Forwards Rev 23 to QA Program for Station Operation, Incorporating Organization Re Changes Associated with Restructuring of Corp
ML17264A762
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/13/1996
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To: Vissing G
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17264A764 List:
References
NUDOCS 9612200268
Download: ML17264A762 (8)


Text

CATEGORY 1 REGULAT(Q INFORMATION DISTRIBUTIONSTEM (RIDS)

ACCESSION NBR:9612200268 DOC.DATE: 96/12/13 NOTARIZED: NO DOCKET FACIL450-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAME AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION VISSINGFG.S.

SUBJECT:

Forwards Rev 23 to "QA Program for Station Operation,"

incorporating organization re changes associated with restructuring of corp.

DISTRIBUTION CODE: Q004D TITLE: QA COPIES RECEIVED:LTR I ENCL l SIZE:

Topical Report, Change, Amendment, or Correspondence (Docket 9gUtili A NOTES:Licence Exp date in accordance with 10CFR2,2.109(9/19/72). 05000244 RECIPIENT 'COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL VISSING, G. 1 1 INTERNAL: DRS/RGN. L-. 1 1 1 1 R

NRR/DISP/PIMB 1 1 NRR/DRCH/HQMB 1 1 NUDOCS-ABSTRACT 1 1 OC/LFDCB 1 1 Y

RGNl FILE 1 1 EXTERNAL: DMB/OSS 1 1 IHS 1 1 NRC PDR 1 1 D

U E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE CONTACT THE DOCUMENT CONTROL DESK4 ROOM OWFN SD-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 11 ENCL 11

AND ROCHESTER GASAND ELECTRIC CORPORATION ~ 89EASTAtrrENUE, ROCHESTER N. Y ldbd9-0001 AREA CODE716 546-2700 ROBERT C. MECREDY Vice President Nuclear operations December 13, 1996 U. S. Nuclear Regulatory Commission Document Control Desk ATTN: Mr. Guy S. Vissing Project Directorate I-1 Washington, DC 20555

SUBJECT:

Revised Submittal of Quality Assurance Program for Station Operation RE E. Ginna Nuclear Power Plant Docket Number 50-244

Dear Mr. Vissing:

In accordance with 10 CFR 50.54(a)(3), enclosed is revision 23 to the Quality Assurance Program for Station Operation. Revision 23 incorporates organization related changes associated with the restructuring of the corporation. These changes do not impact commitments in the Quality Assurance Program description previously approved by the Nuclear Regulatory Commission (NRC) and therefore do not require NRC prior approval.

The changes are described in the attached Synopsis of Changes (Attachment 1) and in the enclosed program revision. Attachment 1 also provides the basis for concluding that the revised program continues to satisfy the 10CFR50 Appendix B criteria and does not reduce the scope of the Quality Assurance Program. Changes made to revision 22 of the Quality Assurance Program for Station Operation are denoted by a single revision bar in the left margin. Attachment 2 is a copy of the enclosure with changes highlighted or struck out.

These Quality Assurance Program changes should be considered ef fective immediately.

Very truly yours, Robert C. Me redy RCM~cjk~qap sub.R23 Attachments 1 and 2

Enclosure:

QA Program for Station Operation Revision 23 96i2200268 9bi2i3 PDR ADQCK 05000244 PDR

( P

xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14D11)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 Ginna Senior Resident Inspector

ATTACHMENT 1 The following organization changes were made and are reflected throughout the text of the document and on the Figure 17.1.2-1 Organization Chart:

The responsibilities of the President are no longer assigned to the Chairman of the Board and the Chief Executive Officer. The Chairman of the Board and the Chief Executive Officer retains the responsibility for directing the establishment of the Quality Assurance Program. The Senior Vice President, Energy Operations reports directly to the Chairman of the Board and Chief Executive Officer regarding Ginna Quality Assurance Program functions while reporting administratively to the President and Chief Operating Officer. The President retains no Quality Assurance Program responsibility.

Strategic Supply Management and Information Services now report to the Senior Vice President Corporate Services who reports to the President and Chief Operating Officer.

The Department Manager, Nuclear Training now reports to the Plant Manager, Ginna Station. Nuclear Training no longer provides training to riggers and crane operators. This responsibility now belongs to Fossil/Hydro Training.

The Engineering Technical Function (ETF) Reorganization resulted in the transfer of responsibility for procurement and fire protection from the Plant Manager, Ginna Station to the Department Manager, Nuclear Engineering Services,.

Additionally, the Nuclear Engineering Services Department reorganized internally from a discipline driven organization to a functional driven organization.

With the completion of the Steam Generator Replacement Project, the portion of the organization dedicated to that activity has been eliminated.

These changes are reflected throughout the revised document and are not identified at each occurrence in the following summary.

ATTACHMENT 1 h n

17. 1 MANAGEMENT Paragraph 1 First Bullet - Changed "Nuclear Division Training" to "Nuclear Training" to be consistent with title change which occurred in Rev. 22.

Third Bullet - Clarified functional group names reporting to Support Services.

Vice President, Changed "Customer Operations" to Nuclear Operations "Energy Operations" to be consistent Group with title change which occurred in Rev.

22.

Department Manager, Changed "Operational Assessment" to Nuclear Assessment "Operating Experience" to be consistent with organization titles.

PORC Changed to clarify that the PORC is not the "on site operating organization" but the "on site operations review group".

Regulatory Guide 1.33 Rewritten to clarify commitments to various standards and portions of standards.

ATTACHMENT 1 17.3 ASSESSMENT Operational Assessment Nuclear Safety and Licensing is responsible for reviewing and evaluating information from INPO and the NRC. Operating Experience is responsible for reviewing and evaluating information from vendors and other utilities.

The revised program, as described above, continues to satisfy the 10CPR50 criteria and does not reduce the scope of the Quality Assurance Program. These changes do not require NRC approval prior to implementation.