MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 ML20078P8251995-02-10010 February 1995 Proposed Tech Specs 2.10 to Relocate Requirements for Incore Instrumentation Sys ML20077S1691995-01-0909 January 1995 Proposed Tech Specs,Reflecting Deletion of Requirements for Toxic Gas Monitoring Sys ML20078G8981994-11-11011 November 1994 Proposed Tech Specs 5.2 & 5.5,reflecting Administrative Changes ML20024J3921994-10-0707 October 1994 Proposed Tech Specs,Deleting SRs in TS 3.6(3)a for Eight Raw Water Backup Valves to Containment Cooling Coils,Deleting SRs in TS 3.2,Table 3-5,item 6 for 58 Raw Water Valves & Revising Basis of TS 2.4 to Reflect Changes ML20069H9261994-06-0606 June 1994 Proposed Tech Specs Incorporating Changes to Credit Leak Before Break Methodology to Resolve USI A-2, Asymmetrical Blowdown Loads on Rcps ML20069D8451994-05-25025 May 1994 Proposed Tech Specs Requesting one-time Schedular Exemption from 10CFR50.36a(2) ML20062N4211993-12-28028 December 1993 Proposed TS Tables 3-1 & 3-2 Re Min Frequencies for Checks, Calibrs & Testing of RPS & Min Frequencies for Checks, Calibrs & Testing of ESFs & Instrumentation & Controls, Respectively LIC-93-0228, Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys1993-08-20020 August 1993 Proposed Tech Specs Incorporating Changes to Leak Before Break Methodology to Resolve Unresolved Safety Issue A-2, Asymmetrical Blowdown Loads on Reactor Primary Coolant Sys ML20045H1791993-07-12012 July 1993 Proposed TS 2.14,Table 2-1,Item 6.b Re ESF Sys Initiation, Degraded Voltage Setting Limits LIC-93-0159, Proposed Tech Specs Incorporating Administrative Changes1993-06-17017 June 1993 Proposed Tech Specs Incorporating Administrative Changes ML20128E5341993-02-0808 February 1993 Proposed Tech Specs Deleting Section 5.9.4 Re Radioactive Effluent Release Rept.Draft Chemistry Manual Procedure Encl ML20128C0461993-02-0101 February 1993 Proposed TS Figures 2-1A & 2-1B Re pressure-temp Limits for Heatup & Cooldown,Respectively 1999-05-26
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20195B4441999-05-26026 May 1999 Proposed Tech Specs Relocating pressure-temp Curves, Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS pressure-temp Limits Rept ML20205J7671999-03-31031 March 1999 Proposed Tech Specs Increasing Min Required RCS Flow Rate & Changing SRs for RCS Flow Rate LIC-99-0001, Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR1999-01-29029 January 1999 Proposed Tech Specs Relocating Three cycle-specific Parameter Limits from FCS TS to COLR LIC-98-0141, SG Eddy Current Test Rept for 1998 Refueling Outage. with1998-10-27027 October 1998 SG Eddy Current Test Rept for 1998 Refueling Outage. with ML20151U3871998-09-0404 September 1998 Revised Bases of TS Sections 1.3(8),2.0.1(2),2.1.6,2.3,2.4, 2.13,2.15,3.1 & 3.6 ML20217B8611998-03-18018 March 1998 Proposed Tech Specs 5.2 & 5.11.2,changing Title of Shift Supervisor to Shift Manager ML20217B8241998-03-18018 March 1998 Proposed Tech Specs Re Requirements for Alternate Shutdown Panel & Associated Auxiliary Feedwater Panel ML20217P2041998-03-0303 March 1998 Proposed Tech Specs Pages,Revising TS 2.6 & Basis by Replacing Refs to TS 3.5(4) W/Refs to TS 5.19 ML20199L7291998-01-30030 January 1998 Proposed Tech Specs Deleting Section 3.E Re License Term ML20199L8951998-01-30030 January 1998 Proposed Tech Specs,Reflecting Relocation of pressure-temp Curves,Predicted Radiation Induced NDTT Shift Curve & LTOP Limits to FCS Unit 1 RCS PT Limits Rept ML20202B0931998-01-30030 January 1998 Proposed Tech Specs Section 2.5 