ML102920500: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML102920500
| number = ML102920500
| issue date = 10/13/2009
| issue date = 10/13/2009
| title = Crystal River 3 Nuclear Condition Report Summary -NCRs Initiated Since Oct 12, 2009
| title = Condition Report Summary -NCRs Initiated Since Oct 12, 2009
| author name =  
| author name =  
| author affiliation = - No Known Affiliation
| author affiliation = - No Known Affiliation
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:For Information Only. Passport is the Application of Record.Summary Report -NCRs Initiated Since Oct 12, 2009 AR Owed To Facility:
{{#Wiki_filter:For Information Only. Passport is the Application of Record.
NCP Criteria:
Summary Report - NCRs Initiated Since Oct 12, 2009 AR Owed To Facility: NCP Criteria: AR Type = NCR; AR Origination Date >= CurrentDate; AR Status -> CANCELED; Attribute Name = 1A POT'L OPERJREPORT; AR Model Ind = N; AR Owed to Facility = NCP; Sorted by Origination Date, AR Nbr, and Priority Orig Date    Potential                                      OAI        Restraint AR Nbr       Originator                     AR Subject                             OperlRep     Status   PRI    Owner          Y/N         YIN       Pot. DE   Keyword
AR Type = NCR; AR Origination Date >= CurrentDate; AR Status -> CANCELED; Attribute Name = 1A POT'L OPERJREPORT; AR Model Ind = N; AR Owed to Facility = NCP;Sorted by Origination Date, AR Nbr, and Priority AR Nbr Originator AR Subject Orig Date Potential OperlRep Status/1.OAI Restraint Y/N YIN Pot. DE Keyword PRI Owner 6 0 360266 s1Iiption:
                                                                                                            /1.
JAMES SGR HYDRODEMOLITION OF RB NOT 20091012 N HIAPPR I I TERRY JR. COMPLETELY EFFECTIVE  
I 6 0 360266 JAMES                 SGR HYDRODEMOLITION OF RB NOT TERRY JR. COMPLETELY EFFECTIVE 20091012      N      HIAPPR I
-I.THE HYDRODEMOLITION CONTRACTOR WAS UNABLE TO COMPLETE REMOVAL OF THE REQUIRED CONCRETE FROM THE CONSTRUCTION OPENING IN THE AREAS BEHIND THE TENDON SHEAVES. MANUAL REMOVAL WAS NECESSARY.
I.                                                 I s1Iiption:    THE HYDRODEMOLITION CONTRACTOR WAS UNABLE TO COMPLETE REMOVAL OF THE REQUIRED CONCRETE FROM THE CONSTRUCTION OPENING IN THE AREAS BEHIND THE TENDON SHEAVES. MANUAL REMOVAL WAS NECESSARY.
I 00360268 CYNTHIA CYBER SECURITY INFORMATION 20091012 N H/APPR .I I BROADW HANDLING AND SEC-NGGC-2122 REV 3 l _ _ I 1 _ELL
00360268 CYNTHIA BROADW ELL CYBER SECURITY HANDLING          INFORMATION REV 3 AND SEC-NGGC-2122             20091012      N        H/APPR            l         _               _.          I I        I 1         _


