ML21361A275: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:ES-301                        Transient and Event Checklist                      Form ES-301-5 Facility: Byron                      Date of Exam: 09/27/21        Operating Test No.: 2021-301 A          E                                  Scenarios (Crew A)
P          V 5              2                  3          3 (Crew C)      T    M P          E O    I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T    N I        T S    A    B    S    A    B      S      A    B  S    A      B          I C                                                                                  A R    T    O    R    T    O      R      T    O  R    T      O          M A          T                                                                      L O    C    P    O    C    P      O      C    P  O    C      P          U N          Y M(*)
T        P E                                                                          R    I  U RO          RX  5              2                          1                          3    1  1  0 NOR 1              1                                                    2    1  1  1 SRO-I1 I/C 2, 4          3, 4,                      2,3                        9    4  4  2 SRO-U                          5, 7, 9
MAJ 6              8                          5                          3    2  2  1 TS  2, 3          5, 6                                                  4    0  2  2 RO-1        RX      5                    2                                  1      3    1  1  0 SRO-I      NOR      1                    1                                  1      3    1  1  1 I/C      2, 4                  5, 7,                              4      6    4  4  2 SRO-U                                      9 MAJ      6                    8                                  5      3    2  2  1 TS                                                                      0    0  2  2 RO-7        RX            5          2                        1                    3    1  1  0 SRO-I      NOR                                                1                    1    1  1  1 I/C          2, 8      3, 4                      4                    5    4  4  2 SRO-U MAJ          6          8                        5                    3    2  2  1 TS                                                                      0    0  2  2 RO          RX                                                                      0    1  1  0 NOR                                                                      0    1  1  1 SRO-I I/C                                                                      0    4  4  2 SRO-U      MAJ                                                                      0    2  2  1 TS                                                                      0    0  2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                        Transient and Event Checklist                        Form ES-301-5 Facility: Byron                      Date of Exam: 09/27/21            Operating Test No.: 2021-301 A          E                                  Scenarios (Crew B)
P          V 5              2                  3                  4        T      M P          E O      I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S    A    B    S    A    B      S      A    B    S      A    B          I C                                                                                    A R    T    O    R    T    O      R      T    O    R      T    O          M A          T                                                                        L O    C    P    O    C    P      O      C    P    O      C    P          U N          Y M(*)
T        P E                                                                            R    I  U RO          RX                2                  1                        6          3    1  1  0 NOR                1                  1                                    2    1  1  1 SRO-I2 I/C                3, 4,              2, 3,                    2, 7      10    4  4  2 SRO-U                          5, 7,              4 9
MAJ                8                  5                        8          3    2  2  1 TS                5, 6              4                                    3    0  2  2 RX  5                                        1          6                  3    1  1  0 RO          NOR 1                                                  1                  2    1  1  1 SRO-I4      I/C 2, 4                                    2, 3      2, 3,              9    4  4  2 4, 5, SRO-U                                                              7 MAJ 6                                        5          8                  3    2  2  1 TS  2, 3                                                1, 4, 7            5    0  2  2 RO-2        RX      5                    2                  1                      3    1  1  0 SRO-I      NOR      1                    1                  1                      3    1  1  1 I/C      2, 4                  5, 7,              4                      6    4  4  2 SRO-U                                      9 MAJ      6                    8                  5                      3    2  2  1 TS                                                                        0    0  2  2 RO-5        RX            5          2                                          6    3    1  1  0 SRO-I      NOR                                                                  1    1    1  1  1 I/C          2, 8      3, 4                                        3, 4, 7    4  4  2 SRO-U                                                                            5 MAJ          6          8                                          8    3    2  2  1 TS                                                                        0    0  2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                        Transient and Event Checklist                        Form ES-301-5 Facility: Byron                      Date of Exam: 09/27/21            Operating Test No.: 2021-301 A          E                                Scenarios (Crew C)
P          V 5              3                  4            3 (Crew A)      T      M P          E O      I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S    A    B    S    A    B    S      A    B    S    A      B          I C                                                                                    A R    T    O    R    T    O    R      T    O    R      T    O          M A          T                                                                        L O    C    P    O    C    P    O      C    P    O    C      P          U N          Y M(*)
T        P E                                                                            R    I  U RO          RX  5                                      6          1                  3    1  1  0 NOR 1                                                  1                  2    1  1  1 SRO-I3 I/C 2, 4                                    2, 7        2, 3,              7    4  4  2 SRO-U                                                              4 MAJ 6                                      8          5                  3    2  2  1 TS  2, 3                                                4                  3    0  2  2 RX      5        1                6                                    3    1  1  0 RO          NOR      1        1                1                                    3    1  1  1 SRO-I5      I/C      2, 4      2, 3,            2, 3,                                10    4  4  2 4                4, 5, SRO-U                                            7 MAJ      6        5                8                                    3    2  2  1 TS                  4                1,4,7                                4    0  2  2 RO-3        RX            5          1                        6                        3    1  1  0 SRO-I      NOR                                              1                        1    1  1  1 I/C          2, 8      2, 3                    3, 4,                    7    4  4  2 SRO-U                                                        5 MAJ          6          5                        8                        3    2  2  1 TS                                                                        0    0  2  2 RO          RX                                                                        0    1  1  0 NOR                                                                        0    1  1  1 SRO-I I/C                                                                        0    4  4  2 SRO-U      MAJ                                                                        0    2  2  1 TS                                                                        0    0  2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.
 
