| number = ML15097A014
| number = ML15097A014
| issue date = 03/26/2015
| issue date = 03/26/2015
| title = South Texas Project, Units 1 & 2, Financial Assurance for Decommissioning - 2015 Update
| title = Financial Assurance for Decommissioning - 2015 Update
| author name = Harrison G R
| author name = Harrison G
| author affiliation = South Texas Project Nuclear Operating Co
| author affiliation = South Texas Project Nuclear Operating Co
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Nuclear Operating CompanySouth Texas Pro/ect Electric Generating Station 90 Bar 289 Madsmiorth. Texas 77483March 26, 2015NOC-AE-1 5003219File No.: D57, G2510 CFR 50.75U. S. Nuclear Regulatory CommissionAttention: Document Control DeskWashington, DC 20555-0001South Texas ProjectUnits 1 and 2Docket Nos. STN 50-498, STN 50-499Financial Assurance for Decommissioning -2015 UpdatePursuant to 10 CFR 50.75(f)(1), the STP Nuclear Operating Company (STPNOC) submits theattached status reports regarding funds available, effective December 31, 2014, fordecommissioning South Texas Project Units 1 and 2. The data are assembled by the individualco-owners of the South Texas Project:* NRG South Texas LP;* City Public Service Board of San Antonio; and" City of Austin -Austin Energy.The attached reports provide the following information for each co-owner:* Estimated amount of decommissioning funds required;* Amount accumulated by December 31, 2014;* A schedule of the annual amounts remaining to be collected;* Assumptions for rates of escalation in decommissioning cost, and for rates used in fundingprojections;* Contracts upon which the owners rely pursuant to 10 CFR 50.75(e)(1)(v);* Modifications to method of providing financial fund assurance; and* Material changes to trust agreements.This letter contains no NRC commitments.If there are any questions, please contact either Hung C. Le at (361) 972-7932 or me at (361) 972-8074.George R. HarrisonExecutive Vice President and Chief Financial OfficerHCLAttachments:1. Financial Assurance for Decommissioning -NRG South Texas LP A2. Financial Assurance for Decommissioning -City Public Service Board of San Antonio f )0-0)3. Financial Assurance for Decommissioning -City of Austin -Austin EnergySTI: 34054098 NOC-AE-1 5003219Page 2 of 2cc:(paper copy)(electronic copy)Regional Administrator, Region IVU.S. Nuclear Regulatory Commission1600 East Lamar BoulevardArlington, TX 76011-4511Lisa M. RegnerSenior Project ManagerU.S. Nuclear Regulatory CommissionOne White Flint North (MS 8 G9A)11555 Rockville PikeRockville, MD 20852Senior Resident InspectorU. S. Nuclear Regulatory CommissionP. 0. Box 289, Mail Code: MNl16Wadsworth, TX 77483Attention: Document Control DeskU. S. Nuclear Regulatory CommissionWashington, DC 20555-0001Morgan, Lewis & Bockius LLPSteve Frantz, EsquireU.S. Nuclear Regulatory CommissionLisa M. RegnerNRG South Texas LPJohn RaganChris O'HaraJim von SuskilCPS EnergyKevin PolioCris EugsterL. D. BlaylockCrain Caton & James, P.C.Peter NemethCity of Austin -Austin EnergyCheryl MeleJohn WesterTexas Dept. of State Health ServicesRichard A. RatliffRobert Free ATTACHMENT ISOUTH TEXAS PROJECTFINANCIAL ASSURANCE FOR DECOMMISSIONING2015 UPDATENRG SOUTH TEXAS LP NOC-AE-1 5003219Page 1 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGNRG South Texas LP13.2% Ownership of South Texas Project Unit IPursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:Amount Accumulated2:$68,229,416$56,506,960Amount Remaining3:$013Number of Years to Collect:Escalation Rate:Earnings Rate:2.471%3.30% -7.91%NoneNoneNone1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees toremove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of theproperty for unrestricted use and termination of the license; or (2) release of the property under restricted conditionsand termination of the license.2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval toestablish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796,NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of largecomponents. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are notincluded in the reported amount. The reported amount includes funds accumulated based upon a site-specific studythat includes license termination and other costs.3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioningcharges established in PUCT Tariff Control No. 41970. Actual collections will vary but the charges are intended toproduce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections arebeing deposited in the large component disposal subaccount. NOC-AE-1 5003219Page 2 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGNRG South Texas LP30.8% Ownership of South Texas Project Unit 1Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:Amount Accumulated2:$159,201,971$138,319,017Amount Remaining3:Number of Years to Collect:Escalation Rate:Earnings Rate:$0132.471%3.30% -7.91%NoneNoneNone1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees toremove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of theproperty for unrestricted use and termination of the license; or (2) release of the property under restricted conditionsand termination of the license.2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval toestablish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796,NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of largecomponents. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are notincluded in the reported amount. The reported amount includes funds accumulated based upon a site-specific studythat includes license termination and other costs.3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioningcharges established in PUCT Tariff Control No. 41941. Actual collections will vary but the charges are intended toproduce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections arebeing deposited in the large component disposal subaccount. NOC-AE-1 5003219Page 3 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGNRG South Texas LP13.2% Ownership of South Texas Project Unit 2Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75 (e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:Amount Accumulated2:$68,229,416$68,278,426Amount Remaining3:$014Number of Years to Collect:Escalation Rate:Earnings Rate:2.476%3.30% -7.91%NoneNoneNone1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees toremove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of theproperty for unrestricted use and termination of the license; or (2) release of the property under restricted conditionsand termination of the license.2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval toestablish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796,NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of largecomponents. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are notincluded in the reported amount. The reported amount includes funds accumulated based upon a site-specific studythat includes license termination and other costs.3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioningcharges established in PUCT Tariff Control No. 41970. Actual collections will vary but the charges are intended toproduce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections arebeing deposited in the large component disposal subaccount. NOC-AE-1 5003219Page 4 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGNRG South Texas LP30.8% Ownership of South Texas Project Unit 2Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)':2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:Amount Accumulated2:$159,201,971$174,158,803Amount Remaining3:$014Number of Years to Collect:Escalation Rate:Earnings Rate:2.476%3.30% -7.91%NoneNoneNone1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees toremove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of theproperty for unrestricted use and termination of the license; or (2) release of the property under restricted conditionsand termination of the license.2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval toestablish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796,NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of largecomponents. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are notincluded in the reported amount. The reported amount includes funds accumulated based upon a site-specific studythat includes license termination and other costs.3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioningcharges established in PUCT Tariff Control No. 41941. Actual collections will vary but the charges are intended toproduce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections arebeing deposited in the large component disposal subaccount.
{{#Wiki_filter:Nuclear Operating Company South Texas Pro/ect Electric GeneratingStation 90 Bar289 Madsmiorth. Texas 77483 March 26, 2015 NOC-AE-1 5003219 File No.: D57, G25 10 CFR 50.75 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Financial Assurance for Decommissioning - 2015 Update Pursuant to 10 CFR 50.75(f)(1), the STP Nuclear Operating Company (STPNOC) submits the attached status reports regarding funds available, effective December 31, 2014, for decommissioning South Texas Project Units 1 and 2. The data are assembled by the individual co-owners of the South Texas Project:
ATTACHMENT 2SOUTH TEXAS PROJECTFINANCIAL ASSURANCE FOR DECOMMISSIONING2015 UPDATECITY PUBLIC SERVICE BOARD OF SAN ANTONIO NOC-AE-1 5003219Page 1 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGCity Public Service (CPS) Board of San Antonio12% Ownership of South Texas Project Unit 1Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:$62,027,313$39,867,468Amount Accumulated2:Amount Remaining3:$013Number of Years to Collect:Escalation Rate:Earnings Rate:2.471%4.35%NoneNoneNo changes since 2013 report was submitted.1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove afacility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the propertyfor unrestricted use and termination of the license; or (2) release of the property under restricted conditions andtermination of the license. The cost of dismantling or demolishing non-radiological systems and structures is notincluded in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site untiltransfer to the Department of Energy are not included in the cost formulas.2. By Order dated November 20, 2008 in PUCT Docket No. 35786, CPS Energy was granted approval to establishseparate spent fuel management and pre-shutdown activities subaccounts. The amounts allocable to thesesubaccounts are not included in the reported amount. The reported amount includes funds accumulated basedupon a site-specific study that includes license termination and other costs.3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study andupdated escalation rates. Additional contributions ended December 31, 2008. If future estimates indicate thatfurther funding may be required, CPS Energy would be able to apply to the PUCT to seek further funding for NRClicense termination costs through cost-of-service recovery authorized by Texas law. NOC-AE-1 5003219Page 2 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGCity Public Service (CPS) Board of San Antonio28% Ownership of South Texas Project Unit 1Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:Amount Accumulated2:$144,730,396$110,081,798Amount Remaining3:Number of Years to Collect:Escalation Rate:Earnings Rate:$0132.471%5.41%NoneNoneNo changes since 2013 report was submitted.1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove afacility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the propertyfor unrestricted use and termination of the license; or (2) release of the property under restricted conditions andtermination of the license. The cost of dismantling or demolishing non-radiological systems and structures is notincluded in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site untiltransfer to the Department of Energy are not included in the cost formulas.2. Consistent with the approach taken for its 12% interest in the Order dated November 20, 2008, in PUCT Docket No.35786, CPS Energy has established separate spent fuel management and pre-shutdown activity subaccounts. Theamounts allocable to these subaccounts are not included in the reported amount. The reported amount includesfunds accumulated based upon a site-specific study that includes license termination and other costs.3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study andupdated escalation rates. Additional contributions ended January 31, 2008. If future estimates indicate that furtherfunding may be required, CPS Energy would be able to exercise its rate setting authority to collect and accumulatefurther funds for NRC license termination costs. NOC-AE-1 5003219Page 3 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGCity Public Service (CPS) Board of San Antonio12% Ownership of South Texas Project Unit 2Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:$62,027,313$53,467,192Amount Accumulated2:Amount Remaining3:$014Number of Years to Collect:Escalation Rate:Earnings Rate:2.476%4.35%NoneNoneNo changes since 2013 report was submitted.1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove afacility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the propertyfor unrestricted use and termination of the license; or (2) release of the property under restricted conditions andtermination of the license. The cost of dismantling or demolishing non-radiological systems and structures is notincluded in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site untiltransfer to the Department of Energy are not included in the cost formulas.2. By Order dated November 20, 2008 in PUCT Docket No. 35786, CPS Energy was granted approval to