ML15345A390: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/08/2015
| issue date = 12/08/2015
| title = Part 21 Report - 2 Motors Were Not Properly Prepared Before Small Steel Shot Blasting
| title = Part 21 Report - 2 Motors Were Not Properly Prepared Before Small Steel Shot Blasting
| author name = Gunvalson J T
| author name = Gunvalson J
| author affiliation = Howden North America, Inc
| author affiliation = Howden North America, Inc
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:12/08/201512/08/2015 U.S. Nuclear Regulatory Commission operations Center Event Report P~easelPart 21 (PAR)Event # 51592Rep Org: HOWDEN NORTH AMERICA, INC. Notification Date / Time: 12/08/2015 14:31 (EST)Supplier: HOWDEN NORTH AMERICA, INC. Event Date / Time: 10/16/2015 (EST)Last Modification: 12/08/2015Region: 1 Docket #:City: COLUMBIA Agreement State: YesCounty: License #:State: SCNRC Notified by: J TODD GUNVALSON Notifications: EUGENE GUTHRIE R20OHQ Ops Officer: JOHN SHOEMAKER PART 21/50.55 REACTORS EMAILEmergency Class: NON EMERGENCY10 CFR Section:21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCEPART 21 REPORT -2 MOTORS WERE NOT PROPERLY PREPARED BEFORE SMALL STEEL SHOTBLASTINGThe following information is an excerpt from an Howden North America email:"It was discovered that two motors being prepared for steel shot blasting prior to application of the coating systemmay not have been properly sealed allowing a small amount of small steel shot blast to enter into the motor."The two motors have been repaired and returned to FPL (Florida Power and Light Company), no further action isrequired.Customer: Florida Power and Light CompanyLocation/Site: Turkey PointMotor Serial Numbers: GG153620115 and GG153620116For questions and additional information, contact:J. Todd GunvalsonDirector, QualityHowden North America7909 Parklane RoadColumbia, SC 29223Phone 803-741-2716 Facsimile Cover SheetFrom: Howden North America, Quality FAX 866-398-1835To: NRC Operations Center 301-816-5151Attached:1 page10 CFR Part 21 NotificationPlease call 803-741-2716 if there are any transmission issues with is FAX.Sent by:a. Todd GunvalsonDirector, QualityHowden North America7909 Parklane Road Suite 300Columbia, SC 29223USAt: +1 (803) 741 2700d: +1 (803) 741 2716m: +1 (803) 420 6184f: +1 (866) 398 1835e: Todd.Gunvalson@Howden. comnw: www.howden.comLatest Blank Master Document Page 1 of 1Page 1 of I  
{{#Wiki_filter:12/08/2015                  12/08/2015 U.S. Nuclear Regulatory Commission operations Center Event Report                     easel P~
=teHowdenHowden North America Inc.10 CFR Part 21 Notification 7909 Parklane Road Suite 3008 December 2015 Columbia SC 29223USATel: 503 741 2700Fax: 885 757 0908Web: www.howden.comThe below information is being provided in accordance with thereporting requirements of 10 CFR Part 21.1. Customers potentially affected:2.3.Customer Purchase Order Number Howden North AmericaControl NumberFlorida Power and Light Cornpany 02321872 A018950Part/Component Name: AC Fan Motors With Safety Related Coating SystemLocation and serial numbers of suspect motors:Customer Location/Site Motor Serial NumberFlorida Power and Light Company** Turkey Point ____GG153620115 **Florida Power and Light Comparny** Turkey Point GG153620116 **** Note: these two motors were found with this nonconformance and they have been repairedand returned to FPL, no further action required.4. Date nonconformance ascertained: 16 October 20155. Description of potential defect/nonconformance: It was discovered that motors being preparedfor steel shot blasting prior to application of the coating system may not have been properlysealed allowing a small amount of small steel shot blast media to enter into the motor.6. Corrective actions being taken: Records, motor drawings, and photographs of all motors preparedfor blasting and coating in Medina, OH were identified, collected and examined. Quality Planningprocess was improved and controlling documents changed to add addition inspections 360degrees around the motor. As noted above the motors purchased by Florida Power and LightCompany have been corrected. The two motors identified above were the only motors that werenot properly prepared for blasting.7. Any advice related to the potential defect/nonconformance: None are recommended as themotors affected by this issue have been repaired and tested. The repair included replacement ofboth motor bearings.8. Individual completing this report:J. Todd GunvalsonDirector, QualityHowden North America7909 Parklane RoadColumbia, SC 29223Phone 803-741-2716Howden North America Is a registered licensee of Howden Group Ltd.
Part 21 (PAR)                                                                                   Event #       51592 Rep Org: HOWDEN NORTH AMERICA, INC.                           Notification Date / Time: 12/08/2015 14:31       (EST)