== Description:==
== Description:==
 
SEC-NGGC-2122 SECTION 9.2 DESCRIBES CONTROLS FOR-DESIGNATION, ACCESS, CONTROL, MARKING, STORAGE, TRANSMISSION, REPRODUCTIONS, AND DESTRUCTION OF INFORMATION CLASSIFIED AS "SECURITY RELATED INFORMATION - PROTECT IN ACCORDANCE WITH 10CFR 2.390." THESE REQUIREMENTS ARE BASED ON 10CFR2.390, RIS 2005-26, SECY 05-0091, AND 49CFR SERIES RELATED TO SECURITY SENSITIVE INFORMATION. SOME REQUIREMENTS IN SEC-NGGC-2122 FOR INFORMATION CLASSIFIED AS "SECURITY RELATED INFORMATION - WITHHOLD UNDER 10CFR 2.390" APPEARS TO GO BEYOND REQUIREMENTS SPECIFIED IN REGULATIONS AND REGULATORY DOCUMENTS. DURING THE DEVELOPMENT OF NEI 08-09, CYBER SECURITY PROGRAM FOR POWER REACTORS WORK WAS CARRIED OUT WITH THE INDUSTRY AND THE NRC. THE DEVELOPMENT DOCUMENTS PROPERLY IDENTIFIED AS "SECURITY RELATED INFORMATION - WITHHOLD UNDER 10CFR 2.390" WERE MANAGED IN A MANNER THAT MEETS THE REGULATORY REQUIREMENTS, BUT WERE NOT HANDLED IN A MANNER THAT MET ALL OF THE REQUIREMENTS OF. SEC-NGGC-2122. THESE INCLUDE LOCKING DOCUMENTS IN DESK DRAWS, CONVERSATIONS RELATING TO PORTIONS OF THE DOCUMENT, ANDENCRYPTING E-MAIL USING PGP. SEC-NGGC-2122 SECTION 9.2.3.1 STATES "PERSONS AUTHORIZED FOR ACCESS TO SAFEGUARDS INFORMATION IN ACCORDANCE WITH SEC -NGGC-2120 ARE DEEMED TRUSTWORTHY AND RELIABLE FOR ACCESS TO SENSITIVE INFORMATION PROTECTED UNDER 10CFR 2.390." IT IS UNCLEAR WHETHER OTHER BADGED NUCLEAR PERSONNEL ARE PERMITTED ACCESS TO 10CFR 2.390 AND IT IS UNCLEAR WHAT THE TERM "ACCESS" COVERS.
SEC-NGGC-2122 SECTION 9.2 DESCRIBES CONTROLS FOR-DESIGNATION, ACCESS, CONTROL, MARKING, STORAGE, TRANSMISSION, REPRODUCTIONS, AND DESTRUCTION OF INFORMATION CLASSIFIED AS "SECURITY RELATED INFORMATION  
JAMES           SGR RB TENDON SHEAVE DESIGN               20091012       N       H/APPR               _   ___             ___             ___         ___
-PROTECT IN ACCORDANCE WITH 10CFR 2.390." THESE REQUIREMENTS ARE BASED ON 10CFR2.390, RIS 2005-26, SECY 05-0091, AND 49CFR SERIES RELATED TO SECURITY SENSITIVE INFORMATION.
0360269 TERRY JR. DIFFERENT THAN ANTICIPATED Q8 ascription:    BASSED ON SGR DESIGN AND INDUSTRY INFORMATION, THE SGR TEAM ANTICIPATED THIN WALL FLEXIBLE TUBING AS THE TENDON SHEAVE MATERIAL. THIS MATERIAL WOULDBE SACRIFICED DURING THE HYDROMOLETION PROCESS. THE ACTUAL MATERIAL WAS A 5 1/4 O.D. CONDUIT TYPE MATERIAL THAT WITHSTOOD THE HYDRODEMOLITION PROCESS AND REQUIRED SEVERING FOR REMOVAL.
SOME REQUIREMENTS IN SEC-NGGC-2122 FOR INFORMATION CLASSIFIED AS "SECURITY RELATED INFORMATION  
9   00360330 ANTHONY             EC KPI IN"YELLOW'STATUS FOR               20091012       N       H/APPR               _       _         _           _       _       _     _
-WITHHOLD UNDER 10CFR 2.390" APPEARS TO GO BEYOND REQUIREMENTS SPECIFIED IN REGULATIONS AND REGULATORY DOCUMENTS.
WILLIAMS        SEPTEMBER 2009                               K                                      1           1           1                     1             1
DURING THE DEVELOPMENT OF NEI 08-09, CYBER SECURITY PROGRAM FOR POWER REACTORS WORK WAS CARRIED OUT WITH THE INDUSTRY AND THE NRC. THE DEVELOPMENT DOCUMENTS PROPERLY IDENTIFIED AS "SECURITY RELATED INFORMATION  
-WITHHOLD UNDER 10CFR 2.390" WERE MANAGED IN A MANNER THAT MEETS THE REGULATORY REQUIREMENTS, BUT WERE NOT HANDLED IN A MANNER THAT MET ALL OF THE REQUIREMENTS OF. SEC-NGGC-2122.
THESE INCLUDE LOCKING DOCUMENTS IN DESK DRAWS, CONVERSATIONS RELATING TO PORTIONS OF THE DOCUMENT, ANDENCRYPTING E-MAIL USING PGP. SEC-NGGC-2122 SECTION 9.2.3.1 STATES "PERSONS AUTHORIZED FOR ACCESS TO SAFEGUARDS INFORMATION IN ACCORDANCE WITH SEC -NGGC-2120 ARE DEEMED TRUSTWORTHY AND RELIABLE FOR ACCESS TO SENSITIVE INFORMATION PROTECTED UNDER 10CFR 2.390." IT IS UNCLEAR WHETHER OTHER BADGED NUCLEAR PERSONNEL ARE PERMITTED ACCESS TO 10CFR 2.390 AND IT IS UNCLEAR WHAT THE TERM "ACCESS" COVERS.Q8 0360269 ascription:
JAMES SGR RB TENDON SHEAVE DESIGN 20091012 N H/APPR _ ___ ___ ___ ___TERRY JR. DIFFERENT THAN ANTICIPATED BASSED ON SGR DESIGN AND INDUSTRY INFORMATION, THE SGR TEAM ANTICIPATED THIN WALL FLEXIBLE TUBING AS THE TENDON SHEAVE MATERIAL.
THIS MATERIAL WOULDBE SACRIFICED DURING THE HYDROMOLETION PROCESS. THE ACTUAL MATERIAL WAS A 5 1/4 O.D. CONDUIT TYPE MATERIAL THAT WITHSTOOD THE HYDRODEMOLITION PROCESS AND REQUIRED SEVERING FOR REMOVAL.9 00360330 ANTHONY EC KPI IN"YELLOW'STATUS FOR 20091012 N H/APPR _ _ _ _ _ _ _WILLIAMS SEPTEMBER 2009 1 1 1 K 1 1


