ML18198A425: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 07/18/2018
| issue date = 07/18/2018
| title = Acceptance for Review of Surface Soil Characterization of Survey Units 6 and 7 (Enterprise Project Identifier L-2018-DF1-0002)
| title = Acceptance for Review of Surface Soil Characterization of Survey Units 6 and 7 (Enterprise Project Identifier L-2018-DF1-0002)
| author name = Ramsey K M
| author name = Ramsey K
| author affiliation = NRC/NMSS/DFCSE/FMB
| author affiliation = NRC/NMSS/DFCSE/FMB
| addressee name = Freudenberger R J
| addressee name = Freudenberger R
| addressee affiliation = Nuclear Fuel Services, Inc
| addressee affiliation = Nuclear Fuel Services, Inc
| docket = 07000143
| docket = 07000143
| license number = SNM-0124
| license number = SNM-0124
| contact person = Ramsey K M
| contact person = Ramsey K
| case reference number = EPID L-2018-DFI-0002
| case reference number = EPID L-2018-DFI-0002
| document type = Letter
| document type = Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:Code of Federal Regulations}}
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2018 Mr. Richard J. Freudenberger Director of Safety and Safeguards Nuclear Fuel Services, Inc.
P.O. Box 337, MS 123 Erwin, TN 37650
 
==SUBJECT:==
ACCEPTANCE FOR REVIEW OF SURFACE SOIL CHARACTERIZATION OF SURVEY UNITS 6 AND 7 (ENTERPRISE PROJECT IDENTIFIER L-2018-DF1-0002)
 
==Dear Mr. Freudenberger:==
 
We have received your submittal dated June 8, 2018, transmitting the surface soil characterization of Survey Units 6 and 7 of the North Site. Your request has been assigned Enterprise Project Identifier L-2018-DF1-0002. Please reference this number in any future correspondence associated with this request.
We have completed our acceptance review of your submittal and have identified no administrative omissions or deficiencies that would prevent us from proceeding with a detailed review. A complete review of this submittal may identify issues that require additional information.
Based on our preliminary review and projection of current review schedules, we anticipate completing our review by the end of December 2018. This date could change depending on the findings of our technical review, urgent assignments, or other factors. We will promptly communicate any significant changes to this schedule. In addition, we estimate that completing the review will require approximately 80 staff hours.
In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the U.S.
Nuclear Regulatory Commissions (NRCs) Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
R. Freudenberger                            2 If you have any questions concerning this letter, please contact me at (301) 415-7506, or via e-mail at Kevin.Ramsey@nrc.gov.
Sincerely,
                                            \RA\
Kevin M. Ramsey, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No. 70-143 License No. SNM-124
 
ML18198A425 OFFICE        FCSE/FMB          FCSE/FMB      FCSE/FMB      FCSE/FMB NAME          KRamsey        TBrockington    RJohnson      KRamsey DATE          07/18/2018        07/18/2018      07/18/2018    07/18/2018}}

Latest revision as of 21:06, 20 October 2019

Acceptance for Review of Surface Soil Characterization of Survey Units 6 and 7 (Enterprise Project Identifier L-2018-DF1-0002)
ML18198A425
Person / Time
Site: Erwin
Issue date: 07/18/2018
From: Kevin Ramsey
Fuel Manufacturing Branch
To: Freudenberger R
Nuclear Fuel Services
Ramsey K
References
EPID L-2018-DFI-0002
Download: ML18198A425 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 July 18, 2018 Mr. Richard J. Freudenberger Director of Safety and Safeguards Nuclear Fuel Services, Inc.

P.O. Box 337, MS 123 Erwin, TN 37650

SUBJECT:

ACCEPTANCE FOR REVIEW OF SURFACE SOIL CHARACTERIZATION OF SURVEY UNITS 6 AND 7 (ENTERPRISE PROJECT IDENTIFIER L-2018-DF1-0002)

Dear Mr. Freudenberger:

We have received your submittal dated June 8, 2018, transmitting the surface soil characterization of Survey Units 6 and 7 of the North Site. Your request has been assigned Enterprise Project Identifier L-2018-DF1-0002. Please reference this number in any future correspondence associated with this request.

We have completed our acceptance review of your submittal and have identified no administrative omissions or deficiencies that would prevent us from proceeding with a detailed review. A complete review of this submittal may identify issues that require additional information.

Based on our preliminary review and projection of current review schedules, we anticipate completing our review by the end of December 2018. This date could change depending on the findings of our technical review, urgent assignments, or other factors. We will promptly communicate any significant changes to this schedule. In addition, we estimate that completing the review will require approximately 80 staff hours.

In accordance with Title 10 of the Code of Federal Regulations, Section 2.390 of the U.S.

Nuclear Regulatory Commissions (NRCs) Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRCs Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

R. Freudenberger 2 If you have any questions concerning this letter, please contact me at (301) 415-7506, or via e-mail at Kevin.Ramsey@nrc.gov.

Sincerely,

\RA\

Kevin M. Ramsey, Senior Project Manager Fuel Manufacturing Branch Division of Fuel Cycle Safety, Safeguards, and Environmental Review Office of Nuclear Material Safety and Safeguards Docket No.70-143 License No. SNM-124

ML18198A425 OFFICE FCSE/FMB FCSE/FMB FCSE/FMB FCSE/FMB NAME KRamsey TBrockington RJohnson KRamsey DATE 07/18/2018 07/18/2018 07/18/2018 07/18/2018