ML20151Y271: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
Line 2: | Line 2: | ||
| number = ML20151Y271 | | number = ML20151Y271 | ||
| issue date = 08/31/1998 | | issue date = 08/31/1998 | ||
| title = Monthly Operating Repts for Aug 1998 for Dresden Nuclear Power Station,Units 1,2 & 3.With | | title = Monthly Operating Repts for Aug 1998 for Dresden Nuclear Power Station,Units 1,2 & 3.With | ||
| author name = Abrell G, Heffley J | | author name = Abrell G, Heffley J | ||
| author affiliation = COMMONWEALTH EDISON CO. | | author affiliation = COMMONWEALTH EDISON CO. | ||
Line 12: | Line 12: | ||
| case reference number = RTR-REGGD-01.016, RTR-REGGD-1.016 | | case reference number = RTR-REGGD-01.016, RTR-REGGD-1.016 | ||
| document report number = GL-97-02, GL-97-2, JMHLTR:#98-0243, JMHLTR:#98-243, NUDOCS 9809180177 | | document report number = GL-97-02, GL-97-2, JMHLTR:#98-0243, JMHLTR:#98-243, NUDOCS 9809180177 | ||
| title reference date = 09-08-1998 | |||
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | | document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT | ||
| page count = 11 | | page count = 11 |
Latest revision as of 21:04, 10 December 2021
ML20151Y271 | |
Person / Time | |
---|---|
Site: | Dresden |
Issue date: | 08/31/1998 |
From: | Abrell G, Heffley J COMMONWEALTH EDISON CO. |
To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
References | |
RTR-REGGD-01.016, RTR-REGGD-1.016 GL-97-02, GL-97-2, JMHLTR:#98-0243, JMHLTR:#98-243, NUDOCS 9809180177 | |
Download: ML20151Y271 (11) | |
Text
.- . . . . . - , . . , - - - . . . . . .
- i Commonw calth lilison Company Drexicn Generating StJtiott J. ' 6MH) Nortti Dirxlen Road '
yo7,,s u n ivi Tel31S W J-2920 September 8,1998 JMHLTR: #98-0243 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
Subject:
Monthly Operating Data Report for August 1998 Dresden Nuclear Power Station n Commonwealth Edison Company Docket Nos.50-010,50-237, and 50-249 Enclosed is the Dresden Nuclear Power Station Monthly Operating Summary Report for August 1998.
This informatio: is supplied to your office as required by Technical Specification 6.9.A.5,
~ in accordance with the instructions set forth in Regulatory Guide 1.16. and Generic Letter 97-02.
Sincer ly, 1
a i J. M. He ey mo(
Site Vice President Dresden Station Enclosure cc: NRC Region III Office Illinois Dept. of Nuclear Safety, State ofIllinois NRC Senior Resident Inspector, Dresden Station UDI, Inc. - Washington, DC '
File / Numerical 9809100177 980631 PDR ADOCK 05000010 R PDR ,,
tnnpon 4 vt/cvU A t'nkom Company
i l
l MONTHLY NRC l
l
SUMMARY
OF OPERATING EXPERIENCE, PER REGULATORY GUIDE 1.16 FOR 1 DRESDEN NUCLEAR POWER STATION ;
1 1
COMMONWEALTH EDISON COMPANY l FOR AUGUST 1998 l
UNIT DOCKET LICENSE ;
1 050-010 DPR-2 l 2 050-237 DPR-19 3 050-249 DPR-25 l
l l
I I
L: 8360\8301\ misc \98\98050501.GA 1 i
r -
1 l TABLE OF CONTENTS AUGUST 1998 NRC REPORT 1
1 1.0 Introduction l 1
l 3.0 Summary of Operating Experience 2.1 Unit 2 Monthly Operating Experience Summary. )
2.2 Unit 3 Monthly Operating Experience Summary. 1 3.0 Operating Data Statistics 3.1 Operating Data Report - Dresden Unit 2 3.2 Operating Data Report - Dresden Unit 3 3.3 Unit 2 Shutdowns 3.4 Unit 3 Shutdowns 4.0 Unique Reporting Requirements 4.1 Main Steam Relief and/or Safety Valve Operations - j Unit 2 and Unit 3 4.2 Technical Specification Amendments L: 8360\8301\ misc \98\98050501,GA 2
l I
I l 1.0 Introduction l I
Dresden Nuclear Power Station is a three reactor generating facility owned and operated by the Comed i Company of Chicago, Illinois. Dresden Station is located at the confluence of the Kankakee and Des Plaines Rivers, in Grundy County, near Morris, Illinois. !
