Line 14: |
Line 14: |
| | page count = 2 | | | page count = 2 |
| | project = | | | project = |
| | stage = Meeting | | | stage = RAI |
| }} | | }} |
|
| |
|
Line 28: |
Line 28: |
| ==SUMMARY== | | ==SUMMARY== |
| ON PLANT INSPECTION OF LICENSEE FIRE PROTECTION EXEMPTION REQUESTS | | ON PLANT INSPECTION OF LICENSEE FIRE PROTECTION EXEMPTION REQUESTS |
| 'By letter dated September 16, 1985, Connecticut Yankee Atomic Power Company requested eight exemptions (consisting of 36 deviations) from the requirements of Section III.G.2 of Appendix R. to 10 CFR 50. On December 10, 1985, the NRC and its technical contractor met with the licensee at the Haddam Neck plant to-' discuss the pending exemption requests and the existing' request | | 'By {{letter dated|date=September 16, 1985|text=letter dated September 16, 1985}}, Connecticut Yankee Atomic Power Company requested eight exemptions (consisting of 36 deviations) from the requirements of Section III.G.2 of Appendix R. to 10 CFR 50. On December 10, 1985, the NRC and its technical contractor met with the licensee at the Haddam Neck plant to-' discuss the pending exemption requests and the existing' request |
| , ' for additional' information. | | , ' for additional' information. |
| The licensee and the staff went to each of the 36 locations identified in_the exemption requests. At each location, the licensee described the | | The licensee and the staff went to each of the 36 locations identified in_the exemption requests. At each location, the licensee described the |
Latest revision as of 22:30, 12 December 2021
|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20216H8631999-09-24024 September 1999 Summary of 990714 Meeting with Cyap & Bpc Re Hazards Analysis of Proposed Installation of Natural gas-fired, Turbine Driven Electric Generation Facility on Site of Haddam Neck Plant.List of Attendees & Meeting Notes Encl ML20212H1911999-09-24024 September 1999 Summary of 990819 Meeting with Util & DOT to Discuss Packaging & Applicable Regulations for Haddam Neck Rv Shipment Scheduled for September 2000 ML20212J5991999-06-28028 June 1999 Summary of 990602 Meeting with Licensees to Discuss Safety & Licensing Requirements Applicable to Installation of Natural gas-fired,turbine-driven Electric Generation Facility on Site at Haddam Neck Plant ML20151W9361998-09-10010 September 1998 Summary of 980902 Meeting W/Duke Engineering & Services in Rockville,Md Re Plans to Transport Haddam Neck Reactor Vessel to Disposal Site in Barnwell,Sc.List of Meeting Attendees & Agenda,Encl ML20137Y9151997-04-21021 April 1997 Summary of 970410 Meeting W/Util in Rockville,Md Re Defueled Safeguards Plan.Portion of Meeting Concerned Proprietary Safeguards Info & Closed to Public.List of Attendees & Meeting Agenda Encl ML20140H5481996-12-19019 December 1996 Summary of 436th ACRS Meeting on 961107-09 Re Proposed Rule & Reg Guide Concerning SG Integrity.Completed Repts,Ltrs, Memos & Draft Repts Listed.Highlights of Key Issues, Considered by Committee,Submitted ML20129G7911996-10-23023 October 1996 Summary of 960904 Meeting W/Cyap in Rockville,Md Re Licensee Evaluation That Concluded That Loads on SW Sys Would Be Unacceptable Following LOCA or MSLB Accident W/Concurrent LNP Event.List of Attendees Encl ML20056H0291993-07-15015 July 1993 Summary of Operating Reactors Events Meeting 93-25 on 930707.Attendance List,Significant Elements of Discussed Events & Reactor Scram Statistics for Wk Ending 930704 Encl ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059B7331990-08-23023 August 1990 Summary of Operating Reactors Events Meeting 90-21 on 900822.Reactor Scram Statistics Encl ML20058L5721990-08-0101 August 1990 Summary of 900628 Meeting W/Util in Berlin,Ct Re Licensing