ML111250572: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML111250572
| number = ML111250572
| issue date = 04/22/2011
| issue date = 04/22/2011
| title = Palo Verde, Units 1, 2 and 3, Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2010
| title = Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2010
| author name = Weber T N
| author name = Weber T
| author affiliation = Arizona Public Service Co
| author affiliation = Arizona Public Service Co
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 22
| page count = 22
}}
}}
=Text=
{{#Wiki_filter:10 CFR 50.46(a)(3)(ii)
LA M                              A subsidiaryof Pinnacle West Capital Corporation Thomas N. Weber                                              Mail Station 7636 Palo Verde Nuclear              Department Leader        Tel. 623-393-5764                  PO Box 52034 Generating Station              Regulatory Affairs        Fax 623-393-5442                    Phoenix, Arizona 85072-2034 102-06347-TNW/RKR April 22, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
==Dear Sirs:==
==Subject:==
Palo Verde Nuclear Generating Station (PVNGS)
Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report For Calendar Year 2010 Pursuant to 10 CFR 50.46(a)(3)(ii), Arizona Public Service Company (APS) is providing a summary of the cumulative effects on calculated peak clad temperature (PCT) for PVNGS due to changes or errors in ECCS performance evaluation models. As described herein, there was one change that affected the PVNGS large break loss of coolant accident (LOCA) peak clad temperature (PCT) calculation by as much as 4 0F for Unit 3 in Calendar Year 2010. There were no changes that affected the PVNGS large break LOCA PCT calculation for Units 1 and 2. There were no known errors or changes that affected the small break LOCA PCT calculation. Additionally, because PCT is not calculated as part of the post LOCA long-term cooling (LTC) analysis, there are no changes or errors in the LTC models that affect PCT.
The enclosures provide a more detailed discussion of the changes and errors associated with the large break LOCA analysis and the changes and errors in Westinghouse (formerly Combustion Engineering) models for Pressurized Water Reactors (PWRs) ECCS performance analysis in calendar year 2010.
A member of the STARS    (Strategic Teaming and Resource          Sharing) Alliance Callaway
* Comanche Peak
* Diablo Canyon
* Palo Verde
* San Onofre
* South Texas    - Wolf Creek
ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report Page 2 No commitments are being made to the NRC by this letter.
Should you need further information regarding this submittal, please contact Russell A.
Stroud, Licensing Section Leader, at (623) 393-5111.
Sincerely, TNW/RAS/RKR/gat Enclosures    1. Summary of Cumulative Effects on Calculated Peak Clad Temperature (PCT) for PVNGS Due to Changes/Errors in ECCS Performance Evaluation Models
: 2. Westinghouse Electric Company Letter, "Palo Verde Nuclear Generating Station Units 1, 2, and 3 10 CFR 50.46 Annual Notification and Reporting for 2010," letter number LTR-LAM-1 1-3, dated January 19, 2011
: 3. Westinghouse Electric Company Letter, "10 CFR 50.46 Report for the Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16," letter number LTR-LAM-10-63, dated April 30, 2010 cc:    E. E. Collins Jr. NRC    Region IV Regional Administrator L. K. Gibson        NRC    NRR Project Manager for PVNGS J. R. Hall          NRC    NRR Senior Project Manager M. A. Brown          NRC    Senior Resident Inspector for PVNGS
ENCLOSURE I Summary of Cumulative Effects on Calculated Peak Clad Temperature (PCT) for PVNGS Due to Changes/Errors in ECCS Performance Evaluation Models
Table 1: Large Break LOCA Margin Summary Sheet for 2010 Plant Name:            Palo Verde Nuclear Generating Station Units 1, 2, and 3 Utility Name:          Arizona Public Service Company Evaluation Model:      Westinghouse (formerly Combustion Engineering) 1999 EM Peak Clad Temperature:        2110 0 F (Analysis-of-Record reported in PVNGS UFSAR Section 6.3)
Net              Absolute PCT                  PCT Effect              Effect A. Cumulative 10 CFR 50.46 Changes and          APCT =        + 40 F    + 40 F (Unit 1 Only)
Error Corrections - Previously                          (Unit 1 Only)
Reported(a)
B. 10 CFR 50.46 Changes and Error Corrections - New for CY 2010
: 1. Plant Modification; Insertion of 8        APCT =        + 40 F    + 40 F (Unit 3 Only)
NGF Lead Use Assemblies (LUAs)                      (Unit 3 Only)
Into PVNGS Unit 3 Core C. Absolute Sum of Cumulative 10 CFR            APCT =                      + 40 F  (Unit 1) 50.46 Changes and Error Corrections                                      + 0°F  (Unit 2)
                                                                                + 40 F  (Unit 3)
D. Licensing Basis PCT (Reported in                                        2110 0 F (Unit 1)
UFSAR) + Cumulative PCT                                                  2106°F (Unit 2)
Assessments (Changes and Error                                          211 00 F (Unit 3)
Corrections)
Note: (a) PVNGS reanalyzed the Large Break LOCA event with an NRC approved Evaluation Model in 2009, as reported in Letter No. 102-06113 "30-Day Report Pursuant to 10 CFR 50.46(a)(3)(ii) and Submittal of Large Break Loss of Coolant Accident Reanalysis Results," dated December 22, 2009 (NRC ADAMS Accession No. MLI100040066). The reanalysis incorporated and corrected previously identified changes and errors, resetting the cumulative changes and error corrections that had previously been reported through the end of CY 2008 (NRC ADAMS Accession No. ML091810703).
The sum of the PCT from the most recent Analysis-of-Record (AOR) using an acceptable evaluation model, and the estimated cumulative effects of PCT impacts for changes and error corrections made since that AOR, remains less than 2200 0 F.
Table 2: Small Break LOCA Margin Summary Sheet for 2010 Plant Name: Palo Verde Nuclear Generating Station Units 1, 2, and 3 Utility Name: Arizona Public Service Company Evaluation Model: Westinghouse (formerly Combustion Engineering) S2M Peak Clad Temperature: 1618°F (Analysis-of-Record reported in PVNGS UFSAR Section 6.3)
Net        Absolute PCT            PCT Effect        Effect A. Cumulative 10 CFR 50.46 Changes and        APCT =      + 0°F          + 0°F Error Corrections - Previously Reported B. 10 CFR 50.46 Changes and Error Corrections - New for CY 2010
: 1. None Identified                      APCT =      + 00 F        + 0°F C. Absolute Sum of Cumulative 10 CFR 50.46    APCT =                      + 00 F Changes and Error Corrections D. Licensing Basis PCT (Reported in UFSAR)                              1618°F
        + Cumulative PCT Assessments (Changes and Error Corrections)
The sum of the PCT from the most recent Analysis-of-Record (AOR) using an acceptable evaluation model, and the estimated cumulative effects of PCT impacts for changes and error corrections made since that AOR, remains less than 2200 0 F.
ENCLOSURE 2 Westinghouse Electric Company Letter, "Palo Verde Nuclear Generating Station Units 1, 2, and 3 10 CFR 50.46 Annual Notification and Reporting for 2010," letter number LTR-LAM-11-3, dated January 19, 2011
Westinghouse Non-Proprietary Class 3 O Westinghouse Westinghouse Electric Company Nuclear Services 20 International Drive Windsor, Connecticut 06095 USA Direct tel: (860) 731-6734 Directfax: (860) 731-1196 e-mail: maguiraj@westinghouse.com Our ref: LTR-LAM-1 1-3 Page 1 of 11 January 19, 2011 Palo Verde Nuclear Generating Station Unit 1, 2 and 3 10 CFR 50.46 Annual Notification and Reporting for 2010
==Dear Sir or Madam:==
