| | number = ML15229B008 | | | number = ML15229B008 |
| | issue date = 08/17/2015 | | | issue date = 08/17/2015 |
| | title = 2015/08/17 NRR E-mail Capture - Final RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474) | | | title = NRR E-mail Capture - Final RAIs- Watts Bar 2 Relief Request SG Welds |
| | author name = Dion J A | | | author name = Dion J |
| | author affiliation = NRC/NRR/DORL/LPWB | | | author affiliation = NRC/NRR/DORL/LPWB |
| | addressee name = Arent G P | | | addressee name = Arent G |
| | addressee affiliation = Tennessee Valley Authority | | | addressee affiliation = Tennessee Valley Authority |
| | docket = 05000391 | | | docket = 05000391 |
Line 14: |
Line 14: |
| | page count = 3 | | | page count = 3 |
| | project = TAC:MF6474 | | | project = TAC:MF6474 |
| | stage = RAI | | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Monday, August 17, 2015 2:02 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov); | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Monday, August 17, 2015 2:02 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov); rhbryan@tva.gov Cc: Poole, Justin; Sheng, Simon |
| rhbryan@tva.gov Cc: Poole, Justin; Sheng, Simon | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FINAL RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474) | | FINAL RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474) |
| Attachments: | | Attachments: FINAL RR WBN-2 PSI-3 RAI (MF6474).docx Bob and Gordon, On July 10, 2014 TVA submitted a request for relief for Watts Bar 2 Preservice Inspections pertaining to inaccessible steam generator welds. On Friday, August 14 a clarification call was held with your staff regarding requests for additional information (RAI) that is needed to complete the safety review. During this call you indicated that TVA would respond to the RAIs no later than August 28, 2015. Please let me know if you expect any delays in responding to these RAIs. |
| FINAL RR WBN-2 PSI-3 RAI (MF6474).docx Bob and Gordon, On July 10, 2014 TVA submitted a request for relief for Watts Bar 2 Preservice Inspections pertaining to inaccessible steam generator welds. On Friday, August 14 a clarification call was held with your staff regarding requests for additional information (RAI) that is needed to complete the safety review. During this call you indicated that TVA would respond to the RAIs no later than August 28, 2015. Please let me know if you expect any delays in responding to these RAIs. | | : Thanks, Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 On Friday August 14, 1 |
| : Thanks, Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 On Friday August 14, Hearing Identifier: NRR_PMDA Email Number: 2301 Mail Envelope Properties (8c675b3a53f7422da3de029f22370208) | | |
| | Hearing Identifier: NRR_PMDA Email Number: 2301 Mail Envelope Properties (8c675b3a53f7422da3de029f22370208) |
|
| |
|
| ==Subject:== | | ==Subject:== |
| FINAL RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474) Sent Date: 8/17/2015 2:01:39 PM Received Date: 8/17/2015 2:01:00 PM From: Dion, Jeanne Created By: Jeanne.Dion@nrc.gov Recipients: "Poole, Justin" <Justin.Poole@nrc.gov> | | FINAL RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474) |
| Tracking Status: None "Sheng, Simon" <Simon.Sheng@nrc.gov> | | Sent Date: 8/17/2015 2:01:39 PM Received Date: 8/17/2015 2:01:00 PM From: Dion, Jeanne Created By: Jeanne.Dion@nrc.gov Recipients: |
| Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov> Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> Tracking Status: None | | "Poole, Justin" <Justin.Poole@nrc.gov> |
| | Tracking Status: None "Sheng, Simon" <Simon.Sheng@nrc.gov> |
| | Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov> |
| | Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov> |
| | Tracking Status: None Post Office: HQPWMSMRS08.nrc.gov Files Size Date & Time MESSAGE 697 8/17/2015 2:01:00 PM FINAL RR WBN-2 PSI-3 RAI (MF6474).docx 31884 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| | Recipients Received: |
|
| |
|
| Post Office: HQPWMSMRS08.nrc.gov Files Size Date & Time MESSAGE 697 8/17/2015 2:01:00 PM FINAL RR WBN-2 PSI-3 RAI (MF6474).docx 31884 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:
| |
| REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUESTS FOR RELIEF WBN-2/PSI-3REGARDING INSPECTION OF CIRCUMFERENTIAL WELD SG-4B-5-2 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 DOCKET NUMBER 50-391 | | REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUESTS FOR RELIEF WBN-2/PSI-3REGARDING INSPECTION OF CIRCUMFERENTIAL WELD SG-4B-5-2 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 DOCKET NUMBER 50-391 |
|
| |
|
| RAI-1 Relief Request WBN-2/PSI-3 states that, "Circumferential shell weld on steam generator number 2 (Weld SG-4B-5 lower shell-to-cone weld) is partially inaccessible for examination because of the upper steam generator support bracket." Describe what it takes to increase the volumetric examination coverage beyond 24 percent reported in the relief request. Also, without explanation,it is hard to confirm from Drawing ISI-2001-E-03 that your best effort will result in a coverage of only 24 percent. Please provide this explanation. | | ===RAI-1=== |
| RAI-2 Provide the preservice inspection results and disposition of indications forWeld SG-4B-5-2 for Unit 2. If the steam generator of Unit 1 was fabricated by the same manufacturer around the similar time as Unit 2, provide corresoponding information of Unit 1 to supplement the limited inspection information for Unit 2. | | Relief Request WBN-2/PSI-3 states that, Circumferential shell weld on steam generator number 2 (Weld SG-4B-5 lower shell-to-cone weld) is partially inaccessible for examination because of the upper steam generator support bracket. Describe what it takes to increase the volumetric examination coverage beyond 24 percent reported in the relief request. Also, without explanation,it is hard to confirm from Drawing ISI-2001-E-03 that your best effort will result in a coverage of only 24 percent. Please provide this explanation. |
| | |
| | ===RAI-2=== |
| | Provide the preservice inspection results and disposition of indications forWeld SG-4B-5-2 for Unit 2. If the steam generator of Unit 1 was fabricated by the same manufacturer around the similar time as Unit 2, provide corresoponding information of Unit 1 to supplement the limited inspection information for Unit 2. |
|
| |
|
| RAI-3 Provide one or two more industry precedents regarding inspection of IWC-2500-1 Category C-A or C-B items for multiple vessels in a unit, with examination coverage less than 50 %.}} | | ===RAI-3=== |
| | Provide one or two more industry precedents regarding inspection of IWC-2500-1 Category C-A or C-B items for multiple vessels in a unit, with examination coverage less than 50 %.}} |
|
---|
Category:E-Mail
MONTHYEARML24022A2592024-01-22022 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Unit 1, License Amendment Request to Revise TS LCO 3.8.2 to Remove Note C-S Diesel Generator ML24016A0762024-01-16016 January 2024 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2 - License Amendment Request to Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications ML23347A0642023-12-13013 December 2023 12-13-23 Email from Kimberly Green to Wells, Russell, Subject: Results of NRC SUNSI Review of Watts Bar Nuclear Plant Dual-Unit UFSAR, Amendment 5 ML23334A0932023-11-28028 November 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Surveillance Requirement 3.9.5.1 to Reduce RHR Flow Rate During Mode 6 ML23319A1662023-11-0202 November 2023 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Sequoyah Nuclear Plant, and Watts Bar Nuclear Plant, Exemption Request Related to 10 CFR 37.11(c)(2) ML23254A2872023-09-11011 September 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise TS Table 1.1-1 Re Number of Required Rvh Closure Bolts ML23236A2562023-08-24024 August 2023 NRR E-mail Capture - Acceptance Review Results for the Sequoyah and Watts Bar License Amendment Request to Adopt TSTF-567 (L-2023-LLA-0106) ML23191A8672023-07-10010 July 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control ML23166A1142023-06-15015 June 2023 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2023-03 ML23150A2472023-05-25025 May 2023 NRR E-mail Capture - Audit Plan Related to Review of the Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23116A1492023-04-21021 April 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Increase the Number of Tritium Producing Burnable Absorber Rods ML23075A0032023-03-13013 March 2023 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1, 2, and 3, License Amendment Request to Revise TS 3.7.11, Required Actions A.1 and E.1 Footnotes Re Date for the Modification ML23072A0722023-03-10010 March 2023 NRR E-mail Capture - (External_Sender) State Consultation - Sequoyah Nuclear