June 28, 1990 Docket Nos. 50-21 V i
and 50-24C LICENSEE: Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company FACILITY: Haddam Neck Plant l
Millstone Nuclear Power Station, Unit 1 SUBJECTS
'UMMARY OF JUNE 13, 1990 MEETING REGARDING CONTROL ROOM musIGN REVIEWS AT MILLSTONE 1 AND HADDAM NECK
-On June 13, 1990, the NRC staff meet with Northeast Utilities (NU) to discuss the' status of the control room design reviews, (CRDR) at the Millstone 1 and Haddam Neck Plants. The staff had initiated the meeting becaust based on the review of the proposed Integrated Safety Assessment Program (ISAP) schedules it was not clear which human engineering discrepancies (HEDs) in the CRDR Summary Reports would be resolved and at what schedule.
The staff requested l
NU to clarify the ISAP process, the CRDR process, and their interrelationship i
for the Millstone l'and Haddam Neck' Plants.
In additMn the staff requested NU to provide a list of the HEDs to be corrected ano tae implementation 4
schedule. NU explained the ISAP process and stated that their intention was to always meet the proposed schedule in the CRDR Summary Reports. The ISAP process is a "living" process used by NU to prioritize the CRDR reviews and integrate the corrections with all other ongoing plant projects.
NU stated that the ISAP review has been completed for the Millstone 1 Plant l
and that a'11 HEDs identified in the Summary Report will be resolved over the next tnree refueling outages. The staff noted that NU should document any future changes to the schedule including'the justification for the deletion o# any HEDs to be corrected. NU stated that this would be done as part of the periodic update to the ISAP schedule.
For the Hadoam Neck Plant, NU stated the ISAP process-is not complete. NU agreed to provide the ISAP ranking of all HEDs identified at Haddam Neck by August 30, 1990 with the intention that.
l all HEDs will-be corrected over the next three refueling outages.
Enclosed is CYAPCO's handout for the meeting and the attendance list.
Original signed by Alan B. Wang, Project Manager L
Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Enclosures As stated cc w/ enclosures See next page
[
SUMMARY
OF MEETING]
SNofRs AWang/Bak MBoyle hl f0k PDI-4:O PDI-4:PM PDI-4:P PDI-4:
JStolz 6/#790 6/T[/90 6/y/90 6/g/9 90C77880F/ 900622 g
PDR ADOCK 05000213 p
R
\\
- DISTRIBUTION Dated: June 28, 1990
.l c
t N Docket file:
o NRC & l'PDRs i
+ -
PDI-4 Rdg l
SVarga
-s L
BBoger-l l-
~JStolz
-AWang OGC EJorden
.ACRS:(10)
.FMiraglia JPartlow.
JCaldwell i
MBoyle o-GVissing CThomas JWermiel-REckenrode-CGoodman JBongarra j
L o
i
' q i
i l
l
l
- [
%g UNITED STATES (l'
NUCLEAR REGULATORY COMMISSION n
WASHINGTON, D. C. 20555 8
June 28, 1990 Docket Nos. 50-219 and 50-245 4
i LICENSEE: Connecticut Yankee Atomic Power Company Northeast Nuclear Energy Company FACILITY: Haddam Neck Plant Millstone Nuclear Power Station, Unit 1
SUBJECT:
SUMMARY
OF JUNE 13, 1990 MEETING REGARDING CONTROL ROOM DESIGN REVIEWS AT MILLSTONE 1 AND HADDAM NECK On June 13, 1990, the NRC staff meet with Northeast Utilities (NU) to discuss the status of the control room design reviews (CRDR) at the Millstone 1 and Haddam Neck Plants. The staff had initiated the meeting because based on the review of the proposed Integrated Safety Assessment Program (ISAP) schedules it was not clear which human engineering discrepancies (HEDs) in the CRDR Sumary Reports would be resolved and at what schedule. The staff _ requested NU to clarify the ISAP process, the CRDR process, and their interrelationship for the Millstone 1 and Haddam Neck Plants.