Dresden Unit 1 is a General Electric Boiling Water Reactor with a design net electrical output rating of 200 megawatts electrical (MWe). The unit is being decommissioned with all nuclear fuel removed from the reactor vessel. Therefore, no Unit 1 operating data is )
provided in this report. l l
Dresden Units 2 and 3 are General Electric Boiling l Water Reactors; each licensed at 2527 megawatts I thermal. The gross outputs of Units 2 and 3 are 832 and 834 megawatts electrical, respectively, with design net electrical output ratings of 794 MWe each. The commercial service date for Unit 2 is 11 August 1970 and 30 October 1971 for Unit 3.
Waste heat is rejected to a man-made cooling lake using the Kankakee River for make-up and the Illinois River for blowdown.
The Architect-Engineer for Dresden Units 2 and 3 was Sargent and Lundy of Chicago, Illinois.
Gary A. Abrell of Dresden Regulatory Assurance Staff compiled this report for AUGUST 1998, telephone number (815) 942-2920, extension 3749.
L: 6360\B301\misci98\98050501.GA 3
l I
l 1
2.0
SUMMARY
OF OPERATING EXPERIENCE FOR. August 1998 2.1 UNIT 2 MONTHLY OPERATING EXPERIENCE SUMt1ARY l l
Unit 2 operated throughout the period at full i power except for the D2F34 forced outage to I resolve intermittent grounding problems plaguing the Unit 2 generator. '
i l
Unit 2 was separated from the system at 0051 on l August 8 and returned to the system at 0256 on l August 9, 1998. )
l Unit 2 reached full power at 0553 on August 13, 1998.
I i
l l
l l
( L: 8360\8301\ misc \98\98050501.GA 4 i
I
. i l
l I
2.0
SUMMARY
OF OPERATING EXPERIENCE FOR August 1998 )
i l
2.2 UNIT 3 MONTHLY OPERATING EXPERIENCE
SUMMARY
Unit 3 operated throughout the period at full power except for short periods for surveillance l and maintenance.
I i
i L: 8360\8301\ misc \98\98050501.GA 5
. . _ _ . . _ . _ _ _ _ . - . . . _ _ . . _ - ~ . _ _ _ . . _ . . . _ . _ . _ . . . . , _ . . . _
l \
L 1 'e .
~
t l
I l !
' 3 '. O OPERATING DAT7' STATISTICS 3.1 OPERATINt >ATA REPORT - DRESDEN UNIT TWO DOCKET No. 050-237 i
DATE September 3, 1998 i COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 I OPERATING STATUS l
- 1. REPORTING PERIOD: August 1998 '
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,527 !
MAXIMUM DEPENDABLE CAPACITY (MWe NET): 772 )
DESIGN ELECTRICAL RATING (MWe Net): 794 '
'3. POWER LEVEL TO WHICH RESTRICTED (MWe Net): No restrictions ;
- 4. REASONS FOR RESTRICTIONS (IF ANY) : See Section 2.1 of this report.
REPORTING PERK)D DATA PARAMETER THIS MONTH YEAR TO DATE CUMULATIVE 5 HOURS IN PERIOD 744 5,831 245,927 6 T M REACTTR CRITICAL 744 4,684 179,692 7 TM REACTOR RESERVE SIRTIDONN (Hours) O C 0 8 TM GENERATOR CN-LINE (Hours) 719 4,567 171,321 9 T M GENERATOR RESERVE SHUTDONN (Hours) 0 3 4 10 THEISAL ENERGY GENERATED (14fHt Gross) 1,714,57E 10,866,857 360,630,280 11 EIECTRICAL ENERQf GENERATED (lefEHe Gross) 548,427 3,519,367 115,253,202 12 ELECTRICAL ENERGY GENERATED (14fEHe Net) 523,733 3,356,439 109,036,614 13 REACTOR SERVICE FACTOR (%) 100.0% 80.3% 73.14 14 REACTOR AVAIIABILITY FACTOR (%) 100.01 80.3% 73.1%
15 GENERATOR SERVICE FACTOR (%) 96.6% 78.3% 69.74 16 GENERA 20R AVAIIABI LITY FACTOR (%) 96.6V 78.4% 69.74 17 CAPACITY FACTOR (Using ICD Net) (%) 91.21 74.6% 57.44 18 CAPACITY FAC'ITE (Using DER Net) (%) 88.7% 72.5% 55.84 19 FORCED OUTAGE FACTOR (%) 31 5.4V 12. 61 L: 8360\8301\ mise'48\98050501.GA b
l._ . i
[
l i :
l 1
I i
l 3.0 OPERATING DATA STATISTICS 3.2 OPERATING DATA REPORT - DRESDEN UNIT THREE i DOCKET No. 050-249 ,
DATE' September 3,1998 I COMPLETED BY G. A. ABRELL TELEPHONE (815) 942-2920 OPERATING STATUS 1
- 1. REPORTING PERIOD: AUGUST 1998
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWth): 2,527 MAXIMUM DEPENDABLE CAPACITY (MWe Net): 773 DESIGN ELECTRICAL RATING (MWe Net): 794
- 3. PCWER LEVEL TO WHICH RESTRICTED: No restriction
- 4. REASONS FOR RESTRICTIONS (IF ANY): See Section 2.2 of-this report.
