MONTHYEARCNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-24-016, Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14)2024-01-10010 January 2024 Supplement to Application to Modify the Technical Specification Surveillance Requirement 3.9.5.1 (WBN-TS-21-14) CNL-23-052, Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability2024-01-0909 January 2024 Application to Adopt TSTF-427-A, Revision 2, Allowance for Non-Technical Specification Barrier Degradation on Supported System Operability CNL-23-062, Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018)2024-01-0808 January 2024 Application to Revise the Technical Specifications Section 3.8.2, AC Sources-Shutdown, to Remove Reference to the C-S Diesel Generator (WBN-TS-23-018) CNL-23-069, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation CNL-23-036, Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08)2023-12-18018 December 2023 Application to Revise Function 5 of Technical Specification Table 3.3.2-1, Engineered Safety Feature Actuation System Instrumentation, for the Sequoyah Nuclear Plant and Watts Bar Nuclear Plant (SQN-TS-23-02 and WBN-TS-23-08) CNL-23-001, Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01)2023-12-13013 December 2023 Rebaseline of Sections 3.1 and 3.2 of the Technical Specifications (WBN-TS-23-01) CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-059, Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-2023-09-20020 September 2023 Supplement to Sequoyah Nuclear Plant, Units 1 and 2, and Watts Bar Nuclear Plant, Units 1 and 2, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 CNL-23-045, License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010)2023-08-0707 August 2023 License Amendment Request to Revise Technical Specification Table 1.1-1 Regarding the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Bolts (WBN-TS-23-010) CNL-23-028, Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06)2023-08-0202 August 2023 Application to Revise Technical Specifications to Adopt TSTF-567-A, Revision 1, Add Containment Sump TS to Address GSI-191 Issues (SQN-TS-23-03 and WBN-TS-23-06) CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions CNL-23-020, Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06)2023-06-28028 June 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control (WBN-TS-22-06) CNL-23-049, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan .2023-06-26026 June 2023 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan . CNL-23-044, Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out2023-06-0101 June 2023 Transmittal of Revision 3 to WCAP-18774-P and WCAP-18774-NP, Addendum to the Rotterdam Dockyard Company Final Stress Report for 173 P.W.R. Vessels TVA III & IV (Report No. 30749-B-030, Rev. 3) - Evaluation of One Closure Stud Out CNL-23-042, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-05-16016 May 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-043, Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09)2023-05-0404 May 2023 Emergency License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1.1-1, Modes (WBN-TS-23-09) CNL-23-030, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2023-04-27027 April 2023 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-23-032, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 412023-04-27027 April 2023 Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 41 CNL-23-033, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-04-24024 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision CNL-23-029, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-04-11011 April 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-023, Annual Insurance Status Report2023-03-30030 March 2023 Annual Insurance Status Report CNL-23-022, Decommissioning Funding Status Report2023-03-29029 March 2023 Decommissioning Funding Status Report CNL-23-024, TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report2023-03-29029 March 2023 TVA Guarantee of Payment of Deferred Premiums - 2022 Annual Report CNL-23-002, Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Sche2023-03-20020 March 2023 Application to Revise Watts Bar Nuclear Plant Units 1 and 2 Technical Specifications to Change the Number of Tritium Producing Burnable Absorber Rods (WBN-TS-21-02) and Proposed Revision to Reactor Vessel Surveillance Capsule Removal Schedu CNL-23-021, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-03-0808 March 2023 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-23-015, Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08)2023-02-27027 February 2023 Expedited Application to Modify the Watts Bar Nuclear Plant, Unit 1 and Unit 2 Technical Specifications for Main Control Room Chiller Completion Time Extension (WBN-TS-22-08) CNL-23-003, Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A2023-01-30030 January 2023 Browns Nuclear Plant, Units 1, 2 & 3; Sequoyah Nuclear Plant, Units 1 & 2; and Watts Bar Nuclear Plant, Units 1 & 2 - Organizational Topic Report TVA-NPOD89-A CNL-23-009, Response to Request for Additional Information Request to Revise Technical Specification 3.4.122023-01-0404 January 2023 Response to Request for Additional Information Request to Revise Technical Specification 3.4.12 CNL-23-008, Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-12-22022 December 2022 Tennessee Valley