ES-301                          Transient and Event Checklist                      Form ES-301-5 Facility: Byron                        Date of Exam: 09/27/21        Operating Test No.: 2021 -301 A          E                                    Scenarios (Crew D)
P          V 2                4                                            T      M P          E O      I L        N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T      N I        T S    A    B    S    A    B      S    A    B  S    A      B            I C                                                                                  A R    T    O    R    T    O      R    T    O  R    T    O            M A          T                                                                        L O    C    P    O    C    P      O    C    P  O    C      P          U N          Y M(*)
T        P E                                                                            R    I  U RO          RX  2                6                                                    2    1    1  0 NOR 1                1                                                    2    1    1  1 SRO-I I/C 3, 4,            2, 3,                                                9    4    4  2 SRO-U-1        5, 7,            5, 7 9
MAJ 8                8                                                    2    2    2  1 TS  5, 6            1,4,7                                                5    0    2  2 RX        2                      6                                        2    1    1  0 RO-4 NOR                              1                                        1    1    1  1 SRO-I      I/C      3, 4                  3, 4,                                    5    4    4  2 5
SRO-U MAJ      8                      8                                        2    2    2  1 TS                                                                        0    0    2  2 RO-6        RX            2          6                                              2    1    1  0 SRO-I      NOR            1                                                          1    1    1  1 I/C            5, 7,      2, 7                                          5    4    4  2 SRO-U                      9 MAJ            8          8                                              2    2    2  1 TS                                                                        0    0    2  2 RO          RX                                                                              1    1  0 NOR                                                                            1    1  1 SRO-I I/C                                                                            4    4  2 SRO-U      MAJ                                                                            2    2  1 TS                                                                              0    2  2
 
ES-301                                        Transient and Event Checklist                                  Form ES-301-5 Instructions:
: 1.        Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
: 2.        Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
: 3.        Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
: 4.        For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.}}

Latest revision as of 08:48, 18 January 2022

ES-301-5
ML21361A275
Person / Time
Site: Byron  Constellation icon.png
Issue date: 10/28/2021
From: Gregory Roach
NRC/RGN-III/DRS/OLB
To:
Exelon Generation Co LLC, Exelon Generation Co
Roach G
Shared Package
ML21055A846 List:
References
Download: ML21361A275 (8)


Text

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron Date of Exam: 09/27/21 Operating Test No.: 2021-301 A E Scenarios (Crew A)

P V 5 2 3 3 (Crew C) T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T S A B S A B S A B S A B I C A R T O R T O R T O R T O M A T L O C P O C P O C P O C P U N Y M(*)

T P E R I U RO RX 5 2 1 3 1 1 0 NOR 1 1 2 1 1 1 SRO-I1 I/C 2, 4 3, 4, 2,3 9 4 4 2 SRO-U 5, 7, 9

MAJ 6 8 5 3 2 2 1 TS 2, 3 5, 6 4 0 2 2 RO-1 RX 5 2 1 3 1 1 0 SRO-I NOR 1 1 1 3 1 1 1 I/C 2, 4 5, 7, 4 6 4 4 2 SRO-U 9 MAJ 6 8 5 3 2 2 1 TS 0 0 2 2 RO-7 RX 5 2 1 3 1 1 0 SRO-I NOR 1 1 1 1 1 I/C 2, 8 3, 4 4 5 4 4 2 SRO-U MAJ 6 8 5 3 2 2 1 TS 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron Date of Exam: 09/27/21 Operating Test No.: 2021-301 A E Scenarios (Crew B)

P V 5 2 3 4 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T S A B S A B S A B S A B I C A R T O R T O R T O R T O M A T L O C P O C P O C P O C P U N Y M(*)

