ML103280242: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML103280242
| number = ML103280242
| issue date = 11/24/2010
| issue date = 11/24/2010
| title = 2010/11/24 Watts Bar 2 OL - FW: Updated OI List
| title = OL - FW: Updated OI List
| author name =  
| author name =  
| author affiliation = NRC/NRR
| author affiliation = NRC/NRR
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:1 WBN2Public Resource From: Poole, Justin Sent: Wednesday, November 24, 2010 11:10 AM To: Crouch, William D Cc: WBN2HearingFile Resource
{{#Wiki_filter:WBN2Public Resource From:                     Poole, Justin Sent:                     Wednesday, November 24, 2010 11:10 AM To:                       Crouch, William D Cc:                       WBN2HearingFile Resource


==Subject:==
==Subject:==
FW: Updated OI List Attachments:
FW: Updated OI List Attachments:               20101124 Open Item List Master NRC Update 11-24-10.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov
20101124 Open Item List Master NRC Update 11-24-10.docx
-----Original Message-----
 
From: Darbali, Samir Sent: Wednesday, November 24, 2010 11:04 AM To: Poole, Justin Cc: Garg, Hukam; Wiebe, Joel
Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission  
 
(301)415-2048  
 
email: Justin.Poole@nrc.gov
  -----Original Message----- From: Darbali, Samir Sent: Wednesday, November 24, 2010 11:04 AM To: Poole, Justin  
 
Cc: Garg, Hukam; Wiebe, Joel  


==Subject:==
==Subject:==
Updated OI List
Updated OI List
: Justin,  
: Justin, Attached is the updated OI list to be sent out to TVA.
: Thanks, Samir 1


Attached is the updated OI list to be sent out to TVA.
Hearing Identifier:   Watts_Bar_2_Operating_LA_Public Email Number:         197 Mail Envelope Properties     (19D990B45D535548840D1118C451C74D7A49394CC4)
Thanks, Samir
 
Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 197   Mail Envelope Properties   (19D990B45D535548840D1118C451C74D7A49394CC4)


==Subject:==
==Subject:==
FW: Updated OI List Sent Date:   11/24/2010 11:10:11 AM Received Date: 11/24/2010 11:10:15 AM From:   Poole, Justin Created By:   Justin.Poole@nrc.gov Recipients:     "WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
FW: Updated OI List Sent Date:             11/24/2010 11:10:11 AM Received Date:         11/24/2010 11:10:15 AM From:                 Poole, Justin Created By:           Justin.Poole@nrc.gov Recipients:
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None Post Office:   HQCLSTR02.nrc.gov
"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>
 
Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>
Files     Size     Date & Time MESSAGE   396     11/24/2010 11:10:15 AM 20101124 Open Item List Master NRC Update 11-24-10.docx   400045 Options Priority:     Standard   Return Notification:   No   Reply Requested:   No   Sensitivity:     Normal Expiration Date:     Recipients Received:
Tracking Status: None Post Office:           HQCLSTR02.nrc.gov Files                         Size                 Date & Time MESSAGE                       396                   11/24/2010 11:10:15 AM 20101124 Open Item List Master NRC Update 11-24-10.docx                   400045 Options Priority:                     Standard Return Notification:           No Reply Requested:               No Sensitivity:                   Normal Expiration Date:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All C B (The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency wide Documents Access and Management System Accession 12/15/2009 Presentation Slides Y Closed  Closed EICB RAI ML093230343 Item 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of the function that 002 All All C B (Are there I&C components and systems that have changed to a new or different digital technology without the change being 12/15/2009 Presentation Slides Y Closed  Closed EICB RAI ML093230343 Item 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of the function that 003 All All C B (Because a digital I&C platform can be configured and programmed for different applications the review process can be divided 12/15/2009 Presentation Slides Y Closed  Closed EICB RAI ML093230343 Item 3/12/2010 NNC 11/19/09: The FSAR contains mostly description of the function that 004 All All C B (Please identify the information that will be submitted for each unreviewed digital I&C system and component and the associated Responder: Webb        1/13/10 Public Meeting Y Closed  Closed  EICB RAI ML093230343 Item January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section 622 states:
Recipients Received:
"Design features and 005 7.1.3.1  B (G aBy letter date February 28, 2008 (Agencywide Documents Access and Management System (ADAMS) Accession Number Responder: Craig/Webb Y Closed  Closed  EICB RAI ML093431118 Item TVA Letter dated 2/5/10  006  B (G aAmendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-1 consists of updating a reference from revision 5 to revision 7 and By letter dated February 5, 2010: TVA provided the Unit 2 setpoint methodology (WCAP
-177044-P Revision 0
- dated Y Closed  Closed  EICB RAI ML093431118 Item TVA Letter dated 2/5/10 NNC: WCAP-12096 Rev. 7 (ML073460281) is in ADAMS 007 7.1.3.1  B (G aThe setpoint methodology has been reviewed and approved by the NRC staff in Section 7131 of NUREG-0847 (ML072060490) TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 on Page 7 of 15): TVA responded to this request for Y Closed This item is reviewed in FSAR Closed  EICB RAI ML093431118 Item TVA Letter dated 3/12/10 TVA to provide Rev. 8 of the Unit 1 document (which is the current one) if 008 7.3  B (G aThere are several staff positions that provide guidance on setpoint methodology (eg Reg Guide 1105 BTP 7
-12 RI S-2006-17 and TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 on Page 7 of 15): TVA responded to this request for Y Closed Closed  EICB RAI ML093431118 Item TVA Letter dated 3/12/10  009 7.3.2 5.6, 635 (D aChange 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line for Unit 2 (ADAMS Accession Number ML080770366) refers to TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 on Page 8 of 15): TVA responded to this request for Y Closed  Closed EICB RAI ML093431118 Item 3/12/10, ML101680598 010 7.3 7.3 (D aThe original SER on Watts Bar (NUREG-0847) documents that the scope of the review of FSAR Section 73 "Engineered Safety TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 on Page 8 of 15): TVA responded to this request for Y Closed Closed  EICB RAI ML093431118 Item 3/12/10, ML101680598 011 7.3.2 5.6, 635 (D aNUREG-0847 Supplement No. 2 Section 7.3.2 includes an evaluation of a change in containment sump level measurement  TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 on Page 13 of 15): TVA responded to this request for Y Closed  Closed EICB RAI ML093431118 Item ML101680598, Item 9  012 7.4 7.4 (D aThe original SER on Watts Bar (NUREG-0847) documents that the scope of the review of FSAR Section 74 "Systems Required for TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 on Page 13 of 15): TVA responded to this request for Y Closed  Closed EICB RAI ML093431118 Item TVA Letter dated 3/12/10  013 7.1.3.1  B (G a Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not include any setpoint values  Please describe how and when TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 on Page 14 of 15): TVA responded to this request for Y Closed  Closed  EICB RAI ML093431118 Item TVA Letter dated 3/12/10 TS have been docketed.
014 All All C B (Provide the justification for any hardware and software changes that have been made since the previous US Nuclear Regulatory Date: 4/27/10 Responder: TVA Y Closed  Closed NRC Meeting Summary TVA Letter dated 4/27/10  015  B (G aVerify that the refurbishment of the power range nuclear instrumentation drawers resulted in only like
-for-like replacements Date: 4/27/10 Responder: TVA Y Closed  Closed NRC Meeting Summary TVA Letter dated 4/27/10  016  B (C arIdentify the precedents in license amendment requests (LARs), if any for source range monitors or intermediate range monitors Date: 4/27/10 Responder: TVA Y Closed  Closed NRC Meeting Summary TVA Letter dated 4/27/10  017 7.3.1 7.3.1, 555 (D aIdentify precedents in LARs, if any, for the solid state protection system  Also identify any hardware deviation from the preceden t Date: 4/27/10 Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10  018  B (G aIdentify any changes made to any instrumentation and control (I&C) system based on prior knowledge of failures Date: 4/27/10 Responder: TVA Y Closed  Closed NRC Meeting Summary TVA Letter dated 4/27/10  019  B (G aVerify that the containment purge isolation radiation monitor is the same as used in Watts Bar Unit 1 or identify any hardware Date: 4/27/10 Y Closed  Closed  NRC Meeting Summary TVA Letter dated 4/27/10  020  B (G aProvide environmental qualification information pursuant to Section 5049 of Title 10 of the Code of Federal Regulations (10 CFR) for Date: 4/27/10 Responder: TVA Y Closed  Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10:
SRP Section 7.0 states:
" The organization responsible for the 021  7.3 B (G aFor the Foxboro Spec 200 platform, identify any changes in hardware from the precedent systems  Provide the design report Date: 5/25/10 Y Closed The resolution of this item will Closed NRC Meeting Summary TVA Letter dated 6/18/10 The resolution of this item will be covered by OI#288 022 7.3.2 5.6, 635 (D aVerify the auxiliary feedwater control refurbishment results in a like-for-like replacement and identify any changes from the Date: 4/27/10 Y Closed  Closed  NRC Meeting Summary TVA Letter dated 4/27/10  023  B (G aProvide environmental qualification (10 CFR 50.49) information for safety-related control transmitters and complete the deviation Date: 4/27/10 Responder: TVA Y Closed  Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10:
SRP Section 7.0 states:
" The organization responsible for the 024  B (C aProvide a schedule by the January 13, 2010, meeting for providing information in accordance with I&C Interim Staff Guidance (ISG) 6 During the January 13, 2010 meeting, TVA presented a schedule for completing various documents for the PA MS Y Closed  Closed  NRC Meeting Summary N/A - Request for schedule NNC 4/30/10:
Carte to address response with respect to PAMS and 025 7.5.2 7.5.1 B (S in For the containment radiation high radiation monitor, verify that the information provided by TVA is consistent with the information Date: 4/27/10 Y Closed  Closed NRC Meeting Summary ML101230248, Item 12  026  B (G aProvide environmental qualification (10 CFR 50.49) information for safety-related monitoring transmitters Date: 4/27/10 Responder: TVA Y Closed  Closed NRC Meeting Summary TVA Letter dated 4/27/10 NNC 4/30/10:
SRP Section 7.0 states:
" The organiz ation responsible for the 027 7.7.1.4  B (C aFor Foxboro I/A provide information regarding safety/non-safety-related interaction common cause failures and communication Date: 4/27/10 Responder: TVA Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10  028  B (G aFor the turbine control AEH system, verify that the refurbishment results in a like
-for-like replacement Responder: Mark Scansen Date: 4/27/10 Y Closed  Closed  NRC Meeting Summary TVA Letter dated 10/5/10  029  B (C aFor the rod control s ystem, verif y that the refurbishment results in a like-for-like replacement Date: 4/27/10 Responder: TVA Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 030  B (G aRegarding the refurbishment of I&C equipment, identify any component digital upgrades and if so provide the supporting Responder: Clark Y Closed  Closed NRC Meeting Summary TVA Letter dated 10/5/10  031  B (C aFor the rod position indication s y stem (CERPI), provide information in accordance with ISG 4  Need to consider cyber
-security issues Date: 4/27/10 Responder: TVA Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 CERPI is non-safety related. Note:  The issue of interlock with rod 032  B (C aFor the process computer, need to consider cyber security issues and emergency response data system needs Date: 4/27/10 Responder: TVA Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 EICB will no longer consider cyber issues 033  B (C aFor the loose parts monitoring system, provide information regarding interactions with safety related equipment Date: 4/27/10 Responder: TVA Y Closed Closed NRC Meeting Summary TVA Letter dated 4/27/10 The loose parts monitoring system is not connected to any other system 034  B (G a 2/4/2010  Responder: TVA Y Closed Awaiting NRC evaluation of Closed N/A TVA Letter dated 4/27/10  034.1  a r g  Chapter 7.1 - Introduction Reactor Coolant System Flow Rate Measurement Y Close Closed N/A N/A  034.2  B (G a  Chapter 7.2 - Reactor Trip System Deletion of Neutron Flux Negative Rate Trip Y Close Closed N/A N/A  034.3 7.3 7.3 (D a  Chapter 7.3 - ESFAS Design Basis Analysis Parameters Y Closed Closed  N/A N/A  034.4 7.5.1.1 7.5.2 (M a r  Chapter 7.5 - Instrumentation Systems Important to Safety Plant Process Computer Replacement Y Closed  Closed  N/A N/A Closed  034.5 7.5.1.1 761 7.5.2 767 a r c  Chapter 7.6 - All Other Systems Required for Safety Plant Process Computer Replacement Y Closed  Closed  N/A  N/A Closed  034.6  in g h/  Chapter 7.7 Control Systems Alternate Means for Monitoring Control or Shutdown Y Closed Closed  N/A N/A  035  B (S in 2/18/2010 Responder: Clark Y Closed  Closed  RAI No. 1 ML102980005 TVA Letter dated 3/12/10 LIC-110 Section 6.2.2 states: "Design features and administrative programs 036 7.5.2 7.5.1 B (C aFebruary 18, 2010 Date: 5/25/10 Responder: Clark Y Closed Closed NRC Meeting Summary  NNC: Unit 2 FSAR Section 7.5.1, "Post Accident Monitoring Instrumentation
" 037 7.5.1.1 7.5.2 (M a r 2/18/2010 Responder: Clark                      Date: 5/25/10 Y Closed  Closed 09/16/10 N/A TVA Letter dated 10/5/10 FSAR Amendment 100 provides information 038 7.5.1.1 7.5.2 (M a r 2/18/2010 Responder: Clark                Date: 5/25/10 Y Closed  Closed  EICB RAI ML102861885 TVA Letter dated 10/5/10 The slides presented at the December 15 2010 meeting (ML093520967) 039  B (G a January 13, 2010 Responder: Clark                                Date: 5/25/10 Y Closed  Closed EICB RAI ML102910008 FSAR amendment 98 The equation for the calculation of the estimated average hot leg temperature 040  B (G a January 13, 2010 Responder: Clark                              Date: 5/25/10 Y Closed  Closed EICB RAI EICB RAI ML102910008 FSAR amendment 98 The equation for the calculation of the power fraction on page 72
-14 of 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents: (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC
 
