{{#Wiki_filter:WASHINGTON PUBLIC POWER SUPPLY SYSTEM wxp PROCEDURE NUMBER+1.3.6 VOLUME NAME APPRO D DATE 12/14/82 1,ADMINISTRATIVE PROC RES SECTION l."3 CONDUCT OF'OPERATIONS TITI E+1.3.6 SHIFT TURNOVER 1.3.6.1~FezZeee This procedure provides instruction for offgoing and oncoming shift per-sonnel during shift turnover to ensure a canprehensive exchange of infor-mation and accomplishment of individual shift responsibilities.
{{#Wiki_filter:WASHINGTON PUBLIC POWER SUPPLY SYSTEM wxp PROCEDURE NUMBER             APPRO  D                    DATE
1.3.6e2 Procedure A.No person shall permit a relief person to assume the shift if.there is doubt the relief is alert, coherent, and fully capable of re-sponsible performance; no person shall assume a shift position un-less physically'nd mentally fit.B.Offgoing shift personnel shall not leave assigned work stations un-til satisfied the relief person is fully aware of existing condi-tions and not until the relief states RYou are relieved." C.D.E.Each shift position shall be relieved by a qualified person who is properly licensed and/or qualified to assume the responsibilities of the position.The offgoing shift should place the plant or any ongoing activity.in a stable condition.
                        +1.3.6                                                       12/14/82 VOLUME NAME 1,ADMINISTRATIVEPROC                RES SECTION l."3       CONDUCT OF 'OPERATIONS TITI E
prior to beginning the shift turnover process.Prior.to assuming the shift, the relieving individual shall review documented information applicable to the position such as logs, special instruction, night orders, and procedure which were gen-.erated in the offtime interval.Oncoming and offgoing Control Room Operators shall walk-down control boards/consoles to verify checklist items and exchange other per-tinent information.
                        +1.3.6     SHIFT TURNOVER 1.3.6.1   ~FezZeee This procedure provides instruction for offgoing and oncoming shift per-sonnel during shift turnover to ensure a canprehensive exchange of infor-mation and accomplishment of individual shift responsibilities.
83040804ih
1.3.6e2   Procedure A. No person shall permit a relief person to assume the shift if. there is doubt the relief is alert, coherent, and fully capable of re-sponsible performance; no person shall assume a shift position un-less physically'nd mentally       fit.
.830323 PDR ADOCK 05000397 E'PDR WP 597 R1 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 1..6 1 1.3.-1 of 7  
B. Offgoing   shift personnel shall not leave assigned work stations un-til satisfied     the relief person is fully aware of existing condi-tions and not until the relief states RYou are relieved."
~..G.'The oncoming Shift Manager sha" complete the checklist per Attach-ment I.H.The offgoing and oncoming Control Room Supervisor shall complete the~checklist per Attachment II.I.The offgoing and oncoming Shift Support supervisors shall complete the checklist per Attachment III.J.Shift Turnover Checklists shall be collected and transmitted to the Operations Manager at the end of each week-day night shift.1.3.6.3'Documentation After review by the Operations Manager, the checklists shall be retains,'er the 1.6 Series of the Plant Procedure Manual.I l.3.6.4 Attachments A.Attachment I-Shift Manager Shift Turnover Checklist B.Attachment II-Control Roon Supervisor Shift Turnover hecklist C.Attachment III-Shift Support Supervisor Shift Turnover Checklist WP 599 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER.3.6-2 of 7 ATTACHMENT I SHIFT MANAGER SHIFT TURNOVER CHECKLIST Offgoing Manager Oncceing Manager Date Shift M D.S Part I-To be reviewed prior to oncoming Manager relieving the shift (check).Shift Crew Coaposition Fire Brigade Composition Liquid Discharge Permits Shift Manager'Log Night Orders Log LCO Status Active MWRs RWPs Active Surveillance Pri.Cont.Status (Outages)Sec.Cont.Status (Outages)Inop Equipment Status.Part II-To be reviewed shortly after assuaing the shift (check).C.R.S.Log Buyer Log/Inventory Inop/Bypass Boards New/Revised Procedures Controlled Key Status C.R.S.Shift Turnover Checklist S.S.S.Shift Turnover Checklist Liquid Waste Capacity Surveillance Schedule Planned MWR/Operations Hot Work Permits Equip.Oper.Log Sheet WP 598 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER.3.6-3 of 7 ATTACHMENT II CONTROL ROOM SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing C.R.S.Ongoing C.R.S.Date Shift M D S Part I-To be completed by offgoing Supervisor.
C. Each   shift position shall be relieved by a qualified person who is properly licensed and/or qualified to assume the responsibilities of the position.
A.Mode Switch: Shutdown Refuel Startup Run B.C.D.Power: SRM IRM: W APRM MWE Press: ps'Recirc: Loop A M/A: Man.W Valve'uto Loop 8 M/A: Man.W Valve Auto Flux M/A: Man.W Set Auto Master M/A: W Set X IOS lb/hr, core I Feedwater:
D. The offgoing   shift   should place the plant or any ongoing activity. in a stable condition. prior to beginning the shift turnover process.
S.U.Valve M/A Man.W Open~.'uto Stpt RFWDT A M/A Man.RPM Auto RFWDT B M/A Man.RIB Auto'Master M/A Man.Auto.Stpt, Element 1 Demins on line (~8 Demin dP~sid Power Limits: PCIOMR Yes No Power Distribution Yes No F.'Rcds: Sequence Rod Notch Inops (List)G.'ypassed:
E. Prior.to   assuming the shift, the     relieving individual shall review documented information applicable       to the position such as logs, special instruction, night orders, and procedure which were           gen-.
IRM APRM Flow RBM RSCS H.MAPLHGR A C E G A C E Unit A C A (List Rods)LIMIT B D F N 8 D F B D B MFLPO MCPR FRTP-WP-598 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER'.3.6-4 of 7 I'I r~~~'~~'I.-.Inop'/Bypass Status Boards: Initial for, check of earth board;explain all Bypass/Inop indications.
erated in the offtime interval.
LFCI-A LPCI-B LPCI-C RCIC Div I RCIC Div II'G-1 DG-2 NSSS Div I NSSS Div II SW-A~SW-8 SLC-A SLC-A RPS-A RPS-B 24 VDC Div I 24 VDC Div II 125 VDC Div I t 125 VDC Div II 250 VDC NSLC Div I NSLC Div II CIA-A CIA-8 SBGT Div I SBGT Div II CAC Div I CAC Div II CR HSV Djv I CR MEV Div II Vent h Purge Div'I Vent 4 Purge Div II Inop/Bypass indication explanations:
Oncoming and   offgoing Control Room Operators shall walk-down control boards/consoles     to verify checklist items and exchange other per-tinent information.
Degraded Equipment:
83040804ih .830323 PDR ADOCK     05000397 E '
List'systems or components and if applicable, Tech-nical Specification Time limitation.
PDR PROCEOURE NUMBER     REVISION NUMBER     PAGE NUMBER 1..6                     1             1.3. -1 of   7 WP 597 R1
~Se/Com Date/Time Entering De raded Mode Time Interval Allowed Date/Time Required V tv t'Reviewed: Oncoming Supervisor, Date/Time WP-598 PROCEOURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER 1.3.6-5 of 7 Ccntrol Board Walkdown Alarms Offsite Power Sources Lifted Wire/Dumper Log Active Surveillance Active MWR/CO Part III-To be reviewed shortly after shift tu."nover.
 