T P E R I U RO RX 2 1 6 3 1 1 0 NOR 1 1 2 1 1 1 SRO-I2 I/C 3, 4, 2, 3, 2, 7 10 4 4 2 SRO-U 5, 7, 4 9

MAJ 8 5 8 3 2 2 1 TS 5, 6 4 3 0 2 2 RX 5 1 6 3 1 1 0 RO NOR 1 1 2 1 1 1 SRO-I4 I/C 2, 4 2, 3 2, 3, 9 4 4 2 4, 5, SRO-U 7 MAJ 6 5 8 3 2 2 1 TS 2, 3 1, 4, 7 5 0 2 2 RO-2 RX 5 2 1 3 1 1 0 SRO-I NOR 1 1 1 3 1 1 1 I/C 2, 4 5, 7, 4 6 4 4 2 SRO-U 9 MAJ 6 8 5 3 2 2 1 TS 0 0 2 2 RO-5 RX 5 2 6 3 1 1 0 SRO-I NOR 1 1 1 1 1 I/C 2, 8 3, 4 3, 4, 7 4 4 2 SRO-U 5 MAJ 6 8 8 3 2 2 1 TS 0 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron Date of Exam: 09/27/21 Operating Test No.: 2021-301 A E Scenarios (Crew C)

P V 5 3 4 3 (Crew A) T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T S A B S A B S A B S A B I C A R T O R T O R T O R T O M A T L O C P O C P O C P O C P U N Y M(*)

T P E R I U RO RX 5 6 1 3 1 1 0 NOR 1 1 2 1 1 1 SRO-I3 I/C 2, 4 2, 7 2, 3, 7 4 4 2 SRO-U 4 MAJ 6 8 5 3 2 2 1 TS 2, 3 4 3 0 2 2 RX 5 1 6 3 1 1 0 RO NOR 1 1 1 3 1 1 1 SRO-I5 I/C 2, 4 2, 3, 2, 3, 10 4 4 2 4 4, 5, SRO-U 7 MAJ 6 5 8 3 2 2 1 TS 4 1,4,7 4 0 2 2 RO-3 RX 5 1 6 3 1 1 0 SRO-I NOR 1 1 1 1 1 I/C 2, 8 2, 3 3, 4, 7 4 4 2 SRO-U 5 MAJ 6 5 8 3 2 2 1 TS 0 0 2 2 RO RX 0 1 1 0 NOR 0 1 1 1 SRO-I I/C 0 4 4 2 SRO-U MAJ 0 2 2 1 TS 0 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.

ES-301 Transient and Event Checklist Form ES-301-5 Facility: Byron Date of Exam: 09/27/21 Operating Test No.: 2021 -301 A E Scenarios (Crew D)

P V 2 4 T M P E O I L N CREW POSITION CREW POSITION CREW POSITION CREW POSITION T N I T S A B S A B S A B S A B I C A R T O R T O R T O R T O M A T L O C P O C P O C P O C P U N Y M(*)

T P E R I U RO RX 2 6 2 1 1 0 NOR 1 1 2 1 1 1 SRO-I I/C 3, 4, 2, 3, 9 4 4 2 SRO-U-1 5, 7, 5, 7 9

MAJ 8 8 2 2 2 1 TS 5, 6 1,4,7 5 0 2 2 RX 2 6 2 1 1 0 RO-4 NOR 1 1 1 1 1 SRO-I I/C 3, 4 3, 4, 5 4 4 2 5

SRO-U MAJ 8 8 2 2 2 1 TS 0 0 2 2 RO-6 RX 2 6 2 1 1 0 SRO-I NOR 1 1 1 1 1 I/C 5, 7, 2, 7 5 4 4 2 SRO-U 9 MAJ 8 8 2 2 2 1 TS 0 0 2 2 RO RX 1 1 0 NOR 1 1 1 SRO-I I/C 4 4 2 SRO-U MAJ 2 2 1 TS 0 2 2

ES-301 Transient and Event Checklist Form ES-301-5 Instructions:

1. Check the applicant level and enter the operating test number and Form ES-D-1 event numbers for each event type; TS are not applicable for RO applicants. ROs must serve in both the at-the-controls (ATC) and balance-of-plant (BOP) positions. Instant SROs (SRO-I) must serve in both the SRO and the ATC positions, including at least two instrument or component (I/C) malfunctions and one major transient, in the ATC position. If an SRO-I additionally serves in the BOP position, one I/C malfunction can be credited toward the two I/C malfunctions required for the ATC position.
2. Reactivity manipulations may be conducted under normal or controlled abnormal conditions (refer to Section D.5.d) but must be significant per Section C.2.a of Appendix D. (*) Reactivity and normal evolutions may be replaced with additional I/C malfunctions on a one-for-one basis.
3. Whenever practical, both instrument and component malfunctions should be included; only those that require verifiable actions that provide insight to the applicants competence count toward the minimum requirements specified for the applicants license level in the right-hand columns.
4. For new reactor facility licensees that use the ATC operator primarily for monitoring plant parameters, the chief examiner may place SRO-I applicants in either the ATC or BOP position to best evaluate the SRO-I in manipulating plant controls.