Items (1) and (2) were docketed by TVA letter dated April 8, 2010.
Item (3) will be addressed by Revision 2 of the Licensing
 
Technical Report. Due 12/3/10 Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10
 
Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10 N Open Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from
 
many other documents by reference.
 
NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there
 
should be no problem to docket this version.  (4) Per ML091560352, the testing process document does not address the test plan
 
requirements of the SPM. Please provide a test plan that implements the requirements of
 
the SPM. Open-TVA/WEC Due:  (3) 12/3/10  (4) 12/10/10 TVA to docket information indentified in ISG6. NRC Meeting Summary NRC
 
Meeting Summary ML093560019, Item No. 11 TVA Letter dated 6/18/10 TVA Letter dated 10/5/10 See also Open Item Nos. 226 & 270.
042 All All C B (February 25, 2010:  Telecom Date: 5/25/10 Responder: Clark Y Closed  Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 The drawing provided did not have the identification numbers as in the FSAR
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 043 7.5.2 7.5.1 EICB (Carte) 2/19/2010 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information
 
needed. The shortcomings of the firs t three lines in the matrix are:
Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.
 
Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.
 
Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.
 
NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.
Responder: WEC                        Date: 5/25/10 The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the
 
information needed. 
 
By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.
 
contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13). 
 
By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."   
 
It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC. Westinghouse documents that are not deliverable to TV A will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.
N Open  Response is included in letter dated 10/5/10.
 
Revised compliance matrix is unacceptable.
 
NNC 8/12/10:
It is not quite enough to provide all of the documents requested. There are two possible routes to
 
review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow


ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                rad22EA6.docx                                                                                    Open Items to be Resolved for SER Approval


the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path
===Response===
SE      FSAR    NRC No.                                                            Issue                                                        TVA Response(s)                        Acceptable        Status/ Current Actions          Resolution Path    RAI No. & Date      RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                          Y/N 001      All      All    C B(    The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency            12/15/2009 Presentation Slides                              Y            Closed                            Closed              EICB RAI            3/12/2010        NNC 11/19/09: The FSAR contains wide Documents Access and Management System Accession                                                                                                                                                    ML093230343  Item                    mostly description of the function that 002      All      All    C B(    Are there I&C components and systems that have changed to a              12/15/2009 Presentation Slides                              Y            Closed                            Closed              EICB RAI            3/12/2010        NNC 11/19/09: The FSAR contains new or different digital technology without the change being                                                                                                                                              ML093230343  Item                    mostly description of the function that 003      All      All    C B(    Because a digital I&C platform can be configured and programmed          12/15/2009 Presentation Slides                              Y            Closed                            Closed              EICB RAI            3/12/2010        NNC 11/19/09: The FSAR contains for different applications the review process can be divided                                                                                                                                              ML093230343  Item                    mostly description of the function that 004      All      All    C B(    Please identify the information that will be submitted for each          Responder: Webb      1/13/10 Public Meeting                Y            Closed                            Closed              EICB RAI            January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section unreviewed digital I&C system and component and the associated                                                                                                                                            ML093230343  Item                    6 2 2 states: "Design features and 005    7.1.3.1          B G
a(    By letter date February 28, 2008 (Agencywide Documents Access            Responder: Craig/Webb                                      Y            Closed                            Closed              EICB RAI            TVA Letter dated and Management System (ADAMS) Accession Number                                                                                                                                                            ML093431118  Item  2/5/10 006                      B G
a(    Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3-            By letter dated February 5, 2010: TVA provided the Unit 2  Y            Closed                            Closed              EICB RAI            TVA Letter dated NNC: WCAP-12096 Rev. 7 1 consists of updating a reference from revision 5 to revision 7 and    setpoint methodology (WCAP-177044-P Revision 0 - dated                                                                          ML093431118  Item  2/5/10            (ML073460281) is in ADAMS 007    7.1.3.1          B G
a(    The setpoint methodology has been reviewed and approved by the          TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7    Y            Closed                            Closed              EICB RAI            TVA Letter dated TVA to provide Rev. 8 of the Unit 1 NRC staff in Section 7 1 3 1 of NUREG-0847 (ML072060490)                on Page 7 of 15): TVA responded to this request for                      This item is reviewed in FSAR                          ML093431118  Item  3/12/10          document (which is the current one) if 008    7.3              B G
a(    There are several staff positions that provide guidance on setpoint      TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8    Y            Closed                            Closed              EICB RAI            TVA Letter dated methodology (e g Reg Guide 1 105 BTP 7-12 RIS-2006-17 and                on Page 7 of 15): TVA responded to this request for                                                                              ML093431118  Item  3/12/10 009    7.3.2    5.6,    D a(    Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line        TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9    Y            Closed                            Closed              EICB RAI            3/12/10, 635            for Unit 2 (ADAMS Accession Number ML080770366) refers to                on Page 8 of 15): TVA responded to this request for                                                                              ML093431118  Item  ML101680598 010    7.3      7.3    D a(    The original SER on Watts Bar (NUREG-0847) documents that the            TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10  Y            Closed                            Closed              EICB RAI            3/12/10, scope of the review of FSAR Section 7 3 Engineered Safety              on Page 8 of 15): TVA responded to this request for                                                                              ML093431118  Item  ML101680598 011    7.3.2    5.6,    D a(    NUREG-0847 Supplement No. 2 Section 7.3.2 includes an                    TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11  Y            Closed                            Closed              EICB RAI            ML101680598, 635            evaluation of a change in containment sump level measurement            on Page 13 of 15): TVA responded to this request for                                                                            ML093431118  Item  Item 9 012    7.4      7.4    D a(    The original SER on Watts Bar (NUREG-0847) documents that the            TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12  Y            Closed                            Closed              EICB RAI            TVA Letter dated scope of the review of FSAR Section 7 4 "Systems Required for            on Page 13 of 15): TVA responded to this request for                                                                            ML093431118  Item  3/12/10 013    7.1.3.1          B G
a(    Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not              TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13  Y            Closed                            Closed              EICB RAI            TVA Letter dated TS have been docketed.
include any setpoint values Please describe how and when                on Page 14 of 15): TVA responded to this request for                                                                            ML093431118  Item  3/12/10 014      All      All    C B(    Provide the justification for any hardware and software changes          Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated that have been made since the previous U S Nuclear Regulatory            Responder: TVA                                                                                                                  Summary              4/27/10 015                      B G
a(    Verify that the refurbishment of the power range nuclear                Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated instrumentation drawers resulted in only like-for-like replacements      Responder: TVA                                                                                                                  Summary              4/27/10 016                      B C(
ar    Identify the precedents in license amendment requests (LARs), if        Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated any for source range monitors or intermediate range monitors            Responder: TVA                                                                                                                  Summary              4/27/10 017    7.3.1    7.3.1,  D a(    Identify precedents in LARs, if any, for the solid state protection      Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated 555            system Also identify any hardware deviation from the precedent                                                                                                                                            Summary              4/27/10 018                      B G
a(    Identify any changes made to any instrumentation and control            Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated (I&C) system based on prior knowledge of failures                        Responder: TVA                                                                                                                  Summary              4/27/10 019                      B G
a(    Verify that the containment purge isolation radiation monitor is the    Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated same as used in Watts Bar Unit 1 or identify any hardware                                                                                                                                                Summary              4/27/10 020                      B G
a(    Provide environmental qualification information pursuant to Section      Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
50 49 of Title 10 of the Code of Federal Regulations (10 CFR) for        Responder: TVA                                                                                                                  Summary              4/27/10          "The organization responsible for the 021              7.3    B G
a(    For the Foxboro Spec 200 platform, identify any changes in              Date: 5/25/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated The resolution of this item will be hardware from the precedent systems Provide the design report                                                                                    The resolution of this item will                        Summary              6/18/10          covered by OI#288 022    7.3.2    5.6,    D a(    Verify the auxiliary feedwater control refurbishment results in a        Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated 635            like-for-like replacement and identify any changes from the                                                                                                                                              Summary              4/27/10 023                      B G
a(    Provide environmental qualification (10 CFR 50.49) information for      Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
safety-related control transmitters and complete the deviation          Responder: TVA                                                                                                                  Summary              4/27/10          "The organization responsible for the 024                      B C
a(    Provide a schedule by the January 13, 2010, meeting for providing        During the January 13, 2010 meeting, TVA presented a        Y            Closed                            Closed              NRC Meeting          N/A - Request for NNC 4/30/10: Carte to address information in accordance with I&C Interim Staff Guidance (ISG) 6        schedule for completing various documents for the PAMS                                                                          Summary              schedule          response with respect to PAMS and 025    7.5.2    7.5.1    B S
in(    For the containment radiation high radiation monitor, verify that the    Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          ML101230248, information provided by TVA is consistent with the information                                                                                                                                            Summary              Item 12 026                      B G
a(    Provide environmental qualification (10 CFR 50.49) information for      Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:
safety-related monitoring transmitters                                  Responder: TVA                                                                                                                  Summary              4/27/10          "The organization responsible for the 027    7.7.1.4          B C
a(    For Foxboro I/A provide information regarding safety/non-safety-        Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated related interaction common cause failures and communication              Responder: TVA                                                                                                                  Summary              4/27/10 028                      B G
a(    For the turbine control AEH system, verify that the refurbishment        Responder: Mark Scansen                                    Y            Closed                            Closed              NRC Meeting          TVA Letter dated results in a like-for-like replacement                                  Date: 4/27/10                                                                                                                    Summary              10/5/10 029                      B C
a(    For the rod control system, verify that the refurbishment results in a  Date: 4/27/10                                              Y            Closed                            Closed              NRC Meeting          TVA Letter dated like-for-like replacement                                                Responder: TVA                                                                                                                  Summary              4/27/10