This letter provides 10 CFR 50.46 reporting information pertaining to the Westinghouse Electric Company Emergency Core Cooling System (ECCS) performance Evaluation Models (EMs) and their application to your plant(s) for calendar year 2010.
There were no changes, error corrections or enhancements to the 1999 Evaluation Model (EM), which is the EM used in your plant's Large Break Loss-of-Coolant Accident (LBLOCA) ECCS performance analysis in calendar year 2010. In addition, there were no 2010 changes, error corrections or enhancements to the Supplement 2 Evaluation Model (S2M), which is the EM used in your plant's Small Break Loss-of-Coolant Accident (SBLOCA) ECCS performance analysis.
The Peak Cladding Temperature (PCT) Rackup sheets along with your plant specific evaluation text are enclosed in the Attachment. The rackup sheets, which were obtained from the Westinghouse 10 CFR 50.46 Rackup eRoom, identify the PCTs of the ECCS performance Analyses of Record (AORs) for your plant(s) and the PCT assessments associated with the AORs through the end of calendar year 2010.
This letter is provided for your use in making a determination relative to the reporting requirements of 10 CFR 50.46. The information provided in this letter was prepared in accordance with Westinghouse's Quality Management System (QMS).
Author:        (Electronically Approved)*                                    Verifier:    (Electronically Approved)*
A. J. Maguire                                                              D. W. Atkins LOCA Analysis & Methods                                                    LOCA Analysis & Methods Verifier:      (Electronically Approved)*                                    Approved: (Electronically Approved)*
E. F. Jageler                                                              D.W. Atkins for J. Ghergurovich LOCA Analysis & Methods                                                    Manager, LOCA Analysis & Methods Attachment
              *Electronicallyapprovedrecords are authenticatedin the electronic document management system.
                                        © 2011 Westinghouse Electric Company LLC All Rights Reserved
Attachment to LTR-LAM-1 1-3                                                          January 19, 2011 Evaluation of the Implementation of NGF LUAS for PVNGS Unit 3 Cycle 16 Discretionary Change
===Background===
An ECCS performance analysis was performed to evaluate the impact of the implementation of up to eight (8) NGF LUAs for Palo Verde Unit 3 Cycle 16. The impact was assessed for Peak Cladding Temperature (PCT) results on Large and Small Break Loss-of-Coolant Accident (LBLOCA & SBLOCA)
Analyses.
This is considered a 'Discretionary Change' since the implementation of the NGF LUAs is being performed at APS's discretion and not performed to correct an outstanding error.
Affected Evaluation Model(s) 1999EM Large Break Evaluation Model with CEFLASH-4A S2M Small Break LOCA Evaluation Model with CEFLASH-4AS Estimated Effect The impact of the implementation of up to eight (8) NGF LUAs into the Palo Verde Unit 3 Cycle 16 core results in a 4°F increase in PCT for LBLOCA and no impact for SBLOCA.
Reference(s)
: 1. WCAP-17188-P, Revision 1, "Palo Verde NGF LUA Engineering Report," April 2010.
Attachment to LTR-LAM-1 1-3                                                                                            January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name:              Palo Verde Nuclear Generating Station Unit 1 Utility Name:            Arizona Public Service Revision Date:            1/4/2011 Analysis Information EM:            1999 EM                      Analysis Date:      8/31/2009              Limiting Break Size:        0.6 DEG/PD Fuel:          16x16 System 80              SGTP (%):          10 PLHGR (kW/ft):      13.1 Notes:          1. Plant Configuration: Rated Core Power =      3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x 16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (OF)            Ref. Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                2106        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS 1 None                                                                                          0 B. PLANNED PLANT MODIFICATION EVALUATIONS I . Evaluation for the Insertion of 8 AREVA LTAs into Palo Verde                                4      2 C. 2010 ECCS MODEL ASSESSMENTS I None                                                                                          0 D. OTHER*
1 None                                                                                          0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT =          2110
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference I CVER-09-62, "Analyis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.
2  . LTR-OA-08-106, "10 CFR 50.46 Report for PVNGS Units 1, 2, and 3 for an Evaluation for the Insertion of 8 AREVA LTAs and the Correction of an Error in the Steam Generator Economizer Input," December 2008.
Notes None
Attachment to LTR-LAM-1 1-3                                                                                            January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name:              Palo Verde Nuclear Generating Station Unit 1 Utility Name:            Arizona Public Service Revision Date:            1/4/2011 Analysis Information EM:            S2M                          Analysis Date:        3/22/2002              Limiting Break Size:        0.05 sq fi/PD Fuel:          16x16 System 80            SGTP (%):            10 PLHGR (kW/ft):        13.5 Notes:          1. Plant Configuration: Rated Core Power =      3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (IF)          Ref.      Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                1618        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS 1 None                                                                                          0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation for the Insertion of 8 AREVA LTAs Into Palo Verde                                  0      2 2 . Evaluation of the Simplified Head Assembly                                                  0      3 C. 2010 ECCS MODEL ASSESSMENTS I None D. OTHER*
I None                                                                                          0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT =          1618
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference I    A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2 and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.
2  . LTR-OA-08-106, "10 CFR 50.46 Report for PVNGS Units 1, 2, and 3 for an Evaluation for the Insertion of 8 AREVA LTAs and the Correction of an Error in the Steam Generator Economizer Input," December 2008.
3  . CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1,2, and 3 ECCS Performance,"
April 2009.
Notes None
Attachment to LTR-LAM-1 1-3                                                                                            January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name:              Palo Verde Nuclear Generating Station Unit 2 Utility Name:            Arizona Public Service Revision Date:          1/4/2011 Analysis Information EM:            1999 EM                    Analysis Date:        8/31/2009              Limiting Break Size:        0.6 DEG/PD Fuel:          16x16 System 80            SGTP (%):              10 PLHGR (kW/ft): 13.1 Notes:          1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
