IR 05000293/2017405: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML17244A109 | ||
| issue date = 09/ | | issue date = 09/05/2017 | ||
| title = | | title = Problem Identification and Resolution Sample Inspection Report 05000293/2017405 (Letter Only) | ||
| author name = | | author name = Dentel G | ||
| author affiliation = | | author affiliation = NRC/RGN-I/DRS/EB2 | ||
| addressee name = | | addressee name = Sullivan B | ||
| addressee affiliation = | | addressee affiliation = Entergy Nuclear Operations, Inc | ||
| docket = 05000293 | | docket = 05000293 | ||
| license number = | | license number = DPR-035 | ||
| contact person = | | contact person = Dentel G | ||
| | | document report number = IR 2017405 | ||
| document type = | | document type = Letter | ||
| page count = | | page count = 3 | ||
}} | }} | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:Sullivan UNITED STATES ber 5, 2017 | ||
[ | |||
==SUBJECT:== | |||
PILGRIM NUCLEAR POWER STATION - PROBLEM IDENTIFICATION AND RESOLUTION SAMPLE INSPECTION REPORT 05000293/2017405 | |||
==Dear Mr. Sullivan:== | |||
On August 11, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security-related Problem Identification and Resolution inspection at your Pilgrim Nuclear Power Station. | |||
On August 23, 2017, the NRC inspector discussed the results of this inspection with Mr. Franco Pasquale, Information Technology Manager, and other members of your staff. The results of this inspection are documented in the enclosed report. | |||
The inspector documented two findings of very low security significance (Green) in this report. | |||
These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy. | |||
Each finding had a distinct cross-cutting aspect. The first cross-cutting aspect was in the area of Problem Identification and Resolution, Resolution, because Entergy did not take effective corrective actions to resolve and correct a previous NRC-identified violation [P.3]. The second cross-cutting aspect was in the area of Problem Identification and Resolution, Evaluation, because Entergy did not conduct an adequate evaluation of a security issue [P.2]. | |||
If you contest the violation or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station. In addition, if you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC Resident Inspector at the Pilgrim Nuclear Power Station. | |||
. | |||
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). | |||
Sincerely, | |||
/RA/ | |||
Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-293 License No. DPR-35 Nonpublic Enclosure: | |||
Inspection Report 05000293/2017405 w/Attachment: Supplementary Information cc w/o encl; w/o OUO-SRI: | |||
Distribution via ListServ cc w/encl; w/OUO-SRI: | |||
P. Beabout, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA ML17244A109 (Cover letter) | |||
ADAMS ACCESSION NUMBER: ML17244A104 (Cover letter w/enclosure) | |||
Non-Public Designation Category: MD 3.4 Non-Public A.3 Cover Letter X Non-Sensitive X Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/Enclosure Non-Sensitive Publicly Available SUNSI Review X Sensitive X Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME LDumont ABurrit GDentel DATE 8/24/17 8/30/17 8/25/17 | |||
}} | }} |
Latest revision as of 20:15, 29 October 2019
ML17244A109 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 09/05/2017 |
From: | Glenn Dentel Engineering Region 1 Branch 2 |
To: | Brian Sullivan Entergy Nuclear Operations |
Dentel G | |
References | |
IR 2017405 | |
Download: ML17244A109 (3) | |
Text
Sullivan UNITED STATES ber 5, 2017
SUBJECT:
PILGRIM NUCLEAR POWER STATION - PROBLEM IDENTIFICATION AND RESOLUTION SAMPLE INSPECTION REPORT 05000293/2017405
Dear Mr. Sullivan:
On August 11, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security-related Problem Identification and Resolution inspection at your Pilgrim Nuclear Power Station.
On August 23, 2017, the NRC inspector discussed the results of this inspection with Mr. Franco Pasquale, Information Technology Manager, and other members of your staff. The results of this inspection are documented in the enclosed report.
The inspector documented two findings of very low security significance (Green) in this report.
These findings involved violations of NRC requirements. The NRC is treating these violations as non-cited violations (NCVs) consistent with Section 2.3.2.a of the Enforcement Policy.
Each finding had a distinct cross-cutting aspect. The first cross-cutting aspect was in the area of Problem Identification and Resolution, Resolution, because Entergy did not take effective corrective actions to resolve and correct a previous NRC-identified violation [P.3]. The second cross-cutting aspect was in the area of Problem Identification and Resolution, Evaluation, because Entergy did not conduct an adequate evaluation of a security issue [P.2].
If you contest the violation or significance of these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at the Pilgrim Nuclear Power Station. In addition, if you disagree with the cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region I and the NRC Resident Inspector at the Pilgrim Nuclear Power Station.
.
Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, the transmittal document is decontrolled. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
Sincerely,
/RA/
Glenn T. Dentel, Chief Engineering Branch 2 Division of Reactor Safety Docket No. 50-293 License No. DPR-35 Nonpublic Enclosure:
Inspection Report 05000293/2017405 w/Attachment: Supplementary Information cc w/o encl; w/o OUO-SRI:
Distribution via ListServ cc w/encl; w/OUO-SRI:
P. Beabout, Protective Services Department Section Manager J. Giarrusso, SLO, Massachusetts Emergency Management Agency (MEMA ML17244A109 (Cover letter)
ADAMS ACCESSION NUMBER: ML17244A104 (Cover letter w/enclosure)
Non-Public Designation Category: MD 3.4 Non-Public A.3 Cover Letter X Non-Sensitive X Publicly Available SUNSI Review Sensitive Non-Publicly Available Cover Letter w/Enclosure Non-Sensitive Publicly Available SUNSI Review X Sensitive X Non-Publicly Available OFFICE RI/DRS RI/DRP RI/DRS NAME LDumont ABurrit GDentel DATE 8/24/17 8/30/17 8/25/17