chosen. For example, it appears that the Westinghouse's CDIs are
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                        rad22EA6.docx                                                                                            Open Items to be Resolved for SER Approval


commercial grade dedication
===Response===
SE      FSAR    NRC No.                                                                    Issue                                                        TVA Response(s)                          Acceptable      Status/ Current Actions            Resolution Path        RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                    Y/N 030                      B G
a(              Regarding the refurbishment of I&C equipment, identify any            Responder: Clark                                              Y            Closed                            Closed                    NRC Meeting        TVA Letter dated component digital upgrades and if so provide the supporting                                                                                                                                                    Summary            10/5/10 031                      B C
a(              For the rod position indication system (CERPI), provide information  Date: 4/27/10                                                  Y            Closed                            Closed                    NRC Meeting        TVA Letter dated  CERPI is non-safety related.
in accordance with ISG 4 Need to consider cyber-security issues      Responder: TVA                                                                                                                          Summary            4/27/10            Note: The issue of interlock with rod 032                      B C
a(              For the process computer, need to consider cyber security issues      Date: 4/27/10                                                  Y            Closed                            Closed                    NRC Meeting        TVA Letter dated  EICB will no longer consider cyber and emergency response data system needs                              Responder: TVA                                                                                                                          Summary            4/27/10            issues 033                      B C
a(              For the loose parts monitoring system, provide information            Date: 4/27/10                                                  Y            Closed                            Closed                    NRC Meeting        TVA Letter dated  The loose parts monitoring system is regarding interactions with safety related equipment                  Responder: TVA                                                                                                                          Summary            4/27/10            not connected to any other system 034                      B G
a(              2/4/2010                                                              Responder: TVA                                                Y            Closed                            Closed                    N/A                TVA Letter dated Awaiting NRC evaluation of                                                      4/27/10 034.1                    a r
g                Chapter 7.1 - Introduction                                                                                                          Y            Close                              Closed                    N/A                N/A Reactor Coolant System Flow Rate Measurement 034.2                    B G
a(              Chapter 7.2 - Reactor Trip System                                                                                                  Y            Close                              Closed                    N/A                N/A Deletion of Neutron Flux Negative Rate Trip 034.3    7.3      7.3    D a(              Chapter 7.3 - ESFAS                                                                                                                Y            Closed                            Closed                    N/A                N/A Design Basis Analysis Parameters 034.4 7.5.1.1    7.5.2  M a(
r              Chapter 7.5 - Instrumentation Systems Important to Safety                                                                          Y            Closed                            Closed                    N/A                N/A                Closed Plant Process Computer Replacement 034.5 7.5.1.1    7.5.2  a r
c                Chapter 7.6 - All Other Systems Required for Safety                                                                                Y            Closed                            Closed                    N/A                N/A                Closed 761        767                        Plant Process Computer Replacement 034.6                    in g
h
                          /              Chapter 7.7 Control Systems                                                                                                        Y            Closed                            Closed                    N/A                N/A Alternate Means for Monitoring Control or Shutdown 035                        B S
in(            2/18/2010                                                            Responder: Clark                                              Y            Closed                            Closed                    RAI No. 1        TVA Letter dated LIC-110 Section 6.2.2 states: Design ML102980005      3/12/10          features and administrative programs 036    7.5.2    7.5.1  B C
a(              February 18, 2010                                                    Date: 5/25/10                                                  Y            Closed                            Closed                    NRC Meeting                        NNC: Unit 2 FSAR Section 7.5.1, Post Responder: Clark                                                                                                                        Summary                            Accident Monitoring Instrumentation 037    7.5.1.1  7.5.2  M a(
r              2/18/2010                                                            Responder: Clark              Date: 5/25/10                  Y            Closed                            Closed                    N/A              TVA Letter dated FSAR Amendment 100 provides 09/16/10                                    10/5/10          information 038    7.5.1.1  7.5.2  M a(
r              2/18/2010                                                            Responder: Clark            Date: 5/25/10                      Y            Closed                            Closed                    EICB RAI          TVA Letter dated The slides presented at the December ML102861885      10/5/10          15 2010 meeting (ML093520967) 039                      B G
a(              January 13, 2010                                                      Responder: Clark                    Date: 5/25/10            Y            Closed                            Closed                    EICB RAI          FSAR amendment The equation for the calculation of the ML102910008      98              estimated average hot leg temperature 040                      B G
a(              January 13, 2010                                                      Responder: Clark                    Date: 5/25/10            Y            Closed                            Closed                    EICB RAI EICB RAI FSAR amendment The equation for the calculation of the ML102910008      98              power fraction on page 7 2-14 of 041    7.5.2    7.5.1                  2/19/2010                                                            Responder: WEC                                                N            Open                              Open-TVA/WEC              NRC Meeting      TVA Letter dated See also Open Item Nos. 226 & 270.
EICB (Carte)
Summary NRC      6/18/10 Please provide the following Westinghouse documents:                  Items (1) and (2) were docketed by TVA letter dated April 8,                Partial Response is included in    Due:                      Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements                2010.                                                                      letter dated 10/5/10.              (3) 12/3/10              ML093560019, Item TVA Letter dated Specification"                                                                                                                                    The SysRS and SRS                  (4) 12/10/10              No. 11            10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design                      Item (3) will be addressed by Revision 2 of the Licensing                  incorporate requirements from Specification"                                                        Technical Report. Due 12/3/10                                              many other documents by            TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g"                                                                                          reference.                        information indentified Please provide the following Westinghouse documents or pointers      Item (4) will be addressed by Westinghouse developing a                                                        in ISG6.
to where the material was reviewed and approved in the CQ TR or      WBN2 Specific Test Plan to compensate for the fact that the                NNC 8/25/10: (3) An earlier SPM:                                                                  NRC disapproved WNA-PT-00058-GEN during the original                        version of this report was (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q            Common Q review. Due 12/7/10                                                docketed for the Common Q Safety systems"                                                                                                                                  topical report; therefore, there (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test                  Item (5) Procedures that are listed in the SPM compliance                  should be no problem to docket Procedure"                                                            table in the Licensing Technical Report revision 1 supersede                this version. (4) Per that test procedure WNA-TP-00357-GEN.Due 10/22/10                          ML091560352, the testing process document does not address the test plan requirements of the SPM.
Please provide a test plan that implements the requirements of the SPM.
042      All      All    C B(              February 25, 2010: Telecom                                            Date: 5/25/10                                                  Y            Closed                            Closed                    EICB RAI          TVA Letter dated The drawing provided did not have the Responder: Clark                                                                                                                        ML102910002        6/18/10          identification numbers as in the FSAR


plans, but Westinghouse maintains that they are commercial grade dedication
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    rad22EA6.docx                                                                                              Open Items to be Resolved for SER Approval