In addition the staff requested NU to provide a list of the HEDs to be corrected and the implementation schedule. NU ex)lained the ISAP process and stated that their intention was to always meet tie proposed schedule in the CRDR Sumary Reports. The ISAP process is a "living" process used by NU to prioritize the CRDR reviews and integrate the corrections with all other ongoing plant projects.
NU stated that the ISAP review has been completed for the Millstone 1 Plant and that all HEDs identified in the Sumary Report will be resolved over the next three refueling outages. The staff noted that NU should document any future changes to the schedule including the justification for the deletion of any HEDs to be corrected. NU stated that this would be done as part of the periodic update to the ISAP schedule.
For the Haddam Neck Plant, NU stated the ISAP process is not complete. NU agreed to provide the ISAP ranking of all HEDs identified at Haddam Neck by August 30, 1990 with the intention that all HEDs will be corrected over the next three refueling outages.
Enclosed is CYAPCO's hadout for the meeting and the attendance list.
n.b Alan B. Wang, Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Enclosures As stated cc w/ enclosures See next page
Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:
Gerald Garfield. Esquire R. M. Kacich, Manager i
Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Director of Quality Services Northeast Utilities Service Company Northeast Utilities Service Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Regional Administrator Radiation Control Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Connission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia, Pennsylvania 19406 Bradford S. Chase, Under Secretary Board of Selectmen Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington Street Hartford, Connecticut 06106 J. T. Shedlosky, Resident Inspector Haddam Neck Plant E. A. DeBarba, Nuclear Station Director c/o V. S. Nuclear Regulatory Commission Haddam Neck Plant Post Office Box 116
' Connecticut Yankee Atomic Power Company East Haddam Post Office RFD 1 Post Office Ecx 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G. H. Bouchard, Nuclear Unit Director E
Haddam Neck Plant Connecticut Yankee Atomic Power Company RFD 1. Post Office Box 127E East Hampton, Connecticut 06424 l
MILLSTONE 1 HADDAM NECK CRDR Heeting 6/13/90 1
NAME COMPANY PHONE
\\
Alan Wang NRR/PDI-4 301-492-3475 Michael Boyle NRR/PDI-4 301-492-1495 Paul A. Blasioli NU/Superviser-Nuclear Lic 203-665-3684 Fred Sears NU/VP-Nuc. & Emr. Eng.
203-665-3758 Tom Shaffer NU/ Manager I&C Eng.
203-665-3774 William Nou NU/ Engineer Millstone Unit One 203-447-1791 Bob McCarthy NU/GIC Eng'r (CRDR Proj. Eng.)
203-665-3926 Guy S. Vissing NRR/PDI-4 301-492-1496 Haz Young NU/ GEN FACIL. Licensing 203-665-3717 S. Varga NRC/DRP 301-492-1403 Cecil Thomas NRC/DLPQ 301-492-0548 John F. Stolz NRR/PDI-4/NRC 301-492-1491 J.S. Wermiel NRR/DLPQ/LHFB 301-492-1015 R.J. Eckenrode NRR/DLPQ/HFAB 301-492-3172 Clare Goodman NRR/DLPQ/HFAB 301-492-1047 J.P. Bongarra, Jr.
NRR/0CPQ/LHFB 301-492-1046
~
AGENDA L
1.
1, o
o INTRODUCTION C. F. SEARS o
OVERVIEW-C. F. SEARS o-MILLSTONE UNIT NO. 1 P. A. BLASIOLI CONTROL ROOM DESIGN REVIEW CHRONOLOGY AND SLM4ARY o
HADDAM. NECK PLANT P. A. BLASIOLI CONTROL ROOM DESIGN-REVIEW l
CHRONOLOGY AND SlH4ARY 0
ISAP/IIS PROCESS AND OVERSIGHT
.R. H. YOUNG, JR.
T i
o CONCLUSIONS C. F. SEARS
f.
