ML11294A293: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(3 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML11294A293 | | number = ML11294A293 | ||
| issue date = 10/06/2011 | | issue date = 10/06/2011 | ||
| title = | | title = Lr - FW: Open Item List from DB | ||
| author name = | | author name = | ||
| author affiliation = NRC/NRR | | author affiliation = NRC/NRR | ||
Line 15: | Line 15: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, October 06, 2011 3:27 PM To: Davis-BesseHearingFile Resource | ||
==Subject:== | ==Subject:== | ||
FW: Open Item List from DB Attachments: | FW: Open Item List from DB Attachments: SER Open Items_2011-09-29.doc From: dorts@firstenergycorp.com [mailto:dorts@firstenergycorp.com] | ||
SER Open Items_2011-09-29.doc From: dorts@firstenergycorp.com | Sent: Friday, September 30, 2011 1:35 PM To: CuadradoDeJesus, Samuel | ||
Sent: Friday, September 30, 2011 1:35 PM To: CuadradoDeJesus, Samuel | |||
==Subject:== | ==Subject:== | ||
Open Item List from DB Sam..... we added a column to your list identifying the letter number that addresses or will address the item... we would like to review this list with you. | Open Item List from DB Sam..... we added a column to your list identifying the letter number that addresses or will address the item... we would like to review this list with you. | ||
Steve Dort DBNPS License Renewal 419.321.7662 work 412.974.3369 cell | |||
----------------------------------------- The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message. | |||
----------------------- The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the | 1 | ||
Hearing Identifier: | |||
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 1816 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806D230B61) | |||
==Subject:== | ==Subject:== | ||
FW: Open Item List from DB | FW: Open Item List from DB Sent Date: 10/6/2011 3:26:33 PM Received Date: 10/6/2011 3:26:34 PM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients: | ||
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov> | |||
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1018 10/6/2011 3:26:34 PM SER Open Items_2011-09-29.doc 72258 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: | |||
Recipients Received: | |||
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status RASB BRogers CI RAI 2.1-3 Abandoned equipment L-11-252 sent Lehman/Istar OI 3.0.3.1.10-1 RAI B.2.22-5 Issue related to standing water in the L-11-252 sent (B.2.22-1) containment annulus, Lehman/Istar OI 3.0.3.1.10-2 RAI B.2.22-6 issue related to borated water leakage from L-11-237 sent (B.2.22-2) the reactor cavity, and Lehman/Istar OI 3.0.3.1.10-4 RAI B.2.22-7 issue related to inspection of the L-11-292 DRAFT (B.2.22-4) containment stainless steel penetration sleeves. | |||
Davis-Besse SER Open Items and Clarification Items | Naus/Lehman 46 OI 3.0.3.2.15-1 RAI B.2.39-9 Refueling canal leaks inside containment, L-11-252 sent (B.2.39-1) | ||
Naus/Lehman 46 OI 3.0.3.2.15-3 B.2.39-11 aggressive groundwater infiltration and L-11-292 DRAFT (B.2.39-3) possible degradation of inaccessible concrete (core bores), and Naus/Lehman 46 OI 3.0.3.2.16-1 RAI B.2.40-1 degradation of the north embankment of the L-11-238 sent (B.2.40-2) safety related portion of the intake canal. | |||
ABuford/ASheikh 63 OI 4.6-1 RAI 4.6-1 The staff needs more information to confirm L-11-292 DRAFT that fatigue evaluations for the containment vessel will remain valid for the period of extended operation. Telecon requested 9/9/2011 to discuss 8/17/2011 response. | |||
Telecon held 9/13/2011 waiting for supplemental response by 9/30/2011. | |||
RARB MHomiack OI RAI B1.4-1 Regarding how FENOC plans to address Supplement sent in the review and incorporation of operating L-11-238 experience into the license renewal aging management programs. | |||
Trillo/Min/Yee 73 OI 3.1.2.2-1 RAI 3.1.2.2-3 Applicants first response do not clearly L-11-252 sent (3.1.2.2-2) address information regarding: (1) the functional groups, (2) the link relationships, or (3) the inspection method, including the frequency, specified for the CSA vent valve body and plenum cylinder reinforcing plate. | |||
SMin and the primary reviewer (Trillo) will determine if the applicant 9/16/2011 response is acceptable by 9/30/2011. | |||
Page 1 of 4 10/21/2011 | |||
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status SMin 101 OI RAI 3.1.2.2.16-1 We're waiting for the applicant response on L-11-317 DRAFT SG tube to tubesheet welds by 10/22/2011. | |||
Oyee/CNg/Medoff OI 4.3.2.3.2-1 RAI 4.3.2.3.2-1 Class 1 valves. This will very likely end as L-11-292 DRAFT an OI. | |||