reports; this apparent deviation should be justified or explained.
===Response===
Open-NRC Review Due 12/1/10 EICB RAI ML102910002 Item No. 2 TVA Letter dated 2/5/10 TVA Letter dated  
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                            Acceptable        Status/ Current Actions            Resolution Path        RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                                    Y/N 043    7.5.2  7.5.1                  2/19/2010                                                          Responder: WEC                    Date: 5/25/10                  N            Open                                  Open-NRC Review          EICB RAI            TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)
ML102910002        2/5/10          compliance matrix was docketed on: (1)
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to            The PAMS ISG6 compliance matrix supplied as Enclosure 1                    Response is included in letter        Due 12/1/10              Item No. 2                          February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the                dated 10/5/10.                                                                    TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed.                                                                                                                                            5/12/10          expressed issued with all of these Revised compliance matrix is                                                                        compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a    By letter dated April 8, 2010 TVA provided the PAMS                          unacceptable.                                                                      TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not      Licensing Technical Report provided additional information.                                                                                                      6/18/10          evaluation.
approved in the associated SE. Westinghouse stated that this was                                                                                  NNC 8/12/10: It is not quite the program and it could now be reviewed. The NRC stated that      Attachment 3 contains the revised Common Q PAMS ISG-6                        enough to provide all of the                                                      TVA Letter dated NNC 11/23/10: WNA-LI-00045-WT-P TVA should identified what they believe was previously reviewed    Compliance Matrix, dated June 11, 2010, that addresses                        documents requested. There                                                        10/5/10          Rev. 1 Section 7 does not include the and approved.                                                      these items (Reference 13).                                                  are two possible routes to                                                                          RSED documents, and it should. Table review that the NRC can                                                                            6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA                              undertake: (1) follow ISG6, and                                                                    RSED RTMs.
but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6                        (2) follow the CQ SPM. The SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as            Compliance Matrix."                                                        TVA response that was being SRP acceptance criteria for PAMS.                                                                                                          originally pursued was to follow It is TVAs understanding that this comment is focused on                  ISG6, but some of the Line 3: TVA identified that the Design report for computer integrity the fact that there are documents that NRC has requested                    compliance items for ISG6 were was completed as part of the common Q topical report. The NRC that are currently listed as being available for audit at the                      addressed by referencing the noted that this report is applicable for a system in a plant, and the Westinghouse offices. For those Common Q PAMS                              SPM. The NRC approved the CQ topical report did no specifically address this PAMS system at documents that are TVA deliverable documents from                              CQ TR and associated SPM; it Watts Bar Unit 2.                                                    Westinghouse, TVA has agreed to provide those to NRC.                      may be more appropriate to Westinghouse documents that are not deliverable to TVA will                review the WBN2 PAMS NRC then concluded that TVA should go through and provide a          be available for audit as                                                  application to for adherence to more complete and thorough compliance matrix.                        stated above. Requirements Traceability Matrix issues will                  the SPM that to ISG6. In either be tracked under NRC RAI Matrix Items 142 (Software                        path chosen, the applicant Requirements Specification) and 145 (System Design                          should provide documents and a Specification). Commercial Item Dedication issues will be                  justification for the acceptability tracked under NRC RAI Matrix Item 138. This item is                        of any deviation from the path considered closed.                                                          chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.
044    7.5.2  7.5.1  B C
a(            February 25, 2010                                                  Date: 5/25/10                                                    Y            Closed                                Closed                  EICB RAI            TVA Letter dated Responder: Clark                                                                                                                            ML102910002        6/18/10 045                    B C
a(            February 25, 2010                                                  Date: 5/25/10                                                    Y            Closed                                Closed                  EICB RAI            TVA Letter dated Responder: Clark                                                                                                                            ML102910002        7/30/10 046                    B C
a(            February 25, 2010                                                  Date: 5/25/10                                                    Y            Closed                                Closed                  N/A - Request for  N/A Responder: Clark                                                                                                                            help finding 047    7.5.2  7.5.1   B C
a(            4/8/2010                                                            Responder: WEC/Hilmes              Date: 5/25/10               Y            Closed                                Closed                  EICB RAI           TVA Letter dated ML102910002         7/30/10 048    7.5.2  7.5.1  B C
a(            April 8, 2010                                                      Date: 5/25/10                                                    Y            Closed                                Closed                  EICB RAI            TVA Letter dated Responder: WEC                                                                                                                              ML102910002        6/18/10 049    7.5.2   7.5.1  B C
a(            4/8/2010                                                            Responder: WEC              Date: 5/25/10                        Y            Closed                                Closed                  EICB RAI            TVA Letter dated ML102910002        6/18/10 050    7.5.2   7.5.1                  4/8/2010                                                            Responder: WEC                    Date: 5/25/10                  N            Open                                  Open-TVA/WEC            EICB RAI            TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)
ML102910002        6/18/10         several Reference 8, however, How should the "shall" statements outside of the bracketed          These sections are descriptive text and not requirements.                    TVA response is inconsistent          Due___________          Item No. 8                          Reference 8 has been deleted.
requirements in Common Q requirements documents be                  The next revision of the Watts Bar Unit 2 PAMS System                        (e.g., WNA-DS-01667-WBT              Discuss at 11/22 phone                      TVA Letter dated interpreted?                                                        Requirements Specification will remove shall from the                      Rev. 1 page 1-1, Section 1.3.1        call.                                        10/29/10 wording in those sections. A date for completing the next                    implies that "SysRS Section                                                        Enclosure 1 Item revision of the System Requirements Specification will be                    ###" has requirements. See                                                        No. 1


5/12/10 TVA Letter dated 6/18/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                          rad22EA6.docx                                                                                    Open Items to be Resolved for SER Approval


TVA Letter dated 10/5/10 NNC 8/25/10:
===Response===
A CQ PAMS ISG6 compliance matrix was docketed on: (1) February, 5 12010, (2) March 12, 2010, & (3) June 18, 2010. The staff has expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.
SE    FSAR    NRC No.                                                      Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                      Y/N provided no later than August 31, 2010.                                    also SDS4.4.2.1-1 on page 4-32).
NNC 11/23/10: WNA-LI-00045-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the RSED RTMs.
The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from                Is there a requirement on the Westinghouse.                                                              shall referenced above??
044 7.5.2 7.5.1 B (C aFebruary 25, 2010 Date: 5/25/10 Responder: Clark Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 045   B (C aFebruary 25, 2010 Date: 5/25/10 Responder: Clark Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 046   B (C aFebruary 25, 2010 Date: 5/25/10 Responder: Clark Y Closed Closed N/A - Request for help finding N/A 047 7.5.2 7.5.1 B (C a 4/8/2010 Responder: WEC/Hilmes                Date: 5/25/10 Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10  048 7.5.2 7.5.1 B (C a April 8, 2010 Date: 5/25/10 Responder: WEC Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 049 7.5.2 7.5.1 B (C a 4/8/2010 Responder: WEC               Date: 5/25/10 Y Closed Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 050 7.5.2 7.5.1 EICB (Carte) 4/8/2010 How should the "shall" statements outside of the bracketed requirements in Common Q requirements documents be interpreted?
TVA Revised Response                                                      Response is provided in letter dated 10/29/10.
Responder: WEC                       Date: 5/25/10 These sections are descriptive text and not requirements.
Shall statements within the scope of the System Requirements Specification (SysRS) and System Design                      TVA Revised Response in TVA Specification (SysDS) were reviewed by Westinghouse. The                  Letter dated 10/29/10 Enclosure statements were either relocated to the numbered                          1 Item No. 1 is Acceptable requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by                    NNC 11/18/10: Revised submittal of revision 2 of the SysRS and the SysDS                        Response is not a statement of (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).                fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many shalls that are not within numbered requirements sections, for example:
The next revision of the Watts Bar Unit 2 PAMS System Requirements Specification will remove "shall" from the wording in those sections. A date for completing the next revision of the System Requirements Specification will be N Open TVA response is inconsistent (e.g., WNA-DS-01667-WBT
(1) Page 2-1, Section 2.3.1 -
See guidance statement (2) Page 2-10, top of page 1 -
See guidance statement 051                    B G
a(    April 15, 2010                                                     Date: 5/25/10                                                Y            Closed                            Closed              N/A                N/A                Review addressed by another Open Responder: Craig/Webb                                                                                                                                                    Item 052    7.5.2  7.5.1    B S
in(   April 19, 2010                                                     Date: 5/25/10                                                Y            Closed                            Closed              RAI No. 12 Responder: Slifer                                                                                                                ML102980005 053    7.5.2  7.5.1    B S
in(  April 19, 2010                                                    Date: 5/25/10                                                 Y            Closed                            Closed              RAI No. 13 Responder: Slifer                                                                                                                ML102980005 054    7.5.7.5.1   B S
in(  4/19/2010                                                          Responder: Slifer/Clark            Date: 5/25/10              Y            Closed                            Closed              RAI No. 14          TVA Letter dated
                                                                                                                                                                                                            -Response acceptable ML102980005        6/18/10 055    7.5.2   7.5.1   B S
in(   4/19/2010                                                          Responder: Slifer/Clark          Date: 5/25/10              Y            Closed                            Closed              RAI No. 15          TVA Letter dated
                                                                                                                                                                                                            -Response acceptable ML102980005        6/18/10 056                    B S
in(  April 19, 2010                                                     Date: 5/25/10                                                 Y           Closed                           Closed               RAI No. 16          TVA Letter dated Sorrento Radiation Monitoring Responder: Slifer                                                                                                                ML102980005        6/18/10 057    7.5.2   7.5.1    B S
in(   4/19/2010                                                          Responder: TVA I&C Staff              Date: 5/25/10          Y            Closed                            Closed              RAI No. 17          TVA Letter dated ML102980005        6/18/10 058    7.5.0    7.5    B S
in(  April 19, 2010                                                     Date: 5/25/10                                               Y            Closed                            Closed              RAI No. 18          TVA Letter dated Responder: Slifer                                                                                                                ML102980005        6/18/10 059    7.5.2  7.5.1    B S
in(  April 19, 2010                                                      Date:                                                        Y           Closed                           Closed               RAI No. 19          TVA Letter dated Responder: Slifer                                                                                                                ML102980005        6/18/10 060    7.5.2  7.5.1   B C
a(   April 19, 2010                                                     Date: 5/25/10                                               Y            Closed                            Closed              N/A                N/A              Addressed by Open Item No. 47 Responder: Clark 061    7.5.2  7.5.1  B C
a(    April 19, 2010                                                      Date: 5/25/10                                                Y           Closed                           Closed               N/A                 N/A               Addressed by Open Item No. 48 Responder: Clark 062    7.5.2   7.5.1   B C
a(    April 19, 2010                                                     Date: 5/25/10                                               Y           Closed                           Closed               N/A                N/A                Addressed by Open Item No. 49 Responder: Clark 063    7.5.2   7.5.1   B C
a(    April 19, 2010                                                     Date: 5/25/10                                               Y            Closed                            Closed              N/A                N/A                Addressed by Open Item No. 50 Responder: Clark 064    7.5.2  7.5.1  B C
a(    By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb    Date: 4/8/2010                          Y           Closed                           Closed               N/A - No question  TVA Letter dated date for the D3 Analysis was April 2 2010                                                                                                                                                            was asked Item      10/5/10 065    7.5.2   7.5.1   B C
a(    By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC           Date: 5/25/10                     Y           Closed                           Closed               N/A - No question  TVA Letter dated date for the FMEA was August 31 2010                                                                                                                                                                was asked Item      10/5/10 066    7.5.2   7.5.1   B C
a(   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                 Date: 5/25/10               Y            Closed                            Closed              N/A - No question  TVA Letter dated date for the "Watts Bar 2 PAMS Software Design Description (two                                                                                                                                      was asked Item      6/18/10 067    7.5.2  7.5.1        By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                N           Open                             Open-TVA/WEC        N/A - No question  TVA Letter dated
(
C a


Rev. 1 page 1-1, Section 1.3.1 implies that "SysRS Section ###" has requirements. See Open-TVA/WEC Due___________ Discuss at 11/22 phone call. EICB RAI ML102910002 Item No. 8 TVA Letter dated 6/18/10 TVA Letter dated
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    rad22EA6.docx                                                                                      Open Items to be Resolved for SER Approval


10/29/10 Enclosure 1 Item No. 1 NNC 11/18/10: SysRS Rev. 2 contains several "Reference 8", however, Reference 8 has been deleted.
===Response===
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
SE     FSAR   NRC No.                                                                 Issue                                                     TVA Response(s)                           Acceptable       Status/ Current Actions         Resolution Path     RAI No. & Date       RAI Resp. Date                 Comments Sec. Sec. POC                                                                                                                                                   Y/N date for the "Commercial Grade Dedication Instructions for AI687,                                                                                                                                       was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q                               This item is addressed in Rev. 2 Due 12/3/10          was opened to track 28, 2010.                                                        PAMS ISG-6 Compliance Matrix submitted in response to                         of the Licensing Technical                            comm8ittment Item 43:                                                                       Report                                                made by applicant.
 
provided no later than August 31, 2010.
The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Westinghouse.
 
