

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes l

Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature l

(L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

  1. 9 / # 8 / # 4

$ 1 / $ 1 / $ 1

- / - / $1 (control room system) l

$ 1 / $ 1 / $ 1

$ 2 / $ 2 / $ 1

  1. 3 / # 3 / # 2 (randomly selected)

$ 1 / $ 1 / $ 1 Palo Verde 11/10/09



SG Level Reduction from LMFRP (Appendix 33) (JS1)

S,A,N,L 4 (Pri)

Reset SIAS (JS3)

S,D,EN 7

Energize PBB per Appendix E of 40AO-9ZZ19 A,E, M 6

X-tie EW Train B to Spent Fuel Pool cooling R,D,E 8

Operation of AFA-P01 from the Remote Shutdown Panel D,E 4 (sec)

ES-301, Page 23 of 27 ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: _____________________________

Date of Examination: ______________

Exam Level: RO SRO-I SRO-U Operating Test No.: _______________

Control Room Systems@ (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

System / JPM Title Type Code*

Safety Function a.

b.

c.

d.

e.

f.

g.

h.

In-Plant Systems@ (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U) i.

j.

k.

All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes l

Criteria for RO / SRO-I / SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature l

(L)ow-Power / Shutdown (N)ew or (M)odified from bank including 1(A)

(P)revious 2 exams (R)CA (S)imulator 4-6 / 4-6 / 2-3

  1. 9 / # 8 / # 4

$ 1 / $ 1 / $ 1

- / - / $1 (control room system) l

$ 1 / $ 1 / $ 1

$ 2 / $ 2 / $ 1

  1. 3 / # 3 / # 2 (randomly selected)

$ 1 / $ 1 / $ 1 Palo Verde 11/10/09



SG Level Reduction from LMFRP (Appendix 33) (JS1)

S,A,N,L 4 (Pri)

Reset SIAS (JS3)

S,D,EN 7

Reset RAS S,D,EN 7

Perform a containment vent S,D 8

Reconnect the SBCS S,D 4 (Sec)

Extended loss of letdown actions S,A,D,P 2

Transfer 13.8 Kv busses S,A,D 6

Energize PBB per Appendix E of 40AO-9ZZ19 A,E, M 6

X-tie EW Train B to Spent Fuel Pool cooling R,D,E 8

Operation of AFA-P01 from the Remote Shutdown Panel D,E 4 (sec)