| issue date = 12/13/1996
| issue date = 12/13/1996
| title = Forwards Rev 23 to QA Program for Station Operation, Incorporating Organization Re Changes Associated with Restructuring of Corp
| title = Forwards Rev 23 to QA Program for Station Operation, Incorporating Organization Re Changes Associated with Restructuring of Corp
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = VISSING G S
| addressee name = Vissing G
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| addressee affiliation = NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000244
| docket = 05000244
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULAT(Q INFORMATION DISTRIBUTIONSTEM (RIDS)ACCESSION NBR:9612200268 DOC.DATE:
{{#Wiki_filter:CATEGORY 1 REGULAT(Q INFORMATION DISTRIBUTIONSTEM             (RIDS)
96/12/13NOTARIZED:
ACCESSION NBR:9612200268           DOC.DATE: 96/12/13      NOTARIZED: NO          DOCKET FACIL450-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester               G 05000244 AUTH. NAME          AUTHOR AFFILIATION MECREDY,R.C.         Rochester Gas 6 Electric Corp.
NOFACIL450-244 RobertEmmetGinnaNuclearPlant,Unit1,Rochester GAUTH.NAMEAUTHORAFFILIATION MECREDY,R.C.
RECIP.NAME           RECIPIENT AFFILIATION VISSINGFG.S.
Rochester Gas6ElectricCorp.RECIP.NAME RECIPIENT AFFILIATION VISSINGFG.S.
DOCKET05000244


==SUBJECT:==
==SUBJECT:==
ForwardsRev23to"QAProgramforStationOperation,"
Forwards Rev 23      to "QA Program for Station Operation,"
incorporating organization rechangesassociated withrestructuring ofcorp.DISTRIBUTION CODE:Q004DCOPIESRECEIVED:LTR IENCLlSIZE:9gATITLE:QATopicalReport,Change,Amendment, orCorrespondence (DocketUtiliNOTES:Licence Expdateinaccordance with10CFR2,2.109(9/19/72).
incorporating organization re changes associated with restructuring of corp.
05000244RECIPIENT IDCODE/NAME VISSING,G.INTERNAL:
DISTRIBUTION CODE: Q004D TITLE:  QA COPIES RECEIVED:LTR     I  ENCL  l SIZE:
DRS/RGN.L-.NRR/DISP/PIMB NUDOCS-ABSTRACT RGNlFILEEXTERNAL:
Topical Report, Change, Amendment, or Correspondence (Docket 9gUtili A NOTES:Licence Exp date      in accordance with 10CFR2,2.109(9/19/72).           05000244 RECIPIENT          'COPIES            RECIPIENT          COPIES ID CODE/NAME          LTTR ENCL      ID CODE/NAME       LTTR ENCL VISSING, G.               1    1 INTERNAL: DRS/RGN. L-.             1    1                            1    1 R
DMB/OSSNRCPDR'COPIESLTTRENCL11111111111111RECIPIENT IDCODE/NAME NRR/DRCH/HQMB OC/LFDCBIHSCOPIESLTTRENCL11R1111Y11DUENNOTETOALL"RIDS"RECIPIENTS:
NRR/DISP/PIMB             1    1    NRR/DRCH/HQMB           1    1 NUDOCS-ABSTRACT          1    1    OC/LFDCB                1    1 Y
PLEASEHELPUSTOREDUCEWASTECONTACTTHEDOCUMENTCONTROLDESK4ROOMOWFNSD-5(EXT.
RGNl    FILE            1    1 EXTERNAL: DMB/OSS                    1    1    IHS                    1    1 NRC PDR                  1    1 D
415-2083)
U E
TOELIMINATE YOURNAMEFROMDISTRIBUTION LISTSFORDOCUMENTS YOUDON'TNEED!TOTALNUMBEROFCOPIESREQUIRED:
N NOTE TO ALL "RIDS" RECIPIENTS:
LTTR11ENCL11
PLEASE HELP US TO REDUCE WASTE CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR            11    ENCL    11


ANDROCHESTER GASANDELECTRICCORPORATION
AND ROCHESTER      GASAND ELECTRIC CORPORATION ~ 89EASTAtrrENUE, ROCHESTER N. Y ldbd9-0001 AREA CODE716 546-2700 ROBERT C. MECREDY Vice President Nuclear operations                          December 13, 1996 U. S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Guy S. Vissing Project Directorate I-1 Washington,           DC    20555
~89EASTAtrrENUE, ROCHESTER N.Yldbd9-0001 AREACODE716546-2700ROBERTC.MECREDYVicePresident Nuclearoperations December13,1996U.S.NuclearRegulatory Commission DocumentControlDeskATTN:Mr.GuyS.VissingProjectDirectorate I-1Washington, DC20555


