ML17265A490: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 12/17/1998
| issue date = 12/17/1998
| title = Forwards LER 98-004-00 Re Improperly Performed Surveillance Due to Procedure non-adherence.Licensee Does Not Agree That, for Equipment Item That Is Otherwise Known to Be Operable, Reporting of Missed Surveillance Should Be Required
| title = Forwards LER 98-004-00 Re Improperly Performed Surveillance Due to Procedure non-adherence.Licensee Does Not Agree That, for Equipment Item That Is Otherwise Known to Be Operable, Reporting of Missed Surveillance Should Be Required
| author name = MECREDY R C
| author name = Mecredy R
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY1REGULATORYINFORMATIONDISTRIBUTIONSYSTEM(RIDS)
{{#Wiki_filter:CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9812240091                    DOC.DATE: 98/12/17 . NOTARIZED: NO                    -        DOCKET FACIL:50-244 Robert            Emmet      Ginna  Nuclear Plant, Unit 1, Rochester                    G  05000244 AUTH. NAM i                  AUTHOR    AFFILIATION MECREDY,R.C.                Rochester Gas & Electric Corp.
RECIP.NAME                  RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
ForwardsLER98-004-00reimproperlyperformedsurveillanceduetoprocedurenon-adherence.Licenseedoesnotagreethat,forequipmentitemthatisotherwiseknowntobeoperable,-reportingofmissedsurveillance'houldberequired.DISTRIBUTIONCODE:IE22TCOPIESRECEIVED:LTRIENCLISIZE:Zr$TITLE:50.73/50.9LicenseeEventReport(LER),IncidentRpt,etc.AE05000244QNOTES:LicenseExpdateinaccordancewith10CFR2,2.109(9/19/72).ACCESSIONNBR:9812240091DOC.DATE:98/12/17.NOTARIZED:NO-DOCKETFACIL:50-244RobertEmmetGinnaNuclearPlant,Unit1,RochesterG05000244AUTH.NAMiAUTHORAFFILIATIONMECREDY,R.C.RochesterGas&ElectricCorp.RECIP.NAMERECIPIENTAFFILIATIONRecordsManagementBranch(DocumentControlDesk)RECIPIENTIDCODE/NAMEPD1-1PDINTERNAL:AEOD/SPDCEENRR/DE/EELBNRR/DRCH/HICBNRR/DRCH/HQMBNRR/DSSA/SPLBRGN1FILE01COPIESLTTRENCL1122111111111111RECIPIENTIDCODE/NAMEVZSSING,G.AEOD/SPD/RRABNRR/DE/ECGBNRR/DE/EMEBNRR/DRCH/HOHBNRR/DRPM/PECBRES/DET/EIBCOPIESLTTRENCL11111111111111EXTERNAL:LSTLOBBYWARDNOACPOORE,W.NRCPDR111111LITCOBRYCE,JHNOACQUEENER,DSNUDOCSFULLTXT111111%epeePAsNTSthyN%'Dt1I"-I-"cC>"'"'0S"M'J-'CURJA~C..ORGA4ZAEONRSMOV~"RCMI.STRTUONL~'hltgtIs+1I0~'rtFULLTEXTCONVERSIONREQUIREDwarrior ANDROCHESTERGASANDEIECTRICCORPORATION~B9EASTAVENUE,ROCHESTER,N.Y14649-000IAREACODE7165'.2700ROBERTC.MECREDYVicePresidentNvcteorOperationsDecember17,1998U.S.NuclearRegulatoryCommission~DocumentControlDeskAttn:Guy'S.VissingProjectDirectorateI-1Washington,D.C.20555
Forwards LER 98-004-00 re improperly performed surveillance due to procedure non-adherence. Licensee does not agree that, for equipment item that is otherwise known to be operable,                                           A
              -reporting of missed surveillance'hould be required.
DISTRIBUTION CODE: IE22T                  COPIES RECEIVED:LTR            I ENCL    I    SIZE:     Zr $
TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc.                                                 E NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) .                                         05000244 Q
RECIPIENT                  COPIES                RECIPIENT                COPIES ID  CODE/NAME              LTTR ENCL          ID  CODE/NAME            LTTR ENCL PD1-1      PD                    1      1        VZSSING,G.                   1        1 INTERNAL: AEOD/SPD                            2      2        AEOD/SPD/RRAB                1        1 CE      E              1      1        NRR/DE/ECGB                  1        1 NRR/DE/EELB                      1      1        NRR/DE/EMEB                  1        1 NRR/DRCH/HICB                    1      1        NRR/DRCH/HOHB                1        1 NRR/DRCH/HQMB                    1      1        NRR/DRPM/PECB                1        1 NRR/DSSA/SPLB                    1      1        RES/DET/EIB                  1        1 RGN1        FILE    01        1      1 EXTERNAL: L ST LOBBY WARD                      1      1        LITCO BRYCE,J H              1        1 NOAC POORE,W.                     1      1        NOAC QUEENER,DS              1        1 NRC PDR                          1      1        NUDOCS FULL TXT              1        1
    %epee P A s    NTS
              "-I - "c thy C
N
                                  % 'Dt 1I
                                    '0 S  "     M'J
                                                          'hl
                                                      -'CUR JA~
                                                        ~
C.. ORGA 4 ZA EON RSMOV ~ "RCM t  g      t Is+ 1  I 0  ~ 'rt I.STRT U  ON L FULL TEXT CONVERSION REQUIRED                                      warrior
 