0 Clad Temp ( F)            Ref. Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                2106        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS I None                                                                                          0 B. PLANNED PLANT MODIFICATION EVALUATIONS I None                                                                                          0 C. 2010 ECCS MODEL ASSESSMENTS I None                                                                                          0 D. OTHER*
I None                                                                                          0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT =          2106
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference
* CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.
Notes None
Attachment to LTR-LAM-1 1-3                                                                                              January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name:              Palo Verde Nuclear Generating Station Unit 2 Utility Name:            Arizona Public Service Revision Date:            1/4/2011 Analysis Information EM:            S2M                          Analysis Date:        3/22/2002              Limiting Break Size:        0.05 sq ft/PD Fuel:          16x 16 System 80            SGTP (%):            10 PLHGR (kW/ft): 13.5 Notes:          1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (IF)            Ref.      Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                1618        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS I None                                                                                          0 B. PLANNED PLANT MODIFICATION EVALUATIONS I . Evaluation of the Simplified Head Assembly                                                  0        2 C. 2010 ECCS MODEL ASSESSMENTS I None                                                                                          0 D. OTHER*
I  None                                                                                        0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT =          1618
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference I    A-PV-FE-0149, Rev. 001, "Palo Verde Units 1,2 and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.
2  . CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1,2, and 3 ECCS Performance,"
April 2009.
Notes None
Attachment to LTR-LAM-1 1-3                                                                                            January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name:              Palo Verde Nuclear Generating Station Unit 3 Utility Name:            Arizona Public Service Revision Date:          1/4/2011 Analysis Information EM:            1999 EM                    Analysis Date:        8/31/2009              Limiting Break Size:        0.6 DEG/PD Fuel:          16x16 System 80            SGTP (%):              10 PLHGR (kW/ft):        13.1 Notes:          1. Plant Configuration: Rated Core Power =      3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x 16 System 80 with ZIRLO TM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (IF)          Ref. Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                2106        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS 1  None                                                                                        0 B. PLANNED PLANT MODIFICATION EVALUATIONS I None                                                                                          0 C. 2010 ECCS MODEL ASSESSMENTS I None D. OTHER*
I None                                                                                          0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT =          2106
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference I . CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.
Notes None
Attachment to LTR-LAM-1 1-3                                                                                            January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name:              Palo Verde Nuclear Generating Station Unit 3 Utility Name:            Arizona Public Service Revision Date:            1/4/2011 Analysis Information EM:            S2M                          Analysis Date:      3/22/2002              Limiting Break Size:        0.05 sq ft/PD Fuel:          16x16 System 80            SGTP (%):            10 PLHGR (kW/ft): 13.5 Notes:          1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (IF)          Ref.      Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                1618        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS I None                                                                                          0 B. PLANNED PLANT MODIFICATION EVALUATIONS I . Evaluation of the Simplified Head Assembly                                                  o      2 C. 2010 ECCS MODEL ASSESSMENTS I None                                                                                          0 D. OTHER*
I  None                                                                                        0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT =          1618
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference I    A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2 and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.
2  . CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1,2, and 3 ECCS Performance,"
April 2009.
Notes None
Attachment to LTR-LAM-1 1-3                                                                                            January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name:              Palo Verde Nuclear Generating Station Unit 3                                                Cycle 16 Utility Name:            Arizona Public Service Revision Date:          1/4/2011 Analysis Information EM:            1999 EM                    Analysis Date:        8/31/2009              Limiting Break Size:        0.6 DEG/PD Fuel:          16x 16 System 80          SGTP (%):              10 PLHGR (kW/ft):        13.1 Notes:          1. Plant Configuration: Rated Core Power =      3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (OF)            Ref. Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                2106        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS I None                                                                                          0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation for the insertion of up to 8 NGF LUAs                                              4      2 C. 2010 ECCS MODEL ASSESSMENTS I None                                                                                          0 D. OTHER*
I None                                                                                          0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT =          2110
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference I CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.
2 . WCAP-17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.
Notes None