Authority Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-109, Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements2022-12-22022 December 2022 Steam Generator Tube Inspection Report to Reflect TSTF-577 Reporting Requirements CNL-22-101, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-012022-11-28028 November 2022 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Request for Alternative WBN-2-ISI-01 CNL-22-106, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operat2022-11-28028 November 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revision. Includes CECC EPIP-14, Revision 38, Nuclear Emergency Public Information Organization and Operatio CNL-22-099, Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update2022-10-31031 October 2022 Tennessee Valley Authority - Hydrologic Engineering Center River Analysis System Project Milestone Status Update CNL-22-098, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 552022-10-17017 October 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC EPIP-7, Rev. 45 & CECC EPIP-8, Rev. 55 CNL-22-085, Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Al2022-09-0202 September 2022 Response to Request for Additional Information Regarding Sequoyah Nuclear Plant (Sqn), Units 1 and 2 and Watts Bar Nuclear Plant (Wbn), Units 1 and 2, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alte CNL-22-077, Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-08-11011 August 2022 Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-030, Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03)2022-07-27027 July 2022 Application to Revise Technical Specification 3.4.12, Low Temperature Overpressure Protection System for Sequoyah Nuclear Plant (SQN-TSC-22-01) and TS 3.4.12 Cold Overpressure Mitigation System for Watts Bar Nuclear Plant (WBN-TS-22-03) CNL-22-039, Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04)2022-07-13013 July 2022 Application to Revise Technical Specifications to Adopt TSTF-554-A, Revision 1, Revise Reactor Coolant Leakage Requirements (BFN TS-537) (SQN-21-05) (WBN-TS-21-04) CNL-22-071, Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08)2022-07-13013 July 2022 Supplement to Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections (SQN-TS-21-03 and WBN-TS-21-08) CNL-22-070, Status Regarding the Improved Flood Mitigation System Project2022-06-30030 June 2022 Status Regarding the Improved Flood Mitigation System Project CNL-22-008, and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002)2022-06-13013 June 2022 and Watts Bar Nuclear Plant - Application to Revise Technical Specifications to Adopt TSTF-529, Clarify Use and Application Rules (BFN-TS-541, SQN-TS-21-09, and WBN-TS-22-002) CNL-22-064, Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change2022-06-0909 June 2022 Response to Request for Additional Information Regarding Tennessee Valley Authority License Amendment Request to Revise Emergency Plan Implementing Procedure Regarding Seismic Event Emergency Action Level Change CNL-22-068, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2022-06-0808 June 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan Implementing Procedure Revisions CNL-22-047, Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2022-05-23023 May 2022 Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions CNL-22-043, Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board.2022-05-0202 May 2022 Response to Request for Additional Information and Confirmation of Information Regarding Application to Modify Watts Bar Nuclear Plant Units 1 and 2 Technical Specification 3.7.8 to Support Shutdown Board. CNL-22-046, Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan.2022-04-28028 April 2022 Tennessee Valley Authority - Radiological Emergency Plan and Central Emergency Control Center Emergency Plan. 2024-01-09
[Table view] |
Text
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402 CNL-15-119 July 10, 2015 10 CFR 50.90 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-001 Watts Bar Nuclear Plant, Unit 2 Construction Permit No. CPPR-92 NRC Docket No. 50-391
Subject:
WATTS BAR NUCLEAR PLANT (WBN) UNIT 2 - REQUEST FOR RELIEF WBN-2/PSI-3 FOR INACCESSIBLE STEAM GENERATOR LOWER SHELL-TO-CONE WELD SG-4B-5-2
References:
- 1. TVA Letter to NRC, Watts Bar Nuclear Plant (WBN) - Preservice Inspection Program, dated November 4, 1991 [ML073550342]
- 2. NUREG-0847, Supplement No. 10, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2, dated October 1992
[ML073450549]
- 3. TVA Letter to NRC, Watts Bar Nuclear Plant (WBN) - Unit 2 - Exemptions, Reliefs, Deviations and Exceptions, dated October 11, 2007 [ML072910331]
- 4. TVA Letter to NRC, Watts Bar Nuclear Plant (WBN) Unit 2 - Preservice Inspection Program Plan and Additional Information, dated June 17, 2010
[ML101680561]
The purpose of this letter is to provide a request for relief regarding inaccessible welds for the Watts Bar Nuclear Plant (WBN) Unit 2 Steam Generator Number 2 lower shell-to-cone weld SG-4B-5-2. The enclosure to this letter provides a Request for Relief, WBN-2/PSI-3, for WBN Unit 2 Preservice Inspection. A similar request was submitted for WBN Unit 1 as part of the WBN Unit 1 Preservice Inspection Program contained in Reference 1. The Nuclear Regulatory Commission (NRC) staff subsequently approved the WBN Unit 1 request in Reference 2.
