| | issue date = 12/10/2012 | | | issue date = 12/10/2012 |
| | title = IR 05000295-12-009(DNMS);05000304-12-009(DNMS)-Zion Safety Inspection Report-Cover Letter | | | title = IR 05000295-12-009(DNMS);05000304-12-009(DNMS)-Zion Safety Inspection Report-Cover Letter |
| | author name = Lipa C A | | | author name = Lipa C |
| | author affiliation = NRC/RGN-III/DNMS/MCID | | | author affiliation = NRC/RGN-III/DNMS/MCID |
| | addressee name = Daly P | | | addressee name = Daly P |
Line 9: |
Line 9: |
| | docket = 05000295, 05000304 | | | docket = 05000295, 05000304 |
| | license number = | | | license number = |
| | contact person = Slawinski W J | | | contact person = Slawinski W |
| | document report number = IR-12-009 | | | document report number = IR-12-009 |
| | document type = Letter, Inspection Report | | | document type = Letter, Inspection Report |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter: | | {{#Wiki_filter:ber 10, 2012 |
| [[Issue date::December 10, 2012]]
| |
|
| |
|
| Mr. Patrick Daly, Senior Vice-President and General Manager ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099
| | ==SUBJECT:== |
| | | NRC INSPECTION REPORT 050-00295/12-009(DNMS); 050-00304/12-009(DNMS) |
| SUBJECT: NRC INSPECTION REPORT 050-00295/12-009(DNMS); 050-00304/12-009(DNMS) ZION NUCLEAR POWER STATION | | ZION NUCLEAR POWER STATION |
|
| |
|
| ==Dear Mr. Daly:== | | ==Dear Mr. Daly:== |
| On August 28, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the third calendar quarter of 2012 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through mid-November 2012. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed onsite with you and other ZionSolutions management on October 25, 2012 and by telephone with Patrick Thurman on November 29, 2012. | | On August 28, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the third calendar quarter of 2012 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through mid-November 2012. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed onsite with you and other ZionSolutions management on October 25, 2012 and by telephone with Patrick Thurman on November 29, 2012. |
|
| |
|
| During the inspection period, the NRC inspector reviewed aspects of spent fuel pool safety, elements of the radiation protection program, and two issues that involved radioactive contamination. The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commission's rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel. Based on the results of this quarterly inspection, two violations of regulatory requirements that are of more than minor safety significance were identified. However, because both these violations are of very low safety significance and were documented in your corrective action program, the NRC is treating these issues as non-cited violations (NCVs) in accordance with Section 2.3.2 of the NRC Enforcement Policy. The Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from the enclosure, this transmittal letter is decontrolled. SECURITED RELATED INFORMATION No response is required for the non-cited violations. However, if you contest the subject or severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III. | | During the inspection period, the NRC inspector reviewed aspects of spent fuel pool safety, elements of the radiation protection program, and two issues that involved radioactive contamination. |
|
| |
|
| In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ reading-rm/adams.html. Since the enclosed inspection report contains security related information and must be protected from unauthorized disclosure, the enclosure will not be made available for public inspection.
| | The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel. |
|
| |
|
| We will gladly discuss any questions you may have regarding this inspection.