Re Steam & Feedwater Sys ML20203G4311997-12-11011 December 1997 Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem ML20199K1391997-11-21021 November 1997 Proposed Tech Specs 5.19 Re Containment Leakage Rate Testing Program ML20217G4601997-10-0303 October 1997 Proposed Tech Specs Pages Revising TS Surveillance 3.9, Auxiliary Feedwater Sys, to Clarify What Flow Paths Are Required to Be Tested & Delete Specific Discharge Pressure ML20211N7591997-10-0202 October 1997 Rev 0 to Fort Calhoun Station Unit 1 Operating Instruction, OI-ES-3, Engineered Safeguard Controls Normal Mode 1,2 & 3 Alignment Check ML20211N7521997-09-21021 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-04, Annunciator Marking ML20211N7471997-09-12012 September 1997 Rev 2 to Fort Calhoun Operations Dept Policy & Directive OPD-6-08, Plastic Label Usage ML20211N7661997-08-25025 August 1997 Rev 4 to Fort Calhoun Station Unit 1 Annunciator Response Procedure ARP-1, APR-1 Annunciator Response Procedure ML20211N7411997-08-24024 August 1997 Rev 0 to Fort Calhoun Operations Dept Policy & Directive OPD-5-14, Test Monitor Program ML20196J0851997-07-25025 July 1997 Proposed Tech Specs Implementing Option B of 10CFR50,App J & Allowing Frequency of Conducting ILRT & Local Leak Rate Testing to Be Based on Component Performance ML20137Y1801997-04-17017 April 1997 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20137H4941997-03-26026 March 1997 Proposed Tech Specs Incorporating Addl Restrictions on Operation of MSSVs ML20138L4361997-02-20020 February 1997 Proposed Tech Specs 5.0 Re Administrative Controls ML20134J6841997-01-20020 January 1997 Rev 5,Change a to Security Training & Qualification Program LIC-96-0183, Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents1996-11-20020 November 1996 Proposed Tech Specs 5.0 Re Administrative Controls & Table of Contents ML20129E5161996-10-24024 October 1996 Proposed Tech Specs 4.3.2,regarding Reactor Core & Control to Allow Use of Either Zircaloy or ZIRLO Cladding Proposed Additional Reference to Westinghouse Topical Report, WCAP-12610-P-A, Vantage + Fuel Assembly Rept ML20129C2621996-10-22022 October 1996 Proposed Tech Specs 5.0 Re Administrative Controls & 5.9.5 Re Core Operating Limits Rept LIC-96-0125, Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core1996-08-23023 August 1996 Proposed Tech Specs Revising Paragraph 2.B(2) of License to Allow Use of Source Matl as Reactor Fuel.Ts 4.3.2 Revision Would Include Depleted U in Describing Reactor Core ML20115G0041996-07-15015 July 1996 Proposed Tech Specs 4.3.2 Re Reactor Core & Control ML20112D3211996-05-31031 May 1996 Proposed Tech Specs Re LCO for Trisodium Phosphate & Increasing Min Required Amount of Trisodium Phosphate Contained in Containment Sump Mesh Baskets ML20117H6981996-05-20020 May 1996 Proposed Tech Specs,Clarifying Surveillance Test Requirements Found in TS 3-1,Tables 3-1,3-2,3-3 & 3-3A ML20117H5931996-05-17017 May 1996 Proposed Tech Specs,Relocating Operability Requirements for Shock Suppressors (Snubbers) to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements Into TS 3.3 ML20129C5351996-03-0101 March 1996 Rev 0 to Incore Instrumentation Operability Requirements ML20097C3081996-02-0101 February 1996 Proposed Tech Specs,Allowing Increase in Initial Nominal U-235 Enrichment Limit of Fuel Assemblies That May Be Stored in Spent Fuel Pool LIC-96-0008, Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition1996-01-22022 January 1996 Proposed Tech Specs Placing Sirw Tank Low Level Channels in Bypass Rather than