Issues Associated W/Facilities,Including Generic Ltrs ML20058K4531990-06-28028 June 1990 Summary of 900613 Meeting W/Util Re Status of Crdr at Facilities.Util Agreed to Provide Isap Ranking of All Human Engineering Discrepancies Identified at Plants by 900830. Meeting Handout Encl ML20247B9101989-03-20020 March 1989 Summary of 890228 Meeting W/Util in Rockville,Md to Discuss New Switchgear Bldg Compliance W/App R.Handouts,Plant Design Change Requests,Attendance List & Agenda Encl ML20236A0601989-03-0808 March 1989 Summary of 890214-17 Meetings W/Util & Foxboro Co Re Review of Reactor Protection Sys Upgrade Implemented During 1987 Outage ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20154N5221988-05-24024 May 1988 Summary of 880510 Meeting W/Util Re Single Failure Problem W/Charging Pumps Sys.List of Attendees Encl ML20154N4501988-05-24024 May 1988 Summary of 880510 Meeting W/Connecticut Yankee Atomic Power Co & Northeast Utilities to Discuss Plans to Convert from Stainless Steel to Zircaloy Core.List of Attendees & Handout Encl ML20153F0081988-05-0202 May 1988 Summary of 880330 Meeting W/Util to Discuss Justification for Continued Operation at Reduced Power Levels Due to Calculated Reduced ECCS Flowrate During Large Break Loca. Agenda Viewgraphs Encl ML20153F0931988-04-28028 April 1988 Summary of 880407 Meeting W/Util & Applied Research Assoc Re SEP Topics III-2, Wind & Tornado Loadings & III-4.A, Tornado Missiles. List of Attendees & Viewgraphs Encl ML20153G8991988-04-28028 April 1988 Summary of 880406 Meeting W/Util Re Addl Info Concerning SEP Topic III-6, Seismic Reevaluation. Util Will Provide Listed Info in Response.Util Handout & List of Attendees Encl ML20196J2331988-03-0707 March 1988 Summary of 880208 Meeting W/Util Re NRC 870930 Request for Addl Info Concerning Facility Fire Protection of Safe Shutdown Capability ML20147G7621988-03-0101 March 1988 Summary of 880210 Meeting W/Util & NUS Co Re Reply to 880205 Request for Addl Info Re Modernization of Reactor Protection Sys.Addl Questions Resulting from Meeting & List of Attendees Encl ML20196B2671988-02-0505 February 1988 Summary of 880127 Meeting W/Util Re Use of Dual Role Senior Reactor Operator/Shift Technical Advisor.List of Attendees & Viewgraphs Encl ML20147C3461988-01-0606 January 1988 Summary of 871210 Meeting W/Util in Bethesda,Md Re Full 40-yr OL & Status of Worker ALARA Programs at Plants.List of Attendees & Viewgraphs Encl ML20237D1561987-12-15015 December 1987 Summary of 871201 Meeting W/Util Re Status of Thermal Shield Repair at Plant.Util Handout & Attendance List Encl ML20237D2581987-12-14014 December 1987 Summary of 871119 Meeting W/Util Re New Failure Mode for Steam Generator Tube Ruptures.Westinghouse Determined That Plant May Be Susceptible to Steam Generator Tube Rupture Similar to Rupture at North Anna.Meeting Handouts Encl ML20212F8491987-03-0202 March 1987 Summary of 870218 Meeting W/Util Re Licensee Proposed Plant Mods for Resolution of Recently Identified Small Break LOCA Concerns & Schedule of Completion.Viewgraphs Encl ML20212F2921986-12-30030 December 1986 Summary of Operating Reactors Events Meeting 86-45 on 861222 Re Events Which Occurred Since Last Meeting on 861215.List of Attendees & Significant Elements of Events Discussed Encl ML20215F0151986-12-16016 December 1986 Summary of Operating Reactor Events Meeting 86-43 on 861208. List of Attendees,Events Discussed & Significant Elements of Events Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20207A7781986-11-0505 November 1986 Summary of 861023 Meeting W/Util in Bethesda,Md Re Fire protection-related Issues,Including Separation of Redundant Shutdown Sys in Drywell Expansion Gap ML20215G6351986-09-25025 September 1986 Handwritten