== Description:==
== Description:==
 
THE SEPTEMBER "EMPLOYEE CONCERN AVERAGE AGE" KPI IS IN YELLOW STATUS FOR SEPTEMBER 2009. ACTIONS NEEDED TO RETURN TO "GREEN" STATUS.
THE SEPTEMBER "EMPLOYEE CONCERN AVERAGE AGE" KPI IS IN YELLOW STATUS FOR SEPTEMBER 2009. ACTIONS NEEDED TO RETURN TO "GREEN" STATUS.Last.Reres .ed ................
Last.Reres         .ed
:O AM ll ..ction -I rac.in. Gener-l UnvreN ... sm ar.cren.d..
                          ................ :O AM ll   ..             ction - rac.in.
e Page. .o..Last Refreshed:
I      Gener-l UnvreN I* ... sm ar.cren.d..         e                                         Page. .o..
10113/2009 05:01:09 AM Action Tracking General Universe-NCP NCR summary current date.rep Page 2 of 7}}
Last Refreshed: 10113/2009 05:01:09 AM                         Action Tracking General Universe-NCP NCR summary current date.rep                                             Page 2 of 7}}

Latest revision as of 12:58, 11 March 2020

Condition Report Summary -NCRs Initiated Since Oct 12, 2009
ML102920500
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/13/2009
From:
- No Known Affiliation
To:
Office of Information Services
References
FOIA/PA-2010-0116
Download: ML102920500 (1)


Text

For Information Only. Passport is the Application of Record.

Summary Report - NCRs Initiated Since Oct 12, 2009 AR Owed To Facility: NCP Criteria: AR Type = NCR; AR Origination Date >= CurrentDate; AR Status -> CANCELED; Attribute Name = 1A POT'L OPERJREPORT; AR Model Ind = N; AR Owed to Facility = NCP; Sorted by Origination Date, AR Nbr, and Priority Orig Date Potential OAI Restraint AR Nbr Originator AR Subject OperlRep Status PRI Owner Y/N YIN Pot. DE Keyword

/1.

I 6 0 360266 JAMES SGR HYDRODEMOLITION OF RB NOT TERRY JR. COMPLETELY EFFECTIVE 20091012 N HIAPPR I

I. I s1Iiption: THE HYDRODEMOLITION CONTRACTOR WAS UNABLE TO COMPLETE REMOVAL OF THE REQUIRED CONCRETE FROM THE CONSTRUCTION OPENING IN THE AREAS BEHIND THE TENDON SHEAVES. MANUAL REMOVAL WAS NECESSARY.