Tripped Condition ML20108A7161995-12-19019 December 1995 Rev 7 to CH-ODCM-0001, ODCM, Incorporating TS Amend 171 for Section 3.1 Update/Reflect Changing Environ ML20094N8631995-11-16016 November 1995 Proposed Tech Specs,Adding LCO & Surveillance Test for Safety Related Inverters & Deleting Nonsafety Related Instrument Buses ML20092G0771995-09-0606 September 1995 Proposed Tech Spec 2.7,extending Allowed Outage Time from 7 Days Per Month to 7 Days W/ Addl Once Per Cycle 10 Day Allowed Outage Time ML20091P4011995-09-0101 September 1995 Rev 3 to Fort Calhoun Station ISI Program Plan Third Ten-Yr Interval 1993-2003 ML20087E0281995-08-0404 August 1995 Proposed Tech Specs Reducing Minimum Operable Containment Radiation High Signal Channels ML20086D5341995-06-27027 June 1995 Proposed Tech Specs Re Reformation & Clarification of TS Re Chemical & Vol Control Sys ML20091G3601995-06-26026 June 1995 Proposed Tech Specs Re Extension of Allowed Outage Time for an Inoperable Low Pressure SI Pump ML20086D3851995-06-26026 June 1995 Proposed Tech Specs Re Audit Frequencies for Plant QA Program ML20085M0081995-06-15015 June 1995 Rev 2 to ISI Program Plan for 1993-2003 Interval ML20084G7751995-05-31031 May 1995 Proposed Tech Specs,Requesting Amend to Provide Addl Restrictions on Operation of CCW Sys Heat Exchangers ML20083C0091995-05-0808 May 1995 Proposed Tech Specs,Incorporating Proposed Revs Per GL 93-05 to Specs 2.3,3.1,3.2,3.3 & 3.6 ML20087G9691995-04-0707 April 1995 Proposed Tech Specs Re Relocation of Axial Power Distribution Figure for License DPR-40 ML20082J0851995-04-0707 April 1995 Proposed Tech Specs Re Administrative Changes to License DPR-40 ML20108A7121995-03-15015 March 1995 Rev 6 to CH-ODCM-0001, ODCM, Incorporating New TS Amend 164 ML20080S0291995-03-0101 March 1995 Proposed Tech Specs Reflecting Administrative Revs to TS 5.5 & 5.8,per GL 93-07 & Revs Unrelated to GL 93-07 to TS 2.5, 2.8,2.11,3.2 & 3.10 1999-05-26
[Table view] |
Text
. ... . -- . - . - = .-
h ,.'M w
,, a.*,",
f ;W ' DEFINITIONS MISCELLANEOUS DEFINITIONS Operable - Operability A system, subsystem, train, component or device shall be OPERABLE or have OPERABILITY when it'.is capable'of. performing its specified function (s).
~
Implicit in this definition shall be the assumption that all necessary attendant;instrunentation, controls, normal and emergency electrical power sources, cooling or seal water, lubrication or other auxiliary equipment that are' required for the system, subsystem, train, component or device
-to perform its function (s) are also capable of performing their related support. function (s).
j In Operation i
2 A system or component is in operation if it is performing its design function.
?
CEA's
~
All full length shutdown and regulating control rods.
. Part Length CEA's CEA's which contain neutron absorbing material only in the lower quarter of their length.
Containment Integrity Containment integrity is . defined to exist when all of the following are met:
'(1) -All' nonautomatic < containment isolation valves which are not required to f
be open during accident conditions and blind flenges:are' closed.
(2) The equipment hatch is properly closed and sealed.
(3) At least;one door in the personnel air lock is properly closed and sealed.
'(h) All. automatic containment isolation valves are operable or locked closed
~(or. isolated by locked closed valves or blind flanges.as permitted by
. limiting condition.for operation).
l(5)[ The uncontrolled containment leakage satisfies Specification 3.5
^TTAC"" ^
1 8 0.0.8 0 6 0 g e3
~ .