Summary of 860925 Meeting W/Util Re Engineering Expertise on Shift.Viewgraphs Encl ML20206M0371986-08-0808 August 1986 Summary of 860508 Meeting W/Util in Region I Ofc Re Questions Resulting from Review of Plant Pump & Valve Inservice Testing Program & Licensee Responses.List of Attendees & Questions Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20211E1981986-06-10010 June 1986 Summary of 860519 Meeting W/Util Re Proposed Changes in Administrative & Reporting Requirements Tech Specs Contained in 820723,830502,850709 & 0813 applications.Marked-up Rev to Tech Specs for Fire Protection Sys Encl ML20210U2221986-05-28028 May 1986 Summary of 860514 Meeting W/Util in Bethesda,Md Re Status of Outstanding Fire Protection Review Issues,Including Util Rept Addressing Generic Ltr 81-12.List of Attendees Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20155G9461986-05-0101 May 1986 Summary of 860423 Meeting W/Util Re Request for Exemption from GDC 35 & Results of Small Range of Break Sizes in Loop of RCS Analysis ML20203C0081986-04-15015 April 1986 Summary of 860404 Meeting W/Util & B&W Re Revised Core Loading Pattern.Dnbr & Peak Fuel Centerline Temp Increased But within Design Values for Plant ML20155D9231986-04-11011 April 1986 Summary of 860401 Meeting W/Util Re Requested Schedular Exemption from Fire Protection Mods to Switchgear Room. Discussion Items from Meeting Listed ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20141D5941986-03-31031 March 1986 Summary of 860320 Meeting W/Util Re in-house Reload Analysis Capability,Per Generic Ltr 83-11.Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154J2871986-03-0303 March 1986 Summary of 860123 Meeting W/Licensee & B&W Re NRC Concerns W/Pending Cycle 14 Reload Application,Methodology for Calculating Reduction in Engineering Hot Channel Factor & Tech Specs Changes ML20138M9761985-12-18018 December 1985 Summary of 851210 Meeting W/Util at Plant Re Pending Requests for Exemptions from Section III.G.2 of App R to 10CFR50 & Request for Addl Info ML20138N3501985-12-17017 December 1985 Summary of 851126 Meeting W/Util Re Proposed Design of Permanent Reactor Cavity Pool Seal & Util Position on Use of leak-before-break.List of Attendees & Viewgraphs Encl ML20210A5011985-11-14014 November 1985 Summary of 851028-30 Meetings W/Utils Re Plant Mods in Response to IE Bulletin 80-11 Masonry Wall Design ML20133C4951985-10-0404 October 1985 Summary of 851002 Meeting W/Util Re Use of Feed & Bleed Core Cooling in Lieu of Qualifying Equipment Outside Containment.Suppl to Safety Evaluation & Schwencer Forwarding Amend 16 to License DPR-61 Encl ML20133E4631985-10-0101 October 1985 Summary of Operating Reactors Events Meeting 85-17 on 850923.List of Attendees & Viewgraphs Encl 1999-09-24
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20216H8631999-09-24024 September 1999 Summary of 990714 Meeting with Cyap & Bpc Re Hazards Analysis of Proposed Installation of Natural gas-fired, Turbine Driven Electric Generation Facility on Site of Haddam Neck Plant.List of Attendees & Meeting Notes Encl ML20212H1911999-09-24024 September 1999 Summary of 990819 Meeting with Util & DOT to Discuss Packaging & Applicable Regulations for Haddam Neck Rv Shipment Scheduled for September 2000 ML20212J5991999-06-28028 June 1999 Summary of 990602 Meeting with Licensees to Discuss Safety & Licensing Requirements Applicable to Installation of Natural gas-fired,turbine-driven Electric Generation Facility on Site at Haddam Neck Plant ML20151W9361998-09-10010 September 1998 Summary of 980902 Meeting W/Duke Engineering & Services in Rockville,Md Re Plans to Transport Haddam Neck Reactor Vessel to Disposal Site in Barnwell,Sc.List of Meeting Attendees & Agenda,Encl