TVA Revised Response
 
Shall statements within the scope of the System Requirements Specification (SysRS) and System Design Specification (SysDS) were reviewed by Westinghouse. The statements were either relocated to the numbered requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by submittal of revision 2 of the SysRS and the SysDS (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10).
also SDS4.4.2.1-1 on page 4-
 
32). Is there a requirement on the
 
shall referenced above??
 
Response is provided in letter dated 10/29/10.
 
TVA Revised Response in TVA Letter dated 10/29/10 Enclosure 1 Item No. 1 is Acceptable
 
NNC 11/18/10:
Revised Response is not a statement of fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many "shalls" that are not within numbered requirements sections, for example:  (1) Page 2-1, Section 2.3.1 - See guidance statement (2) Page 2-10, top of page 1 - See guidance statement 051  B (G a April 15, 2010 Date: 5/25/10 Responder:  Craig/Webb Y Closed  Closed  N/A N/A Review addressed by another Open Item 052 7.5.2 7.5.1 B (S in April 19, 2010 Date: 5/25/10 Responder:  Slifer Y Closed  Closed RAI No. 12 ML102980005 053 7.5.2 7.5.1 B (S in April 19, 2010 Date: 5/25/10 Responder:  Slifer Y Closed  Closed RAI No. 13 ML102980005 054 7.5.2 7.5.1 B (S in 4/19/2010 Responder: Slifer/Clark                    Date: 5/25/10 Y Closed  Closed -Response acceptable RAI No. 14 ML102980005 TVA Letter dated 6/18/10  055 7.5.2 7.5.1 B (S in 4/19/2010 Responder: Slifer/Clark                  Date: 5/25/10 Y Closed  Closed -Response acceptable RAI No. 15 ML102980005 TVA Letter dated 6/18/10  056  B (S in April 19, 2010 Date: 5/25/10 Responder:  Slifer Y Closed  Closed RAI No. 16 ML102980005 TVA Letter dated 6/18/10 Sorrento Radiation Monitoring 057 7.5.2 7.5.1 B (S in 4/19/2010 Responder: TVA I&C Staff                    Date: 5/25/10 Y Closed  Closed  RAI No. 17 ML102980005 TVA Letter dated 6/18/10  058 7.5.0 7.5 B (S in April 19, 2010 Date: 5/25/10 Responder:  Slifer Y Closed  Closed RAI No. 18 ML102980005 TVA Letter dated 6/18/10  059 7.5.2 7.5.1 B (S in April 19, 2010 Date:  Responder:  Slifer Y Closed  Closed RAI No. 19 ML102980005 TVA Letter dated 6/18/10  060 7.5.2 7.5.1 B (C a April 19, 2010 Date:  5/25/10 Responder:  Clark Y Closed Closed N/A N/A Addressed by Open Item No. 47 061 7.5.2 7.5.1 B (C a April 19, 2010 Date:  5/25/10 Responder:  Clark Y Closed Closed N/A N/A Addressed by Open Item No. 48 062 7.5.2 7.5.1 B (C a April 19, 2010 Date:  5/25/10 Responder:  Clark Y Closed Closed N/A N/A Addressed by Open Item No. 49 063 7.5.2 7.5.1 B (C a April 19, 2010 Date:  5/25/10 Responder:  Clark Y Closed Closed N/A N/A Addressed by Open Item No. 50 064 7.5.2 7.5.1 B (C a B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the D3 Analysis was April 2 2010 Responder: Webb      Date: 4/8/2010 Y Closed Closed N/A - No question was asked  Item TVA Letter dated 10/5/10  065 7.5.2 7.5.1 B (C a B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the FMEA was August 31 2010 Responder: WEC                Date: 5/25/10 Y Closed Closed N/A - No question was asked  Item TVA Letter dated 10/5/10  066 7.5.2 7.5.1 B (C a B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Software Design Description (two Responder: WEC                          Date: 5/25/10 Y Closed Closed N/A - No question was asked  Item TVA Letter dated 6/18/10  067 7.5.2 7.5.1 (C a B y letter dated March 12, 2010 TVA stated that the tar get submittal Responder: WEC                          Date: 5/25/10 N Open  Open-TVA/WEC N/A - No question TVA Letter dated Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit This item is addressed in Rev. 2 of the Licensing Technical Report  Due 12/3/10 was asked. Item was opened to track comm8ittment made by applicant.
To be addressed during 9/20-9/21 audit 068   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                    Date: 5/25/10                N            Open                              Open-TVA/WEC        N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688,                                                                                                                                             was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was         The following status is from the revised WB2 Common Q                       This item is addressed in Rev. 2 Due 12/3/10          was opened to track September 28, 2010.                                                PAMS ISG-6 Compliance Matrix submitted in response to                       of the Licensing Technical                            comm8ittment Item 43:                                                                     Report                                                made by applicant.
6/18/10 068 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.
Responder: WEC                          Date: 5/25/10
 
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit  
To be addressed during 9/20-9/21 audit 069   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                  N            Open                              Open-TVA/WEC        N/A - No question N/A EICB          date for the "Watts Bar 2 PAMS Specific FAT Report" was October                                                                                                                                         was asked. Item (Carte)        2010.                                                                                                                                           Awaiting for document to be       Due 2/18/11         was opened to track docketed by TVA.                                      comm8ittment made by applicant.
 
070   7.5.2   7.5.1                   By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                  Date: 5/25/10                  N            Open                              Open-TVA/WEC        N/A - No question    TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was                                                                                                                                             was asked. Item      6/18/10          open item does not agree with the due March 31, 2010.                                                     Per Westinghouse letter WBT-D-1961, this document is                         Partial Response is included in Due 12/17/10          was opened to track                    dated in Open Item No. 71.
N Open This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC
available for audit at the Westinghouse Rockville office.                   letter dated 10/5/10.                                  comm8ittment          TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter                         Regulations require that the to the NRC dated August 20, 2010.                                           NRC review be based on                                                      TVA Letter dated docketed material. Awaiting for                                              10/5/10 The submitted V&V did not address the Requirements                           document to be docketed by Traceability Matrix and did not summarize anomalies. At the                 TVA.
 
September 15th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements                      NNC 8/25/10: Requirements Traceability Matrix (RTM) in the next IV&V report along with                 Phase SVVR provided by TVA
Due 12/3/10 N/A - No question was asked. Item
 
was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10  069 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010. Responder: WEC                    Date: 5/25/10 N Open  Awaiting for document to be  
 
docketed by TVA.
Open-TVA/WEC Due 2/18/11 N/A - No question was asked. Item was opened to track comm8ittment made by applicant.
N/A  070 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Concept and Definition Phase V&V Report" was March 31, 2010.
Responder: WEC                      Date: 5/25/10 Per Westinghouse letter WBT-D-1961, this document is available for audit at the Westinghouse Rockville office.  
 
WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter to the NRC dated August 20, 2010.  
 
The submitted V&V did not address the Requirements Traceability Matrix and did not summarize anomalies. At the September 15 th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements Traceability Matrix (RTM) in the next IV&V report along with N Open  Partial Response is included in letter dated 10/5/10.
Regulations require that the NRC review be based on docketed material. Awaiting for document to be docketed by TVA. NNC 8/25/10:
Requirements Phase SVVR provided by TVA Open-TVA/WEC Due 12/17/10 N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 TVA Letter dated
 
8/20/10  TVA Letter dated
 
10/5/10 NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 71.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments partial Design Phase updates to the RTM.
TVA Revised Response: TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in
 
letter dated August 20, 2010 (Reference 6). The next Independent Verification and Validation (IV&V) report will include the Design


Phase Requirements Traceability Matrix. The Design Phase IV&V Report will be submitted to NRC by February 11, 2011.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              rad22EA6.docx                                                                                        Open Items to be Resolved for SER Approval
letter dated 8/20/10.
NNC 11/23/10:  The requirements Phase SVVR provided by TVA on 8/20/10, is not complete. This report should address the RTM, which it did not. TVA/WEC agreed to address the concept phase RTM in the next revision.
071 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 2 of the I V&V Report" covering the Design and Implementation phases was July 30, 2010. Responder: WEC              Date: 5/25/10


N Open Awaiting for document to be  
===Response===
SE    FSAR    NRC No.                                                                Issue                                                    TVA Response(s)                      Acceptable      Status/ Current Actions        Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                            Y/N partial Design Phase updates to the RTM.                                letter dated 8/20/10.
TVA Revised Response:                                                  NNC 11/23/10: The TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in                        requirements Phase SVVR letter dated August 20, 2010                                            provided by TVA on 8/20/10, is (Reference 6).                                                          not complete. This report The next Independent Verification and Validation (IV&V)                should address the RTM, which report will include the Design                                          it did not. TVA/WEC agreed to Phase Requirements Traceability Matrix. The Design Phase                address the concept phase RTM IV&V Report will be submitted                                          in the next revision.
to NRC by February 11, 2011.
071    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC        Date: 5/25/10                    N            Open                            Open-TVA/WEC            N/A - No question N/A                NNC 11/23/10: The dues date in this EICB          date for Revision 2 of the I V&V Report" covering the Design and                                                                                                                                    was asked. Item                      open item does not agree with the due (Carte)        Implementation phases was July 30, 2010.                                                                                                  Awaiting for document to be     Due 12/10/10            was opened to track                  dated in Open Item No. 70.
docketed by TVA.                                          commitment made by applicant.
072    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                N            Closed                          Closed                  N/A - No question N/A EICB (Carte) date for the "Implementation Phase V&V Report" was September                                                                                                              to item 71. Per WEC,    was asked. Item 30, 2010.                                                                                                                                Awaiting for document to be      the design and          was opened to track docketed by TVA.                implementation phase    commitment made IV&V reports are        by applicant.
combined.
073    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                  N            Open                            Open-TVA/WEC            N/A - No question N/A EICB          date for Revision 3 of the IV&V Report covering the Integration                                                                                                                                    was asked. Item (Carte)        phase was October 29, 2010.                                                                                                              Awaiting for document to be      Due 12/22/10            was opened to track docketed by TVA.                                          commitment made by applicant.
074    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                  N            Open                            Open-TVA/WEC            N/A - No question N/A EICB          date for the Post FAT IV&V Phase Summary Report was                                                                                                                                                was asked. Item (Carte)        November 30, 2010.                                                                                                                        TVA to provide due date.        Due 2/21/11              was opened to track commitment made by applicant.
075    7.5.2  7.5.1                  By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC            Date: 5/25/10                  N            Open                            Open-TVA/WEC            N/A - No question N/A EICB          date for the "Watts Bar 2 PAMS Specific FAT Procedure" was                                                                                                                                          was asked. Item (Carte)        September 30, 2010.                                                                                                                      Awaiting for document to be      Due 12/3/10              was opened to track docketed by TVA.                                          commitment made by applicant.
076    7.5.2  7.5.1  B C
a(              By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark          Date: 5/25/10                Y            Closed                          Closed                  N/A - No question  N/A date for the "Watts Bar 2 PAMS Specific Processor Module                                                                                                                                            was asked Item 077    7.5.2  7.5.1  B C
a(              By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC                Date: 5/25/10              Y            Closed                          Closed                  N/A - No question  TVA Letter dated date for seven other documents was "TDB" Please provide a                                                                                                                                          was asked Item      6/18/10 078                    B G
a(              4/26/2010                                                          Responder: Clark              Date: 5/25/10              Y            Closed                          Closed                  EICB RAI            TVA Letter dated ML102910008        10/5/10 079                    B G
a(              4/26/2010                                                        Responder: Clark                  Date: 5/25/10            Y            Closed                          Closed                  EICB RAI            TVA Letter dated Reviewed under Item 154 ML102910008        10/5/10 080                    B S
in(            4/26/2010                                                        Responder: WEC                                            Y            Closed                          Closed                  RAI No. 2          TVA Letter dated ML102980005        7/30/10 081    7.5.2  7.5.1                  5/6/2010                                                          Responder: Merten/WEC                                      N            Open                            Open-TVA/WEC            EICB RAI            TVA Letter dated EICB (Carte)
ML102910002        6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.        The codes and standards documents listed in Section 7 of                ML101600092 Item No.1: There Due 12/22/10                Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards    the Common Q PAMS Licensing Technical Report are the                    are three sets of regulatory applicable to the Common Q PAMS. This list contains references    documents that the Common Q platform was licensed to                    criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example:    when the NRC approved the original topical report and                  Q application (e.g. WBN2        requested information.
(1) RG 1.29 - September 1978 vs. March 2007                      issued the approved SER. The WBN Unit 2 Common Q                        PAMS):
(2) RG 1.53 - June 1973 vs. November 2003                        PAMS is designed in accordance with the approved                        (a) Common Q platform (a) IEEE 379-1994 vs. -2000                                      Common Q topical report and approved SER and the codes                  components - Common Q TR