= :
2.0' LIMITING CONDITIONS FOR OPERATION 2.0.1- General' Requirements Applicability-Applies to the operable status of all systems, subsystems, trains,
-components, or devices covered by the Limiting Conditions for Oper-
'ation.
Objective ,
To specify corrective measures to be employed for sys;em conditions not covered by or in excess of the Limiting Conditions fcr Operation.
Specification (1) In the event a Limiting Condition for Operation and/or associated action requirements cannot be satisfied because of ci,rcumstances in excess of those addressed in the specification, the unit shall be placed in at least HOT SHUTDOWN within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least suberitical and < 3000F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least
-COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, unless corrective measures are completed that permit operation under the permissible action requirements for the specified time interval as measured from initial discovery or until the reactor is placed in an
-Operating Mode in which the specification is not applicable. Ex-
! ceptions.to these requirements shall be stated in the individual specifications.-
(2) When a system, subsystem, train, component, or device is deter-mined to be inoperable solely because its emergency power source is inoperable, or solely because its normal power source is inoperable, it may be considered OPERABLE for the purpose of satisfying the requirements of its applicable Limiting Condition for Operation, provided: (1) its corresponding normal or emergency power source is OPERABLE; and (2) all of its re-
, dundant system (s), subsystem (s), train (s), component (s), and device (s) are OPERABLE, or likewise satisfy the requirements of this specification. Unless both conditions (1) and (2) are satisfied, the unit shall he placed in at least HOT SHUT-DOWN within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least suberitical and < 3000F within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. .This specification is not appli able in Operating Modes k or-5 Basis-(1) This specification delineates corrective measures to be taken for circumstances not directly provided for in the system
' specific specifications and whose occurrence would violate the intent of the specification. For example, Specification
- 2.3 requires each Low Pressure Safety Injection (LPSI) pump to be operable and provides explicit corrective measures to 2-0
- . ;a? . 's
- 2. 0 . LIMITING CONDITIONS FOR OPERATION 2.0.1: General Requirements A
be followed if.one pump is inoperable. Under the-terms of Specification-2.0.1(1), if more than one LPSI pump is.in-
' operable, the unit must be placed in.at.least HOT SHUTDOWN within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, in at least suberitical and < 3000 F within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in at least COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, unless at least one LPSI pump were restored to operability. It is assumed that the unit is i brought to the required mode within the required times by promptly initiating and carrying out the appropriate measures required by the specification.
'(2) This specification _ delineates what additional conditions must be satisfied to permit operation to continue, consistent with the system specific specifications for power sources, when a' normal or emergency power source is not OPERABLE.
It specifically prohibits operation when one division is a inoperable because its normal or emergency power source is inoperable and a system, subsystem, train, component, or device in another division is inoperable for another reason.
The provisions of this specification permit the requirements cssociated with individual systems, zubsystems, trains, com-ponents, or devices to be consistent with the specification of the associated electrical power source. It allows oper-i ation to be~ governed by the time limits of the requirements associated with the Limiting Condition for Operation for -
the normal or emergency power source, not the individual requirements for each system, subsystem, train, component, or device that is' determined to be inoperable solely be-cause of the inoperability of .its normal or emergency power source.
For example, Specification 2.7 requires in part that two emergency diesel generators be OPERABLE. The specifica-tion provides.for T days per month out-of-service time when one emergency diesel generator is not OPERABLE. If the definition of OPERABLE vere applied without consider-ation 'of Specification 2.0.1(2), all systems, subsystems, trains, components, and devices supplied by the inoperable
, - emergency power source would also be inoperable. This vould dictate invoking the applicable corrective measures for each of the applicable Limiting Conditions for Oper-ation.-lHowever, the' provisions of Specification 2.0.1(2) permit.the. time limits for continued operation to be con-sistent with the requirements for the inoperable emergency 1 diesel generator instead, provided the other specified
. conditions are satisfied. In this case, this would mean that-the correcponding normal power source must be OPERABLE, andiall redundant systems, subsystems, trains, components, and(devices must be OPERABLE, or otherwise satisfy Specifi-cation 2.0.1(2)'(i.e., be capable of performing their design 2-Ca g 7- -
p , - - . -,w , - p ,, -, --
- 2.0 LIMITING CONDITIONS FOR OPERATION 2.0.1 General Requirements.
function and have at least one normal and one emergency power source'0PERABLE). If they are not satisfied, shutdown is re-
. quired in accordance with this specification.