establishseparate spent fuel management and pre-shutdown activities subaccounts. The amounts allocable to thesesubaccounts are not included in the reported amount. The reported amount includes funds accumulated basedupon a site-specific study that includes license termination and other costs.3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study andupdated escalation rates. Additional contributions ended December 31, 2008. If future estimates indicate thatfurther funding may be required, CPS Energy would be able to apply to the PUCT to seek further funding for NRClicense termination costs through cost-of-service recovery authorized by Texas law. NOC-AE-1 5003219Page 4 of 4FINANCIAL ASSURANCE FOR DECOMMISSIONINGCity Public Service (CPS) Board of San Antonio28% Ownership of South Texas Project Unit 2Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)':2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c):3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. .Material changes to trust agreements:Total Required:Amount Accumulated2:$144,730,396$131,558,684Amount Remaining3:$014Number of Years to Collect:Escalation Rate:Earnings Rate:2.476%5.41%NoneNoneNo changes since 2013 report was submitted.1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove afacility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the propertyfor unrestricted use and termination of the license; or (2) release of the property under restricted conditions andtermination of the license. The cost of dismantling or demolishing non-radiological systems and structures is notincluded in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site untiltransfer to the Department of Energy are not included in the cost formulas.2. Consistent with the approach taken for its 12% interest in the Order dated November 20, 2008, in PUCT Docket No.35786, CPS Energy has established separate spent fuel management and pre-shutdown activity subaccounts. Theamounts allocable to these subaccounts are not included in the reported amount. The reported amount includesfunds accumulated based upon a site-specific study that includes license termination and other costs.3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study andupdated escalation rates. Additional contributions ended January 31, 2008. If future estimates indicate that furtherfunding may be required, CPS Energy would be able to exercise its rate setting authority to collect and accumulatefurther funds for NRC license termination costs.
* NRG South Texas LP;
ATTACHMENT 3SOUTH TEXAS PROJECTFINANCIAL ASSURANCE FOR DECOMMISSIONING2015 UPDATECITY OF AUSTIN -AUSTIN ENERGY NOC-AE-1 5003219Page 1 of 2FINANCIAL ASSURANCE FOR DECOMMISSIONINGCity of Austin -Austin Energy16% Ownership of South Texas Project Unit IPursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c)2:3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v)6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:Amount Accumulated:Amount Remaining:Number of Years to Collect:$82,615,898$61,470,759$23,328,76313Escalation Rate:Earnings Rate:4.918%5.073%NoneNoneNone1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove afacility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the propertyfor unrestricted use and termination of the license; or (2) release of the property under restricted conditions andtermination of the license. The cost of dismantling or demolishing non-radiological systems and structures is notincluded in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site untiltransfer to Department of Energy are not included in the cost formulas.2. On October 1, 2008, an accounting division of the Decommissioning Trust balance was recorded to reflect thedivision of costs as referenced in footnote 1. NOC-AE-1 5003219Page 2 of 2FINANCIAL ASSURANCE FOR DECOMMISSIONINGCity of Austin -Austin Energy16% Ownership of South Texas Project Unit 2Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendaryear basis, beginning on March 31, 1999, and every two years thereafter, on the status of itsdecommissioning funding for each reactor or share of reactor it owns. The requested information is providedbelow.1. Minimum decommissioning fund estimate,pursuant to 10 CFR 50.75(b) and (c)1:2. Amount accumulated at the end of the calendaryear preceding the date of the report for itemsincluded in 10 CFR 50.75(b) and (c)2:3. Schedule of the annual amounts remaining to becollected for items in 10 CFR 50.75(b) and (c):4. Assumptions used regarding escalation indecommissioning cost, rates of earnings ondecommissioning funds, and rates of otherfactors used in funding projections:5. Contracts upon which the licensee is relyingpursuant to 10 CFR 50.75(e)(1)(v):6. Modifications to a licensee's current methodproviding financial assurance occurring since thelast submitted report:7. Material changes to trust agreements:Total Required:Amount Accumulated:Amount Remaining:Number of Years to Collect:$82,615,898$68,956,723$19,957,35014Escalation Rate:Earnings Rate:4.918%5.073%NoneNoneNone1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove afacility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the propertyfor unrestricted use and termination of the license; or (2) release of the property under restricted conditions andtermination of the license. The cost of dismantling or demolishing non-radiological systems and structures is notincluded in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site untiltransfer to the Department of Energy are not included in the cost formulas.2. On October 1, 2008, an accounting division of the Decommissioning Trust balance was recorded to reflect thedivision of costs as referenced in footnote 1.}}
* City Public Service Board of San Antonio; and
    "     City of Austin - Austin Energy.
The attached reports provide the following information for each co-owner:
* Estimated amount of decommissioning funds required;
* Amount accumulated by December 31, 2014;
* A schedule of the annual amounts remaining to be collected;
* Assumptions for rates of escalation in decommissioning cost, and for rates used in funding projections;
* Contracts upon which the owners rely pursuant to 10 CFR 50.75(e)(1)(v);
* Modifications to method of providing financial fund assurance; and
* Material changes to trust agreements.
This letter contains no NRC commitments.
If there are any questions, please contact either Hung C. Le at (361) 972-7932 or me at (361) 972-8074.
George R. Harrison Executive Vice President and Chief Financial Officer HCL Attachments:
: 1. Financial Assurance for Decommissioning - NRG South Texas LP                                                             A
: 2. Financial Assurance for Decommissioning - City Public Service Board of San Antonio                                       f )0-0)
: 3. Financial Assurance for Decommissioning - City of Austin - Austin Energy STI: 34054098
 