REPORTING PERIOD DATA PARANETER THIS MONTH YEAR TO DAT CUMULATIVE 5 HOURS IN PERIOD 744 5,831 235,247 6 TDE REACTOR CRITICAL 744 5,325 167,266 7 TIME REACTOR RESERVE SHUTDOWN (Hours) 0 0 0 8 TDE GENERATOR CN-LINE (Hours) 744 5,22E 159,652 9 TDE GENERATOR RESERVE SHUTDOWN (Hours) 0 1 1 10 THERMAL ENERGY GENERATED ()SfHt Gross) 1,861,708 12,747,829 335,952,802 11 EIJ:CHICAL ENERGY GE:NERATED 04fEHe Gross) 598,651 4,124,023 107,612,182 12 ELECTRICAL ENERGY GENERATED ()SfEHe Net) 574,563 3,959,565 102,066,482 13 - REACTOR SERVICE FACTOR (%) 100.0% 91.3% 71.14 14 REACTOR AVAIIABILITY FACTOR (%) 100.0% 91.3% 71.14 15 GENERATOR SERVICE FACTOR (%) 100.0% 89.7% 67.94 16 GENERATOR AVAIIABLILITY FACTOR (%) 100.01 89.7% 67.94 17 CAPACITY FACTOR (Using 1(:D Net) (%) 100.0% 88.01 56.24 18 CAPACITY FACTOR (Using DER Net) (%) 97.3% 85.5? 54.6%
j 19 EVRCED OUTAGE FACTOR (%) 0.04 4.91 14.14 I
L: 8360\8301\ misc \98\98050501.GA 7
.-. . . . ~ - .. . - . . - ..u ...n . . - . ~ . . . ~ . . . . ~ ~ . - . - - . . ~ . - . .
i l
l.
3.3- UNIT 2 SHUTDOWNS REPORT MONTH OF AUGUST 1998 NO 'DATE TYPE DURATION REAECT METHOD OF CORRECTIVE (1) (HOURS)*. (2) SHUTTING ACTIONS /
DOWN CCN!OITS REACTOR '
(3) 5 980808 1 25 A 5 See Sec. 2.1 ;
l' l.
u Year-to-date forced outage hours =' 263 Cumulative forced outage hours = 24691 TABLE KEY:
(1). (3)
F: Forced Method:
S: Scheduled 1. Manual
- 2. Manual Scram (2) Reason: 3. Automatic Scram
-A Equipment Failure (Explain) 4. Other (Explain)
B Maintenance or Test 5. Load Reduction C . Refueling l D Regulatory Restriction l
E Operator Training &
l' Licensing Exam F Administrative G Operational Error l H Other (Explain) l 1
L: 8360\8301\ misc \98\98050501.GA O 1
i 4 ,. -, , , , , , , , e- , ~ . . , nns~.-- - - , , - - - - - - + ~ , -c. - - -
e
- 4 l
l 3.4 UNIT 3 SHUTDOWNS l
REPORT MONTH AUGUST 1998 O DATE TYPE (1) DURATION REASON (2) METHOD OF CORRECTIVE (HOURS)* SHUTTING ACTIONa/
DOWN COMMENTS REACTOR l (3) '
4-Year-to-date forced outage hours = 272 Cumulative forced outage hours = 26,212 TABLE KEY:
(1) (3)
F: Forced Method:
S: Scheduled 1. Manual I
- 2. Manual Scram (2) 3. Automatic Scram Reason: 4. Other (Explain)
A Equipment Failure 5. Load Reduction (Explain) l B Maintenance or Test C Refueling D Regulatory Restriction E Operator Training &
Licensing Exam F Administrative G Operational Error H Other (Explain) l L: 8%0\8301\ misc \98\98050501.GA 9
l
~*
.' i
'4.O UNIQUE REPORTING' REQUIREMENTS 4.1 MAIN STEAM RELIEF AND/OR SAFETY VALVE OPERATIONS - ;
UNIT 2. I I
None l
4.2 Technical Specification Amendments
)
Amendment 163 to DPR-25 for Dresden U-3 was issued on ;
August 7, 1998. It revises Technical Specification l 4.6.E to allow a one-time extension of the 40-month i surveillance interval requirement to set pressure test or replace all main steam safety' valves (MSSVs) to a !
maximum interval of 6-0 months as currently allowed by the American Society of' Mechanical Engineers Boiler and ,
Pressure Vessel Code. I l
i L
I 10
( Lf,5360' 830la!!$C97.97011001.GA l