'As a further example, Specification 2 7 requires in part _that two physically independent circuits between the offsite trans-mission network and the onsite Class IE distribution system be OPERABLE. The specification provides a 24-hour out-of-service time when both required offsite circuits are not OPERABLE. If the definition of OPERABLE vere applied with-out consideration of Specification 2.0.1(2), all systems, subsystems, trains, components, and devices. supplied by the inoperable normal power sources, both of the offsite circuits, would also be inoperable. This would dictate invoking the applicable measures for each of the applicable LCO's. How-ever, the provisions of Specification 2.0.l(2) permit the time limits for continued operation to be consistent with the corrective measures for the inoperable normal power sources instead, provided the other_specified conditions are satisfied. In this case, this would mean that for one divi-sion the emergency power source must be OPERABLE (as must be the components supplied by the emergency power source) and all redundant systems, subsystems, trains, components, and devices in the other division must be OPERABLE, or likewise satisfy Specification 2.0.1(2) (i.e., be capable of performing their design functions and have an emergency
. power source OPERABLE). In other words, both emergency power sources must be OPERABLE and all redundant systems, subsystems, trains, components, and devices in both divi-sions must also be OPERABLE. If these conditions are not satisfied, shutdown is required in accordance with this specification.
In Operating Modes 4 or 5, Specification 2.0.l(2) is not applicable, and thus the individual requirements for each applicable Limiting Condition for Operation in_these modes must be adhered to.
1 4.
2-Oh o
m_____
. ,, . . A DISCUSSION The Omaha Public Power District received a letter from the Nuclear Regulatory Commission, dated April 10, 1980, requesting that Technical' Specification revisions be proposed in order to define the use of the t'erm OPERABLE and to specify corrective actions to be taken when plant operating conditions have degraded beyond the circumstances addressed by existing Limiting Conditions for Operation (LCO). The specifications proposed herein are sub-mitted in response to the Commission's letter.
These specifications require that the plant be placed in a hot shutdown condition within six (6) hours from the time a con-dition is found which exceeds a LC0. Six (6) hours permit a con-trolled and orderly shutdown through the normal boration method at the maximum rampdown rate of approximately 20% per hour. Ef-fecting a shutdown in less than six (6) hours would require emer-gency boration and/or the use of reactor control rods which are used for shutdown purposes only when a rapid automatic or manual trip is required to protect operating equipment from damage or ensure public health and safety. The use of control rods or emergency boration to shutdown the plant when a LCO is violated could have the potential for causing an operational transient at a time when safety related equipment is degraded and defense in depth is not available to mitigate the consequences of the transient.
For example, in the event that two (2) trains of the safety in-jection system are inoperable, sound safety practice dictates that the plant be shutd .vn as carefully as possible in order that the safety injection system is not challenged. A safe, orderly shut-down can be accomplished within six (6) hours at the Fort Calhoun Station. The District's position on this subject was relayed to Mr. Wagner and Mr. Wetmore of the Commission's staff during a telephone conversation on July 24, 1980.
The proposed Technical Specifications are administrative.
They do not represent an unroviewed safety question, since no existing Technical Specifications are modified, except to clarify the term OPERABLE. The new Specification 2.0.1 also provides additional clarification in the application of the term OPERABLE /
OPERABILITY. The proposed changes are consistent with Combustion Engineering Standard Technical Specifications.
ATTACHMENT B
y l
JUSTIFICATION FOR FEE CLASSIFICATION l The proposed amendment is deemed to be Class II, within the meaning of 10 CFR 170.22, because it is administrative in nature and has no safety or environmental significance. It only seeks
'to clarify the term OPERABLE and provide additional clarification in the application of the term OPERABLE /0PERABILITY.
ATTACHMENT C