docketed by TVA.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                               rad22EA6.docx                                                                                       Open Items to be Resolved for SER Approval
Open-TVA/WEC Due 12/10/10 N/A - No question was asked. Item
 
was opened to track commitment made by applicant.
N/A NNC 11/23/10:  The dues date in this open item does not agree with the due dated in Open Item No. 70.
072 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Implementation Phase V&V Report" was September 30, 2010.
Responder: WEC                      Date: 5/25/10 N Closed  Awaiting for document to be docketed by TVA.
Closed  to item 71. Per WEC, the design and implementation phase IV&V reports are combined.
N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A  073 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for Revision 3 of the IV&V Report covering the Integration phase was October 29, 2010.
Responder: WEC                    Date: 5/25/10 N Open  Awaiting for document to be docketed by TVA.
Open-TVA/WEC Due 12/22/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A  074 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010. Responder: WEC                  Date: 5/25/10 N Open  TVA to provide due date.
Open-TVA/WEC Due 2/21/11 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A  075 7.5.2 7.5.1 EICB (Carte) B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Procedure" was September 30, 2010. Responder: WEC                  Date: 5/25/10 N Open  Awaiting for document to be docketed by TVA.
Open-TVA/WEC Due 12/3/10 N/A - No question was asked. Item was opened to track commitment made by applicant.
N/A  076 7.5.2 7.5.1 B (C a B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific Processor Module Responder: Clark                      Date: 5/25/10 Y Closed  Closed  N/A - No question was asked  Item N/A  077 7.5.2 7.5.1 B (C a B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for seven other documents was
" TDB"  Please provide a Responder: WEC                          Date: 5/25/10 Y Closed  Closed N/A - No question was asked  Item TVA Letter dated 6/18/10  078  B (G a 4/26/2010 Responder: Clark                          Date: 5/25/10 Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/5/10  079  B (G a 4/26/2010 Responder: Clark                              Date: 5/25/10 Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/5/10 Reviewed under Item 154 080  B (S in 4/26/2010 Responder: WEC Y Closed Closed  RAI No. 2 ML102980005 TVA Letter dated 7/30/10  081 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 Responder: Merten/WEC
 
The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes N Open ML101600092 Item No.1:  There are three sets of regulatory
 
criteria that relate to a Common
 
Q application (e.g. WBN2
 
PAMS): (a) Common Q platform components - Common Q TR Open-TVA/WEC Due 12/22/10 TVA to provide requested information.
EICB RAI ML102910002
 
Item No. 9 TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences. and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.
 
Bechtel to develop a matrix and work with Westinghouse to provide justification. (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b). The Common Q SER states:
 
'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and
 
conceptual design approach for
 
upgrading an existing PAMS based on Common Q components (page 58, Section
 
4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient
 
information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, "PAMS
 
Evaluation")-'


===Response===
SE    FSAR    NRC No.                                                          Issue                                                        TVA Response(s)                        Acceptable      Status/ Current Actions            Resolution Path    RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                            Y/N (3) RG 1.75 - September 1975 vs. February 2005                          and standards on which the SER was based. Since the                      (b) Application Development (a) IEEE 384-1992 vs. -1992                                            current versions referenced are not applicable to WBN Unit                Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009                            2, there is no basis for a comparison review.                            (c) Application Specific - current (a) IEEE 344-1987 vs. -2004                                                                                                                      regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006                            Bechtel to develop a matrix and work with Westinghouse to                The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003                                        provide justification.                                                    and associated appendices (6) RG 1.168 - September 1997 vs. February 2004                                                                                                  primarily addressed (a) and (b).
(a) IEEE 1012-1986 vs. -1998                                                                                                                      The Common Q SER states:
(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991                                                                                                                    Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984                                                                                            Monitoring Systems, provides endorses 323-1974)                                                                                                                                the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review,"                                                                                  conceptual design approach for states: "Design features and administrative programs that are                                                                                    upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the                                                                                  based on Common Q current staff positions." Please identify all differences between the                                                                            components (page 58, Section versions referenced and the current staff positions. Please provide                                                                              4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these                                                                                  basis of the above review, the differences.                                                                                                                                      staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)
The NRC did not approve the proposed PAMS design.
The NRC did not approve the proposed PAMS design.
Section 6, "References," and  
Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.
 
Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.
Section 7, "Codes and  
603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.
 
Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical  
 
Report contain items that are  
 
not the current regulatory criteria.  
 
Please provide an explanation  
 
of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS  
 
design. For example IEEE Std.
603-1991 Clause 5.6.3, "Independence Between Safety  
 
Systems and Other Systems,"
 
and Clause 6.3, "Interaction Between the Sense and Command Features and Other  
 
Systems," contain application  
 
specific requirements that must be addressed by a PAMS system.  
 
Awaiting TVA Response.
Awaiting TVA Response.
082 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.
082   7.5.2   7.5.1   EICB   5/6/2010                                                               Responder: WEC                       Date: 6/18/10           N           Open                                 Open-TVA/WEC         EICB RAI         TVA Letter dated NNC 11/18/10: See also Open Item No.
Responder: WEC                               Date: 6/18/10 These components can be found in the Summary N Open Regulations require that the Open-TVA/WEC Due 12/3/10 EICB RAI ML102910002 Item No. 10 TVA Letter dated 7/30/10 NNC 11/18/10: See also Open Item No.
(Carte                                                                                                                                                                                                              ML102910002      7/30/10          41, Item No. 3.
41, Item No. 3.
                            )
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 0, Dated April 2010), in Section 2.3, lists hardware/software changes to the Common Q PAMS previously reviewed by the NRC. However the Common Q ISG-6 Compliance Matrix does not contain activities that address qualification of all changes specifically: Qualification Report Of Hardware Testing For Common Q Applications, 00000-ICE-37764, Rev 3 and TWICE Qualification Status Report, WNAQR-00011-SSP  Per Westinghouse letter WBT-D-2024, (Reference __) dated June 9, 2010, these documents are available for audit at the Westinghouse Rockville Office.
The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. These components can be found in the Summary                                          Regulations require that the         Due 12/3/10          Item No. 10
TVA provided information by letter dated July 30, 2010 (ML102160349) - See Enclosure 1 Item No. 7.


Revision 1 of the Licensing Technical Report provides additional detail on the platform specific to WBN2 and
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                rad22EA6.docx                                                                                          Open Items to be Resolved for SER Approval


references to the evaluation documentation. NRC review be based on docketed material. Awaiting for document to be docketed by TVA.  
===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path        RAI No. & Date    RAI Resp. Date    Comments Sec. Sec. POC                                                                                                                                                  Y/N 0, Dated April 2010), in Section 2.3, lists hardware/software      Qualification Report Of Hardware Testing For Common Q                        NRC review be based on changes to the Common Q PAMS previously reviewed by the            Applications, 00000-ICE-37764, Rev 3 and                                    docketed material. Awaiting for Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not        TWICE Qualification Status Report, WNAQR-00011-SSP                          document to be docketed by        Dedication to be contain activities that address qualification of all changes      Per Westinghouse letter WBT-D-2024, (Reference __) dated                    TVA.                              addressed in LTR Rev.
specifically:                                                      June 9, 2010, these documents are available for audit at the                                                  2, Westinghouse Rockville Office.                                              NNC 8/9/10: per telephone conversation on 8/5/10, it is not TVA provided information by letter dated July 30, 2010                      clear how Westinghouse (ML102160349) - See Enclosure 1 Item No. 7.                                  Commercial Grade Dedication Plans and Reports for Digital Revision 1 of the Licensing Technical Report provides                        I&C. Westinghouse agree to additional detail on the platform specific to WBN2 and                      present to the NRC in a public references to the evaluation documentation.                                  meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.
NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
083    7.5.2  7.5.1  B C
a(            May 6, 2010                                                        Date: 6/18/10                                                  Y            Closed                            Closed                  EICB RAI          TVA Letter dated Responder: WEC                                                                                                                          ML102910002      7/30/10 084    7.5.2  7.5.1  B C(
ar            May 6, 2010                                                        Date: 6/18/10                                                  Y            Closed                            Closed                  EICB RAI          TVA Letter dated Responder: Clark                                                                                                                        ML102910002      6/18/10 085    7.5.2  7.5.1                  5/6/2010                                                          Responder: WEC                                                  N            Open                              Open-TVA/WEC            EICB RAI EICB (Carte)
ML102910002 Please provide a detailed description of the PAMS MTP data link    Is the WEC ISG4 evaluation inadequate?                                      A response will be provided by    Due 12/3/10              Item No. 13 to the plant computer. This description should identify all                                                                                    10/31/10 equipment (model & version) and describe the functions that each  Operation of the MTP as a barrier device. MTP Fails as a                                                        Hardware is in Rev. 1 piece of equipment performs. This description should be of        barrier device. Describe what prevents a MTP failure from                    NNC 8/11/10: Design                of the Licensing sufficient detail for the NRC to independently evaluate the        propagating to the AC160?                                                    information should be available    Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.                                                                                        now. By letter dated July 30,      10/22.
Node loss on the bus? Bus loss?                                              2010 (ML102160349) TVA stated that the MTP was            NNC 8/25/10:
Revise the ISG4 section of the Licensing Technical Report                    connected to a Red Hat Linux      Disagree with path (Rev. 2) to provide a more detailed description of the MTP as                Server (see Enclosure 1, Item      forward input by TVA a barrier device.                                                            No. 14 part b.). It is presumed    above. An explanation that this server is not safety-    is about the design is related. IEEE 603-1991 Clause      needed.
5.6.3(1) states, "Isolation devices used to affect a safety    FAT test procedure to system boundary shall be          include data storm classified as part of the safety  testing of the MTP system."                          interface


