ML12090A758

From kanterella
Jump to navigation Jump to search
Entergy Pre-Filed Hearing Exhibit ENT000409 - LRA Auxiliary Feedwater Diagram (Jan. 2012)
ML12090A758
Person / Time
Site: Indian Point  
Issue date: 01/09/2012
From:
Structural Integrity Associates
To:
Entergy Corp, Indian Point, Atomic Safety and Licensing Board Panel
SECY RAS
Shared Package
ML12090A727 List:
References
RAS 22156, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01
Download: ML12090A758 (1)


Text

FP-T-1 Condensate Storage Tank Unit 3 FP-T-2 Condensate Storage Tank Unit 2 Refueling Water Storage Tank U2 Refueling Water Storage Tank U3 300k Gal Suction Tank Primary Water Storage Tank Septic Tank FO Storage Tank FO Storage Tank FO Storage Tank GT1-FOT-12 Appendix R Fuel Oil Storage Tank(ARDG-FO-ST)

Fire Protection Tank

+/-

0 30 60 90 120 15 Feet No Date Revision DRFTRCHK'D VER ENGR 1 1/9/2012 LRA Reviewed and Validated SB AA SI JP Buried Piping Integrity Management Program Westchester, NY Indian Point Energy Center (303) 792-0077 www.structint.com LRA Auxiliary Feedwater Unit 2 - Piping Line Name 10" CST Overflow (CMP) 12" Suction Line 1505 8" Recirc Line 1509 Unit 3 - Piping Line Name 12" Suction Line 1070 8" Overflow Line 1028-2 (CMP) 8" Recirc Line 1080 LRA Auxiliary Feedwater System Name Length Drawings Auxiliary Feedwater 8" Recirc Line 1509 355 9321-F-2263 Auxiliary Feedwater 12" Sucton Li ne 1505 340 9321-F-2263 Auxiliary Feedwater 10" CST Over"ow (CMP )

348 9321-F-2263 Auxiliary Feedwater 12" Sucton Li ne 1070 89 9321-F-22363_U3 Auxiliary Feedwater 8" Recirc Line 1080 92 9321-F-22363_U3 Auxiliary Feedwater 8" Over"ow Li ne 1028-2 (CMP )

104 9321-F-22363_U3 ENT000409 Submitted: March 30, 2012