| | Based on the results of this quarterly inspection, two violations of regulatory requirements that are of more than minor safety significance were identified. However, because both these violations are of very low safety significance and were documented in your corrective action program, the NRC is treating these issues as non-cited violations (NCVs) in accordance with Section 2.3.2 of the NRC Enforcement Policy. |
|
| |
|
| Sincerely,/RA/
| | The Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from the enclosure, this transmittal letter is decontrolled. No response is required for the non-cited violations. However, if you contest the subject or severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III. |
| Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00295; 050-00304 License Nos. DPR-39; DPR-48
| |
|
| |
|
| ===Enclosure:===
| | In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's |
| Inspection Report No. 050-00295/12-009(DNMS);
| | "Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/ |
| 050-00304/12-009(DNMS) (Non Public)
| | reading-rm/adams.html. Since the enclosed inspection report contains security related information and must be protected from unauthorized disclosure, the enclosure will not be made available for public inspection. |
|
| |
|
| cc w/encl: E. Moore, Zion Nuclear Power Station (NPS) Director Regulatory Affairs, Zion NPS State Liaison Officer, State of Illinois
| | We will gladly discuss any questions you may have regarding this inspection. |
|
| |
|
| cc w/o encl: Suzi Schmidt, Illinois General Assembly JoAnn D. Osmond, Illinois General Assembly Barry A. Burton, Lake County Administrator Mark C. Curran, Jr., Lake County Sheriff Laurie Cvengros, Village Clerk, Village of Beach Park, Illinois Willard R. Helander, Lake County Clerk Jana Lee, Village Clerk, Village of Winthrop Harbor, Illinois Judy L. Mackey, City Clerk, City of Zion, Illinois Irene T. Pierce, Lake County, Illinois | | Sincerely, |
| | /RA/ |
| | Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00295; 050-00304 License Nos. DPR-39; DPR-48 Enclosure: |
| | Inspection Report No. 050-00295/12-009(DNMS); |
| | 050-00304/12-009(DNMS) (Non Public) |
| | cc w/encl: E. Moore, Zion Nuclear Power Station (NPS) |
| | Director Regulatory Affairs, Zion NPS State Liaison Officer, State of Illinois cc w/o encl: Suzi Schmidt, Illinois General Assembly JoAnn D. Osmond, Illinois General Assembly Barry A. Burton, Lake County Administrator Mark C. Curran, Jr., Lake County Sheriff Laurie Cvengros, Village Clerk, Village of Beach Park, Illinois Willard R. Helander, Lake County Clerk Jana Lee, Village Clerk, Village of Winthrop Harbor, Illinois Judy L. Mackey, City Clerk, City of Zion, Illinois Irene T. Pierce, Lake County, Illinois SECURITED RELATED INFORMATION |
| }} | | }} |
Similar Documents at Zion |
---|
Category:Letter
MONTHYEARIR 05000295/20240012024-09-0404 September 2024 NRC Inspection Report No. 07201037/2024001; 05000295/2024001; and 05000304/2024001 - Zion Nuclear Power Station ML24192A1752024-07-10010 July 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2024401 ML24136A2392024-06-11011 June 2024 ISFSI - Exemption from Select Requirements of Title 10 of the Code of Federal Regulations Part 73 (EPID L-2023-LLE-0089 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) RS-24-052, 2023 Annual Radiological Environmental Operating Report2024-05-15015 May 2024 2023 Annual Radiological Environmental Operating Report RS-24-047, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report RS-24-023, Report on Status of Decommissioning Funding.2024-03-22022 March 2024 Report on Status of Decommissioning Funding. ML23356A0072023-12-22022 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-122, Amendment No. 15 to Indemnity Agreement No. B-592023-11-29029 November 2023 Amendment No. 15 to Indemnity Agreement No. B-59 ML23291A0802023-11-16016 November 2023 Issuance of Conforming Amendments Regarding Direct