ML13262A149: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/19/2013
| issue date = 09/19/2013
| title = Enclosure 3- NRC Presentation Handout
| title = Enclosure 3- NRC Presentation Handout
| author name = Watson B A
| author name = Watson B
| author affiliation = NRC/FSME/DWMEP/DURLD/RDB
| author affiliation = NRC/FSME/DWMEP/DURLD/RDB
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 15
| page count = 15
}}
}}
=Text=
{{#Wiki_filter:Three Mile Island - 2 Post Shut Down Activities Report Public Meeting Bruce Watson, CHP Chief, Reactor Decommissioning Branch U.S. Nuclear Regulatory Commission, Washington, D.C. 20555 1
US NRC Decommissioned Facilities 12 10 8
6 4
2 0
1998199920002001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Power Reactors Research Reactors Materials Sites 2
Agenda
* Discuss the NRC Decommissioning Process
* Discuss the TMI-2 Post Shutdown Decommissioning Activities Report (PSDAR)
* Discuss the NRC Inspection Process public comments on PSDAR
* Hear p 3
Three Mile Island, Unit 2 P t Sh td Post-Shutdown Decommissioning Activities Report John Buckley Reactor Decommissioning Branch U.S. Nuclear Regulatory Commission, Washington D Washington,  D.C.
C 20555 4
NRC Decommissioning Process
* Permanently cease operations
* Certify permanent cessation of operations
* Certify fuel removed from reactor
* Submit PSDAR (within 2 years)
* SAFSTOR and/or plant decommissioning
* Application for license termination (LTP)
* Li License  termination i i 5
TMI-2 Decommissioning Process
* The March 28, 1979, accident made the shutdown of TMI TMI-2 2 different from all other reactors.
* NRC C approved PDMS  SS SAR on September 14, 1993, with License Amendment 45.
* GPU submits PSDAR on June 28, 2013, to establish compliance with 50.82.
6
PSDAR Requirements
* 10 CFR 50.82(a)(4)
* PSDAR describes:
  - p planned  decommissioning g activities
  - decommissioning schedule
  - cost estimate for the decommissioning
  - environmental impacts of decommissioning deco    ss o g 7
PSDAR Review Process
* NRC notices receipt of PSDAR &
requests public comments
* NRC schedules PSDAR public meeting
* NRC considers public comments
* Review e e PSDAR S      in acco accordance da ce with t
Regulatory Guide 1.185
* PSDAR does not require NRC approval 8
PSDAR Review Criteria
* Decom can be completed as described
* Decom can be completed within 60 years
* Decom can be completed for the estimated cost
* Decom eco actactivities t es do not ot e endanger da ge pub public c
health and safety or the environment 9
PSDAR Highlights
* Decommissioning of TMI-2 will start after TMI-1 operating license expires in April 2034
* TMI-2 TMI 2 willill b be maintained i t i d iin currentt PDMS mode d until til decommissioning begins
* TMI TMI-22 license termination will occur before September 2053 (60 years after cessation of operations)
* Decommissioning costs are estimated to be
  $844 885 000 (b
  $844,885,000      (basedd on 2008 ddollars) ll )
* Environmental impacts of planned decommissioning activities are bounded by impacts associated with post-post accident cleanup activities and GEIS 10
Conclusion
* NRC received a PSDAR for TMI-2 on June 2828, 2013
* Although NRC is not required to approve the PSDAR S      by regulation, NRC C will review the PSDAR
* NRC will consider the public comments in its review of the TMI-2 PSDAR 11
Three Mile Island - Unit 2 Decommissioning Power Reactor Oversight Program PSDAR Public Meeting August 28, 2013 Laurie A. Kauffman Health Physicist Division of Nuclear Materials Safety Region I
Decommissioning Power Reactor Oversight Program
* Decommissioning power reactor inspection program is described in Inspection Manual Chapter 2561
* Annual A      l IInspection ti performed f      d by b R Region i I staff t ff
  - Verify controls and methods for safe storage of radioactive material and structures at permanently shutdown reactors 13
TMI-2 SAFSTOR PROGRAM
* No ongoing decommissioning activities
* Material condition of components remain unchanged
* Safe storage programs being conducted according to Technical Specifications and site procedures
* NRC Inspection Reports are located in ADAMS http://www nrc gov/reading-rm/adams http://www.nrc.gov/reading  rm/adams.html html 14
NRC Contacts
* John Buckley, Project Manager
  - John.Buckley@nrc.gov
  - 301-415-6607
* Bruce Watson, Branch Chief
  - Bruce.Watson@nrc.gov
  - 301-415-6221
* Laurie Kauffman, Inspector
  - Laurie.Kauffman@nrc.gov
  - 610-337-5323 610 337 5323 15}}