NOC-AE-1 5003219 Page 2 of 2 cc:
(paper copy)                       (electronic copy)
Regional Administrator, Region IV  Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission  Steve Frantz, Esquire 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner Senior Project Manager              NRG South Texas LP U.S. Nuclear Regulatory Commission  John Ragan One White Flint North (MS 8 G9A)   Chris O'Hara 11555 Rockville Pike                Jim von Suskil Rockville, MD 20852 Senior Resident Inspector          CPS Energy U. S. Nuclear Regulatory Commission Kevin Polio P. 0. Box 289, Mail Code: MNl16    Cris Eugster Wadsworth, TX 77483                L. D. Blaylock Attention: Document Control Desk    Crain Caton & James, P.C.
U. S. Nuclear Regulatory Commission Peter Nemeth Washington, DC 20555-0001 City of Austin - Austin Energy Cheryl Mele John Wester Texas Dept. of State Health Services Richard A. Ratliff Robert Free
 
ATTACHMENT I SOUTH TEXAS PROJECT FINANCIAL ASSURANCE FOR DECOMMISSIONING 2015 UPDATE NRG SOUTH TEXAS LP
 
Attachment 1 NOC-AE-1 5003219 Page 1 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 13.2% Ownership of South Texas Project Unit I Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                       Total Required:                          $68,229,416 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar                Amount Accumulated 2:                    $56,506,960 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3:                                $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                        13
: 4. Assumptions used regarding escalation in                      Escalation Rate:                              2.471%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                  Earnings Rate:                        3.30% - 7.91%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                       None
: 1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
: 2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41970. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.
 
Attachment 1 NOC-AE-1 5003219 Page 2 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 30.8% Ownership of South Texas Project Unit 1 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                     Total Required:                          $159,201,971 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar                Amount Accumulated 2 :                  $138,319,017 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3:                                  $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                          13
: 4. Assumptions used regarding escalation in                    Escalation Rate:                              2.471%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                  Earnings Rate:                        3.30% - 7.91%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                       None
: 1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
: 2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41941. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.
 