AND 14649-000I    AREA CODE 716 5'.2700 ROCHESTER GAS AND EIECTRIC CORPORATION ~ B9 EASTAVENUE, ROCHESTER, N. Y ROBERT C. MECREDY Vice President Nvcteor Operations December 17, 1998 U.S. Nuclear Regulatory Commission
  ~
Document Control Desk Attn:Guy 'S. Vissing Project Directorate I-1 Washington, D.C. 20555


==Subject:==
==Subject:==
LER1998-004,ImproperlyPerformedSurveillance,DuetoProcedureNon-Adherence,ResultedinConditionProhibitedbyTechnicalSpecificationsR.E.GinnaNuclearPowerPlantDocketNo.50-244
LER 1998-004, Improperly Performed Surveillance, Due                              to Procedure Non-Adherence, Resulted in Condition Prohibited by Technical Specifications R.E. Ginna Nuclear Power Plant Docket No. 50-244
 
==Dear Mr.        Vissing:==
 
In accordance with 10 CFR 50.73, Licensee Event Report System, item (a) (2) (i) (B), which requires a report of, "Any operation or condition prohibited by the plant's Technical Specifications",
the attached Licensee Event Report LER 1998-004 is hereby submitted.
Although we are submitting this LER in accordance with the guidance provided in NUREG-1022, Revision 1, we do not agree that, for an equipment item that is otherwise known to be be operable, the reporting of a missed surveillance should required. The Ginna Station Technical Specifications Bases for Surveillance Requirement 3.0.3 allows the plant to defer declaring equipment inoperable for up to 24 hours for a missed surveillance. No Limiting Condition for Operation (LCO) is entered and no equipment is declared inoperable, surveillance test proves that the equipment is operable. Since if the resultant there is no operation or condition prohibited by the Technical Specifications, 10 CFR 50.72 and 10 CFR 50.73 do 'not apply, and no report should be made.
                                                                                                            /f~ P 98i224009i 98i21T PDR  ADOCK  05000244 PDR .'


==DearMr.Vissing:==
The philosophy behind the Ginna Station Technical Specifications and Bases were presented to the NRC in a letter from RG&E (Mecredy) to NRC, dated May 14, 1996, which is attached. RG&E has never received a formal response to this letter, and hereby requests such a response. We note that the advanced notice of ProPosed rulemaking (ANPR) for 10 CFR 50.72 and 10 CFR 50.73, dated July 23, 1998, indicates that singular events such as missed surveillances should not be reported. We believe that a conforming response to our May 14, 1996, letter will supersede NUREG-1022, Revision 1, which is a guidance document, and allow us not to report missed surveillances for operable equipment in the future.
Inaccordancewith10CFR50.73,LicenseeEventReportSystem,item(a)(2)(i)(B),whichrequiresareportof,"Anyoperationorconditionprohibitedbytheplant'sTechnicalSpecifications",theattachedLicenseeEventReportLER1998-004isherebysubmitted.AlthoughwearesubmittingthisLERinaccordancewiththeguidanceprovidedinNUREG-1022,Revision1,wedonotagreethat,foranequipmentitemthatisotherwiseknowntobeoperable,thereportingofamissedsurveillanceshouldberequired.TheGinnaStationTechnicalSpecificationsBasesforSurveillanceRequirement3.0.3allowstheplanttodeferdeclaringequipmentinoperableforupto24hoursforamissedsurveillance.NoLimitingConditionforOperation(LCO)isenteredandnoequipmentisdeclaredinoperable,iftheresultantsurveillancetestprovesthattheequipmentisoperable.SincethereisnooperationorconditionprohibitedbytheTechnicalSpecifications,10CFR50.72and10CFR50.73do'notapply,andnoreportshouldbemade./f~P98i224009i98i21TPDRADOCK05000244PDR.'
This event has in no way affected the public's health and safety.
Ver    ruly your Robert  C. Mecredy Attachments:    1. LER 1998-004
: 2. Letter dated  May 14, 1996 xc:  U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)
Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region  I 475  Allendale Road King of Prussia, PA  19406 U.S. NRC Ginna Senior Resident Inspector


ThephilosophybehindtheGinnaStationTechnicalSpecificationsandBaseswerepresentedtotheNRCinaletterfromRG&E(Mecredy)toNRC,datedMay14,1996,whichisattached.RG&Ehasneverreceivedaformalresponsetothisletter,andherebyrequestssucharesponse.WenotethattheadvancednoticeofProPosedrulemaking(ANPR)for10CFR50.72and10CFR50.73,datedJuly23,1998,indicatesthatsingulareventssuchasmissedsurveillancesshouldnotbereported.WebelievethataconformingresponsetoourMay14,1996,letterwillsupersedeNUREG-1022,Revision1,whichisaguidancedocument,andallowusnottoreportmissedsurveillancesforoperableequipmentinthefuture.Thiseventhasinnowayaffectedthepublic'shealthandsafety.VerrulyyourRobertC.MecredyAttachments:1.LER1998-0042.LetterdatedMay14,1996xc:U.S.NuclearRegulatoryCommissionMr.GuyS.Vissing(MailStop14C7)ProjectDirectorateI-1Washington,D.C.20555U.S.NuclearRegulatoryCommissionRegionI475AllendaleRoadKingofPrussia,PA19406U.S.NRCGinnaSeniorResidentInspector t,  
t,}}
}}

