During Extended Construction Delay | During Extended Construction Delay | ||
: 1. OVERVIEW 1.1 This Plan is intended to provide specialized treatment, | : 1. OVERVIEW 1.1 This Plan is intended to provide specialized treatment, where appropriate, of Quality Assurance activities during the extended construction delay period at Braidwood Station. | ||
where appropriate, of Quality Assurance activities during the extended construction delay period at Braidwood Station. | |||
This Plan is a part of Commonwealth Edison's Corporate > | This Plan is a part of Commonwealth Edison's Corporate > | ||
Quality Assurance Program; the policies, requirements, i | Quality Assurance Program; the policies, requirements, i | ||
and procedures therein remain in effect and unmodified | and procedures therein remain in effect and unmodified except as specifically identified in this Plan. | ||
except as specifically identified in this Plan. | |||
1.2 This Plan shall be valid for a period of approximately ; | 1.2 This Plan shall be valid for a period of approximately ; | ||
one year from the day of substantial cessation of construc-tion. Thereafter, if extended construction delay continues, l this Plan, including any procedures and instructions spec-ific to this Plan, shall be reviewed on an approximately annual basis to insure that measures for identification, preservation, maintenance, and security of systems, compon-ents, materials, and records are adequate for the then-anticipated duration of the delay. | one year from the day of substantial cessation of construc-tion. Thereafter, if extended construction delay continues, l this Plan, including any procedures and instructions spec-ific to this Plan, shall be reviewed on an approximately annual basis to insure that measures for identification, preservation, maintenance, and security of systems, compon-ents, materials, and records are adequate for the then-anticipated duration of the delay. | ||
Line 34: | Line 30: | ||
ials, and records which arrive on-site during the construc-tion delay. | ials, and records which arrive on-site during the construc-tion delay. | ||
1.4 The essentials of this Plan are summarized as follows: | 1.4 The essentials of this Plan are summarized as follows: | ||
9 | 9 | ||
. . Page 2 of 15 1.4.1 Id:ntification of scfoty-related systems, compo-nents, equipment, materials, and records requiring safeguarding, protection, preservation and/or maintenance. I | |||
.* 1.4.2 Storage and protection of such identified safety- l related systems, components, equipment, materials, and records in appropriate fashion to prevent the degradation of quality. | |||
. . Page 2 of 15 1.4.1 Id:ntification of scfoty-related systems, compo- | 1.4.3 Review of incoming items and documents on a timely basis, and Lacorporation of safety-related items and documents under the programs of .1 and .2 above. | ||
nents, equipment, materials, and records requiring safeguarding, protection, preservation and/or | |||
maintenance. I | |||
.* 1.4.2 Storage and protection of such identified safety- l | |||
related systems, components, equipment, materials, | |||
and records in appropriate fashion to prevent the degradation of quality. | |||
1.4.3 Review of incoming items and documents on a timely | |||
basis, and Lacorporation of safety-related items and documents under the programs of .1 and .2 above. | |||
1.4.4 Inspection, maintenance, and surveillance of the items and records protected under .2 above, with frequency sufficient to insure that protection and identification measures remain in place and effec-tive. | 1.4.4 Inspection, maintenance, and surveillance of the items and records protected under .2 above, with frequency sufficient to insure that protection and identification measures remain in place and effec-tive. | ||
i 1.4.5 Quality' Assurance surveillances and scheduled audits ! | i 1.4.5 Quality' Assurance surveillances and scheduled audits ! | ||
of quality-related activities, to ensure that est-ablished and applicable plans and procedures are i being followed and are effective. ! | of quality-related activities, to ensure that est-ablished and applicable plans and procedures are i being followed and are effective. ! | ||
I e | I e | ||
n' , * - . | n' , * - . | ||
Pago 3 of 15 II. ORGANIZATION 2.1 The site organizations for the purposes of this Plan remain as described in Commonwealth Edison's Corporate Quality Assurance Manual, Q.R. 1.0. | |||
Pago 3 of 15 | |||
II. ORGANIZATION 2.1 The site organizations for the purposes of this Plan remain as described in Commonwealth Edison's Corporate Quality | |||
Assurance Manual, Q.R. 1.0. | |||
f 2.2 Because of the limited activities at the site, the person-nel complement on-site from each department involved in quality-related activities may vary. | f 2.2 Because of the limited activities at the site, the person-nel complement on-site from each department involved in quality-related activities may vary. | ||
2.2.1 Site Quality Assurance activities will be under the direction of a Site Quality Assurance Coordi- | 2.2.1 Site Quality Assurance activities will be under the direction of a Site Quality Assurance Coordi-nator. He will ordinarily be located at the site, but may be absent from time to time for other act-ivities, training, or off-site conferences. When the Q.A. Coordinator is to be unavailable for an extended period (e.g., vacation), other personnel will be made designated to serve in his stead. | ||
5 2.2.1.1 Additional staff, including appropriately qualified Q.A. Engineers or Inspectors, may be assigned to assist the Q.A. Coord-inator on a regular or temporary basis. | |||
nator. He will ordinarily be located at the site, but may be absent from time to time for other act-ivities, training, or off-site conferences. When the Q.A. Coordinator is to be unavailable for an extended period (e.g., vacation), other personnel will be made designated to serve in his stead. | i Further the Q.A. Coordinator may request such assistance through the Director of Quality Assurance (Engineering and Const- i ruction) or if not available', of the Man-ager of Quality Assurance. | ||
5 2.2.1.1 Additional staff, including appropriately qualified Q.A. Engineers or Inspectors, may be assigned to assist the Q.A. Coord- | 2.2.1.2 The Q.A. Coordinator will have responsi-bilities as discussed in 1.4.5.1.C of Q.R. | ||
1.0. In addition, he will be responsible for carrying out those Quality Assurance duties covered by this Plan including | |||
inator on a regular or temporary basis | |||
i Further the Q.A. Coordinator may request | |||
such assistance through the Director of Quality Assurance (Engineering and Const- i ruction) or if not available', of the Man-ager of Quality Assurance. | |||
2.2.1.2 The Q.A. Coordinator will have responsi- | |||
bilities as discussed in 1.4.5.1.C of Q.R. | |||
1.0. In addition, he will be responsible for carrying out those Quality Assurance | |||
duties covered by this Plan including | |||
i Page 4 of 15 l auditing and surveillances to confirm conformance to requirements. | |||
i | |||