A.SRVs: 1)List SRVs having a tailpipe temperature greater than 250oF 2)List SRVs having an unilluminated neon circuit continuity liuent B.Plant Parameters:
          . G. 'The oncoming   Shift Manager sha" complete
Drywell: Press Ave.Suppression Pool/Chamber:
                                                                      ~  .
Spray Ponds (A/B): Levt51 Offgas: Pretreat (mr/hr)Feedwater:
the checklist per Attach-ment I.
mho/cm Level Ave.Temp (M20)X 02 Stack (cpm)C.Annunciators:
H. The offgoing and oncoming Control   Room Supervisor shall complete the
Tested D.Controllers nulled: CRO Flow RCIC FW RFW Putlp Minimus Flow RECIRC E.Procedures:
                ~
New/revised procedures reviewed ,F.Indicating Lamp Survey=List any failed lamps not immediately replaced and/or repaired WP.598 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER~1.3.6-6 of 7 ATTACHMENT III SHIFT SUPPORT SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing Support Supervisor Oncaning Support.Supervisor Date Shift~.D Part I-To be completed by offgoing Supervisor.
checklist per Attachment II.
Condensate:
I. The offgoing and oncoming Shift Support supervisors shall     complete the checklist per Attachment   III.
On-line demins: A 8 C D E F dp psig.Waste TK Levels: CPR-TK-14, CPR-TK-92A CPR-TK-92B Demin H20: DW-TK-1 Level Inservice Train A B Radwaste Tank: Levels: FDR-TK-6,.EDR-TK-2, EDR-TK-5 Diesel Oil Levels:.DO-TK-1A, DO-TK-1B, DO-TK-2 Part II-To be reviewed during shift Radwaste Log Shift Crew Ccmposition Ed Log Sheets.Active MWR/CO Active'urveillance turnover.Inop Equip Status Liquid Discharge Permits Fire Watch/Weld Permits RWP Part III-To be reviewed shortly after shift turnover.MWR/CO Schedule Surveillance Schedule New/Revised Procedures N2 Inventory for Inert N2 CRD Accumulators N2 CIA Backup Protective Clothing Status M.U.H20 Treat Log WP-598 PRf C$DgRE NUMBER REVISION NUMBER PQQg IhIU+Py}}
J. Shift Turnover Checklists shall be collected and transmitted to the Operations Manager at the end of each week-day night shift.
1.3.6.3 'Documentation After review   by the Operations Manager, the checklists shall be the 1.6 Series of the Plant Procedure Manual.
retains,'er I
l.3.6. 4 Attachments A. Attachment I Shift Manager Shift Turnover Checklist B. Attachment II Control Roon Supervisor Shift Turnover hecklist C. Attachment III Shift Support Supervisor   Shift Turnover Checklist PROCEDURE NUMBER    REVISION NUMBER    PAGE NUMBER WP 599 1.3.6                                   .3.6-2 of       7
 