ML20137Y9151997-04-21021 April 1997 Summary of 970410 Meeting W/Util in Rockville,Md Re Defueled Safeguards Plan.Portion of Meeting Concerned Proprietary Safeguards Info & Closed to Public.List of Attendees & Meeting Agenda Encl ML20129G7911996-10-23023 October 1996 Summary of 960904 Meeting W/Cyap in Rockville,Md Re Licensee Evaluation That Concluded That Loads on SW Sys Would Be Unacceptable Following LOCA or MSLB Accident W/Concurrent LNP Event.List of Attendees Encl ML20056H0291993-07-15015 July 1993 Summary of Operating Reactors Events Meeting 93-25 on 930707.Attendance List,Significant Elements of Discussed Events & Reactor Scram Statistics for Wk Ending 930704 Encl ML20062C8111990-10-16016 October 1990 Summary of Operating Reactors Events Meeting 90-25 on 901010.List of Attendees,Reactor Scram Statistics & Tabulation of Events Encl ML20059B7331990-08-23023 August 1990 Summary of Operating Reactors Events Meeting 90-21 on 900822.Reactor Scram Statistics Encl ML20058L5721990-08-0101 August 1990 Summary of 900628 Meeting W/Util in Berlin,Ct Re Licensing Issues Associated W/Facilities,Including Generic Ltrs ML20058K4531990-06-28028 June 1990 Summary of 900613 Meeting W/Util Re Status of Crdr at Facilities.Util Agreed to Provide Isap Ranking of All Human Engineering Discrepancies Identified at Plants by 900830. Meeting Handout Encl ML20247B9101989-03-20020 March 1989 Summary of 890228 Meeting W/Util in Rockville,Md to Discuss New Switchgear Bldg Compliance W/App R.Handouts,Plant Design Change Requests,Attendance List & Agenda Encl ML20236A0601989-03-0808 March 1989 Summary of 890214-17 Meetings W/Util & Foxboro Co Re Review of Reactor Protection Sys Upgrade Implemented During 1987 Outage ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20154N5221988-05-24024 May 1988 Summary of 880510 Meeting W/Util Re Single Failure Problem W/Charging Pumps Sys.List of Attendees Encl ML20154N4501988-05-24024 May 1988 Summary of 880510 Meeting W/Connecticut Yankee Atomic Power Co & Northeast Utilities to Discuss Plans to Convert from Stainless Steel to Zircaloy Core.List of Attendees & Handout Encl ML20153F0081988-05-0202 May 1988 Summary of 880330 Meeting W/Util to Discuss Justification for Continued Operation at Reduced Power Levels Due to Calculated Reduced ECCS Flowrate During Large Break Loca. Agenda Viewgraphs Encl ML20153G8991988-04-28028 April 1988 Summary of 880406 Meeting W/Util Re Addl Info Concerning SEP Topic III-6, Seismic Reevaluation. Util Will Provide Listed Info in Response.Util Handout & List of Attendees Encl ML20153F0931988-04-28028 April 1988 Summary of 880407 Meeting W/Util & Applied Research Assoc Re SEP Topics III-2, Wind & Tornado Loadings & III-4.A, Tornado Missiles. List of Attendees & Viewgraphs Encl ML20196J2331988-03-0707 March 1988 Summary of 880208 Meeting W/Util Re NRC 870930 Request for Addl Info Concerning Facility Fire Protection of Safe Shutdown Capability ML20147G7621988-03-0101 March 1988 Summary of 880210 Meeting W/Util & NUS Co Re Reply to 880205 Request for Addl Info Re Modernization of Reactor Protection Sys.Addl Questions Resulting from Meeting & List of Attendees Encl ML20196B2671988-02-0505 February 1988 Summary of 880127 Meeting W/Util Re Use of Dual Role Senior Reactor Operator/Shift Technical Advisor.List of Attendees & Viewgraphs Encl ML20147C3461988-01-0606 January 1988 Summary of 871210 Meeting W/Util in Bethesda,Md Re Full 40-yr OL & Status of Worker ALARA Programs at Plants.List of Attendees & Viewgraphs Encl ML20237D1561987-12-15015 December 1987 Summary of 871201 Meeting W/Util Re Status of Thermal Shield Repair at Plant.Util Handout & Attendance List Encl ML20237D2581987-12-14014 December 1987 Summary of 871119 Meeting W/Util Re New Failure