12/08/201512/08/2015 U.S. Nuclear Regulatory Commission operations Center Event Report P~easelPart 21 (PAR)Event # 51592Rep Org: HOWDEN NORTH AMERICA, INC. Notification Date / Time: 12/08/2015 14:31 (EST)Supplier: HOWDEN NORTH AMERICA, INC. Event Date / Time: 10/16/2015 (EST)Last Modification: 12/08/2015Region: 1 Docket #:City: COLUMBIA Agreement State: YesCounty: License #:State: SCNRC Notified by: J TODD GUNVALSON Notifications: EUGENE GUTHRIE R20OHQ Ops Officer: JOHN SHOEMAKER PART 21/50.55 REACTORS EMAILEmergency Class: NON EMERGENCY10 CFR Section:21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCEPART 21 REPORT -2 MOTORS WERE NOT PROPERLY PREPARED BEFORE SMALL STEEL SHOTBLASTINGThe following information is an excerpt from an Howden North America email:"It was discovered that two motors being prepared for steel shot blasting prior to application of the coating systemmay not have been properly sealed allowing a small amount of small steel shot blast to enter into the motor."The two motors have been repaired and returned to FPL (Florida Power and Light Company), no further action isrequired.Customer: Florida Power and Light CompanyLocation/Site: Turkey PointMotor Serial Numbers: GG153620115 and GG153620116For questions and additional information, contact:J. Todd GunvalsonDirector, QualityHowden North America7909 Parklane RoadColumbia, SC 29223Phone 803-741-2716 Facsimile Cover SheetFrom: Howden North America, Quality FAX 866-398-1835To: NRC Operations Center 301-816-5151Attached:1 page10 CFR Part 21 NotificationPlease call 803-741-2716 if there are any transmission issues with is FAX.Sent by:a. Todd GunvalsonDirector, QualityHowden North America7909 Parklane Road Suite 300Columbia, SC 29223USAt: +1 (803) 741 2700d: +1 (803) 741 2716m: +1 (803) 420 6184f: +1 (866) 398 1835e: Todd.Gunvalson@Howden. comnw: www.howden.comLatest Blank Master Document Page 1 of 1Page 1 of I  
Supplier: HOWDEN NORTH AMERICA, INC.                               Event Date / Time: 10/16/2015               (EST)
=teHowdenHowden North America Inc.10 CFR Part 21 Notification 7909 Parklane Road Suite 3008 December 2015 Columbia SC 29223USATel: 503 741 2700Fax: 885 757 0908Web: www.howden.comThe below information is being provided in accordance with thereporting requirements of 10 CFR Part 21.1. Customers potentially affected:2.3.Customer Purchase Order Number Howden North AmericaControl NumberFlorida Power and Light Cornpany 02321872 A018950Part/Component Name: AC Fan Motors With Safety Related Coating SystemLocation and serial numbers of suspect motors:Customer Location/Site Motor Serial NumberFlorida Power and Light Company** Turkey Point ____GG153620115 **Florida Power and Light Comparny** Turkey Point GG153620116 **** Note: these two motors were found with this nonconformance and they have been repairedand returned to FPL, no further action required.4. Date nonconformance ascertained: 16 October 20155. Description of potential defect/nonconformance: It was discovered that motors being preparedfor steel shot blasting prior to application of the coating system may not have been properlysealed allowing a small amount of small steel shot blast media to enter into the motor.6. Corrective actions being taken: Records, motor drawings, and photographs of all motors preparedfor blasting and coating in Medina, OH were identified, collected and examined. Quality Planningprocess was improved and controlling documents changed to add addition inspections 360degrees around the motor. As noted above the motors purchased by Florida Power and LightCompany have been corrected. The two motors identified above were the only motors that werenot properly prepared for blasting.7. Any advice related to the potential defect/nonconformance: None are recommended as themotors affected by this issue have been repaired and tested. The repair included replacement ofboth motor bearings.8. Individual completing this report:J. Todd GunvalsonDirector, QualityHowden North America7909 Parklane RoadColumbia, SC 29223Phone 803-741-2716Howden North America Is a registered licensee of Howden Group Ltd.}}
Last Modification: 12/08/2015 Region: 1                                                 Docket #:
City: COLUMBIA                                 Agreement State:             Yes County:                                                   License #:
State: SC NRC Notified by: J TODD GUNVALSON                     Notifications:   EUGENE GUTHRIE                     R20O HQ Ops Officer: JOHN SHOEMAKER                                         PART 21/50.55 REACTORS             EMAIL Emergency Class:   NON EMERGENCY 10 CFR Section:
21.21 (d)(3)(i)   DEFECTS AND NONCOMPLIANCE PART 21 REPORT - 2 MOTORS WERE NOT PROPERLY PREPARED BEFORE SMALL STEEL SHOT BLASTING The following information is an excerpt from an Howden North America email:
"It was discovered that two motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast to enter into the motor."
The two motors have been repaired and returned to FPL (Florida Power and Light Company), no further action is required.
Customer: Florida Power and Light Company Location/Site: Turkey Point Motor Serial Numbers: GG153620115 and GG153620116 For questions and additional information, contact:
J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716
 