Transfer of DPR-39 and DPR-48 Facility Operating Licenses from Zionsolutions, LLC to Constellation Energy Generation LLC ML23286A3132023-11-14014 November 2023 EPA Phase 2 Closure Letter 10-13-23 ML23310A3132023-11-0808 November 2023 Cover Letter, S.Anderson, NRC to J.Sauger, Energysolutions, Remaining Final Status Surveys RS-23-116, Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments2023-11-0808 November 2023 Supplemental Information in Response to Order Consenting to License Transfers and Approval of Conforming License Amendments ML23286A3092023-11-0808 November 2023 Partial Site Release, Zion Nuclear Power Station, Units 1 and 2 ML23310A1082023-11-0303 November 2023 Confirmatory Survey Report 2023 IR 05000295/20230012023-11-0202 November 2023 NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station ML23251A0712023-09-0808 September 2023 Confirmatory Survey Extent of Condition Review ML23237B4132023-08-25025 August 2023 Response to Summary of May 4, 2023, Clarification Meeting Regarding the Partial Site Release Request ML23186A1902023-07-0606 July 2023 Review of Zion Solutions Responses to Requests for Additional Information Related to Zion Nuclear Power Station, Units 1 and 2 Decommissioning and Estimated Partial Site Release Review Schedule ZS-2023-0012, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-12012 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report ML23117A3692023-04-26026 April 2023 Annual Radioactive Effluent Release Report ML23116A2012023-04-24024 April 2023 Occupational Radiation Exposure Annual Report for 2022 ML23094A1292023-03-30030 March 2023 Annual Property Insurance Status Report ML23094A1322023-03-29029 March 2023 Decommissioning Funding Status Report for Shutdown Reactor ML23068A0122023-03-0303 March 2023 Withdrawal of Zion License Amendment Request for the License Termination Plan ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 IR 05000295/20220012023-01-27027 January 2023 NRC Inspection Report 05000295/2022001 (Drss); 05000304/2022001 (Drss) ML23024A0122023-01-26026 January 2023 Letter to Energysolutions Transmitting Threshold Determination for Merger/Restructuring ML22308A1762022-11-17017 November 2022 J. Sauger Letter Regarding Zion License Transfer Order Fourth Extension ML22313A0562022-11-17017 November 2022 Audit Report - Letter to J Sauger ML22306A1342022-11-0909 November 2022 Receipt of Information and License Amendment Request for the Zion Nuclear Power Station, Units 1 and 2, Docket Nos. 50-295 and 50-304 RS-22-113, Updated ISFSI Decommissioning Funding Plan for Zion Nuclear Power Station2022-10-26026 October 2022 Updated ISFSI Decommissioning Funding Plan for Zion Nuclear Power Station ML22294A1622022-10-19019 October 2022 Request for Extension of Order Approving Transfer of the License for Zion Nuclear Power Station, Units 1 and 2, from Zionsolutions, LLC to Constellation Energy Company, LLC ML22293A4332022-10-17017 October 2022 Response to NRC Staff Questions Raised During the Regulatory Audit of RAI Responses Conducted July 19-20, 2022, and August 24-25, 2022 ML22273A1452022-10-0404 October 2022 U.S. NRC Analysis of Zion Solutions, LLC Decommissioning Funding Status Report for the Zion Nuclear Power Station Units 1 and 2 ML22279A9932022-09-30030 September 2022 Revised Final Status Survey Release Records, Final Reports, and Discrete Radioactive Particle Survey Report Technical Support Document ML22237A0952022-08-23023 August 2022 Revised Final Status Survey Release Records ML22200A0112022-07-19019 July 2022 Letter to J. Sauger, Zionsolutions, from K. Conway, NRC, - Regulatory Audit Plan Re Zionsolutions' Response to RAI Related to Partial Site Release and Recent Site Survey Activities ML22111A1872022-04-0606 April 2022 Technical Support Document 2022-001, Discrete Radioactive Particle Survey Report, Revision 1 NMP1L3458, Constellation Energy Generation, LLC, Annual Property Insurance Status Report2022-04-0101 April 2022 Constellation