On Yee CI steel crane, fatigue Waiting for applicant supplement letter L-11-292 DRAFT analysis TLAA adding steel crane fatigue analysis as a new TLAA section. the applicant will provide new section by the end of September. On Yee already agreed to provide the SER input soon (within a week) after we receive the new TLAA section. | |||
Ching/Medoff OI 4.1-1 RAI 4.1-2 ASME Code Case N-481 evaluation. L-11-317 DRAFT Telecom 6/16 and 7/15/2011. On 8/10/11 letter they need to supplement their LRA to address the time-dependent J-integral analysis and TLAA(i). Revised Response received 8/17/2011. Telecon held 9/16/2011 applicant will supplement response to RAI. | |||
Page 2 of 4 10/21/2011 | |||
XXX. Supplemental response received 9/16/2011. Probably closed I need to check with JWise. | Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status RAPB Jklos 33 CI 3.2.2.2.3.6-2 RAI 3.2.2.2.3.6-2 #1 In a teleconference dated August 22, Response sent in 9/21/2011 e-mail 2011 the applicant stated that the item was L-11-238 on Supplemental intended to be deleted but documentation RAI response for had not yet been provided. Pending the Supplemental response 3.2.2.2.3.6-2. applicants changes to LRA Table 3.2.2-2, sent in L-11-252 Teleconference to the staffs review of this item is not complete be scheduled and will be tracked as Confirmatory item Correction to 2 rows 9/29/2011. XXX. Supplemental response received regarding the environment 9/16/2011. Probably closed I need to check and with JWise. statement regarding air-indoor uncontrolled from | ||
#2 Please confirm that these line items are 9/29/11 Telecon to be subject to a moist air (external) environment provided in L-11-292 and submit a correction letter stating that, DRAFT as appropriate. Once the environment has been confirmed for these line items, please restate the AMP to be assigned to these line items related to the applicant's response for 3.2.2.2.3.6-2. The applicant will confirm the environment in an upcoming response letter. Should be closed easily. In 9/16/2011 response letter the LRA was revised to define the moist air (internal) environment to encompass both the air-water interface and the air environment above the interface, we'll discuss this in a Telecon @ 9/29/2011. | |||
Page 3 of 4 10/21/2011 | |||
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status Klos/Kichline 33 OI 3.3.2.14-1 RAI 3.3.2.14-1 NRC reviewer was concerned that not all L-11-292 DRAFT applicable aging effects are identified for the fire water storage tank heat exchanger tubes. FENOC stated that the consequences of tube failure do not directly challenge the function of the tank FENOC will review the issue to determine whether the fire water storage tank heat exchanger should be removed from scope. Waiting for RAI supplement by 9/30/2011. Issue can be easily closed if they remove the fwst from scope as they plan to. | |||
Should be closed once we receive the letter. | JGavula OI RAI 2.3.3.18-4 Letdown cooler replacement frequency. L-11-317 DRAFT (RAI 2.3.3.18-3) Follow-up RAI issued 9/22/2011. | ||
CVIB and CSGB (DCI) | |||
JPoehler/CSydnor/Ganesh OI (9/13/2011 Table 3.1.2-3 RPV flange leak detection L-11-292 DRAFT Teleconference) (Nickel Alloy) missing item. Will receive supplemental response by 9/30/2011. | |||
Should be closed once we receive the letter. | |||
CSydnor 66 OI 4.7.3-1 RAI 4.7.3-1 (Telecon held on 9/13/2011) RAIs will be Maybe L-11-317 DRAFT issued early next week (Oct 3). | |||
CSydnor 67 OI 4.7.4-1 RAI 4.7.4-1 RAIs will be issued early next week (Oct 3). Maybe L-11-317 DRAFT Sydnor 68 OI 4.7.5.2-2 RAI 4.7.5.2-2 SG shell flaw evaluations. RAIs will be Maybe L-11-317 DRAFT issued early next week (Oct 3). | |||
Mkichline/AObodoako OI RAI 3.3.2.2.10.4-1 Explain why copper alloy with less than 15 L-11-317 DRAFT percent zinc components exposed to lubricating oil have no aging effects requiring management or provide an appropriate AMP to manage loss of material. RAI sent 9/22/2011. | |||
Page 4 of 4 10/21/2011}} |
Latest revision as of 20:53, 6 February 2020
ML11294A293 | |
Person / Time | |
---|---|
Site: | Davis Besse |
Issue date: | 10/06/2011 |
From: | Office of Nuclear Reactor Regulation |
To: | Division of License Renewal |
References | |
Download: ML11294A293 (6) | |
Text
Davis-BesseNPEm Resource From: CuadradoDeJesus, Samuel Sent: Thursday, October 06, 2011 3:27 PM To: Davis-BesseHearingFile Resource
Subject:
FW: Open Item List from DB Attachments: SER Open Items_2011-09-29.doc From: dorts@firstenergycorp.com [1]
Sent: Friday, September 30, 2011 1:35 PM To: CuadradoDeJesus, Samuel
Subject:
Open Item List from DB Sam..... we added a column to your list identifying the letter number that addresses or will address the item... we would like to review this list with you.