Facsimile Cover Sheet From:     Howden North America, Quality FAX 866-398-1835 To:       NRC Operations Center 301-816-5151 Attached:
1 page 10 CFR Part 21 Notification Please call 803-741-2716 if there are any transmission issues with is FAX.
Sent by:
: a. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Suite 300 Columbia, SC 29223 USA t: +1 (803) 741 2700 d: +1 (803) 741 2716 m: +1 (803) 420 6184 f: +1 (866) 398 1835 e: Todd.Gunvalson@Howden. comn w: www.howden.com Page 1of 1 Latest Blank Master Document                                               Page 1 of I
 
                                                                                                                        =t e
Howden Howden North America Inc.
10 CFR Part 21 Notification                                                               7909 Parklane Road Suite 300 8 December 2015                                                                           Columbia SC 29223 USA Tel: 503 741 2700 Fax: 885 757 0908 Web: www.howden.com The below information is being provided in accordance with the reporting requirements of 10 CFR Part 21.
: 1. Customers potentially affected:
Customer                                             Purchase Order Number Howden North America Control Number Florida Power and Light Cornpany                     02321872               A018950 2.
Part/Component Name: AC Fan Motors With Safety Related Coating System
: 3. Location and serial numbers of suspect motors:
Customer                                               Location/Site         Motor Serial Number Florida Power and Light Company**                     Turkey Point   ____GG153620115 **
Florida Power and Light Comparny**                     Turkey Point         GG153620116 **
          ** Note: these two motors were found with this nonconformance and they have been repaired and returned to FPL, no further action required.
: 4. Date nonconformance ascertained: 16 October 2015
: 5. Description of potential defect/nonconformance: It was discovered that motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast media to enter into the motor.
: 6. Corrective actions being taken: Records, motor drawings, and photographs of all motors prepared for blasting and coating in Medina, OH were identified, collected and examined. Quality Planning process was improved and controlling documents changed to add addition inspections 360 degrees around the motor. As noted above the motors purchased by Florida Power and Light Company have been corrected. The two motors identified above were the only motors that were not properly prepared for blasting.
: 7. Any advice related to the potential defect/nonconformance: None are recommended as the motors affected by this issue have been repaired and tested. The repair included replacement of both motor bearings.
: 8. Individual completing this report:
J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716 Howden North America Is a registered licensee of Howden Group Ltd.
 