Page 4 of 15 l auditing and surveillances to confirm conformance to requirements. | |||
i 2.2.2 Site Station Construction activities will be under l | i 2.2.2 Site Station Construction activities will be under l | ||
\ | \ | ||
the direction of the Station Project Superintendent I l | |||
the direction of the Station Project Superintendent I | or Project Engineer. | ||
2.2.2.1 The Station Project Superintendent or Project Engineer may have staff of crafts-men to assist him as well as qualified field engineers. | |||
2.2.2.1 The Station Project Superintendent or | |||
Project Engineer may have staff of crafts-men to assist him as well as qualified field engineers. | |||
2.2.2.2 The responsibilities of the Station Pro-dect Superintendent or Pioject Engineer will be as discussed in 1.4.3.1 and 1.4.3.2 of Q.R. 1.0. In addition, he will te ; | 2.2.2.2 The responsibilities of the Station Pro-dect Superintendent or Pioject Engineer will be as discussed in 1.4.3.1 and 1.4.3.2 of Q.R. 1.0. In addition, he will te ; | ||
responsible for carrying out those duties delegated by this Plan to the Station Con-l l | responsible for carrying out those duties delegated by this Plan to the Station Con-l l | ||
struction Department. ! | struction Department. ! | ||
l l | l l | ||
l | l l | ||
4 | |||
Pago 5 of 15 7 | Pago 5 of 15 7 | ||
III. INSTRUCTION,PRdbEDURESANDCHECKLISTS 3.1 TheactiviNestobecarriedoutformaintenanceofquality for safety-$' elated systems, components, equipment, materials, | III. INSTRUCTION,PRdbEDURESANDCHECKLISTS 3.1 TheactiviNestobecarriedoutformaintenanceofquality for safety-$' elated systems, components, equipment, materials, and records'during the extended construction delay will be described in documented site instructions, procedures and/or ; | ||
and records'during the extended construction delay will be | |||
described in documented site instructions, procedures and/or ; | |||
checklists. These docuvnts will also reference applicable ' | checklists. These docuvnts will also reference applicable ' | ||
acceptance briteria which must be satisfied to assure that quality reldted activities have been properly carried out. ! | acceptance briteria which must be satisfied to assure that quality reldted activities have been properly carried out. ! | ||
Line 137: | Line 77: | ||
Revisions will be similarly processed. | Revisions will be similarly processed. | ||
3.3 The Site Quality Assurance Department Coordinator, or his ! | 3.3 The Site Quality Assurance Department Coordinator, or his ! | ||
Designee is esponsible for, but not limited to, develop- | Designee is esponsible for, but not limited to, develop-ing the following: | ||
ing the following: | |||
3.3.1 Procedures for document control of existing and in- l coming contrac+ ors Q.A. Records. | 3.3.1 Procedures for document control of existing and in- l coming contrac+ ors Q.A. Records. | ||
3 3.2 Audit plan or schedule. | 3 3.2 Audit plan or schedule. | ||
3.4 The Site Superintendent or Station Construction Department Project Engineer, or his Designee is responsible for, but not limited to, developing procedures or instructions as re- ' | 3.4 The Site Superintendent or Station Construction Department Project Engineer, or his Designee is responsible for, but not limited to, developing procedures or instructions as re- ' | ||
quired for the following areas: | quired for the following areas: | ||
e Pago 6 of 15 f.: 3.4.1 Receiving, Identification and Control of Materials, i | |||
e | |||
Pago 6 of 15 f.: 3.4.1 Receiving, Identification and Control of Materials, i | |||
;, Parts, Equipment and Components. | ;, Parts, Equipment and Components. | ||
E'. 3.4.2 Control of measurement and test equipment. .; | E'. 3.4.2 Control of measurement and test equipment. .; | ||
Line 162: | Line 90: | ||
j 3.4.4 Non-Conformance Corrective Action. ' | j 3.4.4 Non-Conformance Corrective Action. ' | ||
/ | / | ||
4 | 4 | ||
', 3.4.5 Determination of the status of construction and | ', 3.4.5 Determination of the status of construction and | ||
Line 168: | Line 95: | ||
,y inspection at the time of work cessation. | ,y inspection at the time of work cessation. | ||
'M ' | 'M ' | ||
'',b. ' | '',b. ' | ||
5 2 i | 5 2 i | ||
.t D | |||
.t | .t l | ||
r e | |||
D | i 9 | ||
.t | |||
9 | |||
Pagn 7 of 15 IV. DOCUMENT CONTROL | Pagn 7 of 15 IV. DOCUMENT CONTROL | ||
, 4.1 A Documentation Control System will be developed and used to assure that: , | , 4.1 A Documentation Control System will be developed and used to assure that: , | ||
4.1.1 Contractors' Permanent Documentation on file at | 4.1.1 Contractors' Permanent Documentation on file at the time of work cessation is inventoried and listed and audited. | ||
the time of work cessation is inventoried and listed and audited | |||
4.1.2 controlled access to the Contractors' file / vault is maintained. | 4.1.2 controlled access to the Contractors' file / vault is maintained. | ||
4.1 3 Incoming Documentation is controlled. All aspects of the Document Control System will be handled in , | 4.1 3 Incoming Documentation is controlled. All aspects of the Document Control System will be handled in , | ||
Line 204: | Line 113: | ||
to assure that the Daventory and records are complete, accur-ate and controlled. After such assurance, the Contractor's files / vault will be locked, sealed and controlled access maintained by the Quality Assurance Department. | to assure that the Daventory and records are complete, accur-ate and controlled. After such assurance, the Contractor's files / vault will be locked, sealed and controlled access maintained by the Quality Assurance Department. | ||
l' 4.3 During the extended construction delay, incoming Contractors' documentation will be opened, sorted, retained emd controlled by the Station Construction Department. The Document Inven-tory List will be kept current by the Station Construction Department. Quality related documentation to be retained in the Quality Assurance Department vault will be routed to the Quality Assurance Department for filing. CECO material receiving documentation will bc controlled in accord-i ance with the CECO Q.A. Program | l' 4.3 During the extended construction delay, incoming Contractors' documentation will be opened, sorted, retained emd controlled by the Station Construction Department. The Document Inven-tory List will be kept current by the Station Construction Department. Quality related documentation to be retained in the Quality Assurance Department vault will be routed to the Quality Assurance Department for filing. CECO material receiving documentation will bc controlled in accord-i ance with the CECO Q.A. Program | ||
. Page 8 of 15 V. IDENTIFICATION AND CONTROL OF MATERIALS, COMPONENTS, EQUIPMENT AND SYSTEMS TO BE PROTECTED ' | |||
. Page 8 of 15 V. IDENTIFICATION AND CONTROL OF MATERIALS, COMPONENTS, EQUIPMENT | |||
AND SYSTEMS TO BE PROTECTED ' | |||
i 5.1 Station Construction shall be responsible for establishing an inventory of those safety-related materials, components, l | i 5.1 Station Construction shall be responsible for establishing an inventory of those safety-related materials, components, l | ||
