ML12090A771
| ML12090A771 | |
| Person / Time | |
|---|---|
| Site: | Indian Point |
| Issue date: | 01/09/2012 |
| From: | Entergy Corp, Indian Point |
| To: | Atomic Safety and Licensing Board Panel |
| SECY RAS | |
| Shared Package | |
| ML12090A727 | List:
|
| References | |
| RAS 22156, 50-247-LR, 50-286-LR, ASLBP 07-858-03-LR-BD01 | |
| Download: ML12090A771 (1) | |
Text
Turbine Bldg.
Unit No 2 Turbine Bldg.
Super Heater Bldg.
Fuel Handling Bldg.
Heater Bay Containment Bldg.
Service Bldg.
Heater Bay U3 Containment Bldg. Unit No. 1 Primary Aux. Bldg.
Tech Support/Service Admin. Bldg.
Containment Bldg. Unit No 2 Energy Education Center (EEC)
Primary Aux. Bldg.
Outage Support Bldg.
Unit No 1 Screenwell House Radioactive Machine Shop Nuclear Service Chemical System Bldg.
Maintenance & Outage Bldg.
Fan House Fan House Condensate Polisher Facility Intake Structure Enclosure Bldg.
Service Boiler Bldg.
Fuel Storage Bldg.
Fuel Storage Bldg.
Diesel Generator Bldg.
Control Bldg. Unit 3 Security Bldg.
Turbine No. 1 Unit No 2 Screenwell Structure Nuclear Service Bldg.
House Service Boiler Bldg.
Diesel Generator Bldg.
Station Security Bldg. Con Ed Security Bldg. Contractor Power Conversion Equipment (PCE) Building Maintenance Storage Bldg.
Aux. Feedwater Bldg. U2 Feed Reg Valve Annex U3 Feed Reg Valve Annex U2 Boric Acid Evaporation Bldg.
Fire Protection Pump House Aux. Feedwater Bldg. U3 Overhead Pipe Bridge Overhead Pipe Bridge Smoke Stack Generation Support Bldg.
Diesel Fire Pump House Sewage Treatment Bldg.
Sewage Pumping Station
+/-
0 50 100 150 200 25 Feet No Date Revision DRFTRCHK'D VER ENGR 1 1/9/2012 LRA Reviewed and Validated SB AA SI JP Buried Piping Integrity Management Program Westchester, NY Indian Point Energy Center (303) 792-0077 www.structint.com LRA Fire Protection Unit-2 LRA Fire Safety Unit 2 10" H.P. Water (Fire Protection 21)
ENT000412 Submitted: March 30, 2012