ML12090A756
| ML12090A756 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 01/09/2012 |
| From: | Entergy Corp, Indian Point |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| Shared Package | |
| ML12090A727 | List:
|
| References | |
| RAS 22156, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
| Download: ML12090A756 (1) | |
Text
1.5" WCPP Line Condensate Storage Tank Unit 3 Condensate Storage Tank Unit 2 Refueling Water Storage Tank U2 Primary Water Storage Tank Septic Tank FO Storage Tank FO Storage Tank FO Storage Tank GT1-FOT-12 Unit No 2 Turbine Bldg.
Super Heater Bldg.
Heater Bay Containment Bldg. Unit No. 1 Fuel Handling Bldg.
Service Bldg.
Containment Bldg. Unit No 2 Fan House Fuel Storage Bldg.
Primary Aux. Bldg.
Nuclear Service Chemical System Bldg.
Maintenance & Outage Bldg.
Service Boiler Bldg.
Turbine No. 1 Nuclear Service Bldg.
Diesel Generator Bldg.
Maintenance Storage Bldg.
Aux. Feedwater Bldg. U2 Feed Reg Valve Annex U2 Boric Acid Evaporation Bldg.
Overhead Pipe Bridge Smoke Stack
+/-
0 30 60 90 120 15 Feet No Date Revision DRFTRCHK'D VER ENGR 1 1/9/2012 LRA Reviewed and Validated SB AA SI JP Buried Piping Integrity Management Program Westchester, NY Indian Point Energy Center (303) 792-0077 www.structint.com LRA Containment Isolation Support LRA Containment Isolation Support System Name Length Source Containment Isolaton Suppor t1.5" WCPP Line 133 9321-2236_U2 ENT000411 Submitted: March 30, 2012