; structures and systems to be protected and/or safeguarded. | ; structures and systems to be protected and/or safeguarded. | ||
5.1.1 Station Construction shall be responsible for up- l l | 5.1.1 Station Construction shall be responsible for up- l l | ||
dating or revisions of such inventory, as required, in accordance with appropriate procedures. | dating or revisions of such inventory, as required, in accordance with appropriate procedures. | ||
t 5.1. 2 The inventory shall include locations or cross-refer-ences to permit locating each item listed. | t 5.1. 2 The inventory shall include locations or cross-refer-ences to permit locating each item listed. | ||
5.1. 3 The inventory shall include, or shall be cross-refer- ! | 5.1. 3 The inventory shall include, or shall be cross-refer- ! | ||
Line 227: | Line 125: | ||
5.3 Station Construction shall be responsible for control of the activity, including maintenance, assembly, diasssembly, fur-ther construction, relocation, or operation, upon any pro-tected structure, system, component, equipment, or material; and for documenting any such activity and updating any docu-ments affected thereby. | 5.3 Station Construction shall be responsible for control of the activity, including maintenance, assembly, diasssembly, fur-ther construction, relocation, or operation, upon any pro-tected structure, system, component, equipment, or material; and for documenting any such activity and updating any docu-ments affected thereby. | ||
t | t | ||
l Page 9 of 15 VI. CONTROL OF TEST EQUIPMENT | |||
. 6.1 All test equipment shall be controlled in accordance with the CECO Q.A. Program, Q.R. 12.0 and related Quality Pro-cedures. This will include calibration status and ident-ification traceable to calibration standards. | |||
l | |||
Page 9 of 15 VI. CONTROL OF TEST EQUIPMENT | |||
. 6.1 All test equipment shall be controlled in accordance with the CECO Q.A. Program, Q.R. 12.0 and related Quality Pro- | |||
cedures. This will include calibration status and ident-ification traceable to calibration standards. | |||
6.2 Identification tags or stickers shall indicate the calibra-tion status and requirements. | 6.2 Identification tags or stickers shall indicate the calibra-tion status and requirements. | ||
f t | |||
f | |||
t | |||
i , | i , | ||
l | l O | ||
O | |||
4 9 | 4 9 | ||
' Page 10 of 15 VII. HANDLING AND STURAGE 7.1 Station Construction Department will be responsible for receiving and processing incoming shipments in accordance with Q.P. 7-1. | ' Page 10 of 15 VII. HANDLING AND STURAGE 7.1 Station Construction Department will be responsible for receiving and processing incoming shipments in accordance with Q.P. 7-1. | ||
'., 7.1.1 The Site Quality Assurance Coordinator will be re- | '., 7.1.1 The Site Quality Assurance Coordinator will be re-sponsible for those duties specified in Section 4.3 of Q.P. 7-1. | ||
sponsible for those duties specified in Section 4.3 of Q.P. 7-1. | |||
7.1.2 Station Construction shall classify all safety-related items received as to any requirements for | 7.1.2 Station Construction shall classify all safety-related items received as to any requirements for | ||
: preservation, protection, maintenance, and/or | : preservation, protection, maintenance, and/or | ||
, safeguarding, and shall add any items having such requirements to the inventory required under the. | , safeguarding, and shall add any items having such requirements to the inventory required under the. | ||
provisions of Section V, above. | provisions of Section V, above. | ||
7.2 Station construction Department will provide for effective preservation, protection, maintenance, and/or safeguarding | 7.2 Station construction Department will provide for effective preservation, protection, maintenance, and/or safeguarding of all safety-related materials, components, systems, and structures identified as requiring such protection, preser-vation, maintenance, and/or safeguarding under the provisions of Section V, above. | ||
of all safety-related materials, components, systems, and structures identified as requiring such protection, preser-vation, maintenance, and/or safeguarding under the provisions of Section V, above. | |||
7.2.1 Each item or class of safety-related equipment, structures, or systems will be reviewed to deter-mine what, if any, protection, preservation, main-tenance, and/or safeguarding is requir'ed to prevent significant deterioration of quality during the ex-tended construction delay. Equipment to be reviewed | 7.2.1 Each item or class of safety-related equipment, structures, or systems will be reviewed to deter-mine what, if any, protection, preservation, main-tenance, and/or safeguarding is requir'ed to prevent significant deterioration of quality during the ex-tended construction delay. Equipment to be reviewed | ||
~s hall include, but not be limited to, nuclear steam supply system vessels, heat exchangers, tanks, pumps, piping, internals, and valves of all types; filters, | ~s hall include, but not be limited to, nuclear steam supply system vessels, heat exchangers, tanks, pumps, piping, internals, and valves of all types; filters, | ||
, tanks, pumps, piping and similar equipment for other | , tanks, pumps, piping and similar equipment for other | ||
L l i | L l i | ||
e Page 11 of 1) i i safety-related systems; electrical equipment such | |||
e | |||
Page 11 of 1) i i safety-related systems; electrical equipment such | |||
; as motors, switchgear, cable, termination supplies, ; | ; as motors, switchgear, cable, termination supplies, ; | ||
instruments and control boards (and including cable s trays, conduit, hangers, and other accessories for j t | instruments and control boards (and including cable s trays, conduit, hangers, and other accessories for j t | ||
safety-related systems); hydraulic and pneumatic . | safety-related systems); hydraulic and pneumatic . | ||
I controls and accessories; condensers and related l | I controls and accessories; condensers and related l equipment; structural steel, plate, reinforcing mat- ! | ||
equipment; structural steel, plate, reinforcing mat- ! | |||
erials, bulk concrete supplies, cable, hangers, and I | erials, bulk concrete supplies, cable, hangers, and I | ||
other safety-related hardware; completed and part-ially completed safety-related structures; and all of the above items, where part of completed or part- | other safety-related hardware; completed and part-ially completed safety-related structures; and all of the above items, where part of completed or part-iallyinstalledsystems,'shallbeconsidered,includ-l ing those in storage or stored in place. l l | ||
iallyinstalledsystems,'shallbeconsidered,includ-l | |||
ing those in storage or stored in place. l l | |||
7.2.1.1 Such review will consider, but not be lim-ited to, the following: Required environ- , | 7.2.1.1 Such review will consider, but not be lim-ited to, the following: Required environ- , | ||
l mental conditions and/or protection from j the elements; necessity of protection from l | l mental conditions and/or protection from j the elements; necessity of protection from l | ||