==SUBJECT:==
==SUBJECT:==
RevisedSubmittal ofQualityAssurance ProgramforStationOperation REE.GinnaNuclearPowerPlantDocketNumber50-244
Revised Submittal of Quality Assurance Program                        for Station Operation RE E. Ginna Nuclear Power Plant Docket Number 50-244


==DearMr.Vissing:==
==Dear Mr. Vissing:==
Inaccordance with10CFR50.54(a)(3),
 
enclosedisrevision23totheQualityAssurance ProgramforStationOperation.
In accordance with 10 CFR 50.54(a)(3), enclosed is revision 23 to the Quality Assurance Program for Station Operation. Revision 23 incorporates organization related changes associated with the restructuring of the corporation. These changes do not impact commitments in the Quality Assurance Program description previously approved by the Nuclear Regulatory Commission (NRC) and therefore do not require NRC prior approval.
Revision23incorporates organization relatedchangesassociated withtherestructuring ofthecorporation.
The changes          are described in the attached Synopsis of Changes (Attachment 1) and in the enclosed program revision. Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50 Appendix B criteria and does not reduce the scope of the Quality Assurance Program. Changes made to revision 22 of the Quality Assurance Program for Station Operation are denoted by a single revision bar in the left margin. Attachment 2 is a copy of the enclosure with changes highlighted or struck out.
Thesechangesdonotimpactcommitments intheQualityAssurance Programdescription previously approvedbytheNuclearRegulatory Commission (NRC)andtherefore donotrequireNRCpriorapproval.
These Quality Assurance Program                        changes      should be considered ef fective immediately.
Thechangesaredescribed intheattachedSynopsisofChanges(Attachment 1)andintheenclosedprogramrevision.
Very    truly yours, Robert C.       Me  redy RCM~cjk~qap sub.R23 Attachments          1 and 2
Attachment 1alsoprovidesthebasisforconcluding thattherevisedprogramcontinues tosatisfythe10CFR50AppendixBcriteriaanddoesnotreducethescopeoftheQualityAssurance Program.Changesmadetorevision22oftheQualityAssurance ProgramforStationOperation aredenotedbyasinglerevisionbarintheleftmargin.Attachment 2isacopyoftheenclosure withchangeshighlighted orstruckout.TheseQualityAssurance Programchangesshouldbeconsidered effectiveimmediately.
Verytrulyyours,RobertC.MeredyRCM~cjk~qap sub.R23Attachments 1and2


==Enclosure:==
==Enclosure:==
QA Program        for Station Operation Revision                23 96i2200268 9bi2i3 PDR        ADQCK  05000244 PDR
(    P
xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14D11)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale  Road King of Prussia,  PA  19406 Ginna Senior Resident Inspector
ATTACHMENT 1 The  following organization changes were made and are reflected throughout the text of the document and on the Figure 17.1.2-1 Organization Chart:
The responsibilities of the President are no longer assigned to the Chairman of the Board and the Chief Executive Officer. The Chairman of the Board and the Chief Executive Officer retains the responsibility for directing the establishment of the Quality Assurance Program. The Senior Vice President, Energy Operations reports directly to the Chairman of the Board and Chief Executive Officer regarding Ginna Quality Assurance Program functions while reporting administratively to the President and Chief Operating Officer. The President retains no Quality Assurance Program responsibility.
Strategic Supply Management and Information Services now report to the Senior Vice President  Corporate Services who reports to the President and Chief Operating Officer.
The Department Manager, Nuclear Training now reports to the Plant Manager, Ginna Station. Nuclear Training no longer provides training to riggers and crane operators. This responsibility now belongs to Fossil/Hydro Training.
The  Engineering Technical Function  (ETF) Reorganization resulted in the transfer of responsibility for procurement and fire protection from the Plant Manager, Ginna Station to the Department Manager, Nuclear Engineering Services,.
Additionally, the Nuclear Engineering Services Department reorganized internally from a discipline driven organization to a functional driven organization.
With the completion of the Steam Generator Replacement Project, the portion of the organization dedicated to that activity has been eliminated.
These changes are reflected throughout the revised document and are not identified at each occurrence in the following summary.