Latest revision as of 13:22, 4 November 2019

Enclosure 3- NRC Presentation Handout
ML13262A149
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 09/19/2013
From: Bruce Watson
NRC/FSME/DWMEP/DURLD/RDB
To:
Shared Package
ML13262A166 List:
References
Download: ML13262A149 (15)


Text

Three Mile Island - 2 Post Shut Down Activities Report Public Meeting Bruce Watson, CHP Chief, Reactor Decommissioning Branch U.S. Nuclear Regulatory Commission, Washington, D.C. 20555 1

US NRC Decommissioned Facilities 12 10 8

6 4

2 0

1998199920002001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Power Reactors Research Reactors Materials Sites 2

Agenda

  • Discuss the NRC Decommissioning Process
  • Discuss the TMI-2 Post Shutdown Decommissioning Activities Report (PSDAR)
  • Discuss the NRC Inspection Process public comments on PSDAR
  • Hear p 3

Three Mile Island, Unit 2 P t Sh td Post-Shutdown Decommissioning Activities Report John Buckley Reactor Decommissioning Branch U.S. Nuclear Regulatory Commission, Washington D Washington, D.C.

C 20555 4

NRC Decommissioning Process

  • Permanently cease operations
  • Certify permanent cessation of operations
  • Certify fuel removed from reactor
  • Submit PSDAR (within 2 years)
  • SAFSTOR and/or plant decommissioning
  • Application for license termination (LTP)
  • Li License termination i i 5

TMI-2 Decommissioning Process

  • The March 28, 1979, accident made the shutdown of TMI TMI-2 2 different from all other reactors.
  • NRC C approved PDMS SS SAR on September 14, 1993, with License Amendment 45.
  • GPU submits PSDAR on June 28, 2013, to establish compliance with 50.82.

6

PSDAR Requirements

- p planned decommissioning g activities

- decommissioning schedule

- cost estimate for the decommissioning

- environmental impacts of decommissioning deco ss o g 7

PSDAR Review Process

  • NRC notices receipt of PSDAR &

requests public comments

  • NRC schedules PSDAR public meeting
  • NRC considers public comments
  • Review e e PSDAR S in acco accordance da ce with t

Regulatory Guide 1.185

  • PSDAR does not require NRC approval 8

PSDAR Review Criteria

  • Decom can be completed as described
  • Decom can be completed within 60 years
  • Decom can be completed for the estimated cost
  • Decom eco actactivities t es do not ot e endanger da ge pub public c

health and safety or the environment 9

PSDAR Highlights

  • Decommissioning of TMI-2 will start after TMI-1 operating license expires in April 2034
  • TMI-2 TMI 2 willill b be maintained i t i d iin currentt PDMS mode d until til decommissioning begins
  • TMI TMI-22 license termination will occur before September 2053 (60 years after cessation of operations)
  • Decommissioning costs are estimated to be

$844 885 000 (b

$844,885,000 (basedd on 2008 ddollars) ll )

  • Environmental impacts of planned decommissioning activities are bounded by impacts associated with post-post accident cleanup activities and GEIS 10

Conclusion

  • NRC received a PSDAR for TMI-2 on June 2828, 2013
  • Although NRC is not required to approve the PSDAR S by regulation, NRC C will review the PSDAR
  • NRC will consider the public comments in its review of the TMI-2 PSDAR 11

Three Mile Island - Unit 2 Decommissioning Power Reactor Oversight Program PSDAR Public Meeting August 28, 2013 Laurie A. Kauffman Health Physicist Division of Nuclear Materials Safety Region I

Decommissioning Power Reactor Oversight Program

  • Annual A l IInspection ti performed f d by b R Region i I staff t ff

- Verify controls and methods for safe storage of radioactive material and structures at permanently shutdown reactors 13

TMI-2 SAFSTOR PROGRAM

  • No ongoing decommissioning activities
  • Material condition of components remain unchanged
  • Safe storage programs being conducted according to Technical Specifications and site procedures

NRC Contacts

  • John Buckley, Project Manager

- John.Buckley@nrc.gov

- 301-415-6607

- Bruce.Watson@nrc.gov

- 301-415-6221

- Laurie.Kauffman@nrc.gov

- 610-337-5323 610 337 5323 15