dust or foreign materials; protectionfroml | dust or foreign materials; protectionfroml rust, scale, corrosion, galvanic action, fungi, insects, or deterioriation of cover i i r | ||
rust, scale, corrosion, galvanic action, fungi, insects, or deterioriation of cover i i r | |||
ings or coatings; susceptibilitytoimpactd vibration,' scraping, or other disturbance; f | ings or coatings; susceptibilitytoimpactd vibration,' scraping, or other disturbance; f | ||
~ | ~ | ||
I vulnerability to theft, misoperation, or j malicious interference; need for,'and fre- l | I vulnerability to theft, misoperation, or j malicious interference; need for,'and fre- l quency of, exercising, circulation,.or op- i i | ||
eration; need for, and frequency of, cleaning or replacement of equipment filter ( | |||
quency of, exercising, circulation,.or op- i i | sumps, reservoirs, moisture absorption mat-t | ||
eration; need for, and frequency of, | |||
cleaning or replacement of equipment filter ( | |||
sumps, reservoirs, moisture absorption mat- | |||
t | |||
Page 12 of 15'; | Page 12 of 15'; | ||
erials, etc.; lubrication and coolant ) | erials, etc.; lubrication and coolant ) | ||
requirements; and other servicing or protective action required. | requirements; and other servicing or protective action required. | ||
7.3 Station construction shall establish procedures for mainten- | 7.3 Station construction shall establish procedures for mainten- | ||
, ( | , ( | ||
ance, servicing, operation or exercising at the specified intervals, and shall perform or arrange for such activity. > | ance, servicing, operation or exercising at the specified intervals, and shall perform or arrange for such activity. > | ||
7.4 Station Construction shall establish procedures for inspec-- | 7.4 Station Construction shall establish procedures for inspec-- | ||
tions, surveillances, and/or testing of all inventoried items at frequencies sufficient to insure that all protec-tive requirements are being met. | tions, surveillances, and/or testing of all inventoried items at frequencies sufficient to insure that all protec-tive requirements are being met. | ||
i | i 4 | ||
4 | |||
I l | I l | ||
1 i | 1 i | ||
i | i I | ||
I t l | |||
t l | |||
Page 13 of 15 VIII. NONCONFORMING ACTIONS / ITEMS AND CORRECTIVE ACTION 8.1 All items found to be nonconforming during the duration of the extended shutdown will be controlled and processed - | |||
Page 13 of 15 | |||
VIII. NONCONFORMING ACTIONS / ITEMS AND CORRECTIVE ACTION 8.1 All items found to be nonconforming during the duration of the extended shutdown will be controlled and processed - | |||
in accordance with the CECO Q.A. Program, Q.R.15.0 and , | in accordance with the CECO Q.A. Program, Q.R.15.0 and , | ||
related Quality Procedures. Hold areas and Hold tags will , | related Quality Procedures. Hold areas and Hold tags will , | ||
be provided and utilized. Nonconformances will be written and proper dispositions and follow-up action to prevent any recurrence of such nonconformances will be required. ! | be provided and utilized. Nonconformances will be written and proper dispositions and follow-up action to prevent any recurrence of such nonconformances will be required. ! | ||
Station Construction will be responsible for initiating, i processing and closing out Nonconformances. | Station Construction will be responsible for initiating, i processing and closing out Nonconformances. | ||
I | I | ||
[ | [ | ||
f | f i | ||
6 e | |||
i | |||
6 | |||
e | |||
l | l | ||
Pags 14 of 15 | Pags 14 of 15 | ||
, IX. AUDITS 9.1 During the extended construction delay there will be scheduled audits in accordance with CECO's O.A. Program Q.R.18.0 and related Quality Procedures. The Q.A. Site ! | , IX. AUDITS 9.1 During the extended construction delay there will be scheduled audits in accordance with CECO's O.A. Program Q.R.18.0 and related Quality Procedures. The Q.A. Site ! | ||
Coordinator will establish an approved audit schedule to assure that procedures and duties cited in this Plan are carried out. All Audits will be performed to an approved [ | Coordinator will establish an approved audit schedule to assure that procedures and duties cited in this Plan are carried out. All Audits will be performed to an approved [ | ||
checklist by qualified auditors. | checklist by qualified auditors. | ||
9.2 Follow-up surveillances and audits to detect recurrence of any deficiencies, or to close out audits, will be in accordance with the CECO Q.A. Program. : | 9.2 Follow-up surveillances and audits to detect recurrence of any deficiencies, or to close out audits, will be in accordance with the CECO Q.A. Program. : | ||
l t | l t | ||
I i | I i | ||
[ | [ | ||
L b | |||
L | |||
b | |||
t l | t l | ||
Page 15 of 15 4 | Page 15 of 15 4 | ||
X. ACCESS CONTROL i | X. ACCESS CONTROL i | ||
10.1 Station Construction Department shall be responsible for providing and maintaining barriers surrounding protected areas of the site; | 10.1 Station Construction Department shall be responsible for providing and maintaining barriers surrounding protected areas of the site; | ||
, areas in which safety-related systems, | , areas in which safety-related systems, components, equipment, structures, or materials are loca-ted shall be within one or more such protected areas. | ||
components, equipment, structures, or materials are loca-ted shall be within one or more such protected areas. | |||
10.2 Station Construction shall be responsible for providing security systems and/or. personnel to control access to protected areas. | 10.2 Station Construction shall be responsible for providing security systems and/or. personnel to control access to protected areas. | ||
10.3 Station Construction shall be responsible for controlling distribution of keys or other access devices, where such devices are required to control access to areas containing protected material, structures, components, equipment, or systems. i | 10.3 Station Construction shall be responsible for controlling distribution of keys or other access devices, where such devices are required to control access to areas containing protected material, structures, components, equipment, or systems. i R. Cosaro | ||
R. Cosaro | |||
& / O f/ 8 f7 9 ' | & / O f/ 8 f7 9 ' | ||
/V +V SCD Project Superintendent R. J. Farr Braidwood Station Q.A. Coordinator Braidwood Station Approved for Q.A.: * ~, ' | /V +V SCD Project Superintendent R. J. Farr Braidwood Station Q.A. Coordinator Braidwood Station Approved for Q.A.: * ~, ' | ||
. F. Marcus 77 Director of Quality Assurance Revision 1 dated 10-24-79 ' | . F. Marcus 77 Director of Quality Assurance Revision 1 dated 10-24-79 ' | ||
i i | i i | ||
e e j | e e j | ||
Braidwood Sito Procedure 1 i Rovision O ! | Braidwood Sito Procedure 1 i Rovision O ! | ||
Approved CECO Q.A._.-v W,e - | Approved CECO Q.A._.-v W,e - | ||
Approved CECO SCD TA . Le<t to , | Approved CECO SCD TA . Le<t to , | ||
Date 10-3-79 ! | Date 10-3-79 ! | ||
i LOCUMENT CONTROL LOG (ATTACHMENT A) ! | i LOCUMENT CONTROL LOG (ATTACHMENT A) ! | ||