This request for relief is consistent with Reference 3 in which Tennessee Valley Authority (TVA) stated that upon discovery that a request for exemption or code relief is appropriate, TVA would submit the request to the NRC for review. This submittal also follows one of the key assumptions of using the WBN Unit 1 licensing basis to complete the construction of WBN Unit 2. Reference 4 provided the Unit 2 Preservice Inspection Program plan.
U.S. Nuclear Regulatory Commission CNL-15-119 Page 2 July 10, 2015 There are no new regulatory commitments in this letter. Should you have questions regarding this submittal , please contact Gordon Arent at (423) 365-2004.
Enclosure:
Watts Bar Nuclear Plant, Unit 2, Request for Relief WBN-2/PSl-3 cc (Enclosure):
U.S. Nuclear Regulatory Commission , Region II NRC Project Manager - Watts Bar Nuclear Plant, Unit 2 NRC Senior Resident Inspector - Watts Bar Nuclear Plant, Unit 2
Enclosure Watts Bar Nuclear Plant, Unit 2 Request for Relief WBN-2/PSI-3 Executive Summary The purpose of this enclosure is to provide a request for relief regarding one circumferential shell weld on Watts Bar Nuclear Plant (WBN) Unit 2 steam generator number 2 which is inaccessible because of the upper steam generator support bracket. A similar request was submitted for WBN Unit 1 as part of the WBN Unit 1 Preservice Inspection Program in Reference 1. The Nuclear Regulatory Commission (NRC) staff subsequently approved the WBN Unit 1 request for relief in Reference 2.
This request for relief is consistent with Reference 3 in which Tennessee Valley Authority (TVA) stated that upon discovery that a request for exemption or code relief is appropriate, TVA would submit the request to the NRC for review. This submittal also follows one of the key assumptions of using the WBN Unit 1 licensing basis to complete the construction of WBN Unit 2. Reference 4 provided the Unit 2 Preservice Inspection Program plan.
I. ASME Code Components Affected One circumferential shell weld on WBN Unit 2 steam generator number 2 (Weld SG-4B-5-2) located as shown on Figure 1. The support structure for the steam generator is shown in Figure 2.
II. Applicable ASME Code Edition and Addenda ASME Code Section XI 2001 Edition through 2003 Addenda adopted by the WBN Unit 2 Preservice Inspection Program.
III. Code Requirement The requirement for steam generator circumferential shell weld inspection is listed as Item No. C1.10 of Table IWC-2500-1 of the ASME Code Section XI 2001 Edition through 2003 Addenda which is the code of record for the WBN Unit 2 Preservice Inspection Program. Note 1 of Table IWC-2500-1 requires the inspection to be essentially 100 percent of the weld length. Note 3 of the same table allows one weld to be inspected for multiple vessels of similar design, size, and service, such as steam generators.
IV. Reason for Request Relief is requested from performing the required volumetric examination for the subject circumferential shell weld on steam generator number 2 as required by ASME Code Section XI 2001 Edition through 2003 Addenda under the WBN Unit 2 Preservice Inspection Program. One circumferential shell weld on steam generator number 2 (Weld SG-4B-5 lower shell-to-cone weld) is partially inaccessible for examination because of the upper steam generator support bracket.
E-1
V. Burden Caused by Compliance Circumferential shell weld on steam generator number 2 (Weld SG-4B-5 lower shell-to-cone weld) is partially inaccessible for examination because of the upper steam generator support bracket. Thus, volumetric examination per the code requirement is not possible.