Attachment to LTR-LAM-1 1-3                                                                                            January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name:              Palo Verde Nuclear Generating Station Unit 3                                                C ycle 16 Utility Name:            Arizona Public Service Revision Date:            1/4/2011 Analysis Information EM:            S2M                          Analysis Date:        3/22/2002            Limiting Break Size:        0.05 sq ft/PD Fuel:          16x 16 System 80            SGTP (%):              10 PLHGR (kW/ft): 13.5 Notes:          1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x 16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (OF)            Ref.      Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                1618        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS I None                                                                                          0 B. PLANNED PLANT MODIFICATION EVALUATIONS I  Evaluation of the Simplified Head Assembly                                                  0        2 2  . Evaluation for the insertion of up to 8 NGF LUAs                                            0        3 C. 2010 ECCS MODEL ASSESSMENTS I None                                                                                          0 D. OTHER*
I None                                                                                          0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                    PCT=          1618
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
Reference I A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2, and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.
2 CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1, 2, and 3 ECCS Performance,"
April 2009.
3    WCAP- 17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.
Notes None
Attachment to LTR-LAM-1 1-3                                              January 19, 2011 RACKUP eRoom Check:
EMs applicable to Palo Verde Nuclear Generating Station Unit 1, 2 and 3:
Appendix K Small Break - S2M Appendix K Large Break - 1999 EM 2010 Issues Transmittal Letter      Issue Description LTR-LAM-10-63            Implementation of NGF LUAs for Unit 3 Cycle 16
ENCLOSURE 3 Westinghouse Electric Company Letter, "10 CFR 50.46 Report for the Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16," letter number LTR-LAM-10-63, dated April 30, 2010
Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company Nuclear Services
* Westinghouse                                                                      20 International Drive Windsor, Connecticut 06095 USA Directtel: (860) 731-6426 Directfax: (860) 731-6439 e-mail: atkinsdw@westinghouse.com Our ref: LTR-LAM-10-63 April 30, 2010 10 CFR 50.46 Report for the Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16
==Dear Sir or Madam:==
The attachment documents the 10 CFR 50.46 report and applicable PCT Rackup Sheets for the evaluation of the Implementation of Next Generation Fuel (NGF) Lead Use Assemblies (LUAs) for PVNGS Unit 3 Cycle 16. Please contact your LOCA Plant Cognizant Engineer (PCE) if there are any questions concerning this information.
Author/PCE: (Electronically Approved)*
D. W. Atkins LOCA Analysis & Methods Verifier:      (Electronically Approved)*
E. F. Jageler LOCA Analysis & Methods Approver:      (Electronically Approved)*
J. Ghergurovich Product Manager LOCA Analysis & Methods The Attachment is provided on the following pages.
            *Electronicallyapproved records are authenticatedin the electronic document management system.
                                      © 2010 Westinghouse Electric Company LLC All Rights Reserved
Attachment to LTR-LAM-10-63                                                      April 30, 2010 Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16 (Discretionary Change)
===Background===
An ECCS performance analysis was performed to evaluate the impact of the implementation of up to eight (8) NGF LUAs for Palo Verde Unit 3 Cycle 16. The impact was assessed for Peak Cladding Temperature (PCT) results on Large and Small Break Loss-of-Coolant Accident (LBLOCA & SBLOCA) Analyses.
This is considered a 'Discretionary Change' since the implementation of the NGF LUAs is being performed at APS's discretion and not performed to correct an outstanding error.
Affected Evaluation Models 1999EM Large Break Evaluation Model with CEFLASH-4A S2M Small Break LOCA Evaluation Model with CEFLASH-4AS Estimated Effect The impact of the implementation of up to eight (8) NGF LUAs into the Palo Verde Unit 3 Cycle 16 core results in a 40F increase in PCT for LBLOCA and no impact for SBLOCA.
Reference
: 1. WCAP-17188-P, Revision 1, "Palo Verde NGF LUA Engineering Report," April 2010.
Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name:              Palo Verde Nuclear Generating Station Unit 3                                                C ycle 16 Utility Name:            Arizona Public Service Revision Date:          4/1/10 Analysis Information EM:              1999 EM                    Analysis Date:        8/31/09                Limiting Break Size:        0.6 DEG/PD Fuel:            16x 16 System 80          SGTP (%):              10 PLHGR (kW/ft): 13.1 Notes:          1.Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (IF)          Ref. Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                2106        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
: 1. None                                                                                        0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation for the insertion of up to 8 NGF LUAs                                              4        2 C. 2009 ECCS MODEL ASSESSMENTS
: 1. None                                                                                        0 D. OTHER*
: 1. None                                                                                      0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                    PCT -        2110
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
==References:==
: 1. CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.
2 . WCAP-17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.
Notes:
None
Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name:              Palo Verde Nuclear Generating Station Unit 3                                              C ycle 16 Utility Name:            Arizona Public Service Revision Date:          4/1/10 Analysis Information EM:            S2M                          Analysis Date:        3/22/02              Limiting Break Size:        0.05 sq fl/PD Fuel:          16x16 System 80              SGTP (%):            10 PLHGR (kW/ft): 13.5 Notes:          1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.
: 2. Fuel Design: 16x 16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.
Clad Temp (IF)          Ref.      Notes LICENSING BASIS Analysis-Of-Record PCT                                                                                1618        1 PCT ASSESSMENTS (Delta PCT)
A. PRIOR ECCS MODEL ASSESSMENTS
: 1. None                                                                                      0 B. PLANNED PLANT MODIFICATION EVALUATIONS I    Evaluation of the Simplified Head Assembly                                                0        2 2  . Evaluation for the insertion of up to 8 NGF LUAs                                          0        3 C. 2009 ECCS MODEL ASSESSMENTS I    None                                                                                      0 D. OTHER*
: 1. None                                                                                      0 LICENSING BASIS PCT + PCT ASSESSMENTS                                                  PCT    =      1618
* It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.
==References:==
I    A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2, and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.
2    CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1, 2, and 3 ECCS Performance,"
April 2009.
3    WCAP-17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.
Notes:
None}}