Energy Generation, LLC, Annual Property Insurance Status Report ML22089A0982022-03-28028 March 2022 Revised Response to Request for Additional Information Related to Partial Site Release and Recent Site Survey Activities ZS-2022-0008, Report on Status of Decommissioning Funding for Shutdown Reactors2022-03-28028 March 2022 Report on Status of Decommissioning Funding for Shutdown Reactors ML22089A0262022-03-28028 March 2022 Technical Support Document 2022-001, Discrete Radioactive Particle Survey Report, Revision 0 ML22087A0052022-03-24024 March 2022 Annual Property Insurance Status Report ZS-2022-0001, License Amendment Request for the License Termination Plan2022-03-23023 March 2022 License Amendment Request for the License Termination Plan ML22068A0462022-03-14014 March 2022 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2022401 ML22069A3292022-03-0808 March 2022 Response to Request for Additional Information Related to Partial Site Release and Recent Site Survey Activities, and Notification of Foundation Pad Discovery RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement IR 05000295/20210012022-02-22022 February 2022 NRC Inspection Report No. 05000295/2021001(DNMS); 05000304/2021001(DNMS) 2024-09-04
[Table view] Category:Inspection Report
MONTHYEARIR 05000295/20240012024-09-0404 September 2024 NRC Inspection Report No. 07201037/2024001; 05000295/2024001; and 05000304/2024001 - Zion Nuclear Power Station ML24192A1752024-07-10010 July 2024 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2024401 IR 05000295/20230012023-11-0202 November 2023 NRC Inspection Report No. 05000295/2023001(DRSS); 05000304/2023001 (Drss) - Zion Nuclear Power Station IR 05000295/20220012023-01-27027 January 2023 NRC Inspection Report 05000295/2022001 (Drss); 05000304/2022001 (Drss) ML22068A0462022-03-14014 March 2022 Independent Spent Fuel Storage Installation Security Inspection Report 07201037/2022401 IR 05000295/20210012022-02-22022 February 2022 NRC Inspection Report No. 05000295/2021001(DNMS); 05000304/2021001(DNMS) IR 05000295/20200012021-01-21021 January 2021 NRC Inspection Report No. 05000295/2020001(DNMS); 05000304/2020001(DNMS); and 07201037/2020001(DNMS) - Zion Nuclear Power Station IR 05000295/20190012020-03-18018 March 2020 IR 05000295/2019001(DNMS); 05000304/2019001(DNMS) Zion Nuclear Power Station ML19323D0242019-11-19019 November 2019 (Decommissioning) - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 07201037/2019401(DRS) (G.Bonano) IR 05000295/20180022019-02-27027 February 2019 NRC Inspection Report No. 05000295/2018002(DNMS); 05000304/2018002(DNMS) Zion Nuclear Power Station IR 05000295/20180012018-09-28028 September 2018 NRC Inspection Report No. 05000295/2018001(DNMS); 05000304/2018001(DNMS); and 07201037/2018001(DNMS) Zion Nuclear Power Station IR 05000259/20183012018-08-24024 August 2018 NRC Operator License Examination Report Nos. 05000259/2018301, 05000260/2018301,05000296/2018301 IR 05000295/20174012017-11-15015 November 2017 (Decommissioning) - Independent Spent Fuel Storage Installation - NRC Security Inspection Report 05000295/2017401(DRS), 05000304/2017401(DRS), 07201037/2017401(DRS) - Cover Letter Only (DRS-E.Bonano) IR 05000295/20170012017-07-18018 July 2017 NRC Inspection Report No. 05000295/2017001(DNMS); 05000304/2017001(DNMS) IR 05000295/20160032017-02-16016 February 2017 NRC Inspection Report No. 05000295/2016003(DNMS); 05000304/2016003(DNMS) - Zion Nuclear Power Station IR 05000295/20160022016-08-15015 August 2016 Inspection Report 05000295/2016002 (Dnms); 05000304/2016002 (Dnms); 07201037/2016001 (Dnms), Zion Nuclear Power Station IR 05000295/20164012016-06-10010 June 2016 (Permanently Shut Down) NRC Security Inspection Report 05000295/2016401(DNMS)05000304/2016401(DNMS)Public ML16158A2882016-06-0101 June 2016 Point Presentations -NRC Inspection Report No. 05000295/05000304 (DNMS) IR 05000295/20050002016-06-0101 June 2016 Zion Nuclear Power Station Power Point