{{#Wiki_filter:December 19, 2007 | {{#Wiki_filter:December 19, 2007 Mr. Richard L. Anderson Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 | ||
Mr. Richard L. Anderson | |||
Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785 | |||
==SUBJECT:== | ==SUBJECT:== | ||
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER | CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER | ||
==Dear Mr. Anderson:== | ==Dear Mr. Anderson:== | ||
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas. The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors | As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas. | ||
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature. | |||
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan. | R. Anderson Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49 | /RA by Nick Shah Acting for/ | ||
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49 | |||
==Enclosure:== | ==Enclosure:== | ||
As Stated | As Stated cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer | ||
cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney | |||
M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director | |||
D. Curtland, Plant Manager | |||
S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, | |||
Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan. | R. Anderson Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan. | ||
Sincerely, | Sincerely, | ||
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49 | /RA by Nick Shah Acting for/ | ||
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331; 72-032 License No. DPR-49 | |||
==Enclosure:== | ==Enclosure:== | ||
As Stated | As Stated cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\DUANE ARNOLD.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME NShah, Acting for KRiemer:cms DATE 12/19/07 OFFICIAL RECORD COPY | ||
cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney | |||
M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director | |||
D. Curtland, Plant Manager | |||
S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, | |||
Letter to R. Anderson from K. Riemer dated December 19, 2007 | |||
==SUBJECT:== | ==SUBJECT:== | ||
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER DISTRIBUTION: | CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER DISTRIBUTION: | ||
TEB DWS RidsNrrDirsIrib | TEB DWS RidsNrrDirsIrib MAS KGO JKH3 SRI Duane Arnold CAA1 DRPIII DRSIII PLB1 TXN | ||
Duane Arnold Inspection / Activity Plan 01/01/2008 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI ENG - COMPONENT DESIGN BASES INSPECTION 6 IP 7111121 Component Design Bases Inspection 02/11/2008 03/14/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 02/04/2008 02/08/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/31/2008 04/04/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 03/31/2008 04/04/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/04/2008 08/08/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 08/04/2008 08/08/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 08/04/2008 08/08/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 10/06/2008 10/10/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 10/20/2008 10/24/2008 EP Baseline Inspectio IP 71151-EP01 Drill/Exercise Performance 10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/20/2008 10/24/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections}} | |||
-12/31/2008 | |||
Latest revision as of 21:46, 14 November 2019
ML073540392 | |
Person / Time | |
---|---|
Site: | Duane Arnold |
Issue date: | 12/19/2007 |
From: | Kenneth Riemer NRC/RGN-III/DRP/B2 |
To: | Richard Anderson Florida Power & Light Co |
References | |
Download: ML073540392 (5) | |
Text
December 19, 2007 Mr. Richard L. Anderson Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER
Dear Mr. Anderson:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
R. Anderson Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Nick Shah Acting for/
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331;72-032 License No. DPR-49
Enclosure:
As Stated cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer
R. Anderson Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Nick Shah Acting for/
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-331;72-032 License No. DPR-49
Enclosure:
As Stated cc w/encl: J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security M. Rasmusson, State Liaison Officer DOCUMENT NAME:G:\BRANCH TSS\ALL MOC\MIDCYCLE 2006 TO 2007\ROP REALIGNMENT LETTER\DUANE ARNOLD.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E RIII RIII RIII NAME NShah, Acting for KRiemer:cms DATE 12/19/07 OFFICIAL RECORD COPY
Letter to R. Anderson from K. Riemer dated December 19, 2007
SUBJECT:
CHANGE TO THE INSPECTION PLAN - DUANE ARNOLD ENERGY CENTER DISTRIBUTION:
TEB DWS RidsNrrDirsIrib MAS KGO JKH3 SRI Duane Arnold CAA1 DRPIII DRSIII PLB1 TXN
Duane Arnold Inspection / Activity Plan 01/01/2008 - 12/31/2008 No. of Staff Planned Dates Inspection Inspection Activity Title on Site Start End Type BI ENG - COMPONENT DESIGN BASES INSPECTION 6 IP 7111121 Component Design Bases Inspection 02/11/2008 03/14/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112101 Access Control to Radiologically Significant Areas 02/04/2008 02/08/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 03/31/2008 04/04/2008 Baseline Inspections IP 71151-PR01 RETS/ODCM Radiological Effluent 03/31/2008 04/04/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 08/04/2008 08/08/2008 Baseline Inspections IP 71151-BI01 Reactor Coolant System Activity 08/04/2008 08/08/2008 Baseline Inspections IP 71151-OR01 Occupational Exposure Control Effectiveness 08/04/2008 08/08/2008 Baseline Inspections BI OL - BIENNIAL REQUAL. PROGRAM INSPECTION 2 IP 7111111B Licensed Operator Requalification Program 10/06/2008 10/10/2008 Baseline Inspections BI EP - EP EXERCISE INSPECTION / PI VERIFICATION 3 IP 7111401 Exercise Evaluation 10/20/2008 10/24/2008 EP Baseline Inspectio IP 71151-EP01 Drill/Exercise Performance 10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP02 ERO Drill Participation 10/20/2008 10/24/2008 Baseline Inspections IP 71151-EP03 Alert & Notification System 10/20/2008 10/24/2008 Baseline Inspections BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 IP 7112102 ALARA Planning and Controls 10/20/2008 10/24/2008 Baseline Inspections