Plant, Units 1 and 2; and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML23067A2372023-03-0808 March 2023 WB_2023-02_RP_inspection_doc_request ML23013A0382023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML23013A0362023-01-12012 January 2023 NRR E-mail Capture - (External_Sender) State Consultation for Alabama - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22356A2982022-12-22022 December 2022 Email Response to Letter, Dated November 22, 2022 Regarding Watts Bar Integrated Inspection Report ML22353A0812022-12-15015 December 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Alternative Request WBN-2-ISI-01 Regarding Examination of Upper Head Injection Nozzle Dissimilar Metal Piping Butt Welds ML22348A0972022-12-14014 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-529, Revision 4 (L-2022-LLA-0088) ML22348A0442022-12-13013 December 2022 NRR E-mail Capture - State Consultation - Browns Ferry, Units 1, 2 and 3; Sequoyah, Units 1 and 2; and Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-554-A, Revision 1 (L-2022-LLA-0100) ML22343A0692022-12-0808 December 2022 NRR E-mail Capture - Request for Additional Information - Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.4.12 (L-2022-LLA-0103) ML22227A0712022-08-15015 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 (EPID L-2022-LLA-0103) - Corrected ML22227A0262022-08-12012 August 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah and Watts Bar License Amendment Request to Revise TS 3.4.12 ML22227A0272022-08-11011 August 2022 NRR E-mail Capture - Request for Additional Information Related to Alternative Requests RP-11 for Sequoyah Nuclear Plant, Units 1 and 2, and IST-RR-9 for Watts Bar Nuclear Plant, Units 1 and 2 ML22215A2752022-08-0303 August 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-554 ML22194A8762022-07-13013 July 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Adopt TSTF-529 ML22166A4292022-06-0606 June 2022 NRR E-mail Capture - LAR to Adopt TSTF-577 ML22146A3342022-05-25025 May 2022 NRR E-mail Capture - Acceptance Review Results for Browns Ferry Nuclear Plant, Units 1, 2, and 3, Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Relief Requests (EPID L-2022-LLR-0045 - 0047) ML22136A0182022-05-16016 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, Alternative Request RP-11 and Watts Bar Nuclear Plant, Units 1 and 2, Alternative Request IST-RR-9 ML22144A1002022-05-12012 May 2022 NRR E-mail Capture - Request for Additional Information Related to Tva'S Request to Revised the TVA Plants' Radiological Emergency Plans ML22123A1812022-05-0303 May 2022 NRR E-mail Capture - Acceptance Review Results for Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Adopt TSTF-577 ML22115A1402022-04-25025 April 2022 NRR E-mail Capture - Requests for Confirmation of Information and Additional Information Regarding Watts Bar Nuclear Plant, Unit 2 Exemption Request Re 10 CFR Part 26 (L-2022-LLE-0017) ML22083A2372022-03-24024 March 2022 NRR E-mail Capture - Request for Additional Information and Confirmation of Information Related to Tva'S Request for Changes to Watts Bar Nuclear Plant, Units 1 and 2, Technical Specification 3.7.8 ML22081A2222022-03-22022 March 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 1, License Amendment Request to Revise Allowable Value for TS Table 3.3.2-1, Function 6.e(1) ML22056A3802022-02-25025 February 2022 Document Request for Watts Bar Nuclear Plant - Radiation Protection Inspection - Inspection Report 2022-02 ML22131A1902022-02-23023 February 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Unit 2, Request to Revise the Reactor Vessel Surveillance Capsule Withdrawal Schedule ML22046A0392022-02-15015 February 2022 NRR E-mail Capture - Request for Confirmation of Information Regarding the Watts Bar Nuclear Plant, Unit 2, Cycle 4 Mid-Cycle Outage Generic Letter 95-05 Final Report ML22038A1882022-02-0404 February 2022 NRR E-mail Capture - Acceptance Review Results for TVA Fleet License Amendment Request to Revise the TVA Radiological Emergency Plan ML22018A0272022-01-18018 January 2022 2022 All RFI Responses - Exercise and Program Inspections - Revl ML22011A0382022-01-10010 January 2022 NRR E-mail Capture - Acceptance Review Results for Watts Bar, Units 1 and 2, License Amendment Request to Adopt TSTF-205-A, Rev. 3 and TSTF-563-A ML21306A2452021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specification 3.7.8, Essential Raw Cooling