t | t t | ||
t | |||
f Document Date Q.A. Date Q A. | f Document Date Q.A. Date Q A. | ||
Name & Firm Taken Taken Approved Returned Approved ! | Name & Firm Taken Taken Approved Returned Approved ! | ||
i i | |||
i | |||
i | |||
i t ! | i t ! | ||
I ! | I ! | ||
l l' I P | |||
l l' I | I I | ||
i k | |||
P | i i | ||
9 I | |||
I | l i | ||
i | |||
9 | |||
i | |||
*. ' " ~' ' braidwood Site Procedure 1 Ravicion 0 Apprsved CECO Q.A. 49 % 4- . | |||
*. ' " ~' ' braidwood Site Procedure 1 Ravicion 0 | Approved CECO SCD W.eumo Date 10-3-79 1-3.6 If for any reason a file cannot be sealed, the files will be moved into the CECO document vault and con-e trolled by using the document control log. | ||
Apprsved CECO Q.A. 49 % 4- . | |||
Approved CECO SCD W.eumo Date 10-3-79 1-3.6 If for any reason a file cannot be sealed, the files | |||
will be moved into the CECO document vault and con-e trolled by using the document control log. | |||
1-3.7 Routine inspections of the site offices will be performed by the guard service to assure that fire hazards are not present. | 1-3.7 Routine inspections of the site offices will be performed by the guard service to assure that fire hazards are not present. | ||
e i | |||
i e | |||
e | I l | ||
1 (3) t w -w. e-- s -..,y | |||
i | |||
l | |||
1 | |||
(3) t | |||
w -w. e-- s -..,y | |||
. ,s ,. | . ,s ,. | ||
. - Braidwood Site Procedure 1 Rnvision , 0 Approved CECO Q.A. <vn v4- l Approved CECO SCD fv4 NMcA, 1 Date 10-3-79 Document Control During the | |||
. - Braidwood Site Procedure 1 Rnvision , 0 | ', Extended Construction Delav at Braidwood Station 1-1.0 PURPOSE: | ||
Approved CECO Q.A. <vn v4- l Approved CECO SCD fv4 NMcA, 1 | |||
Date 10-3-79 Document Control During the | |||
', Extended Construction Delav | |||
at Braidwood Station 1-1.0 PURPOSE: | |||
1-1.1 The purpose of this procedure is to assure that all safety-related documents are adequately controlled to prevent loss or damage throughout the csnstruction delay period. | 1-1.1 The purpose of this procedure is to assure that all safety-related documents are adequately controlled to prevent loss or damage throughout the csnstruction delay period. | ||
1-2.0 SCOPE: | 1-2.0 SCOPE: | ||
1-2.1 This procedure applies to all safety-related con-tractor documents excluding construction drawings. | 1-2.1 This procedure applies to all safety-related con-tractor documents excluding construction drawings. | ||
1-3.0 PROCEDURE: | 1-3.0 PROCEDURE: | ||
Line 532: | Line 246: | ||
prepared by the contractor. This inventory shall be reviewed and accepted by CECO Q.A.. | prepared by the contractor. This inventory shall be reviewed and accepted by CECO Q.A.. | ||
1-3.2 Using the document inventory, an audit of the con-tractors' files will be conducted by CECO Q.A. to assure that the documents listed in the inventory are being maintained in the appropriate files. All . | 1-3.2 Using the document inventory, an audit of the con-tractors' files will be conducted by CECO Q.A. to assure that the documents listed in the inventory are being maintained in the appropriate files. All . | ||
discrepancies must be resolved at this time. | discrepancies must be resolved at this time. | ||
1-3.3 After the audit is completed and the discrepancies ! | 1-3.3 After the audit is completed and the discrepancies ! | ||
are resolved CECO Q.A. shall lock and seal the file cabinets / vaults. | are resolved CECO Q.A. shall lock and seal the file cabinets / vaults. | ||
1-3.4 Access to the files will be limited and controlled by CECO Q.A.. Anyone wanting to enter a file for any reason must contact CECO Q.A. so that the seals can be broken and the file unlocked. If a document is , | |||
1-3.4 Access | |||
to the files will be limited and controlled by CECO Q.A.. Anyone wanting to enter a file for any reason must contact CECO Q.A. so that the seals can be broken and the file unlocked. If a document is , | |||
to be removed from a file the document control log (See Attachment A) must be filled out by CECO Q.A. | to be removed from a file the document control log (See Attachment A) must be filled out by CECO Q.A. | ||
and the files relocked and resealed. | and the files relocked and resealed. | ||
1-3.5 When a document is returned to the file CECO Q.A. | 1-3.5 When a document is returned to the file CECO Q.A. | ||
shall complete the document control log, the seals will be broken, the cabinet / vault vill be unlocked, the documents filed, and the file cabinet / vault will be relocked and resealed. | shall complete the document control log, the seals will be broken, the cabinet / vault vill be unlocked, the documents filed, and the file cabinet / vault will be relocked and resealed. | ||
(2) | (2) | ||
;* ~ ' . Braidwood Sita Procedura 1 Rsvicien 0 Approved CECO Q.A./ W 4.a Approved CECO SCD 'F. (WNM ; | |||
;* ~ ' . Braidwood Sita Procedura 1 | |||
Rsvicien 0 | |||
Approved CECO Q.A./ W 4.a Approved CECO SCD 'F. (WNM ; | |||
Date 10-3-79 ' | Date 10-3-79 ' | ||
Document Control During the. | Document Control During the. | ||
o Extended Construction Delay at Braidwood Station ! | o Extended Construction Delay at Braidwood Station ! | ||
l PROCEDURE INDEX TITLE PAGE NUMBERS REVISION NUMBER DATE , | l PROCEDURE INDEX TITLE PAGE NUMBERS REVISION NUMBER DATE , | ||
Line 566: | Line 264: | ||
Scope 2 o go_3_79 Procedure 2&3 0 10-3-79 ! | Scope 2 o go_3_79 Procedure 2&3 0 10-3-79 ! | ||
l Attachment A 4 0 10-3-79 | l Attachment A 4 0 10-3-79 | ||
{ | { | ||
t l | t l | ||
i | i I | ||
I | |||
(1) | (1) | ||
Braidwood Site Proceduro 2 Revision .,1 Approved CECO 0.A. 4.r.s 4./ | |||
Revision .,1 Approved CECO 0.A. 4.r.s 4./ | |||
Approved CECO SCD - | Approved CECO SCD - | ||
# t o .p../ | # t o .p../ | ||
Date 10-26-79 Control of Incoming Quality Document During the "xtended I Construction Delay at Braicwood Station PROCEDURE INDEX TITLE PAGE NUMBERS REVISION NUMBER DATE Index 1 1 ;O-26-79 ' | |||
Date 10-26-79 | i Purpose 2 0 10-05-79 Scope- 2 0 10-05-79 I Procedure 2 1 10-26-79 i | ||
Control of Incoming Quality | |||
Document During the "xtended I Construction Delay at Braicwood Station PROCEDURE INDEX TITLE PAGE NUMBERS REVISION NUMBER DATE Index 1 1 ;O-26-79 ' | |||
i Purpose 2 0 10-05-79 | |||
Scope- 2 0 10-05-79 I Procedure 2 | |||
1 10-26-79 i | |||
i | i | ||
( | ( | ||
Line 606: | Line 280: | ||
{ | { | ||
i | i | ||
. 1 | . 1 b | ||
I i | |||
i | |||
I I | I I | ||
I | I | ||
~ ~ | ~ ~ | ||
Braidwood Site Procsdura 2 | Braidwood Site Procsdura 2 | ||
' Revision _m 1 ; | ' Revision _m 1 ; | ||
Approved CECO Q.A. # 1-/a c. u ; | Approved CECO Q.A. # 1-/a c. u ; | ||
Approved CECO SCD 4A /.m ./ r Date 10-26-79 ! | Approved CECO SCD 4A /.m ./ r Date 10-26-79 ! | ||
t | t Control of Incoming Quality ; | ||
,, Document During the Extended Construction Delay at Braidwood Station 1-1.0 PURPOSE: | |||
Control of Incoming Quality ; | |||
,, Document During the Extended Construction Delay at Braidwood Station | |||
1-1.0 PURPOSE: | |||
1-1.1 The' purpose of this procedure is to assure that all safety-related incoming Quality Documents are properly i | 1-1.1 The' purpose of this procedure is to assure that all safety-related incoming Quality Documents are properly i | ||