INTRODUCTION PURPOSE:
o CLARIFY ISSUES RELATING TO THE ISAP_ PROCESS, THE CONTROL ROOM DESIGN REVIEW
- PROCESS, AND THEIR INTERRELATIONSHIP AT MILLSTONE UNIT NO. 1 AND THE HADDAM NECK PLANT.
o PROVIDE IMPLEMENTATION SCHEDULE INFORMATION FOR THESE TWO PLANTS.
I
CONTROL ROOM DESIGN REVIEW BACKGROUND DECEMBER 17, 1982:
NRC-STAFF ISSUED NUREG 0737 SUPPLEMENT 1.
APRIL 15, 1983:
NU LETTER STATING PLANS TO PERFORM CRDR
)
FOR 4 UNITS IN SERIES AND AGREEING TO SEQUENCE MILLSTONE UNIT NO. 3
- FIRST, THEN TO INITIATE ONE PER YEAR THROUGH COMPLETION.
NOVEMBER 28, 1983:
NU SUPPLIED INTEGRATED IMPLEMENTATION SCHEDULES FOR THE HADDAM NECK
- PLANT, MILLSTONE UNIT NO. 1, AND MILLSTONE. UNIT NO. 2.
FOLLOWING MILLSTONE UNIT NO. 3
- CRDR, SEQUENCE PROPOSED WAS MILLSTONE UNIT NO. 2, HADDAM NECK PLANT, AND MILLSTONE L
UNIT NO. 1.
JULY 31, 1985:
NRC APPROVED INCLUSION OF CRDR INTO ISAP.
I
i 1SAE h
LONG NRC/NU PARTICIPATION IN ISAP.
o C00441SSION POLICY STATEMENT (49 FR 45112)
ON THE SYSTEMATIC SAFETY EVALUATION OF OPERATING NUCLEAR POWER PLANTS (NOVEMBER 1984) DESCRIBING ISAP.
o 0FFERED TO LICENSEES IN GENERIC LETTER 88-02.
o LINKED TO INDIVIDUAL PLANT EXAMINATION (IPE) GL 88-20 AND NUREG-1335; ISA OPTION.
o RECEIVED NUMEROUS FAVORABLE ENDORSEMENTS AMONG STAFF-AND C0t44ISSIONERS.
SUBJECT OF NUMEROUS SECYs.
o-
" INTEGRATED" ASSESSMENT, RESOURCES TO HIGNEST RANKINGS.
o JUNE NU/NRC ISAP MEETING CURRENTLY PLANNED.
= = = - = - - - - - -
ae
I CRDR/ISAP INTEGRATION PR0 FESS
(
O CRDR COMPLETED AND HEDS REQUIRING CORRECTION ARE IDENTIFIED.
1 o
TOTAL PACKAGE EVALUATED AND RANKED IN ISAP.
l o
' GROUPS OF HEDs FURTHER. EVALUATED-AND RANKED IN ISAP.
j L
i o
ALL GROUPS RANKED SUFFICIENTLY HIGH IN ISAP ARE SCHEDULED IN IIS.
o MEETING (S)
CONDUCTED WITH
- CRDR, ISAP, AND PLANT MANAGEMENT PERSONNEL TO COLLECTIVELY DISPOSITION
-REMAINING HED GROUPS.
ABSENT CONSENSUS, UNIT DIRECTOR MAKES DECISION.
1
.1
MILLSTONE UNIT NO. 1 CONTROL ROOM DESIGN REVIEW CHRONOLOGY 1,
s JUNE 12, 1984:
NRC STAFF ISSUED CONFIRMATORY ORDER ON SUPPLEMENT 1 TO NUREG-0737 FOR MILLSTONE UNIT N0. 1.
ORDER REQUIRED THE FOLLOWING BY.
MARCH 2, 1987:-
o SUBMITTAL OF CRDR IMPLEMENTATION PLAN.
o SCHEDULE TO SUBMIT CRDR SUMARY-REPORT.