ATTACHMENT I SHIFT MANAGER SHIFT TURNOVER CHECKLIST Offgoing Manager                                       Date Oncceing Manager                                       Shift         M       D     . S Part I   To be reviewed   prior to   oncoming Manager relieving the shift (check).
Shift Crew Coaposition                     Active  MWRs Fire Brigade Composition                     RWPs Liquid Discharge Permits                     Active Surveillance Shift Manager '   Log                       Pri. Cont. Status (Outages)
Night Orders Log                            Sec. Cont. Status   (Outages)
LCO  Status                                  Inop Equipment Status
    .Part II To be reviewed   shortly after assuaing the shift (check).
C.R.S. Log                                   Liquid Waste Capacity Buyer Log/Inventory                         Surveillance Schedule Inop/Bypass Boards                           Planned MWR/Operations New/Revised Procedures                       Hot Work Permits Controlled   Key Status                     Equip. Oper. Log Sheet C.R.S. Shift Turnover Checklist S.S.S. Shift Turnover Checklist PROCEDURE NUMBER  REVISION NUMBER    PAGE NUMBER 1.3.6                                 .3.6-3 of   7 WP 598
 
ATTACHMENT     II CONTROL ROOM SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing C.R.S.                                                 Date Ongoing C.R.S.                                                 Shift             M         D               S Part I To be   completed by offgoing Supervisor.
A. Mode Switch:           Shutdown             Refuel           Startup             Run B. Power:           SRM         IRM       :
W APRM           MWE   Press:             ps' C. Recirc:   Loop A M/A:
Loop 8 M/A:
Man.
Man.
W W
Valve Valve
                                                                            'uto  Auto Flux M/A:           Man.           W Set         Auto Master M/A:             W Set                   X IOS     lb/hr,   core I
D. Feedwater:     S.U. Valve M/A             Man.         W Open   ~.       'uto         Stpt RFWDT A M/A           Man.           RPM             Auto RFWDT B M/A           Man.           RIB             Auto
                          'Master M/A           Man.           Auto       . Stpt, Element Demins on line 1
(~8           Demin dP   ~sid Power Limits:   PCIOMR           Yes           No Power Distribution               Yes         No F.   'Rcds:   Sequence         Rod           Notch           Inops   (List)
G.'ypassed:
IRM               A       C         E         G       B            D      F      N APRM              A       C         E                 8            D      F Flow Unit         A       C                           B            D RBM              A                                     B RSCS  (List Rods)
H. MAPLHGR                                  LIMIT             MFLPO             MCPR FRTP PROCEDURE NUMBER          REVISION NUMBER          PAGE NUMBER WP-598 1.3.6                                                       of '.3.6-4 7
 