Latest revision as of 01:06, 13 November 2019

Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report for Calendar Year 2010
ML111250572
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 04/22/2011
From: Weber T
Arizona Public Service Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
102-06347-TNW/RKR
Download: ML111250572 (22)


Text

10 CFR 50.46(a)(3)(ii)

LA M A subsidiaryof Pinnacle West Capital Corporation Thomas N. Weber Mail Station 7636 Palo Verde Nuclear Department Leader Tel. 623-393-5764 PO Box 52034 Generating Station Regulatory Affairs Fax 623-393-5442 Phoenix, Arizona 85072-2034 102-06347-TNW/RKR April 22, 2011 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units 1, 2, and 3 Docket Nos. STN 50-528/529/530 Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report For Calendar Year 2010 Pursuant to 10 CFR 50.46(a)(3)(ii), Arizona Public Service Company (APS) is providing a summary of the cumulative effects on calculated peak clad temperature (PCT) for PVNGS due to changes or errors in ECCS performance evaluation models. As described herein, there was one change that affected the PVNGS large break loss of coolant accident (LOCA) peak clad temperature (PCT) calculation by as much as 4 0F for Unit 3 in Calendar Year 2010. There were no changes that affected the PVNGS large break LOCA PCT calculation for Units 1 and 2. There were no known errors or changes that affected the small break LOCA PCT calculation. Additionally, because PCT is not calculated as part of the post LOCA long-term cooling (LTC) analysis, there are no changes or errors in the LTC models that affect PCT.

The enclosures provide a more detailed discussion of the changes and errors associated with the large break LOCA analysis and the changes and errors in Westinghouse (formerly Combustion Engineering) models for Pressurized Water Reactors (PWRs) ECCS performance analysis in calendar year 2010.

A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway

  • Comanche Peak
  • Diablo Canyon
  • Palo Verde
  • San Onofre

ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Emergency Core Cooling System (ECCS) Performance Evaluation Models, 10 CFR 50.46(a)(3)(ii) Annual Report Page 2 No commitments are being made to the NRC by this letter.

Should you need further information regarding this submittal, please contact Russell A.

Stroud, Licensing Section Leader, at (623) 393-5111.

Sincerely, TNW/RAS/RKR/gat Enclosures 1. Summary of Cumulative Effects on Calculated Peak Clad Temperature (PCT) for PVNGS Due to Changes/Errors in ECCS Performance Evaluation Models

2. Westinghouse Electric Company Letter, "Palo Verde Nuclear Generating Station Units 1, 2, and 3 10 CFR 50.46 Annual Notification and Reporting for 2010," letter number LTR-LAM-1 1-3, dated January 19, 2011
3. Westinghouse Electric Company Letter, "10 CFR 50.46 Report for the Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16," letter number LTR-LAM-10-63, dated April 30, 2010 cc: E. E. Collins Jr. NRC Region IV Regional Administrator L. K. Gibson NRC NRR Project Manager for PVNGS J. R. Hall NRC NRR Senior Project Manager M. A. Brown NRC Senior Resident Inspector for PVNGS

ENCLOSURE I Summary of Cumulative Effects on Calculated Peak Clad Temperature (PCT) for PVNGS Due to Changes/Errors in ECCS Performance Evaluation Models

Table 1: Large Break LOCA Margin Summary Sheet for 2010 Plant Name: Palo Verde Nuclear Generating Station Units 1, 2, and 3 Utility Name: Arizona Public Service Company Evaluation Model: Westinghouse (formerly Combustion Engineering) 1999 EM Peak Clad Temperature: 2110 0 F (Analysis-of-Record reported in PVNGS UFSAR Section 6.3)

Net Absolute PCT PCT Effect Effect A. Cumulative 10 CFR 50.46 Changes and APCT = + 40 F + 40 F (Unit 1 Only)

Error Corrections - Previously (Unit 1 Only)

Reported(a)

B. 10 CFR 50.46 Changes and Error Corrections - New for CY 2010

1. Plant Modification; Insertion of 8 APCT = + 40 F + 40 F (Unit 3 Only)

NGF Lead Use Assemblies (LUAs) (Unit 3 Only)