MARCH 2, 1987:
-SUBMITTED- -CRDR IMPLEMENTATION-l PLAN AND COMITTED TO SUBMIT SUMARY l
REPORT BY FEBRUARY 28, 1989.
u FEBRUARY 28, 1989:
NNECO REQUESTED POSTPONEMENT
.TO OCTOBER 30, 1989 0F SUMARY REPORT DUE-u TO REV.
4 EPG INTERRELATIONSHIP AND ISAP.
1 AUGUST 23, 1989:
HEDs GROUPED INTO 23 PACKAGES.
[
MILLSTONE UNIT N0.1 CONTROL ROOM DESIGN REVIEW CHRON0 LOGY (CONT.)
SEPTEMBER 29, 1989:
NNEC0 SUBMITTED ISAP. REPORT (SINGLE EVALUATION)
INCLUDING IMPLEMENTATION-SCHEDULES FOR ALL HEDs FOR-3 CON-SECUTIVE REFUEL OUTAGES BEGINNING IN 1991 AND ENDING IN 1995.
DUE T0. MODERATE ISAP RANKING, NNECO WAS.
CONSIDERING THE APPROPRIATENESS OF PERFORMING CERTAIN.
HED CORRECTIONS.
- FURTHER, AS PART 0F THE CONTINUOUS
- REVIEW, NNECO ANNOUNCED INTENTION TO PERFORM ISAP EVALUATION 0F THE PROPOSED CORRECTIONS FOR INDIVIDUAL OR GROUPS OF HEDS.
OCTOBER 30, 1989:
CRDR StH4ARY REPORT-SUBMITTED WITH-IMPLEMENTATION SCHEDULES..
' JANUARY 17, 1990:
HEDs REGROUPED INTO 18 ISAP PACKAGES BASED ON SAFETY SIGNIFICANCE AND LOGISTIC IMPACT.
FEBRUARY 23, 1990:
ALL HED GROUPS EVALUATED IN ZSAP.
APRIL 30, 1990:
NNECO TRANSMITTED THE ROUTINE ISAP/IIS PERIODIC SUBMITTAL, INCLUDING DETAILED WRITE-UP 0F CRDR HED GROUPS AND IIS.
MILLSTONE UNIT NO. 1 CONTROL ROOM DESIGN.REYIH_CHR010LQGLSulBMLY APRIL 30, 1990:
ISAP/IIS PROVIDED CRDR SCHEDULES FOR BB 0F i
HEDs (14 0F 18 GROUPS SCHEDULED IN THE IIS) EVALUATED IN ISAP.
JUNE 8,_1990:
UNIT DIRECTOR MEETING WITH CRDR AND ISAP PERSONNEL TO RESOLVE REMAINDER OF HEDs.
TODAY:
1 0F THE REMAINING GROUPS (GROUP 10)
ALREADY ACCOMPLISHED.
3 GROUPS (GROUPS 1, 4,
AND 13)
WILL BE ACCOMPLISHED BEFORE OR DURING THE 1995 REFUEL OUTAGE.
1 0
18 GROUPS OF HEDs IDENTIFIED IN MILLSTONE UNIT NO.1 ISAP ARE CURRENTLY SCHEDULED IN THE IIS FOR. NO LATER THAN 1995.
o REMAINING 47 NON-ISAP HEDs (E.G.,
001440NICATIONS, TRAINING, ADMINISTRATIVE CONTROLS, ETC.) ARE SCHEDULED AS FOLLOWS:
14 COMPLETED 27 IW-PROGRESS 6 SCHEDULED FOR NO LATER THAN 1995 0UTAGE o.
ISAP PROCESSING DOES H0I DELAY IMPLEMENTATION OF CRDR
- HEDs, RATHER IT BETTER ASSURES IMPLEMENTATION 0F THE HIGHEST PRIORITY.HEDs FIRST.
u m ut-mmmm -m i
m-
o e
L HADDAM NECK CONTROL ROOM DESIGN REVIEW CHRONOLOGY L
l JUNE ~12, 1984:
ORDER ISSUED REQUIRING THE FOLLOWING BY FEBRUARY 28, 1986: -
o SUBMITTAL OF CRDR
. IMPLEMENTATION PLAN.