Attachment 1 NOC-AE-1 5003219 Page 3 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 13.2% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                       Total Required:                          $68,229,416 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar              Amount Accumulated 2:                    $68,278,426 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3 :                                $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                        14
: 4. Assumptions used regarding escalation in                    Escalation Rate:                              2.476%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                    Earnings Rate:                        3.30% - 7.91%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75 (e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                       None
: 1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
: 2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41970. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.
 
Attachment 1 NOC-AE-1 5003219 Page 4 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 30.8% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                     Total Required:                          $159,201,971 pursuant to 10 CFR 50.75(b) and (c)':
: 2. Amount accumulated at the end of the calendar              Amount Accumulated2 :                    $174,158,803 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3:                                $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                      14
: 4. Assumptions used regarding escalation in                    Escalation Rate:                            2.476%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                    Earnings Rate:                      3.30% - 7.91%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                       None
: 1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
: 2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41941. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.
 
ATTACHMENT 2 SOUTH TEXAS PROJECT FINANCIAL ASSURANCE FOR DECOMMISSIONING 2015 UPDATE CITY PUBLIC SERVICE BOARD OF SAN ANTONIO
 
Attachment 2 NOC-AE-1 5003219 Page 1 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 12% Ownership of South Texas Project Unit 1 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                     Total Required:                            $62,027,313 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar                Amount Accumulated 2:                      $39,867,468 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3 :                                  $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                          13
: 4. Assumptions used regarding escalation in                    Escalation Rate:                                2.471%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                    Earnings Rate:                                    4.35%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                       No changes since 2013 report was submitted.
: 1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
: 2. By Order dated November 20, 2008 in PUCT Docket No. 35786, CPS Energy was granted approval to establish separate spent fuel management and pre-shutdown activities subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended December 31, 2008. If future estimates indicate that further funding may be required, CPS Energy would be able to apply to the PUCT to seek further funding for NRC license termination costs through cost-of-service recovery authorized by Texas law.
 
Attachment 2 NOC-AE-1 5003219 Page 2 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 28% Ownership of South Texas Project Unit 1 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                     Total Required:                          $144,730,396 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar                Amount Accumulated 2:                    $110,081,798 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3 :                                  $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                          13
: 4. Assumptions used regarding escalation in                      Escalation Rate:                                2.471%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                  Earnings Rate:                                    5.41%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                       No changes since 2013 report was submitted.
: 1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
: 2. Consistent with the approach taken for its 12% interest in the Order dated November 20, 2008, in PUCT Docket No.
35786, CPS Energy has established separate spent fuel management and pre-shutdown activity subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended January 31, 2008. If future estimates indicate that further funding may be required, CPS Energy would be able to exercise its rate setting authority to collect and accumulate further funds for NRC license termination costs.
 
Attachment 2 NOC-AE-1 5003219 Page 3 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 12% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                         Total Required:                            $62,027,313 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar                  Amount Accumulated 2 :                      $53,467,192 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3:                                  $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                          14
: 4. Assumptions used regarding escalation in                    Escalation Rate:                                2.476%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                    Earnings Rate:                                    4.35%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                       No changes since 2013 report was submitted.
: 1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
: 2. By Order dated November 20, 2008 in PUCT Docket No. 35786, CPS Energy was granted approval to establish separate spent fuel management and pre-shutdown activities subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended December 31, 2008. Iffuture estimates indicate that further funding may be required, CPS Energy would be able to apply to the PUCT to seek further funding for NRC license termination costs through cost-of-service recovery authorized by Texas law.
 
Attachment 2 NOC-AE-1 5003219 Page 4 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 28% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                         Total Required:                          $144,730,396 pursuant to 10 CFR 50.75(b) and (c)':
: 2. Amount accumulated at the end of the calendar                Amount Accumulated 2 :                    $131,558,684 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
: 3. Schedule of the annual amounts remaining to be              Amount Remaining 3 :                                  $0 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                          14
: 4. Assumptions used regarding escalation in                    Escalation Rate:                                2.476%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                    Earnings Rate:                                    5.41%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                None providing financial assurance occurring since the last submitted report:
: 7.   . Material changes to trust agreements:                   No changes since 2013 report was submitted.
: 1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
: 2. Consistent with the approach taken for its 12% interest in the Order dated November 20, 2008, in PUCT Docket No.
35786, CPS Energy has established separate spent fuel management and pre-shutdown activity subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
: 3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended January 31, 2008. Iffuture estimates indicate that further funding may be required, CPS Energy would be able to exercise its rate setting authority to collect and accumulate further funds for NRC license termination costs.
 
