ENT000431 Submitted: March 30, 2012 ENGINEERING STANDARD EN-EP-S-002-MUL TI I REV. 0 ENTERGY Buried Piping and Tanks General Visual PAGE 12 OF 12 Inspection ATTACHMENT 7.1 INSPECTION CHECKLIST Sheet 2 of 2 IP3 CST Supply to AFW Pumps (12-INSPECTION inch Line 1070) (Ref. WO # 279578-Piping I Tank
~
DATE:
121912011 pipe centerline
@ EL. 11'-6";
ELEVATION:
grade @ EI. 18' LOCATION DWG:
INSPECTOR:
(approx.)
9321-F-23593 J. Peterson NOTE YES
- 1.
ANY BLISTERING (COATING)?
D NO ~
YES
- 2.
ANY PEELING (COATING)?
D NO ~
YES
- 3.
ANY FLAKING (COATING)?
D NO ~
YES
- 4.
ANY DELAMINATION (COATING)?
D NO ~
YES
- 5.
ANY EMBRITTLEMENT (COATING)?
D NO ~
YES
- 6.
ANY EMBEDDED ROCKS (COATING AND/OR METAL)?
D NO ~
YES
- 7.
ANY CRACKING (COATING AND/OR METAL)?
D NO ~
YES
- 8.
ANY RUST (METAL)?
D NO D n/a YES
- 9.
ANY CORROSION (METAL)?
D NO D n/a YES
- 10.
ANY FLAKING OR SCALING (METAL)?
D NO D n/a YES
- 11.
ANY MECHANICAL DAMAGE (METAL)?
D NO D n/a YES
- 12.
ANY NICKS, GOUGES OR ARC STRIKES (METAL)?
D NO D n/a YES
- 13.
ANY TUBERCLES (METAL - IF INTERNAL INSPECTION)?
D NO D n/a GENERAL APPEARANCE (Inspector): An approx. 14 ft length of 12-inch dia. Line 1070 was excavated, of which approx. 12 ft was exposed for its full circumference. The coating appearance was uniform in color, with no indications of degradation (blistering, peeling, flaking, cracking or separation of coating from the metal surface). The coating outerwrap appeared to be evenly applied, with the edges of overlapping layers of the wrap sealed with the coal tar enamel. Further, there was no discoloration or evidence of corrosion product under or at the edges of the wrap, and the coating surface was solid to the touch. Photos are attached.
DEGRADATION FOUND?
FURTHER EVALUATION REQUIRED?
YEsD NO~
YESD NO~
CR-COMMENTS (Inspector): This inspection is a visual inspection of the As-Found condition of the pipe coating. The portion of Line 1070 inspected under this task is shown on the attached dwg. 9321-F-23593 excerpt (attached). The results of this inspection will be evaluated with the results of direct UT and guided wave inspections, to be performed under separate tasks.
INSPECTOR(S) PRINT/SIGN/DATE:
J. Peterson
-?7!r7/~
/ R?~0l///
ENGINEERING STANDARD EN-EP-S-002-MUL TI I REV. 0 ENTERGY Buried Piping and Tanks General Visual PAGE 12 OF 12 Inspection ATTACHMENT 7.1 INSPECTION CHECKLIST Sheet 2 of 2 IP3 CST Supply to AFW Pumps (12-INSPECTION inch Line 1070) (Ref. WO # 279578-Piping I Tank
- 03)
DATE:
121912011 pipe centerline
@ EL. 11'-6";
ELEVATION:
grade @ EI. 18' LOCATION DWG:
INSPECTOR:
(approx.)
9321-F-23593 J. Peterson NOTE YES
- 1.
ANY BLISTERING (COATING)?
D NO ~
YES
- 2.
ANY PEELING (COATING)?
D NO ~
YES
- 3.
ANY FLAKING (COATING)?
D NO ~
YES
- 4.
ANY DELAMINATION (COATING)?
D NO ~
YES
- 5.
ANY EMBRITTLEMENT (COATING)?
D NO ~
YES
- 6.
ANY EMBEDDED ROCKS (COATING AND/OR METAL)?
D NO ~
YES
- 7.
ANY CRACKING (COATING AND/OR METAL)?
D NO ~
YES
- 8.
ANY RUST (METAL)?
D NO D n/a YES
- 9.
ANY CORROSION (METAL)?
D NO D n/a YES
- 10.
ANY FLAKING OR SCALING (METAL)?
D NO D n/a YES
- 11.
ANY MECHANICAL DAMAGE (METAL)?
D NO D n/a YES
- 12.