1 o
SCHEDULE TO
' SUBMIT CRDR SUMARY REPORT.
~
FEBRUARY 28, 1986:
CYAPC0 SUBMITTED CRDR IMPLEMENTATION PLAN AND COMITTED TO SUBMIT SUWARY REPORT BY FEBRUARY 25, 1988.
1 JULY 2, 1986:
NRC ORDER CONFIRMING HADDAM NECK PLANT C01441THENTS.
SPECIFICALLY, ORDER 1
REQUIRED SUBMITTAL OF SUM ARY REPORT BY FEBRUARY 25, 1988.
AUGUST. 10 13, 1987:
IN-PROGRESS AUDIT.
NO AUDIT REPORT ISSUED.
JANUARY 29, 1988:
CYAPC0 REQUESTED EXTENSION TO CRDR-SUMARY REPORT TO ALLOW SCHEDULING OF PROPOSED HED CORRECTIONS IN ISAP (FEBRUARY 25, 1988 TO NOVEMBER 1, 1988).
L HADDAM NECK CONTROL ROOM DESIGN REVIEW CHRONOLOGY (CONT.)
L FEBRUARY 25, 1988:
NRC LETTER END0RSING HED -SCHEDULING-IN
~
i ISAP AND SUMARY REPORT SCHEDULE EXTENSION.
APRIL 26, 1988:
CRDR HEDs EVALUATED AS SINGLE TOPIC IN ISAP.
OCTOBER 31, 1988:
CYAPC0 SUBMITTED CRDR SUMARY REPORT PROVIDING HED IMPLEMENTATION SCHEDULE IN ACCORDANCE WITH CONFIRMATORY ORDER (4 CONSECUTIVE OUTAGES BEGINNING 1991).
DUE TO LOW ISAP
- RANKING, SUBSEQUENT ISAP.
EVALUATIONS (AND SCOPE / SCHEDULE CHANGES)
WOULD BE REPORTED-IN SUBSEQUENT ISAP/IIS UPDATE SUBMITTALS TO STAFF.
L i
MARCH 2, 1989:
CYAPC0 SUBMITTED ISAP REPORT INDICATING LOW RANKING.
(PROPOSED INDIVIDUAL OR GROUP EVALUATION TO IDENTIFY THOSE HEDS WITH HIGHEST SIGNIFICANCE.)
MARCH 29, 1989:
HEDs BROKEN OUT INTO INDIVIDUAL WORK PACKAGES.
MAY 23, 1989:
HEDs REVIEW MEETING WITH KEY ISAP AND CRDR PERSONNEL.
a ev*.
+
HADDAM NECK i
CONTROL ROOM DESIGN REVIEW CHRONOLOGY (CONT.)
o MAY 31, 1989:
HEDs PACKAGES REVIEWED AT. SIMULATOR, WITH HUMAN
- FACTORS, CRDR, AND ISAP
~
EVALUATION PERSONNEL.
JUNE 22, 1989:
HEDs PACKAGES GROUPED FOR EVALUATION.
JULY 22, 1989:
HEDs GROUPS PRIORITIZED (USING ENGINEERING JUDGMENT),
- 6. HIGHEST PRIORITY GROUPS EVALUATED IN-ISAP.
AUGUST 8, 1989:
HEDs GROUP EVALUATIONS RANKED WITH 4
OTHER HADDAM NECK PLANT PROJECT-TOPICS.
DECEMBER 12-13, 1989:
CRDR AUDIT BY NRC STAFF.
AUDIT REPORT /SER--NOT YET ISSUED.
APRIL 30, 1990:
HADDAM NECK PLANT-TRANSMITTED PERIODIC ISAP/IIS SUBMITTAL INCLUDING DETAILED WRITE-UP 0F CRDR AND IIS.
