ML23310A313

From kanterella
Jump to navigation Jump to search

Cover Letter, S.Anderson, NRC to J.Sauger, Energysolutions, Remaining Final Status Surveys
ML23310A313
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 11/08/2023
From: Shaun Anderson
Reactor Decommissioning Branch
To: Sauger J
Zion Restoration Project, ZionSolutions
Shared Package
ML23310A311 List:
References
EPID L-2017-DTP-0007, EPID L-2017-DTP-0006
Download: ML23310A313 (1)


Text

John T. Sauger, General Manager Zion Restoration Project ZionSolutions, LLC 101 Shiloh Boulevard Zion, IL 60099-2797

SUBJECT:

REMAINING FINAL STATUS SURVEYS, ZION NUCLEAR POWER STATION, UNIT NOS. 1 AND 2 (ZION) (EPIDS L-2017-DTP-0006 AND L-2017-DTP-0007)

Dear Mr. Sauger:

The Nuclear Regulatory Commission (NRC) staff has completed its review of the Zion Final Status Survey Reports associated with the remaining 128 survey units from the Zion Facility Operating Licenses outside the on-site Independent Spent Fuel Storage Installation boundary. The NRC staff conclude that the Final Status Surveys provide reasonable assurance that the residual radioactivity in each of the survey units meets the criteria established in the Zion License Termination Plan and in 10 CFR 20.1402, Radiological criteria for unrestricted use, for the reasons stated in the Conclusions Section of the enclosed safety evaluation. This safety evaluation supports the June 5, 2020 (Agencywide Document Management and Access System (ADAMS) Accession No. ML20164A096) as supplemented on March 3, 2021 ( ML21102A397), Partial Site Release (PSR) application.

The NRC will provide a decision on the PSR request under separate correspondence.

In accordance with 10 CFR 2.390 of the NRCs Agency Rules of Practice and Procedure, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRCs ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html.

November 8, 2023 J.Sauger 2 If you have any questions concerning this evaluation, please contact Amy Snyder, Senior Project Manager, at (301) 4156822 or via email at Amy.Snyder@NRC.gov.

Sincerely, Shaun M. Anderson, Chief Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery, and Waste Programs Office of Nuclear Material Safety and Safeguards Docket No. 50-295, License No. DPR-39 Docket No. 50-304, License No. DPR-48 Docket No. 72-1037

Enclosure:

1. Safety Evaluation Related to the Final Status Survey of the Remaining Survey Units cc: A. Hazelhoff, EnergySolutions J. Wheat, EnergySolutions ZION List Serv Snyder, Amy signing on behalf of Anderson, Shaun on 11/08/23

ML23310A311; Ltr ML23310A313

  • via email OFFICE NMSS/DUWP/RDB NMSS/DUWP/RTAB* NMSS/DUWP/RDB NMSS/DUWP/RDB NAME ASnyder AS CMcKenney CM ASnyder AS SAnderson ASnyder for AS DATE Nov 8, 2023 Nov 8, 2023 Nov 8, 2023 Nov 8, 2023