received and controlled to assure that no loss or , | received and controlled to assure that no loss or , | ||
deterioration of Quality Documents occurs during the l extended construction delay. | deterioration of Quality Documents occurs during the l extended construction delay. | ||
Line 647: | Line 302: | ||
1-3 2 Station Construction and Contractors Quality Documents ! | 1-3 2 Station Construction and Contractors Quality Documents ! | ||
will be reviewed and controlled by Station Construction i Department Personnel. | will be reviewed and controlled by Station Construction i Department Personnel. | ||
1-3 3 This procedure control will be in accordance with the ; | 1-3 3 This procedure control will be in accordance with the ; | ||
Commonwealth Edison Company's Quality Procedure 17-1. | Commonwealth Edison Company's Quality Procedure 17-1. | ||
F 6 | |||
6 | |||
F | . l n- . . . , . _ . _ . . _ | ||
. l | |||
n- . . . , . _ . _ . . _ | |||
., , , ,_., - . ._. --- , , , ,. _ . . . , . - _ . . . , , . - .- . , - , . - . . _,,i}} | ., , , ,_., - . ._. --- , , , ,. _ . . . , . - _ . . . , , . - .- . , - , . - . . _,,i}} |
Latest revision as of 22:54, 21 February 2020
ML19305D353 | |
Person / Time | |
---|---|
Site: | Braidwood |
Issue date: | 10/24/1979 |
From: | Casaro R, Farr R, Marcus G COMMONWEALTH EDISON CO. |
To: | |
Shared Package | |
ML19305D346 | List: |
References | |
NUDOCS 8004140449 | |
Download: ML19305D353 (21) | |
Text
____ _______ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
, ,, Quality Assuranco Plan for Braidwood Station Page 1 of 15
() .
During Extended Construction Delay
- 1. OVERVIEW 1.1 This Plan is intended to provide specialized treatment, where appropriate, of Quality Assurance activities during the extended construction delay period at Braidwood Station.
This Plan is a part of Commonwealth Edison's Corporate >
Quality Assurance Program; the policies, requirements, i
and procedures therein remain in effect and unmodified except as specifically identified in this Plan.
1.2 This Plan shall be valid for a period of approximately ;
one year from the day of substantial cessation of construc-tion. Thereafter, if extended construction delay continues, l this Plan, including any procedures and instructions spec-ific to this Plan, shall be reviewed on an approximately annual basis to insure that measures for identification, preservation, maintenance, and security of systems, compon-ents, materials, and records are adequate for the then-anticipated duration of the delay.
1.3 The objectives of this Plan shall be the maintenance of the identity, integrity, and quality of those safety-related structures, systems, components, equipment, mater-ials, and records on-site as of the date of construction cessation; and the safeguarding of the identity, integrity, and quality of safety-related components, equipment, mater- .
ials, and records which arrive on-site during the construc-tion delay.
1.4 The essentials of this Plan are summarized as follows:
9
. . Page 2 of 15 1.4.1 Id:ntification of scfoty-related systems, compo-nents, equipment, materials, and records requiring safeguarding, protection, preservation and/or maintenance. I
.* 1.4.2 Storage and protection of such identified safety- l related systems, components, equipment, materials, and records in appropriate fashion to prevent the degradation of quality.
1.4.3 Review of incoming items and documents on a timely basis, and Lacorporation of safety-related items and documents under the programs of .1 and .2 above.
1.4.4 Inspection, maintenance, and surveillance of the items and records protected under .2 above, with frequency sufficient to insure that protection and identification measures remain in place and effec-tive.
i 1.4.5 Quality' Assurance surveillances and scheduled audits !
of quality-related activities, to ensure that est-ablished and applicable plans and procedures are i being followed and are effective. !
I e
n' , * - .
Pago 3 of 15 II. ORGANIZATION 2.1 The site organizations for the purposes of this Plan remain as described in Commonwealth Edison's Corporate Quality Assurance Manual, Q.R. 1.0.
f 2.2 Because of the limited activities at the site, the person-nel complement on-site from each department involved in quality-related activities may vary.
2.2.1 Site Quality Assurance activities will be under the direction of a Site Quality Assurance Coordi-nator. He will ordinarily be located at the site, but may be absent from time to time for other act-ivities, training, or off-site conferences. When the Q.A. Coordinator is to be unavailable for an extended period (e.g., vacation), other personnel will be made designated to serve in his stead.
5 2.2.1.1 Additional staff, including appropriately qualified Q.A. Engineers or Inspectors, may be assigned to assist the Q.A. Coord-inator on a regular or temporary basis.
i Further the Q.A. Coordinator may request such assistance through the Director of Quality Assurance (Engineering and Const- i ruction) or if not available', of the Man-ager of Quality Assurance.
2.2.1.2 The Q.A. Coordinator will have responsi-bilities as discussed in 1.4.5.1.C of Q.R.
1.0. In addition, he will be responsible for carrying out those Quality Assurance duties covered by this Plan including
i Page 4 of 15 l auditing and surveillances to confirm conformance to requirements.
i 2.2.2 Site Station Construction activities will be under l
\
the direction of the Station Project Superintendent I l
or Project Engineer.
2.2.2.1 The Station Project Superintendent or Project Engineer may have staff of crafts-men to assist him as well as qualified field engineers.
2.2.2.2 The responsibilities of the Station Pro-dect Superintendent or Pioject Engineer will be as discussed in 1.4.3.1 and 1.4.3.2 of Q.R. 1.0. In addition, he will te ;
responsible for carrying out those duties delegated by this Plan to the Station Con-l l
struction Department. !
l l
l l
4
Pago 5 of 15 7
III. INSTRUCTION,PRdbEDURESANDCHECKLISTS 3.1 TheactiviNestobecarriedoutformaintenanceofquality for safety-$' elated systems, components, equipment, materials, and records'during the extended construction delay will be described in documented site instructions, procedures and/or ;
checklists. These docuvnts will also reference applicable '
acceptance briteria which must be satisfied to assure that quality reldted activities have been properly carried out. !
Site Sta'tiori Construction and Quality Assurance shall have ;
documentad N ocedures to implement their responsibilities, as necessarp.
3.2 Site Proceddies and/or instructions ~ supplementing the Quality Procedures of the CECO Ouality Assurance Manual '
willbeprehred,reviewedandapprovedwithintheindivid- '
ualSiteDehrtmentresponsiblefortheactivitiesinvolved f
(
andtheiru$bmonitoredbytheSiteQualityAssuranceOrgan- '
T .
ization. The Procedures will be independently reviewed and evaluated by the other involved department; comments will be forwarded,to the issuing department, for disposition.