12/08/2015                  12/08/2015 U.S. Nuclear Regulatory Commission operations Center Event Report                     easel P~
Part 21 (PAR)                                                                                   Event #       51592 Rep Org: HOWDEN NORTH AMERICA, INC.                           Notification Date / Time: 12/08/2015 14:31       (EST)
Supplier: HOWDEN NORTH AMERICA, INC.                               Event Date / Time: 10/16/2015               (EST)
Last Modification: 12/08/2015 Region: 1                                                 Docket #:
City: COLUMBIA                                 Agreement State:             Yes County:                                                   License #:
State: SC NRC Notified by: J TODD GUNVALSON                     Notifications:   EUGENE GUTHRIE                     R20O HQ Ops Officer: JOHN SHOEMAKER                                         PART 21/50.55 REACTORS             EMAIL Emergency Class:   NON EMERGENCY 10 CFR Section:
21.21 (d)(3)(i)   DEFECTS AND NONCOMPLIANCE PART 21 REPORT - 2 MOTORS WERE NOT PROPERLY PREPARED BEFORE SMALL STEEL SHOT BLASTING The following information is an excerpt from an Howden North America email:
"It was discovered that two motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast to enter into the motor."
The two motors have been repaired and returned to FPL (Florida Power and Light Company), no further action is required.
Customer: Florida Power and Light Company Location/Site: Turkey Point Motor Serial Numbers: GG153620115 and GG153620116 For questions and additional information, contact:
J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716
 
Facsimile Cover Sheet From:     Howden North America, Quality FAX 866-398-1835 To:       NRC Operations Center 301-816-5151 Attached:
1 page 10 CFR Part 21 Notification Please call 803-741-2716 if there are any transmission issues with is FAX.
Sent by:
: a. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Suite 300 Columbia, SC 29223 USA t: +1 (803) 741 2700 d: +1 (803) 741 2716 m: +1 (803) 420 6184 f: +1 (866) 398 1835 e: Todd.Gunvalson@Howden. comn w: www.howden.com Page 1of 1 Latest Blank Master Document                                               Page 1 of I
 
                                                                                                                        =t e
Howden Howden North America Inc.
10 CFR Part 21 Notification                                                               7909 Parklane Road Suite 300 8 December 2015                                                                           Columbia SC 29223 USA Tel: 503 741 2700 Fax: 885 757 0908 Web: www.howden.com The below information is being provided in accordance with the reporting requirements of 10 CFR Part 21.
: 1. Customers potentially affected:
Customer                                             Purchase Order Number Howden North America Control Number Florida Power and Light Cornpany                     02321872               A018950 2.
Part/Component Name: AC Fan Motors With Safety Related Coating System
: 3. Location and serial numbers of suspect motors:
Customer                                               Location/Site         Motor Serial Number Florida Power and Light Company**                     Turkey Point   ____GG153620115 **
Florida Power and Light Comparny**                     Turkey Point         GG153620116 **
          ** Note: these two motors were found with this nonconformance and they have been repaired and returned to FPL, no further action required.
: 4. Date nonconformance ascertained: 16 October 2015
: 5. Description of potential defect/nonconformance: It was discovered that motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast media to enter into the motor.
: 6. Corrective actions being taken: Records, motor drawings, and photographs of all motors prepared for blasting and coating in Medina, OH were identified, collected and examined. Quality Planning process was improved and controlling documents changed to add addition inspections 360 degrees around the motor. As noted above the motors purchased by Florida Power and Light Company have been corrected. The two motors identified above were the only motors that were not properly prepared for blasting.
: 7. Any advice related to the potential defect/nonconformance: None are recommended as the motors affected by this issue have been repaired and tested. The repair included replacement of both motor bearings.
: 8. Individual completing this report:
J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716 Howden North America Is a registered licensee of Howden Group Ltd.}}

