IR 05000483/2018405: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:December 3, 2018 Mr. Fadi Diya, Senior Vice President and Chief Nuclear Officer Ameren Missouri Callaway Plant 8315 County Road 459 Steedman, MO 65 077 SUBJECT: CALLAWAY PLANT  
{{#Wiki_filter:ber 3, 2018
- NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2018405
 
==SUBJECT:==
CALLAWAY PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2018405


==Dear Mr. Diya:==
==Dear Mr. Diya:==
On November 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Callaway Plant and the NRC inspector discussed the results of this inspection with Mr. B. Cox, Assistant Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.
On November 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Callaway Plant and the NRC inspector discussed the results of this inspection with Mr. B. Cox, Assistant Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.


The NRC inspector did not identify any finding s or violation s of more than minor significance.
The NRC inspector did not identify any findings or violations of more than minor significance.


This letter will be available electronically for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Ro om in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
This letter will be available electronically for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information , please mark your entire response "Security-Related Information  
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with10 CFR 2.390(d)(1) and follow the instructions for withholding in CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
- Withhold from Public Disclosure under 10 CFR 2.390" in accordance with10 CFR 2.390(d)(1) and follow the instructions for withholding in CFR 2.390(b)(1).
 
The NRC is waiving the affidavit requirements for your response i n accordance with 10 CFR 2.390(b)(1)(ii).


Sincerely,
Sincerely,
/RA/ Heather J. Gepford, PhD, CHP, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-483 License No.
/RA/
: NPF-30 Enclosure:
Heather J. Gepford, PhD, CHP, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-483 License No.: NPF-30 Enclosure:
Inspection Report 05000483/2018405 cc: Electronic Distribution to Callaway Plant  
Inspection Report 05000483/2018405 cc: Electronic Distribution to Callaway Plant ML18338A217 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
 
SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML18338A218 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:
ML18338A217 Entire Report:
SUNSI Review By:JJO Yes No Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PSB2 C:PBB C:PSB2 NAME JODonnell HGepford NTaylor HGepford SIGNATURE /RA/ /RA by /RA/ /RA by PElkmann PElkmann Acting For/  Acting For/
ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By:
Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML18338A218 Cover Letter Only:
ADAMS: Non-Publicly Available Non-Sensitive Keyword: SUNSI Review By:
JJO Yes No Publicly Available Sensitiv e NRC-002 OFFICE HP:PSB2 C:PSB2 C: PB B C:PSB2 NAME JO'Donnell HGepford NTaylor HGepford SIGNATURE /RA/ /RA by PElkmann Acting For/
/RA/ /RA by PElkmann Acting For/
DATE 11/15/18 11/28/18 12/02/18 12/03/18
DATE 11/15/18 11/28/18 12/02/18 12/03/18
}}
}}

Latest revision as of 09:44, 20 October 2019

NRC Material Control and Accounting Program Inspection Report 05000483/2018405
ML18338A218
Person / Time
Site: Callaway Ameren icon.png
Issue date: 12/03/2018
From: Heather Gepford
NRC/RGN-IV/DRS/PSB-2
To: Diya F
Ameren Missouri
References
IR 2018405
Download: ML18338A218 (3)


Text

ber 3, 2018

SUBJECT:

CALLAWAY PLANT - NRC MATERIAL CONTROL AND ACCOUNTING PROGRAM INSPECTION REPORT 05000483/2018405

Dear Mr. Diya:

On November 9, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Callaway Plant and the NRC inspector discussed the results of this inspection with Mr. B. Cox, Assistant Site Vice President and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any findings or violations of more than minor significance.

This letter will be available electronically for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390" in accordance with10 CFR 2.390(d)(1) and follow the instructions for withholding in CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

Heather J. Gepford, PhD, CHP, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-483 License No.: NPF-30 Enclosure:

Inspection Report 05000483/2018405 cc: Electronic Distribution to Callaway Plant ML18338A217 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML18338A218 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By:JJO Yes No Publicly Available Sensitive NRC-002 OFFICE HP:PSB2 C:PSB2 C:PBB C:PSB2 NAME JODonnell HGepford NTaylor HGepford SIGNATURE /RA/ /RA by /RA/ /RA by PElkmann PElkmann Acting For/ Acting For/

DATE 11/15/18 11/28/18 12/02/18 12/03/18