Steve Dort DBNPS License Renewal 419.321.7662 work 412.974.3369 cell
The information contained in this message is intended only for the personal and confidential use of the recipient(s) named above. If the reader of this message is not the intended recipient or an agent responsible for delivering it to the intended recipient, you are hereby notified that you have received this document in error and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you have received this communication in error, please notify us immediately, and delete the original message.
1
Hearing Identifier: Davis_BesseLicenseRenewal_Saf_NonPublic Email Number: 1816 Mail Envelope Properties (377CB97DD54F0F4FAAC7E9FD88BCA6D0806D230B61)
Subject:
FW: Open Item List from DB Sent Date: 10/6/2011 3:26:33 PM Received Date: 10/6/2011 3:26:34 PM From: CuadradoDeJesus, Samuel Created By: Samuel.CuadradoDeJesus@nrc.gov Recipients:
"Davis-BesseHearingFile Resource" <Davis-BesseHearingFile.Resource@nrc.gov>
Tracking Status: None Post Office: HQCLSTR01.nrc.gov Files Size Date & Time MESSAGE 1018 10/6/2011 3:26:34 PM SER Open Items_2011-09-29.doc 72258 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status RASB BRogers CI RAI 2.1-3 Abandoned equipment L-11-252 sent Lehman/Istar OI 3.0.3.1.10-1 RAI B.2.22-5 Issue related to standing water in the L-11-252 sent (B.2.22-1) containment annulus, Lehman/Istar OI 3.0.3.1.10-2 RAI B.2.22-6 issue related to borated water leakage from L-11-237 sent (B.2.22-2) the reactor cavity, and Lehman/Istar OI 3.0.3.1.10-4 RAI B.2.22-7 issue related to inspection of the L-11-292 DRAFT (B.2.22-4) containment stainless steel penetration sleeves.
Naus/Lehman 46 OI 3.0.3.2.15-1 RAI B.2.39-9 Refueling canal leaks inside containment, L-11-252 sent (B.2.39-1)
Naus/Lehman 46 OI 3.0.3.2.15-3 B.2.39-11 aggressive groundwater infiltration and L-11-292 DRAFT (B.2.39-3) possible degradation of inaccessible concrete (core bores), and Naus/Lehman 46 OI 3.0.3.2.16-1 RAI B.2.40-1 degradation of the north embankment of the L-11-238 sent (B.2.40-2) safety related portion of the intake canal.
ABuford/ASheikh 63 OI 4.6-1 RAI 4.6-1 The staff needs more information to confirm L-11-292 DRAFT that fatigue evaluations for the containment vessel will remain valid for the period of extended operation. Telecon requested 9/9/2011 to discuss 8/17/2011 response.
Telecon held 9/13/2011 waiting for supplemental response by 9/30/2011.
RARB MHomiack OI RAI B1.4-1 Regarding how FENOC plans to address Supplement sent in the review and incorporation of operating L-11-238 experience into the license renewal aging management programs.
Trillo/Min/Yee 73 OI 3.1.2.2-1 RAI 3.1.2.2-3 Applicants first response do not clearly L-11-252 sent (3.1.2.2-2) address information regarding: (1) the functional groups, (2) the link relationships, or (3) the inspection method, including the frequency, specified for the CSA vent valve body and plenum cylinder reinforcing plate.
SMin and the primary reviewer (Trillo) will determine if the applicant 9/16/2011 response is acceptable by 9/30/2011.
