ML19326C252: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 19: Line 19:
{{#Wiki_filter:a Qi '                    '                                                    dm 12/9/n.    -
{{#Wiki_filter:a Qi '                    '                                                    dm 12/9/n.    -
                                                                                             ':e .
                                                                                             ':e .
        ''
  ,
       ..~
       ..~
SUPPLEMENT NO. 14
SUPPLEMENT NO. 14 TABLE OF CONTENTS AND CHANGE DIRECTIONS SECTION  CONTENTS AND DIRECTICNS                      PAGES 1    QUALITY ASSURANCE PROGRAM (Appendix l-B)
    .
TABLE OF CONTENTS AND CHANGE DIRECTIONS SECTION  CONTENTS AND DIRECTICNS                      PAGES 1    QUALITY ASSURANCE PROGRAM (Appendix l-B)
Insert these pages behind Appendix l-A  1-B-i & 11,          2 (Tab Sheet 1-B will be sent later.)    1-3-1 through 1-B-50, Figures
Insert these pages behind Appendix l-A  1-B-i & 11,          2 (Tab Sheet 1-B will be sent later.)    1-3-1 through 1-B-50, Figures
* 1, 2, 3, Appen -
* 1, 2, 3, Appen -
Line 35: Line 31:
place.
place.
Deletepages8.k-9 pad 8.5-2.-  8.4-5,'8.4-6,''
Deletepages8.k-9 pad 8.5-2.-  8.4-5,'8.4-6,''
-
i 8.4-7,'8.4-8, 8.5-1 7 2    SPEIn FUEL POOL DESIGN In Supplement No. 6 to the PSAR insert  4,f  5    s these pages and remove those they re-place.
i 8.4-7,'8.4-8, 8.5-1 7 2    SPEIn FUEL POOL DESIGN In Supplement No. 6 to the PSAR insert  4,f  5    s these pages and remove those they re-place.
3    REACTOR BUILDING BASE SLAB Atm LINER PIATE REVISIONS In Section 5 of the PSAR insert these    5-1,f / t-pages and figures and remove those they  5-8,,J-2,5-7,c.,
3    REACTOR BUILDING BASE SLAB Atm LINER PIATE REVISIONS In Section 5 of the PSAR insert these    5-1,f / t-pages and figures and remove those they  5-8,,J-2,5-7,c.,
5-9,",5-12, replace.                                Figures 5-2'and 5-3                                '
5-9,",5-12, replace.                                Figures 5-2'and 5-3                                '
          '
In Supplement No. 4 to the PSAR insert  11.2.2-l[
In Supplement No. 4 to the PSAR insert  11.2.2-l[
these pages and Figure and remove those  ll . 2. 3-1P which th y replace. elete Figures    11.2      3-2, y' 11.2 3-1 and 11.2 3- a                  11. 2. 23 -1, *',
these pages and Figure and remove those  ll . 2. 3-1P which th y replace. elete Figures    11.2      3-2, y' 11.2 3-1 and 11.2 3- a                  11. 2. 23 -1, *',
Line 47: Line 41:
this page.                              vii /      -
this page.                              vii /      -
                                                                             , /  ' ' '      ''
                                                                             , /  ' ' '      ''
                                                                    .
O        -
O        -
g.
g.
.
8004220              IM}}
8004220              IM}}

Latest revision as of 00:26, 1 February 2020

Table of Contents & Change Directions for Psar.Response to AEC 690929 Questions
ML19326C252
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 11/14/1969
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML19326C247 List:
References
NUDOCS 8004220822
Download: ML19326C252 (1)


Text

a Qi ' ' dm 12/9/n. -

':e .

..~

SUPPLEMENT NO. 14 TABLE OF CONTENTS AND CHANGE DIRECTIONS SECTION CONTENTS AND DIRECTICNS PAGES 1 QUALITY ASSURANCE PROGRAM (Appendix l-B)

Insert these pages behind Appendix l-A 1-B-i & 11, 2 (Tab Sheet 1-B will be sent later.) 1-3-1 through 1-B-50, Figures

  • 1, 2, 3, Appen -

dix B -

In Section 5 of the PSAR insert these 5-47, 5 48 #

pages and remove those they repince

/

In Supplement No. 3 to the PSAR insert 8.3-1, 8.3-2,/

these pages and remove those they re- 8.4-1,~8.k-2,"

place.

Deletepages8.k-9 pad 8.5-2.- 8.4-5,'8.4-6,

i 8.4-7,'8.4-8, 8.5-1 7 2 SPEIn FUEL POOL DESIGN In Supplement No. 6 to the PSAR insert 4,f 5 s these pages and remove those they re-place.

3 REACTOR BUILDING BASE SLAB Atm LINER PIATE REVISIONS In Section 5 of the PSAR insert these 5-1,f / t-pages and figures and remove those they 5-8,,J-2,5-7,c.,

5-9,",5-12, replace. Figures 5-2'and 5-3 '

In Supplement No. 4 to the PSAR insert 11.2.2-l[

these pages and Figure and remove those ll . 2. 3-1P which th y replace. elete Figures 11.2 3-2, y' 11.2 3-1 and 11.2 3- a 11. 2. 23 -1, *',

1253-1,-

11 5 3-2, /

Figure 11.2.23-1 4 PSAR TABLE OF CONTEIU In the Table of Appendices replace , , ,

this page. vii / -

, / ' ' '

O -

g.

8004220 IM