ML12090A736: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 15: | Line 15: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | |||
{{#Wiki_filter:ENT000410 LRA City Water Submitted: March 30, 2012 Generation Support Bldg. IP2 Simulator Bldg. | |||
+/- | |||
3" City Water 6 16" City Water 3 Energy Education Center (EEC) | |||
Security Bldg. Contractor Station Security Bldg. Con Ed 3" City Water 1 3" City Water 5 City Water Storage Tank 10" City Water 1 6" City Water 4 16" City Water 4 8" City Water 5 Diesel Fire Pump House Fire Protection Pump House Fuel Handling Bldg. | |||
Nuclear Service Chemical System Bldg. | |||
Boric Acid Evaporation Bldg. | |||
4" City Water 1 (FP 88 I) 2" City Water 3 Containment Bldg. Unit No. 1 Radioactive Machine Shop Maintenance & Outage Bldg. | |||
Diesel Generator Bldg. | |||
Fuel Storage Bldg. Primary Aux. Bldg. 12" City Water 7 Fuel Storage Bldg. Primary Aux. Bldg. | |||
Maintenance Storage Bldg. Nuclear Service Bldg. | |||
Fan House Outage Support Bldg. | |||
Fan House 1.5" City Water 1 16" City Water 1 1" City Water 1 16" City Water 2 Containment Bldg. Unit No 2 8" City Water 4 Containment Bldg. 2" City Water 5 2" City Water 6 1.5" City Water 2 8" City Water 3 Control Bldg. Unit 3 Super Heater Bldg. Service Boiler Bldg. Aux. Feedwater Bldg. U3 Smoke Stack Diesel Generator Bldg. | |||
Aux. Feedwater Bldg. U2 Feed Reg Valve Annex U3 Turbine No. 1 2" City Water 4 Feed Reg Valve Annex U2 12" City Water 2 (Pipe Tunnel) Overhead Pipe Bridge Overhead Pipe Bridge 3" City Water 3 2" City Water 2 Sewage Pumping Station 4" City Water 5 House Service Boiler Bldg. | |||
Unit No 2 Turbine Bldg. Turbine Bldg. | |||
8" City Water 6 Tech Support/Service Admin. Bldg. | |||
8" City Water 7 Heater Bay Service Bldg. 8" City Water 8 Heater Bay U3 Sewage Treatment Bldg. | |||
12" City Water 1 (Pipe Tunnel) 4" City Water 6 (Potable Water) 1 1/9/2012 LRA Reviewed and Validated SI JP SB AA 3" City Water 2 No Date Revision DRFTRCHK'D ENGR VER Power Conversion Equipment (PCE) Building Indian Security Bldg. Point Energy Center Receiving Warehouse 8" City Water 1 12" City Water 6 (H.P) 12" City Water 3 Westchester, NY Unit No 2 Screenwell Structure Unit No 1 Screenwell House Condensate Polisher Facility Buried Piping Integrity Management Program Intake Structure Enclosure Bldg. | |||
12" City Water 4 LRA City Water 0 25 50 100 150 200 www.structint.com Feet (303) 792-0077}} |
Latest revision as of 06:43, 12 November 2019
ML12090A736 | |
Person / Time | |
---|---|
Site: | Indian Point |
Issue date: | 01/09/2012 |
From: | Entergy Corp, Indian Point |
To: | Atomic Safety and Licensing Board Panel |
SECY RAS | |
Shared Package | |
ML12090A727 | List:
|
References | |
RAS 22156, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
Download: ML12090A736 (1) | |
Text
ENT000410 LRA City Water Submitted: March 30, 2012 Generation Support Bldg. IP2 Simulator Bldg.
+/-
3" City Water 6 16" City Water 3 Energy Education Center (EEC)
Security Bldg. Contractor Station Security Bldg. Con Ed 3" City Water 1 3" City Water 5 City Water Storage Tank 10" City Water 1 6" City Water 4 16" City Water 4 8" City Water 5 Diesel Fire Pump House Fire Protection Pump House Fuel Handling Bldg.
Nuclear Service Chemical System Bldg.
Boric Acid Evaporation Bldg.
4" City Water 1 (FP 88 I) 2" City Water 3 Containment Bldg. Unit No. 1 Radioactive Machine Shop Maintenance & Outage Bldg.
Diesel Generator Bldg.
Fuel Storage Bldg. Primary Aux. Bldg. 12" City Water 7 Fuel Storage Bldg. Primary Aux. Bldg.
Maintenance Storage Bldg. Nuclear Service Bldg.
Fan House Outage Support Bldg.
Fan House 1.5" City Water 1 16" City Water 1 1" City Water 1 16" City Water 2 Containment Bldg. Unit No 2 8" City Water 4 Containment Bldg. 2" City Water 5 2" City Water 6 1.5" City Water 2 8" City Water 3 Control Bldg. Unit 3 Super Heater Bldg. Service Boiler Bldg. Aux. Feedwater Bldg. U3 Smoke Stack Diesel Generator Bldg.
Aux. Feedwater Bldg. U2 Feed Reg Valve Annex U3 Turbine No. 1 2" City Water 4 Feed Reg Valve Annex U2 12" City Water 2 (Pipe Tunnel) Overhead Pipe Bridge Overhead Pipe Bridge 3" City Water 3 2" City Water 2 Sewage Pumping Station 4" City Water 5 House Service Boiler Bldg.
Unit No 2 Turbine Bldg. Turbine Bldg.
8" City Water 6 Tech Support/Service Admin. Bldg.
8" City Water 7 Heater Bay Service Bldg. 8" City Water 8 Heater Bay U3 Sewage Treatment Bldg.
12" City Water 1 (Pipe Tunnel) 4" City Water 6 (Potable Water) 1 1/9/2012 LRA Reviewed and Validated SI JP SB AA 3" City Water 2 No Date Revision DRFTRCHK'D ENGR VER Power Conversion Equipment (PCE) Building Indian Security Bldg. Point Energy Center Receiving Warehouse 8" City Water 1 12" City Water 6 (H.P) 12" City Water 3 Westchester, NY Unit No 2 Screenwell Structure Unit No 1 Screenwell House Condensate Polisher Facility Buried Piping Integrity Management Program Intake Structure Enclosure Bldg.
12" City Water 4 LRA City Water 0 25 50 100 150 200 www.structint.com Feet (303) 792-0077