r I
      'I
            ~
I.- .
                                            ~
Inop'/Bypass Status Boards:
Initial for, check of       earth board; explain     all
~
          ~
            ~
Bypass/Inop indications.
SW-A                             NSLC  Div   I
                                              ~      SW-8                              NSLC    Div   II LFCI-A                      SLC-A                              CIA-A LPCI-B                      SLC-A                             CIA-8 LPCI-C                      RPS-A                             SBGT  Div  I RCIC Div  I                RPS-B                             SBGT  Div  II RCIC Div                    24 VDC   Div   I                 CAC  Div  I II'G-1 24 VDC   Div   II                 CAC  Div   II DG-2                        125  VDC  Div t
I               CR HSV  Djv    I NSSS Div  I                125   VDC   Div   II               CR MEV  Div   II NSSS Div   II               250  VDC                          Vent h Purge     Div 'I Vent 4 Purge Div       II Inop/Bypass indication explanations:
Degraded Equipment:     List 'systems or       components   and   if applicable,     Tech-nical Specification Time limitation.
Date/Time Entering             Time   Interval         Date/Time Required
                    ~Se/Com            De raded Mode                  Allowed                tv     t'             V Reviewed:
Oncoming   Supervisor, Date/Time PROCEOURE NUMBER        REVISION NUMBER        PAGE NUMBER WP-598 1.3.6                                         1.3.6-5 of     7
 
Ccntrol Board Walkdown                       Lifted   Wire/Dumper Log Alarms                                      Active Surveillance Offsite    Power Sources                    Active   MWR/CO Part III To   be reviewed   shortly after shift tu."nover.
A. SRVs:   1)   List SRVs having a   tailpipe temperature greater       than 250oF
: 2)   List SRVs having an unilluminated neon         circuit continuity liuent B. Plant Parameters:
Drywell: Press           Ave.
Suppression   Pool/Chamber:     Level          Ave. Temp  (M20)      X 02 Spray Ponds (A/B):       Levt51 Offgas:   Pretreat (mr/hr)             Stack (cpm)
Feedwater:     mho/cm C. Annunciators:     Tested D. Controllers nulled:
CRO   Flow               FW RCIC                     RFW Putlp Minimus Flow RECIRC E. Procedures:     New/revised procedures       reviewed
    ,F. Indicating   Lamp Survey =   List   any failed lamps not immediately replaced and/or repaired PROCEDURE NUMBER       REVISION NUMBER      PAGE NUMBER ~
1.3.6                                     1.3.6-6 of   7 WP.598
 
ATTACHMENT III SHIFT SUPPORT SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing Support Supervisor                                   Date Oncaning Support .Supervisor                                   Shift         ~.       D Part I   To be   completed by offgoing Supervisor.
Condensate:     On-line demins:           A     8     C       D     E     F   dp         psig
                      .Waste TK Levels:       CPR-TK-14,           CPR-TK-92A CPR-TK-92B Demin H20:   DW-TK-1   Level           Inservice Train           A     B Radwaste   Tank:   Levels:           FDR-TK-6,     . EDR-TK-2,         EDR-TK-5 Diesel Oil Levels:           . DO-TK-1A,           DO-TK-1B,           DO-TK-2 Part II To   be reviewed   during   shift turnover.
Radwaste   Log                               Inop Equip Status Shift   Crew Ccmposition                   Liquid Discharge Permits Ed Log Sheets                               Fire Watch/Weld Permits
                  .Active   MWR/CO                             RWP Active'urveillance Part III To   be reviewed   shortly after shift turnover.
MWR/CO   Schedule                           N2 Inventory for Inert Surveillance Schedule                      N2 CRD   Accumulators New/Revised Procedures                      N2 CIA Backup Protective Clothing Status                 M.U. H20 Treat Log PRf C$ DgRE NUMBER     REVISION NUMBER       PQQg IhIU+Py WP-598}}