Latest revision as of 03:23, 31 October 2019

Part 21 Report - 2 Motors Were Not Properly Prepared Before Small Steel Shot Blasting
ML15345A390
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/08/2015
From: Gunvalson J
Howden North America
To:
Office of Nuclear Reactor Regulation
References
51592
Download: ML15345A390 (3)


Text

12/08/2015 12/08/2015 U.S. Nuclear Regulatory Commission operations Center Event Report easel P~

Part 21 (PAR) Event # 51592 Rep Org: HOWDEN NORTH AMERICA, INC. Notification Date / Time: 12/08/2015 14:31 (EST)

Supplier: HOWDEN NORTH AMERICA, INC. Event Date / Time: 10/16/2015 (EST)

Last Modification: 12/08/2015 Region: 1 Docket #:

City: COLUMBIA Agreement State: Yes County: License #:

State: SC NRC Notified by: J TODD GUNVALSON Notifications: EUGENE GUTHRIE R20O HQ Ops Officer: JOHN SHOEMAKER PART 21/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21 REPORT - 2 MOTORS WERE NOT PROPERLY PREPARED BEFORE SMALL STEEL SHOT BLASTING The following information is an excerpt from an Howden North America email:

"It was discovered that two motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast to enter into the motor."

The two motors have been repaired and returned to FPL (Florida Power and Light Company), no further action is required.

Customer: Florida Power and Light Company Location/Site: Turkey Point Motor Serial Numbers: GG153620115 and GG153620116 For questions and additional information, contact:

J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716

Facsimile Cover Sheet From: Howden North America, Quality FAX 866-398-1835 To: NRC Operations Center 301-816-5151 Attached:

1 page 10 CFR Part 21 Notification Please call 803-741-2716 if there are any transmission issues with is FAX.

Sent by:

a. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Suite 300 Columbia, SC 29223 USA t: +1 (803) 741 2700 d: +1 (803) 741 2716 m: +1 (803) 420 6184 f: +1 (866) 398 1835 e: Todd.Gunvalson@Howden. comn w: www.howden.com Page 1of 1 Latest Blank Master Document Page 1 of I

=t e

Howden Howden North America Inc.

10 CFR Part 21 Notification 7909 Parklane Road Suite 300 8 December 2015 Columbia SC 29223 USA Tel: 503 741 2700 Fax: 885 757 0908 Web: www.howden.com The below information is being provided in accordance with the reporting requirements of 10 CFR Part 21.

1. Customers potentially affected:

Customer Purchase Order Number Howden North America Control Number Florida Power and Light Cornpany 02321872 A018950 2.

Part/Component Name: AC Fan Motors With Safety Related Coating System

3. Location and serial numbers of suspect motors:

Customer Location/Site Motor Serial Number Florida Power and Light Company** Turkey Point ____GG153620115 **

Florida Power and Light Comparny** Turkey Point GG153620116 **

    • Note: these two motors were found with this nonconformance and they have been repaired and returned to FPL, no further action required.
4. Date nonconformance ascertained: 16 October 2015
5. Description of potential defect/nonconformance: It was discovered that motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast media to enter into the motor.
6. Corrective actions being taken: Records, motor drawings, and photographs of all motors prepared for blasting and coating in Medina, OH were identified, collected and examined. Quality Planning process was improved and controlling documents changed to add addition inspections 360 degrees around the motor. As noted above the motors purchased by Florida Power and Light Company have been corrected. The two motors identified above were the only motors that were not properly prepared for blasting.
7. Any advice related to the potential defect/nonconformance: None are recommended as the motors affected by this issue have been repaired and tested. The repair included replacement of both motor bearings.
8. Individual completing this report:

J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716 Howden North America Is a registered licensee of Howden Group Ltd.