ATTACHMENT 3 SOUTH TEXAS PROJECT FINANCIAL ASSURANCE FOR DECOMMISSIONING 2015 UPDATE CITY OF AUSTIN - AUSTIN ENERGY
 
Attachment 3 NOC-AE-1 5003219 Page 1 of 2 FINANCIAL ASSURANCE FOR DECOMMISSIONING City of Austin - Austin Energy 16% Ownership of South Texas Project Unit I Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                         Total Required:                            $82,615,898 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar                  Amount Accumulated:                      $61,470,759 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c) 2:
: 3. Schedule of the annual amounts remaining to be                Amount Remaining:                        $23,328,763 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                          13
: 4. Assumptions used regarding escalation in                      Escalation Rate:                                4.918%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                    Earnings Rate:                                  5.073%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                  None pursuant to 10 CFR 50.75(e)(1)(v)
: 6. Modifications to a licensee's current method                  None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                         None
: 1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to Department of Energy are not included in the cost formulas.
: 2. On October 1, 2008, an accounting division of the Decommissioning Trust balance was recorded to reflect the division of costs as referenced in footnote 1.
 
Attachment 3 NOC-AE-1 5003219 Page 2 of 2 FINANCIAL ASSURANCE FOR DECOMMISSIONING City of Austin - Austin Energy 16% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.
: 1. Minimum decommissioning fund estimate,                         Total Required:                            $82,615,898 pursuant to 10 CFR 50.75(b) and (c)1 :
: 2. Amount accumulated at the end of the calendar                  Amount Accumulated:                      $68,956,723 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c) 2:
: 3. Schedule of the annual amounts remaining to be                Amount Remaining:                        $19,957,350 collected for items in 10 CFR 50.75(b) and (c):
Number of Years to Collect:                          14
: 4. Assumptions used regarding escalation in                        Escalation Rate:                                4.918%
decommissioning cost, rates of earnings on decommissioning funds, and rates of other                    Earnings Rate:                                  5.073%
factors used in funding projections:
: 5. Contracts upon which the licensee is relying                    None pursuant to 10 CFR 50.75(e)(1)(v):
: 6. Modifications to a licensee's current method                    None providing financial assurance occurring since the last submitted report:
: 7. Material changes to trust agreements:                           None
: 1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
: 2. On October 1, 2008, an accounting division of the Decommissioning Trust balance was recorded to reflect the division of costs as referenced in footnote 1.}}

Latest revision as of 14:19, 31 October 2019

Financial Assurance for Decommissioning - 2015 Update
ML15097A014
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/26/2015
From: Harrison G
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-1 5003219, STI: 34054098
Download: ML15097A014 (15)


Text

Nuclear Operating Company South Texas Pro/ect Electric GeneratingStation 90 Bar289 Madsmiorth. Texas 77483 March 26, 2015 NOC-AE-1 5003219 File No.: D57, G25 10 CFR 50.75 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Financial Assurance for Decommissioning - 2015 Update Pursuant to 10 CFR 50.75(f)(1), the STP Nuclear Operating Company (STPNOC) submits the attached status reports regarding funds available, effective December 31, 2014, for decommissioning South Texas Project Units 1 and 2. The data are assembled by the individual co-owners of the South Texas Project:

  • City Public Service Board of San Antonio; and

" City of Austin - Austin Energy.

The attached reports provide the following information for each co-owner:

  • Estimated amount of decommissioning funds required;
  • Amount accumulated by December 31, 2014;
  • A schedule of the annual amounts remaining to be collected;
  • Assumptions for rates of escalation in decommissioning cost, and for rates used in funding projections;
  • Modifications to method of providing financial fund assurance; and
  • Material changes to trust agreements.

This letter contains no NRC commitments.

If there are any questions, please contact either Hung C. Le at (361) 972-7932 or me at (361) 972-8074.

George R. Harrison Executive Vice President and Chief Financial Officer HCL Attachments:

1. Financial Assurance for Decommissioning - NRG South Texas LP A
2. Financial Assurance for Decommissioning - City Public Service Board of San Antonio f )0-0)
3. Financial Assurance for Decommissioning - City of Austin - Austin Energy STI: 34054098

NOC-AE-1 5003219 Page 2 of 2 cc:

(paper copy) (electronic copy)

Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission Steve Frantz, Esquire 1600 East Lamar Boulevard Arlington, TX 76011-4511 U.S. Nuclear Regulatory Commission Lisa M. Regner Lisa M. Regner Senior Project Manager NRG South Texas LP U.S. Nuclear Regulatory Commission John Ragan One White Flint North (MS 8 G9A) Chris O'Hara 11555 Rockville Pike Jim von Suskil Rockville, MD 20852 Senior Resident Inspector CPS Energy U. S. Nuclear Regulatory Commission Kevin Polio P. 0. Box 289, Mail Code: MNl16 Cris Eugster Wadsworth, TX 77483 L. D. Blaylock Attention: Document Control Desk Crain Caton & James, P.C.