Water (ERCW) System ML21267A1392021-09-23023 September 2021 Document Request for Upcoming RP Inspection at Watts Bar ML21252A0912021-09-0909 September 2021 NRR E-mail Capture - Request for Comments on Proposed Issuance of Amendments to Watts Bar Nuclear Plant, Unit 2 - Revise Steam Generator Secondary Side Water Level ML21223A2592021-08-11011 August 2021 Affidavit - Prop Slides - Partially Closed Meeting with TVA Potential Watts Bar, Unit 2 Tube Locking LAR ML21221A2602021-08-0909 August 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise Watts Bar, Unit 1 Tech Specs Related to Continuous Opening of the Auxiliary Building Secondary Containment Enclosure Boundary ML21215A1152021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21215A1142021-07-26026 July 2021 NRR E-mail Capture - (External_Sender) Correction to WBN Chiller Replacement LAR ML21197A0452021-07-15015 July 2021 WBN U1 Isi/Sgisi Request for Information (RFI) Letter ML21193A2422021-07-12012 July 2021 NRR E-mail Capture - Request for Additional Information Regarding Tva'S Request to Revise the Watts Bar Nuclear Plant, Unit 2 Technical Specifications Related to Steam Generator Inspection/Repair Program Provisions ML21189A0202021-06-29029 June 2021 NRR E-mail Capture - Acceptance Review Results for Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Request to Revise Technical Specifications 3.3.6 and 3.3.7 Re Radiation Monitor Redundant Unit of Measure 2024-01-22
[Table view] |
Text
NRR-PMDAPEm Resource From: Dion, Jeanne Sent: Monday, August 17, 2015 2:02 PM To: Arent, Gordon <garent@tva.gov> (garent@tva.gov); rhbryan@tva.gov Cc: Poole, Justin; Sheng, Simon
Subject:
FINAL RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474)
Attachments: FINAL RR WBN-2 PSI-3 RAI (MF6474).docx Bob and Gordon, On July 10, 2014 TVA submitted a request for relief for Watts Bar 2 Preservice Inspections pertaining to inaccessible steam generator welds. On Friday, August 14 a clarification call was held with your staff regarding requests for additional information (RAI) that is needed to complete the safety review. During this call you indicated that TVA would respond to the RAIs no later than August 28, 2015. Please let me know if you expect any delays in responding to these RAIs.
- Thanks, Jeanne Dion Project Manager Watts Bar Special Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-1349 On Friday August 14, 1
Hearing Identifier: NRR_PMDA Email Number: 2301 Mail Envelope Properties (8c675b3a53f7422da3de029f22370208)
Subject:
FINAL RAIs- Watts Bar 2 Relief Request SG Welds (TAC No. MF6474)
Sent Date: 8/17/2015 2:01:39 PM Received Date: 8/17/2015 2:01:00 PM From: Dion, Jeanne Created By: Jeanne.Dion@nrc.gov Recipients:
"Poole, Justin" <Justin.Poole@nrc.gov>
Tracking Status: None "Sheng, Simon" <Simon.Sheng@nrc.gov>
Tracking Status: None "Arent, Gordon <garent@tva.gov> (garent@tva.gov)" <garent@tva.gov>
Tracking Status: None "rhbryan@tva.gov" <rhbryan@tva.gov>
Tracking Status: None Post Office: HQPWMSMRS08.nrc.gov Files Size Date & Time MESSAGE 697 8/17/2015 2:01:00 PM FINAL RR WBN-2 PSI-3 RAI (MF6474).docx 31884 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received:
REQUEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION REQUESTS FOR RELIEF WBN-2/PSI-3REGARDING INSPECTION OF CIRCUMFERENTIAL WELD SG-4B-5-2 TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT, UNIT 2 DOCKET NUMBER 50-391
RAI-1
Relief Request WBN-2/PSI-3 states that, Circumferential shell weld on steam generator number 2 (Weld SG-4B-5 lower shell-to-cone weld) is partially inaccessible for examination because of the upper steam generator support bracket. Describe what it takes to increase the volumetric examination coverage beyond 24 percent reported in the relief request. Also, without explanation,it is hard to confirm from Drawing ISI-2001-E-03 that your best effort will result in a coverage of only 24 percent. Please provide this explanation.
RAI-2
Provide the preservice inspection results and disposition of indications forWeld SG-4B-5-2 for Unit 2. If the steam generator of Unit 1 was fabricated by the same manufacturer around the similar time as Unit 2, provide corresoponding information of Unit 1 to supplement the limited inspection information for Unit 2.
RAI-3
Provide one or two more industry precedents regarding inspection of IWC-2500-1 Category C-A or C-B items for multiple vessels in a unit, with examination coverage less than 50 %.