Page 1 of 4 10/21/2011
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status SMin 101 OI RAI 3.1.2.2.16-1 We're waiting for the applicant response on L-11-317 DRAFT SG tube to tubesheet welds by 10/22/2011.
Oyee/CNg/Medoff OI 4.3.2.3.2-1 RAI 4.3.2.3.2-1 Class 1 valves. This will very likely end as L-11-292 DRAFT an OI.
On Yee CI steel crane, fatigue Waiting for applicant supplement letter L-11-292 DRAFT analysis TLAA adding steel crane fatigue analysis as a new TLAA section. the applicant will provide new section by the end of September. On Yee already agreed to provide the SER input soon (within a week) after we receive the new TLAA section.
Ching/Medoff OI 4.1-1 RAI 4.1-2 ASME Code Case N-481 evaluation. L-11-317 DRAFT Telecom 6/16 and 7/15/2011. On 8/10/11 letter they need to supplement their LRA to address the time-dependent J-integral analysis and TLAA(i). Revised Response received 8/17/2011. Telecon held 9/16/2011 applicant will supplement response to RAI.
Page 2 of 4 10/21/2011
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status RAPB Jklos 33 CI 3.2.2.2.3.6-2 RAI 3.2.2.2.3.6-2 #1 In a teleconference dated August 22, Response sent in 9/21/2011 e-mail 2011 the applicant stated that the item was L-11-238 on Supplemental intended to be deleted but documentation RAI response for had not yet been provided. Pending the Supplemental response 3.2.2.2.3.6-2. applicants changes to LRA Table 3.2.2-2, sent in L-11-252 Teleconference to the staffs review of this item is not complete be scheduled and will be tracked as Confirmatory item Correction to 2 rows 9/29/2011. XXX. Supplemental response received regarding the environment 9/16/2011. Probably closed I need to check and with JWise. statement regarding air-indoor uncontrolled from
- 2 Please confirm that these line items are 9/29/11 Telecon to be subject to a moist air (external) environment provided in L-11-292 and submit a correction letter stating that, DRAFT as appropriate. Once the environment has been confirmed for these line items, please restate the AMP to be assigned to these line items related to the applicant's response for 3.2.2.2.3.6-2. The applicant will confirm the environment in an upcoming response letter. Should be closed easily. In 9/16/2011 response letter the LRA was revised to define the moist air (internal) environment to encompass both the air-water interface and the air environment above the interface, we'll discuss this in a Telecon @ 9/29/2011.
Page 3 of 4 10/21/2011
Davis-Besse SER Open Items and Clarification Items Reviewers TRP CI / OI RAI Notes DB Letter / Status Klos/Kichline 33 OI 3.3.2.14-1 RAI 3.3.2.14-1 NRC reviewer was concerned that not all L-11-292 DRAFT applicable aging effects are identified for the fire water storage tank heat exchanger tubes. FENOC stated that the consequences of tube failure do not directly challenge the function of the tank FENOC will review the issue to determine whether the fire water storage tank heat exchanger should be removed from scope. Waiting for RAI supplement by 9/30/2011. Issue can be easily closed if they remove the fwst from scope as they plan to.
JGavula OI RAI 2.3.3.18-4 Letdown cooler replacement frequency. L-11-317 DRAFT (RAI 2.3.3.18-3) Follow-up RAI issued 9/22/2011.
CVIB and CSGB (DCI)
JPoehler/CSydnor/Ganesh OI (9/13/2011 Table 3.1.2-3 RPV flange leak detection L-11-292 DRAFT Teleconference) (Nickel Alloy) missing item. Will receive supplemental response by 9/30/2011.
Should be closed once we receive the letter.
CSydnor 66 OI 4.7.3-1 RAI 4.7.3-1 (Telecon held on 9/13/2011) RAIs will be Maybe L-11-317 DRAFT issued early next week (Oct 3).
CSydnor 67 OI 4.7.4-1 RAI 4.7.4-1 RAIs will be issued early next week (Oct 3). Maybe L-11-317 DRAFT Sydnor 68 OI 4.7.5.2-2 RAI 4.7.5.2-2 SG shell flaw evaluations. RAIs will be Maybe L-11-317 DRAFT issued early next week (Oct 3).
Mkichline/AObodoako OI RAI 3.3.2.2.10.4-1 Explain why copper alloy with less than 15 L-11-317 DRAFT percent zinc components exposed to lubricating oil have no aging effects requiring management or provide an appropriate AMP to manage loss of material. RAI sent 9/22/2011.
Page 4 of 4 10/21/2011