Into PVNGS Unit 3 Core C. Absolute Sum of Cumulative 10 CFR APCT = + 40 F (Unit 1) 50.46 Changes and Error Corrections + 0°F (Unit 2)

+ 40 F (Unit 3)

D. Licensing Basis PCT (Reported in 2110 0 F (Unit 1)

UFSAR) + Cumulative PCT 2106°F (Unit 2)

Assessments (Changes and Error 211 00 F (Unit 3)

Corrections)

Note: (a) PVNGS reanalyzed the Large Break LOCA event with an NRC approved Evaluation Model in 2009, as reported in Letter No. 102-06113 "30-Day Report Pursuant to 10 CFR 50.46(a)(3)(ii) and Submittal of Large Break Loss of Coolant Accident Reanalysis Results," dated December 22, 2009 (NRC ADAMS Accession No. MLI100040066). The reanalysis incorporated and corrected previously identified changes and errors, resetting the cumulative changes and error corrections that had previously been reported through the end of CY 2008 (NRC ADAMS Accession No. ML091810703).

The sum of the PCT from the most recent Analysis-of-Record (AOR) using an acceptable evaluation model, and the estimated cumulative effects of PCT impacts for changes and error corrections made since that AOR, remains less than 2200 0 F.

Table 2: Small Break LOCA Margin Summary Sheet for 2010 Plant Name: Palo Verde Nuclear Generating Station Units 1, 2, and 3 Utility Name: Arizona Public Service Company Evaluation Model: Westinghouse (formerly Combustion Engineering) S2M Peak Clad Temperature: 1618°F (Analysis-of-Record reported in PVNGS UFSAR Section 6.3)

Net Absolute PCT PCT Effect Effect A. Cumulative 10 CFR 50.46 Changes and APCT = + 0°F + 0°F Error Corrections - Previously Reported B. 10 CFR 50.46 Changes and Error Corrections - New for CY 2010

1. None Identified APCT = + 00 F + 0°F C. Absolute Sum of Cumulative 10 CFR 50.46 APCT = + 00 F Changes and Error Corrections D. Licensing Basis PCT (Reported in UFSAR) 1618°F

+ Cumulative PCT Assessments (Changes and Error Corrections)

The sum of the PCT from the most recent Analysis-of-Record (AOR) using an acceptable evaluation model, and the estimated cumulative effects of PCT impacts for changes and error corrections made since that AOR, remains less than 2200 0 F.

ENCLOSURE 2 Westinghouse Electric Company Letter, "Palo Verde Nuclear Generating Station Units 1, 2, and 3 10 CFR 50.46 Annual Notification and Reporting for 2010," letter number LTR-LAM-11-3, dated January 19, 2011

Westinghouse Non-Proprietary Class 3 O Westinghouse Westinghouse Electric Company Nuclear Services 20 International Drive Windsor, Connecticut 06095 USA Direct tel: (860) 731-6734 Directfax: (860) 731-1196 e-mail: maguiraj@westinghouse.com Our ref: LTR-LAM-1 1-3 Page 1 of 11 January 19, 2011 Palo Verde Nuclear Generating Station Unit 1, 2 and 3 10 CFR 50.46 Annual Notification and Reporting for 2010

Dear Sir or Madam:

This letter provides 10 CFR 50.46 reporting information pertaining to the Westinghouse Electric Company Emergency Core Cooling System (ECCS) performance Evaluation Models (EMs) and their application to your plant(s) for calendar year 2010.

There were no changes, error corrections or enhancements to the 1999 Evaluation Model (EM), which is the EM used in your plant's Large Break Loss-of-Coolant Accident (LBLOCA) ECCS performance analysis in calendar year 2010. In addition, there were no 2010 changes, error corrections or enhancements to the Supplement 2 Evaluation Model (S2M), which is the EM used in your plant's Small Break Loss-of-Coolant Accident (SBLOCA) ECCS performance analysis.

The Peak Cladding Temperature (PCT) Rackup sheets along with your plant specific evaluation text are enclosed in the Attachment. The rackup sheets, which were obtained from the Westinghouse 10 CFR 50.46 Rackup eRoom, identify the PCTs of the ECCS performance Analyses of Record (AORs) for your plant(s) and the PCT assessments associated with the AORs through the end of calendar year 2010.

This letter is provided for your use in making a determination relative to the reporting requirements of 10 CFR 50.46. The information provided in this letter was prepared in accordance with Westinghouse's Quality Management System (QMS).

Author: (Electronically Approved)* Verifier: (Electronically Approved)*

A. J. Maguire D. W. Atkins LOCA Analysis & Methods LOCA Analysis & Methods Verifier: (Electronically Approved)* Approved: (Electronically Approved)*

E. F. Jageler D.W. Atkins for J. Ghergurovich LOCA Analysis & Methods Manager, LOCA Analysis & Methods Attachment

  • Electronicallyapprovedrecords are authenticatedin the electronic document management system.

© 2011 Westinghouse Electric Company LLC All Rights Reserved

Attachment to LTR-LAM-1 1-3 January 19, 2011 Evaluation of the Implementation of NGF LUAS for PVNGS Unit 3 Cycle 16 Discretionary Change

Background

An ECCS performance analysis was performed to evaluate the impact of the implementation of up to eight (8) NGF LUAs for Palo Verde Unit 3 Cycle 16. The impact was assessed for Peak Cladding Temperature (PCT) results on Large and Small Break Loss-of-Coolant Accident (LBLOCA & SBLOCA)

Analyses.

