ML12090A740
| ML12090A740 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 10/29/2009 |
| From: | Entergy Nuclear Operations |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| Shared Package | |
| ML12090A727 | List:
|
| References | |
| RAS 22156, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
| Download: ML12090A740 (6) | |
Text
ENT000434 Submitted: March 30, 2012 o
o NOTE: This inspection report form is extracted from EN-EP-S-002-MUL TI (Rev. 0 target effective date 10/31/09)
ATTACHMENT 7.1 INSPECTION CHECKLIST Sheet 1 of 2 Piping 1 Tank 1G-lnch City Water Line from INSPECTION 120' EL.
(approx.
_C~a~t~sk~I~II~W~a~~~r~S~u~p~pl~y _____ DATE:
9321-F-41933, 10/29/09 ELEVATION:
grade)
LOCATION DWG:
zone 0-5 INSPECTOR:
J. Peterson NOTE YES
- 1.
ANY BLISTERING (COATING)?
D NO~ _________ __
YES
- 2.
ANY PEELING (COATING)?
D NO ~ -----------
YES
- 3.
ANY FLAKING (COATING)?
D NO ~ ________
YES
- 4.
ANY DELAMINATION (COATING)?
D NO ~ ________
YES
- 5.
ANY EMBRITTLEMENT (COATING)?
D NO~ _________ __
YES
- 6.
ANY EMBEDDED ROCKS (COATING AND/OR METAL)?
D NO ~ -----------
YES
- 7.
ANY CRACKING (COATING AND/OR METAL)?
D NO ~ ________
YES
- 8.
ANY RUST (METAL)?
D NO~ _________ __
YES
- 9.
ANY CORROSION (METAL)?
D NO ~ -----------
YES
- 10.
ANY FLAKING OR SCALING (METAL)?
D NO ~ ________
YES
- 11.
ANY MECHANICAL DAMAGE (METAL)?
D NO ~ _________ __
YES
- 12.
ANY NICKS. GOUGES OR ARC STRIKES (METAL)?
D NO ~ _________ __
YES
- 13.
ANY TUBERCLES (METAL -IF INTERNAL INSPECTION)?
D NO 0 N/A-extemal inspection only GENERAL APPEARANCE (Inspector): Exterior pipe coating found in aood condition. with no observable discontinuities, peeling. blistering.
separation. embrittlemcnt. flaking. etc. Coating also having good adhesion to the pipe with no bubbled spots (i.e.* gaps between pipe and coating.).
Sec attached photo documentation and Notes. Photo included of the backfill material, showing absence of any large rocks. or foreign material.
DEGRADATION FOUND?
FURTHER EVALUATION REQUIRED?
YEsD NO~
YESD NO~
CR-COMMENTS (Inspector): IO-inch city water line from the City Watt r Storage Tank was inspected at ex.cavalcd location. Line runs approx.imately parallcl with the 16*inch city water line (also excavation under the same modification. F.e 13314). Approx. 8 loot length of pipe inspected.
INSPECTOR(S) PRINTISIGNIDA TE:
V1_ ~ I J. Peterson rtf'T7
- o NOTE: This inspection report form is extracted from EN-EP-S-002-MUL TI (Rev. 0 target effective date 10/31/09)
ATTACHMENT 7.1 INSPECTION CHECKLIST Sheet 2 of2 EVALUATION:
ACCEPTABLE I:8J ACCEPTABLE WITH DEFICIENCIES D UNACCEPTABLE D RECOMMENDED ACTION (Program Owner):
Capture the results of this piping inspection in the BPT Program database (IDDEAL Scheduleworks).
FUTURE MONITORING: D None required. Future inspections of this line will be as scheduled and managed under the IPEG Buried Pipe and Tank Program. Based on results of this inspection. any future inspections of this line should be at other locations.
o PREVENTIVE MAINTENANCE: D None required.
CORRECTIVE ACTIONS: D None required.
PHOTOGRAPHIC OR VIDEO RECORDS ATTACHED?
YES I:8J NO D o
o o
o
~z
/:'.
~
)..
"l
~
AIJ.
4,
,.~
-,,>::z