Mode for Steam Generator Tube Ruptures.Westinghouse Determined That Plant May Be Susceptible to Steam Generator Tube Rupture Similar to Rupture at North Anna.Meeting Handouts Encl ML20212F8491987-03-0202 March 1987 Summary of 870218 Meeting W/Util Re Licensee Proposed Plant Mods for Resolution of Recently Identified Small Break LOCA Concerns & Schedule of Completion.Viewgraphs Encl ML20212F2921986-12-30030 December 1986 Summary of Operating Reactors Events Meeting 86-45 on 861222 Re Events Which Occurred Since Last Meeting on 861215.List of Attendees & Significant Elements of Events Discussed Encl ML20215F0151986-12-16016 December 1986 Summary of Operating Reactor Events Meeting 86-43 on 861208. List of Attendees,Events Discussed & Significant Elements of Events Encl ML20215D0631986-12-11011 December 1986 Summary of Operating Reactor Events Meeting 86-42 on 861201. List of Attendees & Viewgraphs Re Significant Elements of Events Discussed Encl ML20207A7781986-11-0505 November 1986 Summary of 861023 Meeting W/Util in Bethesda,Md Re Fire protection-related Issues,Including Separation of Redundant Shutdown Sys in Drywell Expansion Gap ML20215G6351986-09-25025 September 1986 Handwritten Summary of 860925 Meeting W/Util Re Engineering Expertise on Shift.Viewgraphs Encl ML20206M0371986-08-0808 August 1986 Summary of 860508 Meeting W/Util in Region I Ofc Re Questions Resulting from Review of Plant Pump & Valve Inservice Testing Program & Licensee Responses.List of Attendees & Questions Encl ML20211G7781986-06-13013 June 1986 Summary of Operating Reactor Events Meeting 86-19 on 860609. List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20211E1981986-06-10010 June 1986 Summary of 860519 Meeting W/Util Re Proposed Changes in Administrative & Reporting Requirements Tech Specs Contained in 820723,830502,850709 & 0813 applications.Marked-up Rev to Tech Specs for Fire Protection Sys Encl ML20210U2221986-05-28028 May 1986 Summary of 860514 Meeting W/Util in Bethesda,Md Re Status of Outstanding Fire Protection Review Issues,Including Util Rept Addressing Generic Ltr 81-12.List of Attendees Encl ML20197F7721986-05-0808 May 1986 Summary of Operating Reactors Events Meeting 86-15 on 860505.List of Attendees,Events Discussed & Status of Previous Assignments Encl ML20197F1691986-05-0808 May 1986 Summary of Operating Reactors Events 860428 Meeting W/Listed Divs Re Chernobyl Nuclear Accident & Events at Us Reactors ML20155G9461986-05-0101 May 1986 Summary of 860423 Meeting W/Util Re Request for Exemption from GDC 35 & Results of Small Range of Break Sizes in Loop of RCS Analysis ML20203C0081986-04-15015 April 1986 Summary of 860404 Meeting W/Util & B&W Re Revised Core Loading Pattern.Dnbr & Peak Fuel Centerline Temp Increased But within Design Values for Plant ML20155D9231986-04-11011 April 1986 Summary of 860401 Meeting W/Util Re Requested Schedular Exemption from Fire Protection Mods to Switchgear Room. Discussion Items from Meeting Listed ML20141F4091986-04-10010 April 1986 Summary of Operating Reactors Events Meeting 86-10 W/Ofc Director,Div Directors & Representatives Re Events Since 860324.Viewgraphs & Supporting Documentation Encl ML20141D5941986-03-31031 March 1986 Summary of 860320 Meeting W/Util Re in-house Reload Analysis Capability,Per Generic Ltr 83-11.Viewgraphs Encl ML20154P0071986-03-12012 March 1986 Summary of Operating Reactor Events 860303 Meeting 86-06 W/Ornl Re Events Occurring Since 860224 Meeting.Followup Review Assignments,Status of Previous Assignments,List of Attendees & Viewgraphs Encl ML20154J2871986-03-0303 March 1986 Summary of 860123 Meeting W/Licensee & B&W Re NRC Concerns W/Pending Cycle 14 Reload Application,Methodology for Calculating Reduction in Engineering