12/08/2015 12/08/2015 U.S. Nuclear Regulatory Commission operations Center Event Report easel P~

Part 21 (PAR) Event # 51592 Rep Org: HOWDEN NORTH AMERICA, INC. Notification Date / Time: 12/08/2015 14:31 (EST)

Supplier: HOWDEN NORTH AMERICA, INC. Event Date / Time: 10/16/2015 (EST)

Last Modification: 12/08/2015 Region: 1 Docket #:

City: COLUMBIA Agreement State: Yes County: License #:

State: SC NRC Notified by: J TODD GUNVALSON Notifications: EUGENE GUTHRIE R20O HQ Ops Officer: JOHN SHOEMAKER PART 21/50.55 REACTORS EMAIL Emergency Class: NON EMERGENCY 10 CFR Section:

21.21 (d)(3)(i) DEFECTS AND NONCOMPLIANCE PART 21 REPORT - 2 MOTORS WERE NOT PROPERLY PREPARED BEFORE SMALL STEEL SHOT BLASTING The following information is an excerpt from an Howden North America email:

"It was discovered that two motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast to enter into the motor."

The two motors have been repaired and returned to FPL (Florida Power and Light Company), no further action is required.

Customer: Florida Power and Light Company Location/Site: Turkey Point Motor Serial Numbers: GG153620115 and GG153620116 For questions and additional information, contact:

J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716

Facsimile Cover Sheet From: Howden North America, Quality FAX 866-398-1835 To: NRC Operations Center 301-816-5151 Attached:

1 page 10 CFR Part 21 Notification Please call 803-741-2716 if there are any transmission issues with is FAX.

Sent by:

a. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Suite 300 Columbia, SC 29223 USA t: +1 (803) 741 2700 d: +1 (803) 741 2716 m: +1 (803) 420 6184 f: +1 (866) 398 1835 e: Todd.Gunvalson@Howden. comn w: www.howden.com Page 1of 1 Latest Blank Master Document Page 1 of I

=t e

Howden Howden North America Inc.

10 CFR Part 21 Notification 7909 Parklane Road Suite 300 8 December 2015 Columbia SC 29223 USA Tel: 503 741 2700 Fax: 885 757 0908 Web: www.howden.com The below information is being provided in accordance with the reporting requirements of 10 CFR Part 21.

1. Customers potentially affected:

Customer Purchase Order Number Howden North America Control Number Florida Power and Light Cornpany 02321872 A018950 2.

Part/Component Name: AC Fan Motors With Safety Related Coating System

3. Location and serial numbers of suspect motors:

Customer Location/Site Motor Serial Number Florida Power and Light Company** Turkey Point ____GG153620115 **

Florida Power and Light Comparny** Turkey Point GG153620116 **

    • Note: these two motors were found with this nonconformance and they have been repaired and returned to FPL, no further action required.
4. Date nonconformance ascertained: 16 October 2015
5. Description of potential defect/nonconformance: It was discovered that motors being prepared for steel shot blasting prior to application of the coating system may not have been properly sealed allowing a small amount of small steel shot blast media to enter into the motor.
6. Corrective actions being taken: Records, motor drawings, and photographs of all motors prepared for blasting and coating in Medina, OH were identified, collected and examined. Quality Planning process was improved and controlling documents changed to add addition inspections 360 degrees around the motor. As noted above the motors purchased by Florida Power and Light Company have been corrected. The two motors identified above were the only motors that were not properly prepared for blasting.
7. Any advice related to the potential defect/nonconformance: None are recommended as the motors affected by this issue have been repaired and tested. The repair included replacement of both motor bearings.
8. Individual completing this report:

J. Todd Gunvalson Director, Quality Howden North America 7909 Parklane Road Columbia, SC 29223 Phone 803-741-2716 Howden North America Is a registered licensee of Howden Group Ltd.