Latest revision as of 07:58, 4 February 2020

Rev 1 to Procedure 1.3.6, Shift Turnover.
ML17277A537
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/14/1982
From:
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
Shared Package
ML17277A534 List:
References
RTR-NUREG-0892, RTR-NUREG-892 1.3.6, NUDOCS 8304080416
Download: ML17277A537 (7)


Text

WASHINGTON PUBLIC POWER SUPPLY SYSTEM wxp PROCEDURE NUMBER APPRO D DATE

+1.3.6 12/14/82 VOLUME NAME 1,ADMINISTRATIVEPROC RES SECTION l."3 CONDUCT OF 'OPERATIONS TITI E

+1.3.6 SHIFT TURNOVER 1.3.6.1 ~FezZeee This procedure provides instruction for offgoing and oncoming shift per-sonnel during shift turnover to ensure a canprehensive exchange of infor-mation and accomplishment of individual shift responsibilities.

1.3.6e2 Procedure A. No person shall permit a relief person to assume the shift if. there is doubt the relief is alert, coherent, and fully capable of re-sponsible performance; no person shall assume a shift position un-less physically'nd mentally fit.

B. Offgoing shift personnel shall not leave assigned work stations un-til satisfied the relief person is fully aware of existing condi-tions and not until the relief states RYou are relieved."

C. Each shift position shall be relieved by a qualified person who is properly licensed and/or qualified to assume the responsibilities of the position.

D. The offgoing shift should place the plant or any ongoing activity. in a stable condition. prior to beginning the shift turnover process.

E. Prior.to assuming the shift, the relieving individual shall review documented information applicable to the position such as logs, special instruction, night orders, and procedure which were gen-.

erated in the offtime interval.

Oncoming and offgoing Control Room Operators shall walk-down control boards/consoles to verify checklist items and exchange other per-tinent information.

83040804ih .830323 PDR ADOCK 05000397 E '

PDR PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 1..6 1 1.3. -1 of 7 WP 597 R1

. G. 'The oncoming Shift Manager sha" complete

~ .

the checklist per Attach-ment I.

H. The offgoing and oncoming Control Room Supervisor shall complete the

~

checklist per Attachment II.

I. The offgoing and oncoming Shift Support supervisors shall complete the checklist per Attachment III.

J. Shift Turnover Checklists shall be collected and transmitted to the Operations Manager at the end of each week-day night shift.

1.3.6.3 'Documentation After review by the Operations Manager, the checklists shall be the 1.6 Series of the Plant Procedure Manual.

retains,'er I

l.3.6. 4 Attachments A. Attachment I Shift Manager Shift Turnover Checklist B. Attachment II Control Roon Supervisor Shift Turnover hecklist C. Attachment III Shift Support Supervisor Shift Turnover Checklist PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER WP 599 1.3.6 .3.6-2 of 7

ATTACHMENT I SHIFT MANAGER SHIFT TURNOVER CHECKLIST Offgoing Manager Date Oncceing Manager Shift M D . S Part I To be reviewed prior to oncoming Manager relieving the shift (check).

Shift Crew Coaposition Active MWRs Fire Brigade Composition RWPs Liquid Discharge Permits Active Surveillance Shift Manager ' Log Pri. Cont. Status (Outages)

Night Orders Log Sec. Cont. Status (Outages)

LCO Status Inop Equipment Status

.Part II To be reviewed shortly after assuaing the shift (check).

C.R.S. Log Liquid Waste Capacity Buyer Log/Inventory Surveillance Schedule Inop/Bypass Boards Planned MWR/Operations New/Revised Procedures Hot Work Permits Controlled Key Status Equip. Oper. Log Sheet C.R.S. Shift Turnover Checklist S.S.S. Shift Turnover Checklist PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER 1.3.6 .3.6-3 of 7 WP 598

ATTACHMENT II CONTROL ROOM SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing C.R.S. Date Ongoing C.R.S. Shift M D S Part I To be completed by offgoing Supervisor.

A. Mode Switch: Shutdown Refuel Startup Run B. Power: SRM IRM  :

W APRM MWE Press: ps' C. Recirc: Loop A M/A:

Loop 8 M/A:

Man.