HADDAM NECK CONTROL ROOM DESIGN REVIEW SUMARY l
o
'595 HEDs RECOMENDED TO MANAGEMENT FOR RESOLUTION.
o 55 WILL BE CORRECTED-WITH OTHER PROJECTS AND ARE SCHEDULED IN APRIL 30, 1990 IIS.
2 WITH APPENDIX R MODIFICATIONS (ISAP TOPIC 1.14).
44 WITH RPS REPLACEMENT PROJECT (ISAP TOPIC 2.04).
J 9 WITH NI REPLACEMENT PROJECT (ISAP TOPIC 2.18).
o 92 NON-ISAP HEDs (82 ARE COMPLETED).
]
o AN ADDITIONAL 317-.HEDs EVALUATED IN ISAP 314 SCHEDULED IN APRIL 30,1990 IIS (1991 THROUGH 1994 REFUELING OUTAGES).
3 HEDs REQUIRE FURTHER EVALUATION o
131 HEDs PRESENTLY UNDERGOING ISAP EVALUATION.
o REMAINING 144 WILL BE DISPOSITIONED AND SCHEDULED FOR IMPLEMENTATION IN SEPTEMBER 30,-
1990-ISAP/IIS SUBMITTAL.
(THOSE BEING IMPLEMENTED ARE EXPECTED TO BE SCHEDULED FOR 1991, 1992, 1994 REFUEL OUTAGES.)
o ISAP PROCESSING DOES H0I DELAY IMPLEMENTATION OF CRDR
- HEDs, RATHER IT BETTER ASSURES IMPLEMENTATION OF THE HIGHEST PRIORITY HEDs FIRST.
s N
S yN D
D E
O E
C I
I R
O T
e":
C r
C U
A S
O S
A u
T S
g:
NS -
T L
N E
E R
G y
E A
A.
M ENS
)
UO A
LP M
I I
I D
C c
(
ETARG T
ET R
N I
A t'o N
l H
N S
n R
E O
O P
C M
I T
T C
K E
A A
C 8
M W
Z F
A 08 S
A I
TN)
L V
B T
O I
C I
A A
R N
P T
G O
R L
L I
O S
E T
T RB I
I T
S S
O N
F R
P N
O e
W K
g PR E
C I
88 CI A
R S(
LA
='
C c
c IT I
P N
I A
G 0
L0 S
A00 I 0 T9 0A l
9R 8
I GN IK d
NAR
)
7 4
4 L M E
T LD R E
S C
O AO S
L G
CM A E
E I
C C A I
T Y
f I
T
(
U C
B T
0 Y I
T I I 0
Y 8
UE 0T GR C
L R
BF 9E O O E
9 O
A T
UA RF O F N
ta A
PS CE R
l A
EP P
y 4
4
'< S u
lllll
p 1
CONCLUSION o
-CLARIFIED ISSUES RELATING TO CRDR AND ISAP.
o ALL CRDR CONFIRMATORY ORDER REQUIREMENTS WERE MET.
o ACTIONS CONSISTENT WITH COMITNENTS AND MUTUALLY AGREED UPON APPROACHES.
o EVALUATING CRDR IN ISAP DOES RQI DELAY IMPLEMENTATION OF HED CORRECTION.
o ISAP UTILIZED TO 'PRIORITIZE AND INTEGRATE HED GROUPS WITHIN SCOPE OF CRDR AND RELATIVE TO OTHER PLANT SAFETY ENHANCEMENT PROJECTS.
o WE CONTINUE TO ENDORSE THE ISAP PROCESS FOR ALL PROJECTS TO ALLOCATE RESOURCES TO ENHANCE PUBLIC SAFETY.
o FOR MILLSTONE UNIT NO. 1, ALL HEDs HAVE BEEN SCHEDULED FOR RESOLUTION OR CORRECTED.
-o FOR THE HADDAM NECK
- PLANT, ALL BUT 144 SCHEDULED.
DISPOSITION FOR THESE WILL BE SUBMI1TED IN SEPTEMBER 30, 1990 ISAP REPORT.