| issue date = 02/03/2012
| issue date = 02/03/2012
| title = IR 05000341-12-402(DRS); on 01/09/2012 - 01/12/2012; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection Cover Letter Only
| title = IR 05000341-12-402(DRS); on 01/09/2012 - 01/12/2012; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection Cover Letter Only
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRS/PSB
| author affiliation = NRC/RGN-III/DRS/PSB
| addressee name = Davis J M
| addressee name = Davis J
| addressee affiliation = Detroit Edison, Co
| addressee affiliation = Detroit Edison, Co
| docket = 05000341
| docket = 05000341
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES ary 3, 2012
-4352 February 3, 2012 Mr. Jack Senior Vice President and Chief Nuclear Officer Detroit Edison Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, MI 48166


SUBJECT: FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2012402(DRS)
==SUBJECT:==
FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2012402(DRS)


==Dear Mr. Davis:==
==Dear Mr. Davis:==
On January 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with Mr. W. Colonello and other members of your staff.
On January 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.


The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commission's rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with Mr. W. Colonello and other members of your staff.
 
The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings were identified.
Based on the results of this inspection, no findings were identified.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.
 
be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letter's enclosures will not be available for public inspection. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
 
Sincerely,/RA/ Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50
-341 License No. NPF
-43 Nonpublic


===Enclosure:===
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Inspection Report 05000341/2012402(DRS)


===w/Attachment:===
Sincerely,
Supplemental Information cc w/encl:
/RA/
S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR C. Johnson, NSIR J. Trapp, Region I B. Desai, RII M. Hay, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl:
Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2012402(DRS)
Distribution via ListServ TM
w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR C. Johnson, NSIR J. Trapp, Region I B. Desai, RII M. Hay, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ TM
}}
}}

Latest revision as of 09:49, 12 November 2019

IR 05000341-12-402(DRS); on 01/09/2012 - 01/12/2012; Fermi Power Plant, Unit 2; Routine Security Baseline Inspection Cover Letter Only
ML12037A047
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/03/2012
From: Richard Skokowski
Plant Support Branch II
To: Jennifer Davis
Detroit Edison, Co
References
IR-12-402
Download: ML12037A047 (3)


Text

UNITED STATES ary 3, 2012

SUBJECT:

FERMI POWER PLANT, UNIT 2 NRC SECURITY BASELINE INSPECTION REPORT 05000341/2012402(DRS)

Dear Mr. Davis:

On January 12, 2012, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection of your Fermi Power Plant, Unit 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on January 12, 2012, with Mr. W. Colonello and other members of your staff.

The inspection examined activities conducted under your licenses as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your licenses. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosures, and in accordance with 10 CFR 2.390, a copy of this letters enclosures will not be available for public inspection.

Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Richard A. Skokowski, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: Inspection Report 05000341/2012402(DRS)

w/Attachment: Supplemental Information cc w/encl: S. Coker, NSIR/DSO/DDSO/ST R. Albert, NSIR C. Johnson, NSIR J. Trapp, Region I B. Desai, RII M. Hay, RIV K. Yale, State Liaison Officer, State of Michigan cc w/o encl: Distribution via ListServ TM