Man.

W W

Valve Valve

'uto Auto Flux M/A: Man. W Set Auto Master M/A: W Set X IOS lb/hr, core I

D. Feedwater: S.U. Valve M/A Man. W Open ~. 'uto Stpt RFWDT A M/A Man. RPM Auto RFWDT B M/A Man. RIB Auto

'Master M/A Man. Auto . Stpt, Element Demins on line 1

(~8 Demin dP ~sid Power Limits: PCIOMR Yes No Power Distribution Yes No F. 'Rcds: Sequence Rod Notch Inops (List)

G.'ypassed:

IRM A C E G B D F N APRM A C E 8 D F Flow Unit A C B D RBM A B RSCS (List Rods)

H. MAPLHGR LIMIT MFLPO MCPR FRTP PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER WP-598 1.3.6 of '.3.6-4 7

r I

'I

~

I.- .

~

Inop'/Bypass Status Boards:

Initial for, check of earth board; explain all

~

~

~

Bypass/Inop indications.

SW-A NSLC Div I

~ SW-8 NSLC Div II LFCI-A SLC-A CIA-A LPCI-B SLC-A CIA-8 LPCI-C RPS-A SBGT Div I RCIC Div I RPS-B SBGT Div II RCIC Div 24 VDC Div I CAC Div I II'G-1 24 VDC Div II CAC Div II DG-2 125 VDC Div t

I CR HSV Djv I NSSS Div I 125 VDC Div II CR MEV Div II NSSS Div II 250 VDC Vent h Purge Div 'I Vent 4 Purge Div II Inop/Bypass indication explanations:

Degraded Equipment: List 'systems or components and if applicable, Tech-nical Specification Time limitation.

Date/Time Entering Time Interval Date/Time Required

~Se/Com De raded Mode Allowed tv t' V Reviewed:

Oncoming Supervisor, Date/Time PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER WP-598 1.3.6 1.3.6-5 of 7

Ccntrol Board Walkdown Lifted Wire/Dumper Log Alarms Active Surveillance Offsite Power Sources Active MWR/CO Part III To be reviewed shortly after shift tu."nover.

A. SRVs: 1) List SRVs having a tailpipe temperature greater than 250oF

2) List SRVs having an unilluminated neon circuit continuity liuent B. Plant Parameters:

Drywell: Press Ave.

Suppression Pool/Chamber: Level Ave. Temp (M20) X 02 Spray Ponds (A/B): Levt51 Offgas: Pretreat (mr/hr) Stack (cpm)

Feedwater: mho/cm C. Annunciators: Tested D. Controllers nulled:

CRO Flow FW RCIC RFW Putlp Minimus Flow RECIRC E. Procedures: New/revised procedures reviewed

,F. Indicating Lamp Survey = List any failed lamps not immediately replaced and/or repaired PROCEDURE NUMBER REVISION NUMBER PAGE NUMBER ~

1.3.6 1.3.6-6 of 7 WP.598

ATTACHMENT III SHIFT SUPPORT SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing Support Supervisor Date Oncaning Support .Supervisor Shift ~. D Part I To be completed by offgoing Supervisor.

Condensate: On-line demins: A 8 C D E F dp psig

.Waste TK Levels: CPR-TK-14, CPR-TK-92A CPR-TK-92B Demin H20: DW-TK-1 Level Inservice Train A B Radwaste Tank: Levels: FDR-TK-6, . EDR-TK-2, EDR-TK-5 Diesel Oil Levels: . DO-TK-1A, DO-TK-1B, DO-TK-2 Part II To be reviewed during shift turnover.

Radwaste Log Inop Equip Status Shift Crew Ccmposition Liquid Discharge Permits Ed Log Sheets Fire Watch/Weld Permits

.Active MWR/CO RWP Active'urveillance Part III To be reviewed shortly after shift turnover.

MWR/CO Schedule N2 Inventory for Inert Surveillance Schedule N2 CRD Accumulators New/Revised Procedures N2 CIA Backup Protective Clothing Status M.U. H20 Treat Log PRf C$ DgRE NUMBER REVISION NUMBER PQQg IhIU+Py WP-598