QAProgramforStationOperation Revision23(96i2200268 9bi2i3PDRADQCK05000244PPDR xc:U.S.NuclearRegulatory Commission Mr.GuyS.Vissing(MailStop14D11)ProjectDirectorate I-1Washington, D.C.20555U.S.NuclearRegulatory Commission RegionI475Allendale RoadKingofPrussia,PA19406GinnaSeniorResidentInspector ATTACHMENT 1Thefollowing organization changesweremadeandarereflected throughout thetextofthedocumentandontheFigure17.1.2-1Organization Chart:Theresponsibilities ofthePresident arenolongerassignedtotheChairmanoftheBoardandtheChiefExecutive Officer.TheChairmanoftheBoardandtheChiefExecutive Officerretainstheresponsibility fordirecting theestablishment oftheQualityAssurance Program.TheSeniorVicePresident, EnergyOperations reportsdirectlytotheChairmanoftheBoardandChiefExecutive Officerregarding GinnaQualityAssurance Programfunctions whilereporting administratively tothePresident andChiefOperating Officer.ThePresident retainsnoQualityAssurance Programresponsibility.
ATTACHMENT 1 h n
Strategic SupplyManagement andInformation ServicesnowreporttotheSeniorVicePresident
: 17. 1 MANAGEMENT Paragraph  1              First Bullet  - Changed "Nuclear Division Training" to "Nuclear Training" to be consistent with title change which occurred in Rev. 22.
-Corporate ServiceswhoreportstothePresident andChiefOperating Officer.TheDepartment Manager,NuclearTrainingnowreportstothePlantManager,GinnaStation.NuclearTrainingnolongerprovidestrainingtoriggersandcraneoperators.
Third Bullet - Clarified functional group names reporting to Support Services.
Thisresponsibility nowbelongstoFossil/Hydro Training.
Vice President,           Changed "Customer Operations" to Nuclear Operations        "Energy Operations" to be consistent Group                      with title change which occurred in Rev.
TheEngineering Technical Function(ETF)Reorganization resultedinthetransferofresponsibility forprocurement andfireprotection fromthePlantManager,GinnaStationtotheDepartment Manager,NuclearEngineering Services,.
22.
Additionally, theNuclearEngineering ServicesDepartment reorganized internally fromadiscipline drivenorganization toafunctional drivenorganization.
Department Manager,       Changed  "Operational Assessment" to Nuclear Assessment        "Operating Experience" to be consistent with organization titles.
Withthecompletion oftheSteamGenerator Replacement Project,theportionoftheorganization dedicated tothatactivityhasbeeneliminated.
PORC                      Changed to clarify that the PORC is not the "on site operating organization" but the "on site operations review group".
Thesechangesarereflected throughout thereviseddocumentandarenotidentified ateachoccurrence inthefollowing summary.  
Regulatory Guide 1.33 Rewritten to clarify commitments to various standards and portions of standards.


ATTACHMENT 1hn17.1MANAGEMENT Paragraph 1FirstBullet-Changed"NuclearDivisionTraining" to"NuclearTraining" tobeconsistent withtitlechangewhichoccurredinRev.22.ThirdBullet-Clarified functional groupnamesreporting toSupportServices.
ATTACHMENT 1 17.3  ASSESSMENT Operational Assessment Nuclear Safety and Licensing is responsible for reviewing and evaluating information from INPO and the NRC. Operating Experience is responsible for reviewing and evaluating information from vendors and other utilities.
VicePresident, NuclearOperations GroupChanged"Customer Operations" to"EnergyOperations" tobeconsistent withtitlechangewhichoccurredinRev.22.Department Manager,NuclearAssessment Changed"Operational Assessment" to"Operating Experience" tobeconsistent withorganization titles.PORCChangedtoclarifythatthePORCisnotthe"onsiteoperating organization" butthe"onsiteoperations reviewgroup".Regulatory Guide1.33Rewritten toclarifycommitments tovariousstandards andportionsofstandards.
The  revised program, as described above, continues to satisfy the 10CPR50  criteria and does not reduce the scope of the Quality Assurance Program. These changes do not require NRC approval prior to implementation.}}
ATTACHMENT 117.3ASSESSMENT Operational Assessment NuclearSafetyandLicensing isresponsible forreviewing andevaluating information fromINPOandtheNRC.Operating Experience isresponsible forreviewing andevaluating information fromvendorsandotherutilities.
Therevisedprogram,asdescribed above,continues tosatisfythe10CPR50criteriaanddoesnotreducethescopeoftheQualityAssurance Program.ThesechangesdonotrequireNRCapprovalpriortoimplementation.}}

Latest revision as of 18:01, 29 October 2019

Forwards Rev 23 to QA Program for Station Operation, Incorporating Organization Re Changes Associated with Restructuring of Corp
ML17264A762
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/13/1996
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A764 List:
References
NUDOCS 9612200268
Download: ML17264A762 (8)


Text

CATEGORY 1 REGULAT(Q INFORMATION DISTRIBUTIONSTEM (RIDS)

ACCESSION NBR:9612200268 DOC.DATE: 96/12/13 NOTARIZED: NO DOCKET FACIL450-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSINGFG.S.