Revisions will be similarly processed.
3.3 The Site Quality Assurance Department Coordinator, or his !
Designee is esponsible for, but not limited to, develop-ing the following:
3.3.1 Procedures for document control of existing and in- l coming contrac+ ors Q.A. Records.
3 3.2 Audit plan or schedule.
3.4 The Site Superintendent or Station Construction Department Project Engineer, or his Designee is responsible for, but not limited to, developing procedures or instructions as re- '
quired for the following areas:
e Pago 6 of 15 f.: 3.4.1 Receiving, Identification and Control of Materials, i
- , Parts, Equipment and Components.
E'. 3.4.2 Control of measurement and test equipment. .;
, .[.[ 3.4.3 Handling, storage, maintenance and surveillance *
"I-of materials, parts, equipment and components.
j 3.4.4 Non-Conformance Corrective Action. '
/
4
', 3.4.5 Determination of the status of construction and
'l
,y inspection at the time of work cessation.
'M '
,b. '
5 2 i
.t D
.t l
r e
i 9
Pagn 7 of 15 IV. DOCUMENT CONTROL
, 4.1 A Documentation Control System will be developed and used to assure that: ,
4.1.1 Contractors' Permanent Documentation on file at the time of work cessation is inventoried and listed and audited.
4.1.2 controlled access to the Contractors' file / vault is maintained.
4.1 3 Incoming Documentation is controlled. All aspects of the Document Control System will be handled in ,
accordance with site procedures, instructions and
,the CECO Q.A. Mnnual.
4.2 The Station Construction Department shall require Contrac- i tors doing safety-related work to provide an inventory of I all permanent records on file at the time of work cessation.
The Quality Assurance Department will then audit these files l
to assure that the Daventory and records are complete, accur-ate and controlled. After such assurance, the Contractor's files / vault will be locked, sealed and controlled access maintained by the Quality Assurance Department.
l' 4.3 During the extended construction delay, incoming Contractors' documentation will be opened, sorted, retained emd controlled by the Station Construction Department. The Document Inven-tory List will be kept current by the Station Construction Department. Quality related documentation to be retained in the Quality Assurance Department vault will be routed to the Quality Assurance Department for filing. CECO material receiving documentation will bc controlled in accord-i ance with the CECO Q.A. Program
. Page 8 of 15 V. IDENTIFICATION AND CONTROL OF MATERIALS, COMPONENTS, EQUIPMENT AND SYSTEMS TO BE PROTECTED '
i 5.1 Station Construction shall be responsible for establishing an inventory of those safety-related materials, components, l
- structures and systems to be protected and/or safeguarded.
5.1.1 Station Construction shall be responsible for up- l l
dating or revisions of such inventory, as required, in accordance with appropriate procedures.
t 5.1. 2 The inventory shall include locations or cross-refer-ences to permit locating each item listed.
5.1. 3 The inventory shall include, or shall be cross-refer- !
enced to permit identification of, the protection, j preservation, maintenance, and/or safeguarding requirements established for each item under Section VII of this Plan.
5.1.4 Copies of the inventory and of each approved revision l thereof shall be distributed by Station Construction li in accordance with appropriate procedures. l 5.2 Station Construction shall be responsible for placing and maintaining clear and legible identifying markings on each protected item or, in the case of bulk materials, on each lot.
5.3 Station Construction shall be responsible for control of the activity, including maintenance, assembly, diasssembly, fur-ther construction, relocation, or operation, upon any pro-tected structure, system, component, equipment, or material; and for documenting any such activity and updating any docu-ments affected thereby.
t
l Page 9 of 15 VI. CONTROL OF TEST EQUIPMENT
. 6.1 All test equipment shall be controlled in accordance with the CECO Q.A. Program, Q.R. 12.0 and related Quality Pro-cedures. This will include calibration status and ident-ification traceable to calibration standards.
6.2 Identification tags or stickers shall indicate the calibra-tion status and requirements.
f t
i ,
l O
4 9
' Page 10 of 15 VII. HANDLING AND STURAGE 7.1 Station Construction Department will be responsible for receiving and processing incoming shipments in accordance with Q.P. 7-1.
'., 7.1.1 The Site Quality Assurance Coordinator will be re-sponsible for those duties specified in Section 4.3 of Q.P. 7-1.
7.1.2 Station Construction shall classify all safety-related items received as to any requirements for
- preservation, protection, maintenance, and/or
, safeguarding, and shall add any items having such requirements to the inventory required under the.
provisions of Section V, above.
7.2 Station construction Department will provide for effective preservation, protection, maintenance, and/or safeguarding of all safety-related materials, components, systems, and structures identified as requiring such protection, preser-vation, maintenance, and/or safeguarding under the provisions of Section V, above.
7.2.1 Each item or class of safety-related equipment, structures, or systems will be reviewed to deter-mine what, if any, protection, preservation, main-tenance, and/or safeguarding is requir'ed to prevent significant deterioration of quality during the ex-tended construction delay. Equipment to be reviewed
~s hall include, but not be limited to, nuclear steam supply system vessels, heat exchangers, tanks, pumps, piping, internals, and valves of all types; filters,
, tanks, pumps, piping and similar equipment for other
L l i
e Page 11 of 1) i i safety-related systems; electrical equipment such
- as motors, switchgear, cable, termination supplies, ;
instruments and control boards (and including cable s trays, conduit, hangers, and other accessories for j t
safety-related systems); hydraulic and pneumatic .
I controls and accessories; condensers and related l equipment; structural steel, plate, reinforcing mat- !
erials, bulk concrete supplies, cable, hangers, and I
other safety-related hardware; completed and part-ially completed safety-related structures; and all of the above items, where part of completed or part-iallyinstalledsystems,'shallbeconsidered,includ-l ing those in storage or stored in place. l l
7.2.1.1 Such review will consider, but not be lim-ited to, the following: Required environ- ,
l mental conditions and/or protection from j the elements; necessity of protection from l
dust or foreign materials; protectionfroml rust, scale, corrosion, galvanic action, fungi, insects, or deterioriation of cover i i r
ings or coatings; susceptibilitytoimpactd vibration,' scraping, or other disturbance; f
~
I vulnerability to theft, misoperation, or j malicious interference; need for,'and fre- l quency of, exercising, circulation,.or op- i i
eration; need for, and frequency of, cleaning or replacement of equipment filter (
sumps, reservoirs, moisture absorption mat-t
Page 12 of 15';
erials, etc.; lubrication and coolant )
requirements; and other servicing or protective action required.