Hot Channel Factor & Tech Specs Changes ML20138M9761985-12-18018 December 1985 Summary of 851210 Meeting W/Util at Plant Re Pending Requests for Exemptions from Section III.G.2 of App R to 10CFR50 & Request for Addl Info ML20138N3501985-12-17017 December 1985 Summary of 851126 Meeting W/Util Re Proposed Design of Permanent Reactor Cavity Pool Seal & Util Position on Use of leak-before-break.List of Attendees & Viewgraphs Encl ML20210A5011985-11-14014 November 1985 Summary of 851028-30 Meetings W/Utils Re Plant Mods in Response to IE Bulletin 80-11 Masonry Wall Design ML20133C4951985-10-0404 October 1985 Summary of 851002 Meeting W/Util Re Use of Feed & Bleed Core Cooling in Lieu of Qualifying Equipment Outside Containment.Suppl to Safety Evaluation & Schwencer Forwarding Amend 16 to License DPR-61 Encl ML20133E4631985-10-0101 October 1985 Summary of Operating Reactors Events Meeting 85-17 on 850923.List of Attendees & Viewgraphs Encl ML20127K0201985-05-17017 May 1985 Summary of 850430 & 0501 Meetings W/Util in Berlin,Ct Re Status of Licensing Actions & Integrated Safety Assessment Program.Purchase of Spare Main Transformer & Improvements to Secondary Water Chemistry Program Discussed 1999-09-24
[Table view] |
Text
,
]
.. . December 18, 1985 Docket Nos. 50-213 LICENSEE: Connecticut Yankee Atomic Power Company
-FACILITY: Haddam Neck Plant
SUBJECT:
MEETING
SUMMARY
ON PLANT INSPECTION OF LICENSEE FIRE PROTECTION EXEMPTION REQUESTS
'By letter dated September 16, 1985, Connecticut Yankee Atomic Power Company requested eight exemptions (consisting of 36 deviations) from the requirements of Section III.G.2 of Appendix R. to 10 CFR 50. On December 10, 1985, the NRC and its technical contractor met with the licensee at the Haddam Neck plant to-' discuss the pending exemption requests and the existing' request
, ' for additional' information.
The licensee and the staff went to each of the 36 locations identified in_the exemption requests. At each location, the licensee described the
' ^ current' deficiency in compliance with the necessary Appendix R requirements and described the compensatory measures (detection and/or suppression) currently existing. The licensee also described why they felt that the existing fire protection was adequate.-
H :Upon~ completion of the' plant walkdown, the staff discussed with the licensee-those areas where it . felt the existing evaluations were' inadequate and where
- additional information may be necessary. In particular, the inadequacies of
~the evaluations Exemption concerning(Exemption Nos. 4, No. 5 _in 7 and 8 lack of fire dampers (structural steel) ventilation and parts of penetrations)
-were~ highlighted.
The meeting adjourned with the understanding that the contractor would review the information and provide the NRC project manager any additional requests for information necessary to support the licensees exemption requests. It was'also agreed that the licensee would respond to the existiro and future L ' requests for information simultaneously to assure the completeness of the i
response package.
Original signed by: F. Akstulewicz Francis M. Akstulewicz Integrated Safety Assessment Project Directorate Division of PWR Licensing - B cc: See Next Page DISTRIBUTION QDocketJ11e;d FAkstulewicz E. Jordan ISAPD Reading JStang B. Grimes NRC PDR DKubicki J. Partlow Local PDR FMiraglia PAnderson NSIC OELD ACRS (10)
JI R-B ISAPD:PWR-B IS P FAkstulewicz CGrimes 12/pg /85 12/f/85 12/fy/85 f
F512230299 851218 i PDR ADOCK 05000213 C~F PDR
, Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry.& Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant RDF 11 Post Office Box 127E East Hampton, Connecticut 06424 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
.