ANY NICKS, GOUGES OR ARC STRIKES (METAL)?
D NO D n/a YES
- 13.
ANY TUBERCLES (METAL - IF INTERNAL INSPECTION)?
D NO D n/a GENERAL APPEARANCE (Inspector): An approx. 14 ft length of 12-inch dia. Line 1070 was excavated, of which approx. 12 ft was exposed for its full circumference. The coating appearance was uniform in color, with no indications of degradation (blistering, peeling, flaking, cracking or separation of coating from the metal surface). The coating outerwrap appeared to be evenly applied, with the edges of overlapping layers of the wrap sealed with the coal tar enamel. Further, there was no discoloration or evidence of corrosion product under or at the edges of the wrap, and the coating surface was solid to the touch. Photos are attached.
DEGRADATION FOUND?
FURTHER EVALUATION REQUIRED?
YEsD NO~
YESD NO~
CR-COMMENTS (Inspector): This inspection is a visual inspection of the As-Found condition of the pipe coating. The portion of Line 1070 inspected under this task is shown on the attached dwg. 9321-F-23593 excerpt (attached). The results of this inspection will be evaluated with the results of direct UT and guided wave inspections, to be performed under separate tasks.
INSPECTOR(S) PRINT/SIGN/DATE:
J. Peterson
ENGINEERING STANDARD EN-EP-S-002-MUL TI I REV. 0 ENTERGY Buried Piping and Tanks General Visual PAGE 12 OF 12 Inspection ATTACHMENT 7.1 INSPECTION CHECKLIST Sheet 2 of 2 EVALUATION:
ACCEPTABLE ~
ACCEPTABLE WITH DEFICIENCIES 0 UNACCEPTABLE 0 RECOMMENDED ACTION (Program Owner): This visual inspection of the As-Found condition of the pipe coating is one element of a focused inspection of Line 1070. The results of this inspection will be evaluated along with the results of UT and Guided Wave inspections under separate tasks (WO #s 279578-13 & 16, respectively) and soil analysis results to assess the condition of the Line 1080 iaw the IPEC Underground Piping & Tank Program. Results will be captured in the UPT program database.
FUTURE MONITORING: 0 None required.
PREVENTIVE MAINTENANCE: 0 None required.
CORRECTIVE ACTIONS: 0 None required.
PHOTOGRAPHIC OR VIDEO RECORDS ATTACHED?
YES~ NOO PROGRAM OWNER PRINT/SIGN/DATE:
Robert C. Lee Wet-'---I-p=---+-,I'~~liL4----
I f
EN-EP-S-002-MUL TI I I
ENGINEERING STANDARD REV. 0 ENTERGY Buried Piping and Tanks General Visual PAGE 12 OF 12 Inspection ATTACHMENT 7.1 INSPECTION CHECKLIST Sheet 2 of 2 EVALUATION:
ACCEPTABLE ~
ACCEPTABLE WITH DEFICIENCIES 0 UNACCEPTABLE 0 RECOMMENDED ACTION (Program Owner): This visual inspection of the As-Found condition of the pipe coating is one element of a focused inspection of Line 1070. The results of this inspection will be evaluated along with the results of UT and Guided Wave inspections under separate tasks (WO #s 279578-13 & 16, respectively) and soil analysis results to assess the condition of the Line 1080 iaw the IPEC Underground Piping & Tank Program. Results will be captured in the UPT program database.
FUTURE MONITORING: 0 None reguired.
PREVENTIVE MAINTENANCE: 0 None reguired.
CORRECTIVE ACTIONS: 0 None reguired.
PHOTOGRAPHIC OR VIDEO RECORDS ATTACHED?
YES~ NOO PROGRAM OWNER PRINT/SIGN/DATE:
RobertC.L ** Wet-pLf'J--Ut I
f
i I t
- Itp
- FO,EL 0 I..
TAN I
I.
I r
11--
~
.I I
Ref. Drawing 9321-F-23593 IP3 Yard / NE comer of AFP Bldg WO # 279578 - Excavation/Inspection of CondlAFW Lines 1070 & 1080 rulU4 e.. '1~,;
- ~iI~b
.. 1Gtl L:f~..rIO"
?L,(, a..1tZ. '.t'i ~
Ref. Drawing 9321-F-23593 IP3 Yard / NE comer of AFP Bldg
,lli',~\\;'?,;.:""
\\~,~ -" -~~~ ~-
...,.~'.... '-\\:
L.~.c,:" \\'-'1
\\~.~...
- ~,;~~
WO # 279578 - Excavation/Inspection of CondlAFW Lines 1070 & 1080