This is considered a 'Discretionary Change' since the implementation of the NGF LUAs is being performed at APS's discretion and not performed to correct an outstanding error.

Affected Evaluation Model(s) 1999EM Large Break Evaluation Model with CEFLASH-4A S2M Small Break LOCA Evaluation Model with CEFLASH-4AS Estimated Effect The impact of the implementation of up to eight (8) NGF LUAs into the Palo Verde Unit 3 Cycle 16 core results in a 4°F increase in PCT for LBLOCA and no impact for SBLOCA.

Reference(s)

1. WCAP-17188-P, Revision 1, "Palo Verde NGF LUA Engineering Report," April 2010.

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name: Palo Verde Nuclear Generating Station Unit 1 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: 1999 EM Analysis Date: 8/31/2009 Limiting Break Size: 0.6 DEG/PD Fuel: 16x16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.1 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x 16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (OF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 2106 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS 1 None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I . Evaluation for the Insertion of 8 AREVA LTAs into Palo Verde 4 2 C. 2010 ECCS MODEL ASSESSMENTS I None 0 D. OTHER*

1 None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 2110

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference I CVER-09-62, "Analyis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.

2 . LTR-OA-08-106, "10 CFR 50.46 Report for PVNGS Units 1, 2, and 3 for an Evaluation for the Insertion of 8 AREVA LTAs and the Correction of an Error in the Steam Generator Economizer Input," December 2008.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: Palo Verde Nuclear Generating Station Unit 1 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: S2M Analysis Date: 3/22/2002 Limiting Break Size: 0.05 sq fi/PD Fuel: 16x16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.5 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (IF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1618 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS 1 None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation for the Insertion of 8 AREVA LTAs Into Palo Verde 0 2 2 . Evaluation of the Simplified Head Assembly 0 3 C. 2010 ECCS MODEL ASSESSMENTS I None D. OTHER*

I None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1618

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference I A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2 and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.

2 . LTR-OA-08-106, "10 CFR 50.46 Report for PVNGS Units 1, 2, and 3 for an Evaluation for the Insertion of 8 AREVA LTAs and the Correction of an Error in the Steam Generator Economizer Input," December 2008.

3 . CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1,2, and 3 ECCS Performance,"

April 2009.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name: Palo Verde Nuclear Generating Station Unit 2 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: 1999 EM Analysis Date: 8/31/2009 Limiting Break Size: 0.6 DEG/PD Fuel: 16x16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.1 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

0 Clad Temp ( F) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 2106 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS I None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I None 0 C. 2010 ECCS MODEL ASSESSMENTS I None 0 D. OTHER*

I None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 2106

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference

  • CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: Palo Verde Nuclear Generating Station Unit 2 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: S2M Analysis Date: 3/22/2002 Limiting Break Size: 0.05 sq ft/PD Fuel: 16x 16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.5 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (IF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1618 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS I None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I . Evaluation of the Simplified Head Assembly 0 2 C. 2010 ECCS MODEL ASSESSMENTS I None 0 D. OTHER*

I None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1618

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference I A-PV-FE-0149, Rev. 001, "Palo Verde Units 1,2 and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.

2 . CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1,2, and 3 ECCS Performance,"

April 2009.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name: Palo Verde Nuclear Generating Station Unit 3 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: 1999 EM Analysis Date: 8/31/2009 Limiting Break Size: 0.6 DEG/PD Fuel: 16x16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.1 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x 16 System 80 with ZIRLO TM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (IF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 2106 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS 1 None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I None 0 C. 2010 ECCS MODEL ASSESSMENTS I None D. OTHER*

I None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 2106

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference I . CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: Palo Verde Nuclear Generating Station Unit 3 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: S2M Analysis Date: 3/22/2002 Limiting Break Size: 0.05 sq ft/PD Fuel: 16x16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.5 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (IF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1618 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS I None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I . Evaluation of the Simplified Head Assembly o 2 C. 2010 ECCS MODEL ASSESSMENTS I None 0 D. OTHER*

I None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1618

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference I A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2 and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.

2 . CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1,2, and 3 ECCS Performance,"

April 2009.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name: Palo Verde Nuclear Generating Station Unit 3 Cycle 16 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: 1999 EM Analysis Date: 8/31/2009 Limiting Break Size: 0.6 DEG/PD Fuel: 16x 16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.1 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (OF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 2106 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS I None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation for the insertion of up to 8 NGF LUAs 4 2 C. 2010 ECCS MODEL ASSESSMENTS I None 0 D. OTHER*

I None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 2110

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference I CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.

2 . WCAP-17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: Palo Verde Nuclear Generating Station Unit 3 C ycle 16 Utility Name: Arizona Public Service Revision Date: 1/4/2011 Analysis Information EM: S2M Analysis Date: 3/22/2002 Limiting Break Size: 0.05 sq ft/PD Fuel: 16x 16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.5 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x 16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (OF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1618 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS I None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation of the Simplified Head Assembly 0 2 2 . Evaluation for the insertion of up to 8 NGF LUAs 0 3 C. 2010 ECCS MODEL ASSESSMENTS I None 0 D. OTHER*

I None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT= 1618

  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

Reference I A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2, and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.

2 CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1, 2, and 3 ECCS Performance,"

April 2009.

