Summary of 850430 & 0501 Meetings W/Util in Berlin,Ct Re Status of Licensing Actions & Integrated Safety Assessment Program.Purchase of Spare Main Transformer & Improvements to Secondary Water Chemistry Program Discussed
ML20127K020
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/17/1985
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
LSO5-85-05-019, LSO5-85-5-19, NUDOCS 8505220015
Download: ML20127K020 (3)


Text

r ih %of

~ ,

UNITED STATES

'8- o- NUCLEAR REGULATORY COMMISSION

- r,  :; WASHINGTON, D. C. 20555

+, . . . . . # May 17, 1985

~

. Docket No. 50-213 LS05-85-05-019 y

. MEMORANDUM FOR: John A. Zwolinski, Chief-Operating Reactors Branch No. 5 Division of Licensing FROM: Francis Akstulewicz, Project Manager Operating Reactors Branch No. 5

, -. . ' Division of Licensing

SUBJECT:

SUMMARY

OF APRIL 30, 1985 AND MAY 1, 1985 MEETINGS i WITH NORTHEAST UTILITIES REPRESENTATIVES RE:

F STATUS OF LICENSING ACTIONS AND ISAP EFFORTS

.On April 30, 1985, we met with the Resident Inspector and with the licensing-P personnel for Haddam Neck at the utility's corporate offices in Berlin,

,  ; Connecticut. The goal of this meeting was to introduce the utility counter-

[. parts, to discuss the progress of the ISAP effort and to discuss the status i of licensing actions with the Resident Inspector and my licensing counterparts.

4 The discussion of the progress of ISAP included an identification of past and 3 present projects by Northeast Utilities (NU) which could be classified as

" plant improvements." Those projects which were particularly highlighted

' included the purchasing of a spare main transformer (approximately $4 million),  ;

improvements to the secondary water chemistry program, chemical icboratory upgrades, engineering study to modernize the reactor protection system wiring

' and the complete replacement ~of copper bearing materials in the feedwater

{J system.

h 3 After the discussion of the plant improvement programs, we discussed licensing i L actions which are of particular interest to the Resident Inspector. The first

! action discussed involved a necessary change in the Technical' Specification to l permit on-line testing'of the Post-Accident Sampling System (PASS). NU

. responded that a Technical Specification change request was currently in L progress and that the NRC might receive this request around July of this year. l The next action discussed involved the current integrated leak rate testing '

(ILRT) program at the Haddam Neck Plant. Mr. Swetland stated that in order

-to establish containment integrity at Haddam Neck the January 1986 ILRT must be conducted in full compliance with Appendix J including any necessary exemptions. Mr. Swetland stated that identified problem areas need rapid resolution. He also noted that some of his concerns about Appendix J testing have been identified as ISAP topics and that as such may not be receiving the necessary attention to achieve resolution, t i

8505220015 850517 PDR P

ADOCK 05000213 pop l

v n -

u m

/ John lA. Zwolinski -- May 17,.1985-The;1ast item discussed with the~ Resident Inspector was the current schedule i

for the submittal of the Standard Technical: Specifications (STS)..-NU responded that submittal to-NRC:is expected in August of this year and that actual imple-P mentation would not occur-until~sometime in the sumer of 1986 '(three to four months _ after completion of-their planned outage in January of 1986).. Current =

' internal procedures at NU require all Technical Specification change requests to include.an appropriate STS section so that' approval or rejection wi.11 not.

Eslow internal; review or~ implementation efforts.

LAfter the . departure of Mr.ESwetland, I met with NU repre'sentatives to review the .

current; backlog of. Technical Specification change ~ requests to identify those requests which may no. longer be necessary and to discuss a plan for, eliminating -

. the backlog.of previous' Technical Specification requests. -This process was

  1. particularly fruitful in that one' licensing action-(TAC 51639) currently being-tracked as an active' issue had actually been completed and therefore no further action was required. j However, .we' identified one licensing action (TAC 51995) which was'previously closed, that needed to be reopened because the requested gTechnical Specification' changes were never issued. In an effort to reduce the.

backlog, .a : list of 'important Technical Specification changes was identified and

'it was agreed that theseJidentified actions would receive the necessary attention

~

-to achieve: resolution.

On May 1, we visited the Haddam Neck site and met with Mr. Dick Graves and Mr. John'Ferguson. . After a tour of the Emergency Offsite Facility,

-Mr. Ferguson' served as.our escort on a tour of the plant. I would like to-note' that:during al1 phases of this trip, management at both the NU offices and the plant site made every effort to accommodate our requests. I believe this reflects' positively on NU personnel and management's commitments to assure Lthat NU. plants are properly maintained and operated.

hg f. h .

Francis Akstulewicz.. Project Man er Operating Reactors Branch No. 5 Division of. Licensing

cc:' See next page DISTRIBUTION Docket File OELD CGrimes NRC PDR EJordan M8oyle Local PDR . BGrimes OR8 #5 Reading ACRS (10) \

.CJamerson' JZwolinski FAkstulewicz fP 7

O v

DL:0RB#5 DL:0RB#5' , h

$/]f DL:0RB#5 cfyd G

CJamerson b. FAkstul cz +l JZwolinski V

$/p/85 y/g/85' g//7/85

n

~

a \

i- CC .

l

' Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law -Department of Environmental .

. City Place Protection Hartford, Connecticut 06103-3499 State Office Building '

Hartford. . Connecticut 06106 Superintendent Haddam Neck Plant Mr. John. P. Opeka, Senior Vice RDF #1 President.

-Post Office Box 127E Nuclear Engineering and Operations

~- -

East Hampton, Connecticut 06424 Connecticut Yankee Atomic Power l' . Company Edward J. Mroczka Post Office Box ?70 Vice President, Nuclear Operations Hartford, Connecticut 06141 Northeast Utilities Service Company Post Office Box 270 Hartford, Connecticut 06141

. . Roard of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 U.S. Environmental Protection Agency Region I Office

, . ATTN: Regional Radiation Representative JFK Federal Building Boston, Massachusetts 02203 Resident Inspector Haddam Neck Nuclear Power Station i c/o U.S. NRC

' East Haddam Post Office East Haddam, Connecticut 06423 ,

Regional Administrator

~ Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 L 4

. - -. . -