U. S. Nuclear Regulatory Commission Peter Nemeth Washington, DC 20555-0001 City of Austin - Austin Energy Cheryl Mele John Wester Texas Dept. of State Health Services Richard A. Ratliff Robert Free

ATTACHMENT I SOUTH TEXAS PROJECT FINANCIAL ASSURANCE FOR DECOMMISSIONING 2015 UPDATE NRG SOUTH TEXAS LP

Attachment 1 NOC-AE-1 5003219 Page 1 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 13.2% Ownership of South Texas Project Unit I Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $68,229,416 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated 2: $56,506,960 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3: $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 13

4. Assumptions used regarding escalation in Escalation Rate: 2.471%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 3.30% - 7.91%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: None
1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41970. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.

Attachment 1 NOC-AE-1 5003219 Page 2 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 30.8% Ownership of South Texas Project Unit 1 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $159,201,971 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated 2 : $138,319,017 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3: $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 13

4. Assumptions used regarding escalation in Escalation Rate: 2.471%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 3.30% - 7.91%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: None
1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41941. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.

Attachment 1 NOC-AE-1 5003219 Page 3 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 13.2% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $68,229,416 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated 2: $68,278,426 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3 : $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 14

4. Assumptions used regarding escalation in Escalation Rate: 2.476%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 3.30% - 7.91%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75 (e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: None
1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41970. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.

Attachment 1 NOC-AE-1 5003219 Page 4 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING NRG South Texas LP 30.8% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $159,201,971 pursuant to 10 CFR 50.75(b) and (c)':
2. Amount accumulated at the end of the calendar Amount Accumulated2 : $174,158,803 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3: $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 14

4. Assumptions used regarding escalation in Escalation Rate: 2.476%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 3.30% - 7.91%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: None
1. The NRC formulas in section 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license.
2. By Order dated October 10, 2008 in PUCT Docket No. 35772, NRG South Texas LP was granted approval to establish a separate spent fuel management subaccount. By Order dated July 13, 2009 in PUCT Docket No. 36796, NRG South Texas LP was granted approval to establish a separate subaccount for pre-shutdown disposal of large components. The amounts allocable to the spent fuel management and pre-shutdown disposal subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
3. Target amounts to be collected were established by the PUCT-approved separate non-bypassable decommissioning charges established in PUCT Tariff Control No. 41941. Actual collections will vary but the charges are intended to produce the targeted annual collection amounts established in PUCT Docket No. 41580. All current collections are being deposited in the large component disposal subaccount.

ATTACHMENT 2 SOUTH TEXAS PROJECT FINANCIAL ASSURANCE FOR DECOMMISSIONING 2015 UPDATE CITY PUBLIC SERVICE BOARD OF SAN ANTONIO

Attachment 2 NOC-AE-1 5003219 Page 1 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 12% Ownership of South Texas Project Unit 1 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $62,027,313 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated 2: $39,867,468 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3 : $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 13

4. Assumptions used regarding escalation in Escalation Rate: 2.471%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 4.35%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: No changes since 2013 report was submitted.
1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
2. By Order dated November 20, 2008 in PUCT Docket No. 35786, CPS Energy was granted approval to establish separate spent fuel management and pre-shutdown activities subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended December 31, 2008. If future estimates indicate that further funding may be required, CPS Energy would be able to apply to the PUCT to seek further funding for NRC license termination costs through cost-of-service recovery authorized by Texas law.

Attachment 2 NOC-AE-1 5003219 Page 2 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 28% Ownership of South Texas Project Unit 1 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $144,730,396 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated 2: $110,081,798 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3 : $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 13

4. Assumptions used regarding escalation in Escalation Rate: 2.471%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 5.41%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: No changes since 2013 report was submitted.
1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
2. Consistent with the approach taken for its 12% interest in the Order dated November 20, 2008, in PUCT Docket No.

35786, CPS Energy has established separate spent fuel management and pre-shutdown activity subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.

3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended January 31, 2008. If future estimates indicate that further funding may be required, CPS Energy would be able to exercise its rate setting authority to collect and accumulate further funds for NRC license termination costs.