VI. Proposed Alternative and Basis for Use Both the original WBN U1 steam generators and the existing WBN U2 steam generators were fabricated at approximately the same time in 1975 and contain the same weld configurations. These welds were examined volumetrically by radiography during fabrication in accordance with ASME Code Section III requirements.
With regard to the ASME Code Section XI volumetric examination for WBN Unit 2, TVA examined weld SG-4B-5-2 only (Steam Generator No. 2). Due to the upper lateral restraint support interference, 76 percent of the exam coverage was not obtained.
Examination coverage achieved was approximately 24 percent. The other three welds were not examined since they are of similar design and configuration.
VII. Duration of Use of the Proposed Alternative The duration of the use for the proposed alternative is a one time use to address the requirements of the WBN Unit 2 Preservice Inspection Program.
VIII. Industry Precedents TVA previously submitted Relief Request ISI-5 for WBN Unit 1 by letter dated November 4, 1991, Watts Bar Nuclear Plant (WBN) - Preservice Inspection Program, (Reference 1) which was subsequently approved by NRC. Since that time, code requirements have changed and the information provided below is historical in nature and is provided to aid the NRC staff review:
Field observation of the same welds on WBN Unit 1 was conducted by a NRC Region II inspector and documented in NRC Inspection Report Nos. 50-390/89-15 and 50-391/89-15, dated September 27, 1989, which states in part for Request for Relief ISI-5:
This request involved 1 circumferential shell weld on each of the 4 steam generators.
The circumferential weld is considered inaccessible due to the upper steam generator support brackets for 3 of the steam generators. The commitment for these welds states that one weld on one generator will be examined on a "best effort" basis. In-field visual observations of two of these welds indicated that the welds were inaccessible. A review of historical examination records for one weld indicated that the examination commitments stated in the request for relief had been fulfilled.
NRC staff evaluation of this request for relief was documented in NUREG-0847, Supplement No. 10, Appendix Z which reads as follows:
Staff Evaluation: An NRC Region II inspector performed a routine inspection at the Watts Bar, Unit 1 site on September 11 through 15, 1989 (see Inspection Report 50-390, 391/89-15, of September 27, 1989). This NRC inspection included, in part, a E-2
review of the Unit 1 PSI plan, reviews of the active requests for relief from required PSI examinations, and random in-field visual verifications to confirm that the relief requests were justified. For Relief Request ISI-5, the inspector confirmed that, as the applicant has stated, these welds are inaccessible for volumetric examination to the extent required by the code, and that the applicant's commitments as stated in the request for relief had been fulfilled.
The staff has determined that the subject welds cannot be examined to the extent specified by the code because of interference by the upper support brackets. These welds have been examined volumetrically by radiography in accordance with ASME Code Section III during fabrication. Therefore, the staff has concluded that the limited best-effort preservice volumetric examination, the fabrication examinations performed during construction, and the hydrostatic pressure test offer reasonable assurance of the preservice structural integrity of the welds. This particular joint, in the existing steam generators throughout industry, has not had any inservice failures. The staff has also determined that compliance with the specified requirement would result in hardship or unusual difficulty without a compensating increase in the level of quality and safety. Therefore, pursuant to 10 CFR 50.55a(a)(3)(ii), relief is authorized as requested.
IX. References
- 1. TVA Letter to NRC, Watts Bar Nuclear Plant (WBN) - Preservice Inspection Program , dated November 4, 1991 [ML073550342]
- 2. NUREG-0847, Supplement No. 10, Safety Evaluation Report Related to the Operation of Watts Bar Nuclear Plant, Units 1 and 2, dated October 1992
[ML073450549]
- 3. TVA Letter to NRC, Watts Bar Nuclear Plant (WBN) - Unit 2 - Exemptions, Reliefs, Deviations and Exceptions, dated October 11, 2007 [ML072910331]
- 4. TVA Letter to NRC, Watts Bar Nuclear Plant (WBN) Unit 2 - Preservice Inspection Program Plan and Additional Information, dated June 17, 2010 [ML101680561]
E-3
Figure 1 E-4
Figure 2 E-5