00360268 CYNTHIA BROADW ELL CYBER SECURITY HANDLING INFORMATION REV 3 AND SEC-NGGC-2122 20091012 N H/APPR l _ _. I I I 1 _

Description:

SEC-NGGC-2122 SECTION 9.2 DESCRIBES CONTROLS FOR-DESIGNATION, ACCESS, CONTROL, MARKING, STORAGE, TRANSMISSION, REPRODUCTIONS, AND DESTRUCTION OF INFORMATION CLASSIFIED AS "SECURITY RELATED INFORMATION - PROTECT IN ACCORDANCE WITH 10CFR 2.390." THESE REQUIREMENTS ARE BASED ON 10CFR2.390, RIS 2005-26, SECY 05-0091, AND 49CFR SERIES RELATED TO SECURITY SENSITIVE INFORMATION. SOME REQUIREMENTS IN SEC-NGGC-2122 FOR INFORMATION CLASSIFIED AS "SECURITY RELATED INFORMATION - WITHHOLD UNDER 10CFR 2.390" APPEARS TO GO BEYOND REQUIREMENTS SPECIFIED IN REGULATIONS AND REGULATORY DOCUMENTS. DURING THE DEVELOPMENT OF NEI 08-09, CYBER SECURITY PROGRAM FOR POWER REACTORS WORK WAS CARRIED OUT WITH THE INDUSTRY AND THE NRC. THE DEVELOPMENT DOCUMENTS PROPERLY IDENTIFIED AS "SECURITY RELATED INFORMATION - WITHHOLD UNDER 10CFR 2.390" WERE MANAGED IN A MANNER THAT MEETS THE REGULATORY REQUIREMENTS, BUT WERE NOT HANDLED IN A MANNER THAT MET ALL OF THE REQUIREMENTS OF. SEC-NGGC-2122. THESE INCLUDE LOCKING DOCUMENTS IN DESK DRAWS, CONVERSATIONS RELATING TO PORTIONS OF THE DOCUMENT, ANDENCRYPTING E-MAIL USING PGP. SEC-NGGC-2122 SECTION 9.2.3.1 STATES "PERSONS AUTHORIZED FOR ACCESS TO SAFEGUARDS INFORMATION IN ACCORDANCE WITH SEC -NGGC-2120 ARE DEEMED TRUSTWORTHY AND RELIABLE FOR ACCESS TO SENSITIVE INFORMATION PROTECTED UNDER 10CFR 2.390." IT IS UNCLEAR WHETHER OTHER BADGED NUCLEAR PERSONNEL ARE PERMITTED ACCESS TO 10CFR 2.390 AND IT IS UNCLEAR WHAT THE TERM "ACCESS" COVERS.

JAMES SGR RB TENDON SHEAVE DESIGN 20091012 N H/APPR _ ___ ___ ___ ___

0360269 TERRY JR. DIFFERENT THAN ANTICIPATED Q8 ascription: BASSED ON SGR DESIGN AND INDUSTRY INFORMATION, THE SGR TEAM ANTICIPATED THIN WALL FLEXIBLE TUBING AS THE TENDON SHEAVE MATERIAL. THIS MATERIAL WOULDBE SACRIFICED DURING THE HYDROMOLETION PROCESS. THE ACTUAL MATERIAL WAS A 5 1/4 O.D. CONDUIT TYPE MATERIAL THAT WITHSTOOD THE HYDRODEMOLITION PROCESS AND REQUIRED SEVERING FOR REMOVAL.

9 00360330 ANTHONY EC KPI IN"YELLOW'STATUS FOR 20091012 N H/APPR _ _ _ _ _ _ _

WILLIAMS SEPTEMBER 2009 K 1 1 1 1 1

Description:

THE SEPTEMBER "EMPLOYEE CONCERN AVERAGE AGE" KPI IS IN YELLOW STATUS FOR SEPTEMBER 2009. ACTIONS NEEDED TO RETURN TO "GREEN" STATUS.

Last.Reres .ed

................ :O AM ll .. ction - rac.in.

I Gener-l UnvreN I* ... sm ar.cren.d.. e Page. .o..

Last Refreshed: 10113/2009 05:01:09 AM Action Tracking General Universe-NCP NCR summary current date.rep Page 2 of 7