Latest revision as of 09:12, 4 February 2020

Forwards LER 98-004-00 Re Improperly Performed Surveillance Due to Procedure non-adherence.Licensee Does Not Agree That, for Equipment Item That Is Otherwise Known to Be Operable, Reporting of Missed Surveillance Should Be Required
ML17265A490
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/17/1998
From: Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17265A491 List:
References
NUDOCS 9812240091
Download: ML17265A490 (5)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9812240091 DOC.DATE: 98/12/17 . NOTARIZED: NO - DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH. NAM i AUTHOR AFFILIATION MECREDY,R.C. Rochester Gas & Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards LER 98-004-00 re improperly performed surveillance due to procedure non-adherence. Licensee does not agree that, for equipment item that is otherwise known to be operable, A

-reporting of missed surveillance'hould be required.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR I ENCL I SIZE: Zr $

TITLE: 50.73/50.9 Licensee Event Report (LER), Incident Rpt, etc. E NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72) . 05000244 Q

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD1-1 PD 1 1 VZSSING,G. 1 1 INTERNAL: AEOD/SPD 2 2 AEOD/SPD/RRAB 1 1 CE E 1 1 NRR/DE/ECGB 1 1 NRR/DE/EELB 1 1 NRR/DE/EMEB 1 1 NRR/DRCH/HICB 1 1 NRR/DRCH/HOHB 1 1 NRR/DRCH/HQMB 1 1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 RES/DET/EIB 1 1 RGN1 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE,J H 1 1 NOAC POORE,W. 1 1 NOAC QUEENER,DS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1

%epee P A s NTS

"-I - "c thy C

N

% 'Dt 1I

'0 S " M'J

'hl

-'CUR JA~

~

C.. ORGA 4 ZA EON RSMOV ~ "RCM t g t Is+ 1 I 0 ~ 'rt I.STRT U ON L FULL TEXT CONVERSION REQUIRED warrior

AND 14649-000I AREA CODE 716 5'.2700 ROCHESTER GAS AND EIECTRIC CORPORATION ~ B9 EASTAVENUE, ROCHESTER, N. Y ROBERT C. MECREDY Vice President Nvcteor Operations December 17, 1998 U.S. Nuclear Regulatory Commission

~

Document Control Desk Attn:Guy 'S. Vissing Project Directorate I-1 Washington, D.C. 20555

Subject:

LER 1998-004, Improperly Performed Surveillance, Due to Procedure Non-Adherence, Resulted in Condition Prohibited by Technical Specifications R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Vissing:

In accordance with 10 CFR 50.73, Licensee Event Report System, item (a) (2) (i) (B), which requires a report of, "Any operation or condition prohibited by the plant's Technical Specifications",

the attached Licensee Event Report LER 1998-004 is hereby submitted.

Although we are submitting this LER in accordance with the guidance provided in NUREG-1022, Revision 1, we do not agree that, for an equipment item that is otherwise known to be be operable, the reporting of a missed surveillance should required. The Ginna Station Technical Specifications Bases for Surveillance Requirement 3.0.3 allows the plant to defer declaring equipment inoperable for up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> for a missed surveillance. No Limiting Condition for Operation (LCO) is entered and no equipment is declared inoperable, surveillance test proves that the equipment is operable. Since if the resultant there is no operation or condition prohibited by the Technical Specifications, 10 CFR 50.72 and 10 CFR 50.73 do 'not apply, and no report should be made.

/f~ P 98i224009i 98i21T PDR ADOCK 05000244 PDR .'

The philosophy behind the Ginna Station Technical Specifications and Bases were presented to the NRC in a letter from RG&E (Mecredy) to NRC, dated May 14, 1996, which is attached. RG&E has never received a formal response to this letter, and hereby requests such a response. We note that the advanced notice of ProPosed rulemaking (ANPR) for 10 CFR 50.72 and 10 CFR 50.73, dated July 23, 1998, indicates that singular events such as missed surveillances should not be reported. We believe that a conforming response to our May 14, 1996, letter will supersede NUREG-1022, Revision 1, which is a guidance document, and allow us not to report missed surveillances for operable equipment in the future.

This event has in no way affected the public's health and safety.

Ver ruly your Robert C. Mecredy Attachments: 1. LER 1998-004

2. Letter dated May 14, 1996 xc: U.S. Nuclear Regulatory Commission Mr. Guy S. Vissing (Mail Stop 14C7)

Project Directorate I-1 Washington, D.C. 20555 U.S. Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406 U.S. NRC Ginna Senior Resident Inspector

t,