7.3 Station construction shall establish procedures for mainten-
, (
ance, servicing, operation or exercising at the specified intervals, and shall perform or arrange for such activity. >
7.4 Station Construction shall establish procedures for inspec--
tions, surveillances, and/or testing of all inventoried items at frequencies sufficient to insure that all protec-tive requirements are being met.
i 4
I l
1 i
i I
I t l
Page 13 of 15 VIII. NONCONFORMING ACTIONS / ITEMS AND CORRECTIVE ACTION 8.1 All items found to be nonconforming during the duration of the extended shutdown will be controlled and processed -
in accordance with the CECO Q.A. Program, Q.R.15.0 and ,
related Quality Procedures. Hold areas and Hold tags will ,
be provided and utilized. Nonconformances will be written and proper dispositions and follow-up action to prevent any recurrence of such nonconformances will be required. !
Station Construction will be responsible for initiating, i processing and closing out Nonconformances.
I
[
f i
6 e
l
Pags 14 of 15
, IX. AUDITS 9.1 During the extended construction delay there will be scheduled audits in accordance with CECO's O.A. Program Q.R.18.0 and related Quality Procedures. The Q.A. Site !
Coordinator will establish an approved audit schedule to assure that procedures and duties cited in this Plan are carried out. All Audits will be performed to an approved [
checklist by qualified auditors.
9.2 Follow-up surveillances and audits to detect recurrence of any deficiencies, or to close out audits, will be in accordance with the CECO Q.A. Program. :
l t
I i
[
L b
t l
Page 15 of 15 4
X. ACCESS CONTROL i
10.1 Station Construction Department shall be responsible for providing and maintaining barriers surrounding protected areas of the site;
, areas in which safety-related systems, components, equipment, structures, or materials are loca-ted shall be within one or more such protected areas.
10.2 Station Construction shall be responsible for providing security systems and/or. personnel to control access to protected areas.
10.3 Station Construction shall be responsible for controlling distribution of keys or other access devices, where such devices are required to control access to areas containing protected material, structures, components, equipment, or systems. i R. Cosaro
& / O f/ 8 f7 9 '
/V +V SCD Project Superintendent R. J. Farr Braidwood Station Q.A. Coordinator Braidwood Station Approved for Q.A.: * ~, '
. F. Marcus 77 Director of Quality Assurance Revision 1 dated 10-24-79 '
i i
e e j
Braidwood Sito Procedure 1 i Rovision O !
Approved CECO Q.A._.-v W,e -
Approved CECO SCD TA . Le<t to ,
Date 10-3-79 !
i LOCUMENT CONTROL LOG (ATTACHMENT A) !
t t
f Document Date Q.A. Date Q A.
Name & Firm Taken Taken Approved Returned Approved !
i i
i t !
I !
l l' I P
I I
i k
i i
9 I
l i
- . ' " ~' ' braidwood Site Procedure 1 Ravicion 0 Apprsved CECO Q.A. 49 % 4- .
Approved CECO SCD W.eumo Date 10-3-79 1-3.6 If for any reason a file cannot be sealed, the files will be moved into the CECO document vault and con-e trolled by using the document control log.
1-3.7 Routine inspections of the site offices will be performed by the guard service to assure that fire hazards are not present.
e i
i e
I l
1 (3) t w -w. e-- s -..,y
. ,s ,.
. - Braidwood Site Procedure 1 Rnvision , 0 Approved CECO Q.A. <vn v4- l Approved CECO SCD fv4 NMcA, 1 Date 10-3-79 Document Control During the
', Extended Construction Delav at Braidwood Station 1-1.0 PURPOSE:
1-1.1 The purpose of this procedure is to assure that all safety-related documents are adequately controlled to prevent loss or damage throughout the csnstruction delay period.
1-2.0 SCOPE:
1-2.1 This procedure applies to all safety-related con-tractor documents excluding construction drawings.
1-3.0 PROCEDURE:
1-3.1 A documented and detailed inventory listing every safety-related document in the contractor's posession at the time safety-related work was halted shall be :
prepared by the contractor. This inventory shall be reviewed and accepted by CECO Q.A..
1-3.2 Using the document inventory, an audit of the con-tractors' files will be conducted by CECO Q.A. to assure that the documents listed in the inventory are being maintained in the appropriate files. All .
discrepancies must be resolved at this time.
1-3.3 After the audit is completed and the discrepancies !
are resolved CECO Q.A. shall lock and seal the file cabinets / vaults.
1-3.4 Access to the files will be limited and controlled by CECO Q.A.. Anyone wanting to enter a file for any reason must contact CECO Q.A. so that the seals can be broken and the file unlocked. If a document is ,
to be removed from a file the document control log (See Attachment A) must be filled out by CECO Q.A.
and the files relocked and resealed.
1-3.5 When a document is returned to the file CECO Q.A.
shall complete the document control log, the seals will be broken, the cabinet / vault vill be unlocked, the documents filed, and the file cabinet / vault will be relocked and resealed.
(2)
- ~ ' . Braidwood Sita Procedura 1 Rsvicien 0 Approved CECO Q.A./ W 4.a Approved CECO SCD 'F. (WNM ;
Date 10-3-79 '
Document Control During the.
o Extended Construction Delay at Braidwood Station !
l PROCEDURE INDEX TITLE PAGE NUMBERS REVISION NUMBER DATE ,
Index 1 0 10-3-79 Purpose 2 0 10-3-79 !
Scope 2 o go_3_79 Procedure 2&3 0 10-3-79 !
l Attachment A 4 0 10-3-79
{
t l
i I
(1)
Braidwood Site Proceduro 2 Revision .,1 Approved CECO 0.A. 4.r.s 4./
Approved CECO SCD -
- t o .p../
Date 10-26-79 Control of Incoming Quality Document During the "xtended I Construction Delay at Braicwood Station PROCEDURE INDEX TITLE PAGE NUMBERS REVISION NUMBER DATE Index 1 1 ;O-26-79 '
i Purpose 2 0 10-05-79 Scope- 2 0 10-05-79 I Procedure 2 1 10-26-79 i
i
(
l f i
I
{
i
. 1 b
I i
I I
I
~ ~
Braidwood Site Procsdura 2
' Revision _m 1 ;
Approved CECO Q.A. # 1-/a c. u ;
Approved CECO SCD 4A /.m ./ r Date 10-26-79 !
t Control of Incoming Quality ;
,, Document During the Extended Construction Delay at Braidwood Station 1-1.0 PURPOSE:
1-1.1 The' purpose of this procedure is to assure that all safety-related incoming Quality Documents are properly i
received and controlled to assure that no loss or ,
deterioration of Quality Documents occurs during the l extended construction delay.
1-2.0 SCOPE: ,
1-2.1 This procedure applies to all incoming Quality Documents.
1-3 0 PROCEDURE:
1-3 1 When documents are received, they will be opened and !
sent to the Q.A. Coordinator for his review, identifica- l tion and filing. :
1-3 2 Station Construction and Contractors Quality Documents !
will be reviewed and controlled by Station Construction i Department Personnel.
1-3 3 This procedure control will be in accordance with the ;
Commonwealth Edison Company's Quality Procedure 17-1.
F 6
6
. l n- . . . , . _ . _ . . _
., , , ,_., - . ._. --- , , , ,. _ . . . , . - _ . . . , , . - .- . , - , . - . . _,,i