SUBJECT:

Forwards Rev 23 to "QA Program for Station Operation,"

incorporating organization re changes associated with restructuring of corp.

DISTRIBUTION CODE: Q004D TITLE: QA COPIES RECEIVED:LTR I ENCL l SIZE:

Topical Report, Change, Amendment, or Correspondence (Docket 9gUtili A NOTES:Licence Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT 'COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL VISSING, G. 1 1 INTERNAL: DRS/RGN. L-. 1 1 1 1 R

NRR/DISP/PIMB 1 1 NRR/DRCH/HQMB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 1 Y

RGNl FILE 1 1 EXTERNAL: DMB/OSS 1 1 IHS 1 1 NRC PDR 1 1 D

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

AND ROCHESTER GASAND ELECTRIC CORPORATION ~ 89EASTAtrrENUE, ROCHESTER N. Y ldbd9-0001 AREA CODE716 546-2700 ROBERT C. MECREDY Vice President Nuclear operations December 13, 1996 U. S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Guy S. Vissing Project Directorate I-1 Washington, DC 20555

SUBJECT:

Revised Submittal of Quality Assurance Program for Station Operation RE E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr. Vissing:

In accordance with 10 CFR 50.54(a)(3), enclosed is revision 23 to the Quality Assurance Program for Station Operation. Revision 23 incorporates organization related changes associated with the restructuring of the corporation. These changes do not impact commitments in the Quality Assurance Program description previously approved by the Nuclear Regulatory Commission (NRC) and therefore do not require NRC prior approval.

The changes are described in the attached Synopsis of Changes (Attachment 1) and in the enclosed program revision. Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50 Appendix B criteria and does not reduce the scope of the Quality Assurance Program. Changes made to revision 22 of the Quality Assurance Program for Station Operation are denoted by a single revision bar in the left margin. Attachment 2 is a copy of the enclosure with changes highlighted or struck out.

These Quality Assurance Program changes should be considered ef fective immediately.

Very truly yours, Robert C. Me redy RCM~cjk~qap sub.R23 Attachments 1 and 2

Enclosure:

QA Program for Station Operation Revision 23 96i2200268 9bi2i3 PDR ADQCK 05000244 PDR

( P

xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14D11)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

ATTACHMENT 1 The following organization changes were made and are reflected throughout the text of the document and on the Figure 17.1.2-1 Organization Chart:

The responsibilities of the President are no longer assigned to the Chairman of the Board and the Chief Executive Officer. The Chairman of the Board and the Chief Executive Officer retains the responsibility for directing the establishment of the Quality Assurance Program. The Senior Vice President, Energy Operations reports directly to the Chairman of the Board and Chief Executive Officer regarding Ginna Quality Assurance Program functions while reporting administratively to the President and Chief Operating Officer. The President retains no Quality Assurance Program responsibility.

Strategic Supply Management and Information Services now report to the Senior Vice President Corporate Services who reports to the President and Chief Operating Officer.

The Department Manager, Nuclear Training now reports to the Plant Manager, Ginna Station. Nuclear Training no longer provides training to riggers and crane operators. This responsibility now belongs to Fossil/Hydro Training.

The Engineering Technical Function (ETF) Reorganization resulted in the transfer of responsibility for procurement and fire protection from the Plant Manager, Ginna Station to the Department Manager, Nuclear Engineering Services,.

Additionally, the Nuclear Engineering Services Department reorganized internally from a discipline driven organization to a functional driven organization.

With the completion of the Steam Generator Replacement Project, the portion of the organization dedicated to that activity has been eliminated.

These changes are reflected throughout the revised document and are not identified at each occurrence in the following summary.

ATTACHMENT 1 h n

17. 1 MANAGEMENT Paragraph 1 First Bullet - Changed "Nuclear Division Training" to "Nuclear Training" to be consistent with title change which occurred in Rev. 22.

Third Bullet - Clarified functional group names reporting to Support Services.

Vice President, Changed "Customer Operations" to Nuclear Operations "Energy Operations" to be consistent Group with title change which occurred in Rev.

22.

Department Manager, Changed "Operational Assessment" to Nuclear Assessment "Operating Experience" to be consistent with organization titles.

PORC Changed to clarify that the PORC is not the "on site operating organization" but the "on site operations review group".

Regulatory Guide 1.33 Rewritten to clarify commitments to various standards and portions of standards.

ATTACHMENT 1 17.3 ASSESSMENT Operational Assessment Nuclear Safety and Licensing is responsible for reviewing and evaluating information from INPO and the NRC. Operating Experience is responsible for reviewing and evaluating information from vendors and other utilities.