NNC 8/9/10:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                            rad22EA6.docx                                                                                        Open Items to be Resolved for SER Approval
per telephone conversation on 8/5/10, it is not clear how Westinghouse Commercial Grade Dedication


Plans and Reports for Digital I&C. Westinghouse agree to present to the NRC in a public
===Response===
SE      FSAR    NRC No.                                                                    Issue                                                          TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path        RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                        Y/N Please describe how the MTP      NNC 11/18/10: WEC serves as the isolation device. response states that CQ PAMS LTR Rev. 2 will contain relevant information.
086    7.5.2    7.5.1                  5/6/2010                                                                Responder: WEC                      Date: 5/24/10              N            Open                              Open-TVA/WEC            EICB RAI            TVA Letter dated EICB (Carte)
ML102910002        6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev.              The regulatory documents listed in the Common Q PAMS                        TVA to address with item OI      Due 12/22/10            Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the  Licensing Technical Report are the documents that the                      81.
Common Q PAMS. This list contains references to old revisions of        Common Q platform was licensed to when the NRC several regulatory documents, for example:                              approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1                        SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185)                                                            accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review,"        approved SER and the regulatory documents on which the states: "Design features and administrative programs that are            SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the          not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the    comparison review.
versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these        Rev 0 of the Licensing Technical Report references Rev. 1 of differences.                                                            ISG4 087    7.5.2    7.5.1    B S
in(            May 6, 2010                                                              Date: 5/24/10                                                  Y            Closed                            Closed                  RAI No. 20          TVA Letter dated Responder: Slifer                                                                                                                    ML102980005        6/18/10 088    7.5.2    7.5.1  (SB in            May 6, 2010                                                              Date: 5/24/10                                                  Y            Closed                            Closed                  RAI No. 21          TVA Letter dated Responder: Slifer                                                                                                                    ML102980005        6/18/10 089                    B C
a(              5/6/2010                                                                Responder: Clark                                              Y            Closed                            Closed                  EICB RAI            TVA Letter dated NNC: Docketed response states that ML102910002        3/12/10          the applicable FSAR Sections are:
090                    B C
a(              5/6/2010                                                                Responder: Clark                Date: 5/25/10                Y            Closed                            Closed                  EICB RAI            TVA Letter dated ML102910002        3/12/10 091    7.4      7.4    D a(              May 20, 2010                                                            Date: 5/25/10                                                  Y            Closed                            Closed                  EICB RAI No.1      TVA Letter dated Responder: Clark                                                                                                                      ML102910017        6/18/10 092                                    5/20/2010                                                                Responder: Hilmes                                              Y            Open                              Open-TVA DORL (Poole)
TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this                                                                  Due: SER Issue are proprietary.                                                document as a communications tool.
Continuous review as items are added 093                    B G
a(              May 20, 2010                                                            Date: 5/25/10                                                  Y            Closed                            Closed                  N/A                N/A                Will be reviewed under item 154 Responder: Knuettel 094                    B G
a(              5/20/2010                                                                Responder: Clark                  Date: 5/25/10                Y            Closed                            Closed                  N/A                N/A                Information was found in FSAR 095    7.8.1,    XX    D a(              May 20, 2010                                                            Date:                                                          Y            Closed                            Closed                  EICB RAI No. 2      TVA Letter dated 784                                                                                                      Responder:                                                                                                                            ML102910017        7/30/10 096    7.7.5    XX    D a(              5/20/2010                                                                Responder:                                                    Y            Closed                            Closed                  EICB RAI No.3      TVA Letter dated ML102910017        7/30/10 097    7.4.2    7.4    D a(              May 20, 2010                                                            Date:                                                          Y            Closed                            Closed                  EICB RAI No.4      TVA Letter dated Responder:                                                                                                                            ML102910017        7/30/10 098    7.4.2    7.4    D a(              May 25, 2010                                                            Date:                                                          Y            Closed                            Closed                  EICB RAI No.5      TVA Letter dated Responder:                                                                                                                            ML102910017        7/30/10 099                      R L
(B              April 12, 2010                                                          Date:                                                          Y            Closed                            Closed                                                        Closed to Item 129 Responder: WEC ail 100                    B C
a(              5/20/2010                                                                Responder: WEC                                                Y            Closed                            Closed                  N/A - No question  N/A was asked Item 101                                    4/12/2010                                                                Responder: Slifer                                              Y            Open                              Open-NRC Review        N/A                                    TVA is working with the vendor to meet DORL                                                                                                                                                                                                                                                                the 6/30 date, however there is the (Poole)        The non-proprietary versions of the following RM-1000,                  The documents, and affidavits for withholding for the listed                Documents provided in letter      Due 10/14/10                                                  potential this will slip to 7/14.
Containment High Range Post Accident Radiation Monitor                  documents were submitted to the NRC on TVA letter to the                    dated 07/15/10 documents will be provided by June 30, 2010.                            NRC dated July 15, 2010.                                                                                      Confirm receipt.


meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              rad22EA6.docx                                                                                        Open Items to be Resolved for SER Approval
NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and


associated reports be docketed.
===Response===
SE    FSAR    NRC No.                                                              Issue                                                  TVA Response(s)                          Acceptable      Status/ Current Actions      Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                            Y/N
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR 102                  B C
a(              May 24, 2010                                                    Date: 5/24/10                                                Y            Closed                        Closed                      N/A                TVA Letter dated  Request for schedule not information.
Responder: WEC                                                                                                                                          6/18/10 103    7.4    7.4    D a(            5/27/2010                                                      Responder: Ayala              Date: 5/27/10                  Y            Closed                        Closed                      EICB RAI No.1      TVA Letter dated  Submittal date is based on current ML102910017        10/29/10          EDCR scheduled issue date 104    7.4    7.4    D a(            5/27/2010                                                      Responder: Merten              Date: 5/27/10                  Y            Closed                        Closed                      EICB RAI No.1      TVA Letter dated  Submittal date is based on current ML102910017        10/29/10          EDCR scheduled issue date 105                  B G
a(              April 29, 2010                                                  Date:                                                        Y            Closed                        Closed                      N/A                N/A                Will be reviewed under item 154.
Responder: Langley 106                    (SB in            May 6, 2010                                                    Date: 5/25/10                                                Y            Closed                        Closed                      RAI No. 9          TVA Letter dated Responder: Davies                                                                                                                    ML102980005        6/18/10 107                    (SB in            May 6, 2010                                                    Date: 5/28/10                                                Y            Closed                        Closed                      RAI No. 22        TVA Letter dated Responder: Clark                                                                                                                    ML102980005        6/18/10 108                  B G
a(              May 6, 2010                                                    Date: 5/25/10                                                Y            Closed                        Closed                      N/A                N/A              Will be reviewed under OI#154 Responder: Webb/Hilmes 109.b                B C
a(              5/6/2010                                                        Responder: N/A                                                Y            Closed                        Closed                      N/A                N/A                Duplicate of another open Item.
109.a  7.8    XX    D a(            5/6/2010                                                        Responder: N/A                                                Y            Closed                        Closed                      N/A                N/A 110                  B G
a(              May 6, 2010                                                    Date:                                                        Y            Closed                        Closed                      N/A                N/A                Information was found.
Responder: Clark 111                  B C(
ar              May 6, 2010                                                    Date: 5/28/10                                                Y            Closed                        Closed                      N/A                TVA Letter dated Request to help find, not a request for Responder: Clark                                                                                                                                        6/18/10          information 112                    B G(            June 1, 2010                                                    Date:                                                        Y            Closed                        Closed                      N/A                N/A              Information was received Responder: Clark 113                  B G
a(              6/1/2010                                                        Responder: Clark                                              Y            Closed                        Closed                      EICB RAI          TVA Letter dated ML102910008        6/18/10 114    7.2    7.2  B G
a(              6/1/2010                                                        Responder: WEC                                                Y            Close                        Closed                      EICB RAI          TVA Letter dated ML102910008        6/18/10 115                  B C
a(              2/25/2010                                                      Responder: Clark                                              Y            Closed                        Closed                      EICB RAI          TVA Letter dated ML102910002        6/18/10 116                  B G
a(              6/3/2010                                                        Responder: WEC                                                Y            Closed                        Closed                      EICB RAI          TVA Letter dated Letter sent to Westinghouse requesting ML102910008        10/5/10          the basis information and 117    7.1    7.1                  6/3/2010                                                        Responder: Hilmes                                            Y            Open                          Open-TVA/A102              EICB RAI          TVA Letter dated EICB (Garg)
ML102910008        10/29/10 Does TVA use a single sided or double sided methodology for as- Reactor Protection System (RPS) (comprised of Reactor Trip                Revised response is included in Pending FSAR              Item#21            Enclosure 1 Item found and as-left instrument setpoint values. (RIS2006-7)      (RPS) and Engineered Safety Features Actuation System                      letter dated 10/29/10          Amendment 102                                No. 7 (ESFAS)) setpoint values are monitored by periodic                                                        submittal performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-                                                  Due 12/17/10 sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoint surveillance tests as described in FSAR                                              TVA needs to address amendment 100.                                                                                          that trip setpoint and allowable value TVA Revised Response:                                                                                    uncertainties are not reduced by the For TSTF-493 parameters WBN Unit 2 uses only double                                                      reduction factor for the sided correction factors. Attachment 3 contains the revised                                              single sided reduction FSAR section 7.1.2.1.9 that will be included in FSAR                                                    factor. TVA response Amendment 102 that reflects this change.                                                                not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint


