ENT000436 Submitted: March 30, 2012 ENTERGY ATTACHMENT 7.1 Sheet 1 of 2 Piping 1 Tank 120' EL.
(approx.
ENGINEERING STANDARD Buried Piping and Tanks General Visual Inspection 10-inch City Water/Fire Water Line at the IP2 Maintenance Training Facility (MTF)
NYPA-3899-G-202-0, zone EN-EP-S-002-MUL TI I REV. 0 PAGE 11 OF 12 INSPECTION CHECKLIST INSPECTION DATE:
11/23/09 ELEVATION:
grade)
LOCATION DWG: -"'C---=1...:.1 ___
INSPECTOR:
R.Allen NOTE YES
- 1.
ANY BLISTERING (COATING)?
0 NO ~
YES
- 2.
ANY PEELING (COATING)?
0 NO ~
YES
- 3.
ANY FLAKING (COATING)?
0 NO ~
YES
- 4.
ANY DELAMINATION (COATING)?
0 NO ~
YES
- 5.
ANY EMBRITTLEMENT (COATING)?
0 NO ~
YES
- 6.
ANY EMBEDDED ROCKS (COATING AND/OR METAL)?
0 NO ~
YES
- 7.
ANY CRACKING (COATING AND/OR METAL)?
0 NO ~
YES
- 8.
ANY RUST (METAL)?
0 NO ~
YES
- 9.
ANY CORROSION (METAL)?
0 NO [gJ YES
- 10.
ANY FLAKING OR SCALING (METAL)?
0 NO [gJ YES 11.
ANY MECHANICAL DAMAGE (METAL)?
0 NO [gJ YES
- 12.
ANY NICKS. GOUGES OR ARC STRIKES (METAL)?
0 NO [gJ YES 13 ANY TUBERCLES (METAL-IF INTERNAL INSPECTION)?
0 NO 0 Nt A-external inspection only GENERAL APPEARANCE (Inspector): See attached photo documentation. Piping at the installed saddle (west) end of the excavation was relatively clean of soil Jdhering 10 the 00 of the pipe, without requiring much cleaning. The east end of the piping required use of a water spnly bailie to wet and clean off the hardened red clay-like soil adhering to the pipe 00 ro get to the pipe exterior. The pipe was coaled with a painted on protective coating. which was observed to be in very good conuition with no signs of discontinuities. peeling, separation, blistering, naking, etc.
DEGRADATION FOUND?
FURTHER EVALUATION REQUIRED?
YES 0 NO [gJ YES 0 NO [gJ CR-COMMENTS (Inspector): OppOltunislic inspection of underground IO-inch fire water main mOiling from Broadway in Westerly direction to the intelim Radwaste Storage Facility. Section of line on the south side of the Maintenance Training Facility (MTF) excavaWd as part of installation of a I-inch tic-in to supply water to the MTF. (Ref. EC 133 14). Approx. 8 FOOL length of piping was inspected. Section included a bell & spigot pipingjoinl, and new saddle for a I-inch bmnch supply to the MTF. Pipe in vel)' good condition. no deficiencies noted.
INSPECTOR(S) PRINT/SIGN/DATE:
A. Allen
ENTERGY ENGINEERING STANDARD EN-EP-S-002-MULTI I REV. 0 Buried Piping and Tanks General Visual PAGE 11 OF 12 Inspection ATTACHMENT 7.1 INSPECTION CHECKLIST Sheet 2 of 2 EVALUATION:
ACCEPTABLE [8]
ACCEPTABLE WITH DEFICIENCIES 0 UNACCEPTABLE 0 RECOMMENDED ACTION (Program Owner): k~ "/ ').-~ /0 'i Capture the results of this piping inspection in the BPT Program database (IOJEAL Scheduleworks).
FUTURE MONITORING: 0 None required. Future inspections of this line will be as scheduled and managed under the IPEG Buried Pioe and Tank Program. Based on results of this inspection. any future inspections of this line should be at other locations.
PREVENTIVE MAINTENANCE: 0 None required.
CORRECTIVE ACTIONS: 0 None required.
PHOTOGRAPHIC OR VIDEO RECORDS ATTACHED?
Attachments: drawing showing excavated area location Pholographs (3 sheels)
YES[8]
NO D
8
)it F:E;::: -gsa 344 - FM -OOs ECI 3 3 J tf e
~
10 tt
'3 eN'IPA - 38"1'i -
(j- - L.. 0) pOifeo.
f>. _~ I) {t(lJ:1A
~
SECTION W-'wI', *X-X",
ry-Y' ANlI 'Z-Z' SEE DRA'WING 500194~
J T rJ,
~.. v",Avr' Lt:;
I t::.1./7-</-
'v---../ vi
\\J~-
I I
V MAINTENANCE TRAINNING FACILITY
. '-.JIl.-.
~1~.J**V.*.
//
/.,--,..... '"
I
, ~,
//'.-
o
.. ;(/', r'-
-i: --,
//
I J
~
/
~.
<t
~
~