3 WCAP- 17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.

Notes None

Attachment to LTR-LAM-1 1-3 January 19, 2011 RACKUP eRoom Check:

EMs applicable to Palo Verde Nuclear Generating Station Unit 1, 2 and 3:

Appendix K Small Break - S2M Appendix K Large Break - 1999 EM 2010 Issues Transmittal Letter Issue Description LTR-LAM-10-63 Implementation of NGF LUAs for Unit 3 Cycle 16

ENCLOSURE 3 Westinghouse Electric Company Letter, "10 CFR 50.46 Report for the Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16," letter number LTR-LAM-10-63, dated April 30, 2010

Westinghouse Non-Proprietary Class 3 Westinghouse Electric Company Nuclear Services

  • Westinghouse 20 International Drive Windsor, Connecticut 06095 USA Directtel: (860) 731-6426 Directfax: (860) 731-6439 e-mail: atkinsdw@westinghouse.com Our ref: LTR-LAM-10-63 April 30, 2010 10 CFR 50.46 Report for the Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16

Dear Sir or Madam:

The attachment documents the 10 CFR 50.46 report and applicable PCT Rackup Sheets for the evaluation of the Implementation of Next Generation Fuel (NGF) Lead Use Assemblies (LUAs) for PVNGS Unit 3 Cycle 16. Please contact your LOCA Plant Cognizant Engineer (PCE) if there are any questions concerning this information.

Author/PCE: (Electronically Approved)*

D. W. Atkins LOCA Analysis & Methods Verifier: (Electronically Approved)*

E. F. Jageler LOCA Analysis & Methods Approver: (Electronically Approved)*

J. Ghergurovich Product Manager LOCA Analysis & Methods The Attachment is provided on the following pages.

  • Electronicallyapproved records are authenticatedin the electronic document management system.

© 2010 Westinghouse Electric Company LLC All Rights Reserved

Attachment to LTR-LAM-10-63 April 30, 2010 Evaluation of the Implementation of NGF LUAs for PVNGS Unit 3 Cycle 16 (Discretionary Change)

Background

An ECCS performance analysis was performed to evaluate the impact of the implementation of up to eight (8) NGF LUAs for Palo Verde Unit 3 Cycle 16. The impact was assessed for Peak Cladding Temperature (PCT) results on Large and Small Break Loss-of-Coolant Accident (LBLOCA & SBLOCA) Analyses.

This is considered a 'Discretionary Change' since the implementation of the NGF LUAs is being performed at APS's discretion and not performed to correct an outstanding error.

Affected Evaluation Models 1999EM Large Break Evaluation Model with CEFLASH-4A S2M Small Break LOCA Evaluation Model with CEFLASH-4AS Estimated Effect The impact of the implementation of up to eight (8) NGF LUAs into the Palo Verde Unit 3 Cycle 16 core results in a 40F increase in PCT for LBLOCA and no impact for SBLOCA.

Reference

1. WCAP-17188-P, Revision 1, "Palo Verde NGF LUA Engineering Report," April 2010.

Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Large Break Plant Name: Palo Verde Nuclear Generating Station Unit 3 C ycle 16 Utility Name: Arizona Public Service Revision Date: 4/1/10 Analysis Information EM: 1999 EM Analysis Date: 8/31/09 Limiting Break Size: 0.6 DEG/PD Fuel: 16x 16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.1 Notes: 1.Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (IF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 2106 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS

1. None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation for the insertion of up to 8 NGF LUAs 4 2 C. 2009 ECCS MODEL ASSESSMENTS
1. None 0 D. OTHER*
1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT - 2110
  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

References:

1. CVER-09-62, "Analysis of Record for Large Break LOCA ECCS Performance Analysis Including Replacement Steam Generators and Simplified Head Implementation for PVNGS Units 1, 2, and 3," August 2009.

2 . WCAP-17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.

Notes:

None

Westinghouse LOCA Peak Clad Temperature Summary for Appendix K Small Break Plant Name: Palo Verde Nuclear Generating Station Unit 3 C ycle 16 Utility Name: Arizona Public Service Revision Date: 4/1/10 Analysis Information EM: S2M Analysis Date: 3/22/02 Limiting Break Size: 0.05 sq fl/PD Fuel: 16x16 System 80 SGTP (%): 10 PLHGR (kW/ft): 13.5 Notes: 1. Plant Configuration: Rated Core Power = 3990 MWt, Replacement Steam Generators.

2. Fuel Design: 16x 16 System 80 with ZIRLOTM cladding, value-added pellets, and erbia burnable absorbers.

Clad Temp (IF) Ref. Notes LICENSING BASIS Analysis-Of-Record PCT 1618 1 PCT ASSESSMENTS (Delta PCT)

A. PRIOR ECCS MODEL ASSESSMENTS

1. None 0 B. PLANNED PLANT MODIFICATION EVALUATIONS I Evaluation of the Simplified Head Assembly 0 2 2 . Evaluation for the insertion of up to 8 NGF LUAs 0 3 C. 2009 ECCS MODEL ASSESSMENTS I None 0 D. OTHER*
1. None 0 LICENSING BASIS PCT + PCT ASSESSMENTS PCT = 1618
  • It is recommended that the licensee determine if these PCT allocations should be considered with respect to 10 CFR 50.46 reporting requirements.

References:

I A-PV-FE-0149, Rev. 001, "Palo Verde Units 1, 2, and 3 S2M Bounding SBLOCA ECCS Performance Analysis," March 2002.

2 CVER-09-25, "Interim Evaluation of the Effects of SHA Implementation on PVNGS Units 1, 2, and 3 ECCS Performance,"

April 2009.

3 WCAP-17188-P, Rev. 1, "Palo Verde NGF LUA Engineering Report," April 2010.

Notes:

None