Attachment 2 NOC-AE-1 5003219 Page 3 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 12% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $62,027,313 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated 2 : $53,467,192 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3: $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 14

4. Assumptions used regarding escalation in Escalation Rate: 2.476%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 4.35%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: No changes since 2013 report was submitted.
1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
2. By Order dated November 20, 2008 in PUCT Docket No. 35786, CPS Energy was granted approval to establish separate spent fuel management and pre-shutdown activities subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.
3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended December 31, 2008. Iffuture estimates indicate that further funding may be required, CPS Energy would be able to apply to the PUCT to seek further funding for NRC license termination costs through cost-of-service recovery authorized by Texas law.

Attachment 2 NOC-AE-1 5003219 Page 4 of 4 FINANCIAL ASSURANCE FOR DECOMMISSIONING City Public Service (CPS) Board of San Antonio 28% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $144,730,396 pursuant to 10 CFR 50.75(b) and (c)':
2. Amount accumulated at the end of the calendar Amount Accumulated 2 : $131,558,684 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c):
3. Schedule of the annual amounts remaining to be Amount Remaining 3 : $0 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 14

4. Assumptions used regarding escalation in Escalation Rate: 2.476%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 5.41%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. . Material changes to trust agreements: No changes since 2013 report was submitted.
1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
2. Consistent with the approach taken for its 12% interest in the Order dated November 20, 2008, in PUCT Docket No.

35786, CPS Energy has established separate spent fuel management and pre-shutdown activity subaccounts. The amounts allocable to these subaccounts are not included in the reported amount. The reported amount includes funds accumulated based upon a site-specific study that includes license termination and other costs.

3. CPS Energy estimates that the Trust is currently fully funded, based on the 2012 decommissioning cost study and updated escalation rates. Additional contributions ended January 31, 2008. Iffuture estimates indicate that further funding may be required, CPS Energy would be able to exercise its rate setting authority to collect and accumulate further funds for NRC license termination costs.

ATTACHMENT 3 SOUTH TEXAS PROJECT FINANCIAL ASSURANCE FOR DECOMMISSIONING 2015 UPDATE CITY OF AUSTIN - AUSTIN ENERGY

Attachment 3 NOC-AE-1 5003219 Page 1 of 2 FINANCIAL ASSURANCE FOR DECOMMISSIONING City of Austin - Austin Energy 16% Ownership of South Texas Project Unit I Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $82,615,898 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated: $61,470,759 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c) 2:
3. Schedule of the annual amounts remaining to be Amount Remaining: $23,328,763 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 13

4. Assumptions used regarding escalation in Escalation Rate: 4.918%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 5.073%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v)
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: None
1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to Department of Energy are not included in the cost formulas.
2. On October 1, 2008, an accounting division of the Decommissioning Trust balance was recorded to reflect the division of costs as referenced in footnote 1.

Attachment 3 NOC-AE-1 5003219 Page 2 of 2 FINANCIAL ASSURANCE FOR DECOMMISSIONING City of Austin - Austin Energy 16% Ownership of South Texas Project Unit 2 Pursuant to 10 CFR 50.75(f)(1), each power reactor licensee is required to report to the NRC on a calendar year basis, beginning on March 31, 1999, and every two years thereafter, on the status of its decommissioning funding for each reactor or share of reactor it owns. The requested information is provided below.

1. Minimum decommissioning fund estimate, Total Required: $82,615,898 pursuant to 10 CFR 50.75(b) and (c)1 :
2. Amount accumulated at the end of the calendar Amount Accumulated: $68,956,723 year preceding the date of the report for items included in 10 CFR 50.75(b) and (c) 2:
3. Schedule of the annual amounts remaining to be Amount Remaining: $19,957,350 collected for items in 10 CFR 50.75(b) and (c):

Number of Years to Collect: 14

4. Assumptions used regarding escalation in Escalation Rate: 4.918%

decommissioning cost, rates of earnings on decommissioning funds, and rates of other Earnings Rate: 5.073%

factors used in funding projections:

5. Contracts upon which the licensee is relying None pursuant to 10 CFR 50.75(e)(1)(v):
6. Modifications to a licensee's current method None providing financial assurance occurring since the last submitted report:
7. Material changes to trust agreements: None
1. The NRC formulas in 10 CFR 50.75(c) include only those decommissioning costs incurred by licensees to remove a facility or site safely from service, and reduce residual radioactivity to levels that permit: (1) release of the property for unrestricted use and termination of the license; or (2) release of the property under restricted conditions and termination of the license. The cost of dismantling or demolishing non-radiological systems and structures is not included in NRC decommissioning cost estimates. The costs of managing and storing spent fuel on site until transfer to the Department of Energy are not included in the cost formulas.
2. On October 1, 2008, an accounting division of the Decommissioning Trust balance was recorded to reflect the division of costs as referenced in footnote 1.