Presentations -NRC Inspection Report No. 05000295/05000304 (DNMS) IR 05000295/20160012016-05-0606 May 2016 NRC Inspection Report No. 05000295/2016001 (Dnms); 05000304/2016001(DNMS), January 1, 2016, Through April 12, 2016 - Zion Nuclear Power Station IR 05000295/20150102016-02-16016 February 2016 IR 05000295/2015010 (Dnms); 05000304/2015010 (Dnms); and 07201037/2015002 (Dnms), Zion Nuclear Power Station, October 1, 2015, Through December 31, 2015 IR 05000295/20154012015-11-24024 November 2015 IR 05000295/2015401 (Dnms), 05000304/2015401 (Dnms), and 07201037/2015401 (Dnms), October 27, 2015, Zion Independent Spent Fuel Storage Installation - Security Inspection IR 05000295/20150092015-11-0404 November 2015 NRC Inspection Report No. 05000295/2015009(DNMS); 05000304/20150009(DNMS) Zion Nuclear Power Station IR 05000295/20150082015-08-0505 August 2015 IR 05000295/2015008(DNMS); 05000304/2015008(DNMS), 06/19/2015 - Zion Nuclear Power Station IR 05000295/20150072015-05-0808 May 2015 First Quarter 2015 Inspection Report 05000295/2015007(DNMS); 05000304/2015007(DNMS); 07201037/2015001(DNMS) IR 05000295/20140102015-02-0606 February 2015 Fourth Quarter 2014 Inspection Report 05000295/2014010(DNMS); 05000304/2014010(DNMS); 07201037/2014004(DNMS) IR 05000295/20140092014-11-10010 November 2014 IR 05000295/2014009(DNMS); 05000304/2014009(DNMS); 07201037/2014003(DNMS) on 09/18/14 with In-office Review Through 10/16/14, Zion Nuclear Power Station, NRC Inspection Report IR 05000295/20140082014-08-18018 August 2014 IR 05000295/2014-008 (Dnms), 05000304/2014-008(DNMS); 07201037/2014-002 (DNMS) - Zion Nuclear Power Station, Second Quarter 2014 Inspection Report IR 05000295/20134042014-05-28028 May 2014 EA-14-025, Notice of Violation and Proposed Imposition of Civil Penalty - $17,500; Zion Nuclear Power Station (Permanently Shut Down); NRC Security Inspection Report 05000295-13-404 (Dnms); 05000304-13-404 (DNMS) IR 05000295/20140072014-05-19019 May 2014 IR 05000295-14-007 (Dnms); 05000304-14-007 (Dnms); 07201037-14-001 (Dnms), 12/18-21 & 28-31/2013, 01/1-4, 7-9 & 21-24/2014, 02/10-14 & 24-28/2014 and 03/13-14/2014, Zion Nuclear Power Station First Quarter 2014 IR 05000454/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000456/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000254/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000373/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000272/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000289/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000352/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000237/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000277/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC ML14105A1632014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC IR 05000219/20120122014-05-0101 May 2014 Nuclear Regulatory Commission Office of Investigations Investigation Summary of OI Report No. 3-2010-034 for Exelon Generation, LLC ML14066A0872014-03-0606 March 2014 IR 05000295-13-404(DNMS); 05000304-13-404(DNMS); 06/2013 and 02/11/2014, Zion NRC Security Inspection - Cover Letter IR 05000295/20130142014-02-21021 February 2014 IR 05000295-13-014, 05000304-13-014; 12/23/2013; Zion Power Station Fourth Quarter, Inspection Report IR 05000295/20130132014-01-24024 January 2014 IR 05000295-13-013, 05000304-13-013 & 07201037-12-002, on 12/17/2013, Zion Nuclear Power Station, Units 1 & 2 IR 05000295/20134052013-12-26026 December 2013 IR-05000295-13-405 and 05000304-13-405(DNMS), 07201037-14-401- Zion (Permanently Shutdown)Isfsi Public Initial Security Inspection SRI ML13360A2932013-12-26026 December 2013 IR-05000295-13-405 and 05000304-13-405(DNMS), 07201037-14-401- Zion (Permanently Shutdown)Isfsi Public Initial Security Inspection SRI ML13325A8982013-11-20020 November 2013 IR 05000295-13-012(DNMS); 05000304-13-012(DNMS); 07201037-12-001(DNMS), on 11/05/13, Zion Nuclear Power Station IR 05000295/20130122013-11-20020 November 2013 IR 05000295-13-012(DNMS); 05000304-13-012(DNMS); 07201037-12-001(DNMS), on 11/05/13, Zion Nuclear Power Station IR 05000295/20130112013-11-14014 November 2013 Third Quarter Inspection Report 05000295-13-011(DNMS);05000304-13-011(DNMS) IR 05000295/20134032013-07-12012 July 2013 IR 05000295-13-403 and 05000304-13-403 for Zion Nuclear Power Station 2024-09-04
[Table view] |
Inspection Report - Zion - 2012009 |
---|
|
|
Text
ber 10, 2012
SUBJECT:
NRC INSPECTION REPORT 050-00295/12-009(DNMS); 050-00304/12-009(DNMS)
ZION NUCLEAR POWER STATION
Dear Mr. Daly:
On August 28, 2012, the U.S. Nuclear Regulatory Commission (NRC) completed onsite inspection activities for the third calendar quarter of 2012 at the permanently shut-down Zion Nuclear Power Station in Zion, Illinois. The inspection continued with in-office review through mid-November 2012. The purpose of the inspection was to determine whether decommissioning activities were conducted safely and in accordance with NRC requirements. The enclosed report presents the results of this inspection, which were discussed onsite with you and other ZionSolutions management on October 25, 2012 and by telephone with Patrick Thurman on November 29, 2012.
During the inspection period, the NRC inspector reviewed aspects of spent fuel pool safety, elements of the radiation protection program, and two issues that involved radioactive contamination.
The inspection consisted of an examination of activities at the site as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection consisted of a selective examination of procedures and representative records, observation of work activities, independent radiation measurements, and interviews with personnel.
Based on the results of this quarterly inspection, two violations of regulatory requirements that are of more than minor safety significance were identified. However, because both these violations are of very low safety significance and were documented in your corrective action program, the NRC is treating these issues as non-cited violations (NCVs) in accordance with Section 2.3.2 of the NRC Enforcement Policy.
The Enclosure Contains Sensitive Unclassified Non-Safeguards Information. When separated from the enclosure, this transmittal letter is decontrolled. No response is required for the non-cited violations. However, if you contest the subject or severity level of the NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001, with a copy to the Regional Administrator, U.S. Nuclear Regulatory Commission - Region III.
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390 of the NRC's
"Rules of Practice," a copy of this letter will be made available electronically for public inspection in the NRC Public Document Room or from the NRC's Agencywide Document Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/
reading-rm/adams.html. Since the enclosed inspection report contains security related information and must be protected from unauthorized disclosure, the enclosure will not be made available for public inspection.
We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA/
Christine A. Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch Division of Nuclear Materials Safety Docket Nos. 050-00295; 050-00304 License Nos. DPR-39; DPR-48 Enclosure:
Inspection Report No. 050-00295/12-009(DNMS);
050-00304/12-009(DNMS) (Non Public)
cc w/encl: E. Moore, Zion Nuclear Power Station (NPS)
Director Regulatory Affairs, Zion NPS State Liaison Officer, State of Illinois cc w/o encl: Suzi Schmidt, Illinois General Assembly JoAnn D. Osmond, Illinois General Assembly Barry A. Burton, Lake County Administrator Mark C. Curran, Jr., Lake County Sheriff Laurie Cvengros, Village Clerk, Village of Beach Park, Illinois Willard R. Helander, Lake County Clerk Jana Lee, Village Clerk, Village of Winthrop Harbor, Illinois Judy L. Mackey, City Clerk, City of Zion, Illinois Irene T. Pierce, Lake County, Illinois SECURITED RELATED INFORMATION