NNC 11/18/10:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                rad22EA6.docx                                                                                    Open Items to be Resolved for SER Approval
During the September 20-21, 2010 audit, TVA agreed to put a description


of the commercial grade  
===Response===
SE      FSAR      NRC No.                                                                    Issue                                                    TVA Response(s)                Acceptable      Status/ Current Actions            Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.      POC                                                                                                                                    Y/N and allowable value and if it is used then provide justifications.
118    7.4      7.4      D a(            6/8/2010                                                          Responder: Merten                                Y            Closed                            Closed                    EICB RAI No.1      TVA Letter dated Submittal date is based on current ML102910017        10/29/10        EDCR scheduled issue date Note:
119                      B S
in(              June 10, 2010                                                      Date:                                            Y            Closed                            Closed                    RAI No. 23          TVA Letter dated Responder:                                                                                                                  ML102980005        7/30/10 120                      B C
a(                5/6/2010                                                          Responder: Hilmes/Merten/Costley                  Y            Closed                            Closed                    EICB RAI            TVA Letter dated ML102910002        7/30/10 121                      B C
a(                5/6/2010                                                          Responder: Webb/Webber                            Y            Closed                            Closed                    EICB RAI            TVA Letter dated ML102980066 Item    7/30/10 122                      B C
a(                June 14, 2010                                                      Date:                                            Y            Closed                            Closed                    N/A - Request for  N/A Responder: WEC                                                                                                              schedule not 123    7.7.3    7.4.1,    D a(            6/14/2010                                                          Responder:                                        Y            Closed                            Closed                    ML101720589,      TVA Letter dated 9342                                                                                                                                                                                                                      RAIs 21 and 22    7/30/10 124    7.7.5      XX        D a(            6/14/2010                                                          Responder:                                        Y            Closed                            Closed                    ML101720589, Item TVA Letter dated No 23 6/25/10 and 7/30/10 125    7.7.8    7.7.1.12    D a(            6/14/2010                                                          Responder:                                        Y            Closed                            Closed                    ML101720589, Item TVA Letter dated No s 24 and 25    7/30/10 126    7.8      7.8      D a(            June 14, 2010                                                      Date:                                            Y            Closed                            Closed                    ML101720589, Item TVA Letter dated Responder:                                                                                                                  No 26 6/25/10 and 7/30/10 127    7.2      7.2    B G
a(                6/16/2010                                                          Responder: WEC/Clark                              Y            Closed                            Closed                    EICB RAI          TVA Letter dated ML102910008      6/18/10 128    7.2      7.2    B G
a(                6/18/2010                                                          Responder: WEC Drake /TVA Craig                  Y            Closed                            Closed                    EICB RAI          TVA Letter dated Track through SE open item ML102910008      10/29/10 129                      L P
o(                6/12/2010                                                          Responder: WEC                                    Y            Closed                            Closed                    N/A              TVA Letter dated 10/5/10 130                      L P
o(                6/28/2010                                                          Responder: Clark                                  Y            Closed                            Closed                    N/A              TVA Letter dated 10/5/10 131                      L P
o(                6/28/2010                                                          Responder: Clark                                  Y            Closed                            Closed                    N/A              TVA Letter dated 10/5/10 132                      L P
o(                6/28/2010                                                          Responder: Clark                                  Y            Closed                            Closed                    N/A              TVA Letter dated 10/5/10 133                      L P
o(                6/28/2010                                                          Responder: Clark                                  Y            Closed                            Closed                                      TVA Letter dated 10/5/10 134                      L P
o(                6/28/2010                                                          Responder: Clark                                  Y            Closed                            Closed                                      TVA Letter dated 10/5/10 135    7.3.1    7.3.1      D a(            6/30/2010                                                          Responder: Clark                                  Y            Closed                            Closed                    RAI not necessary TVA Letter dated because this item 10/5/10 item 27 136    7.3.2,  7.4, 5.6,  D a(            6/30/2010                                                          Responder: Clark                                  Y            Closed                            Closed                    RAI not necessary TVA Letter dated 74        635                                                                                                                                                                                                                      because this item 10/5/10 item 28 137                      B C
a(                Several WBN2 PAMS documents contain a table titled, Document Responder: WEC                                        Y            Closed                            Closed                    ML101650255, Item TVA Letter dated Traceability & Compliance                                                                                                                                                                      No 1              10/5/10 138                                        By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC                                      N            Open                              Open-TVA/WEC              ML101650255, Item EICB (Carte) certain PAMS documentation has been completed.                                                                                                                                                  No. 2 This item is used to track all Commercial Grade                  TVA agreed to include a            Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues.                                              description of the generic should be provided with an application for a Tier 2 review.                                                                        Westinghouse hardware              To be addressed by commercial grade dedication        Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial                                                                  process in the PAMS licensing      Technical Report.
grade dedication plan was included in the Common Q Topical                                                                        technical report. (see Report Section 11, Commercial Grade Dedication Program.                                                                          ML102920031 Item No 1)
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is                                                                  TVA agreed to include (in the developed for each Common Q hardware or software component                                                                        PAMS licensing technical report) that requires commercial grade dedication.                                                                                        an evaluation of WBN2 critical characteristics for commercial Please provide the commercial grade dedication plans for each                                                                      Westinghouse hardware


dedication program and implementation in Rev. 2 of the CQ PAMS LTR.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                              rad22EA6.docx                                                                                          Open Items to be Resolved for SER Approval
Commercial Grade Dedication to be addressed in LTR Rev.


2,   083 7.5.2 7.5.1 B (C a May 6, 2010 Date:  6/18/10 Responder: WEC Y Closed Closed EICB RAI ML102910002 TVA Letter dated 7/30/10 084 7.5.2 7.5.1 B (C ar May 6, 2010 Date:  6/18/10 Responder: Clark Y Closed  Closed EICB RAI ML102910002 TVA Letter dated 6/18/10 085 7.5.2 7.5.1 EICB (Carte) 5/6/2010  Please provide a detailed description of the PAMS MTP data link to the plant computer. This description should identify all equipment (model & version) and describe the functions that each piece of equipment performs. This description should be of sufficient detail for the NRC to independently evaluate the statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3.
===Response===
Responder: WEC Is the WEC ISG4 evaluation inadequate?  
SE    FSAR    NRC No.                                                              Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions            Resolution Path      RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                Y/N Common Q hardware or software component that has not been                                                                                    components against the generic previously reviewed and approved by the NRC.                                                                                                  critical characteristics. (see ML102920031 Item No 2)
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval                                                                              TVA agreed to include a for a Tier 2 review.                                                                                                                          description of the generic Westinghouse software (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade                                                                                  commercial grade dedication Dedication Report for the QNX Operating System for Common Q                                                                                  process in the PAMS licensing Applications.                                                                                                                                technical report. (see ML102920031 Item No 3)
(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications.                                                                                   TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 139              B C
a(                The WBN2 PAMS System Requirements Specification (WBN2              Responder: WEC                                               Y           Closed                             Closed                 ML101650255, Item  TVA Letter dated   WBN2 PAMS System Requirements PAMS SysRS) contains a table (see page iii) titled Document                                                                                                                                            No 3                10/5/10           Specification 140                                  The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1)        Responder: Clark                                             N            Open                                Open-TVA/WEC          ML101650255, Item  TVA Letter dated   WBN2 PAMS System Requirements EICB (Carte) states: The PAMS shall be capable of operation during normal                                                                                                                                            No. 4              10/29/10           Specification and abnormal environments and plant operating modes. The          WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post                      NNC 11/3/10: The origin of the     Due 12/3/10                                Enclosure 1 Item rational for this requirement is that it is necessary to meet      Accident Monitoring System (PAMS) specifies the Reg.                      requirements in the SysRS are                                                  No. 10            TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97.                                        Guide 1.97 variables implemented in the Common Q based                    not clearly document. Rev. 1 of     TVA to docket PAMS                                            Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS                                                            the Common Q PAMS Licensing        Licensing Technical                                          Completion Program I&C Projects Post What document specifies which RG 1.97 variables are                                                                                          Technical Report contains an        Report Rev. 2.                                                Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS?                                                                                                  open item that will be addressed                                                                  Requirements Specification, dated in Rev. 2; this open item is to                                                                  December 2009.
include TVAs enhanced contract compliance matrix. It is expected that this matrix will address this open item.
141              B C
a(                Deleted by DORL                                                Date:                                                      Y                  Closed                              Closed                ML101650255, Item                      WBN2 PAMS System Requirements Responder:                                                                                                                                No 5                                  Specification 142                                  The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC                                              N                  Open                                Open-TVA/WEC          ML101650255, Item                      WBN2 PAMS System Requirements EICB (Carte)
SysRS would be IEEE 830 as endorsed by Regulatory Guide                                                                                                                                                  No. 6                                  Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -  This item is used to track all traceability issues with the                    TVA/Westinghouse agreed to         Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section Software Requirements Specification (SRS).                                      include the V&V evaluation of                                                                    TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is                                                                                their reusable software element    To be addressed by                                            Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear At the September 15 public meeting in Rockville, the                          development process in the          Revision of the RTM,                                          Completion Program I&C Projects Post following actions were agreed to. These items address the                      V&V design phase summary            SRS, SysRS, and                                              Accident Monitoring System- System
: 1. How did TVA ensure the traceability of each requirement in traceability concerns with the Software Requirements                          report. This evaluation would      SysDS.                                                        Requirements Specification, dated the WBN2 PAMS SysRS.                                    Specification.                                                                 include an evaluation against                                                                    December 2009.
the development process
: 2. Explain the source(s) of the requirements present in the Post 1. Westinghouse will perform completed a review of the                  requirements. This evaluation Accident Monitoring Systems Software Requirements                Requirements Traceability Matrix(RT), using the issues                would also include an evaluation Specification. To clarify, many documents have                    identified at the 9/15 public meeting as a guide                      of how the WBN2 specific requirements that are incorporated by reference into the          (documented below) and update the RTM as required.                    requirements were addressed SRS, but what served to direct the author to include those                                                                              by the reusable software various documents in the SRS or, if the requirement is based 2. The next issue of the IV&V report will include the                    elements. (see ML102920031 on the System Requirements Specification, what directed the        Requirements phase review of the RTM and a partial                    Item No 5) author to include the requirement there?                           review for the Design phase.
: 3. Clarify whether the unnumbered paragraphs in the Post        3. Westinghouse will add a comments column in the Accident Monitoring Systems Software Requirements                Requirements Traceability Matrix (RTM) to address


Operation of the MTP as a barrier device. MTP Fails as a barrier device. Describe what prevents a MTP failure from propagating to the AC160? 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                        rad22EA6.docx                                                                Open Items to be Resolved for SER Approval


Node loss on the bus?   Bus loss?
===Response===
Revise the ISG4 section of the Licensing Technical Report (Rev. 2) to provide a more detailed description of the MTP as a barrier device.
SE    FSAR   NRC No.                                                      Issue                                                      TVA Response(s)                       Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date        Comments Sec. Sec. POC                                                                                                                                        Y/N Specification, such as in the section headings, or are all such    items not in the SRS or SysRS.
N Open A response will be provided by
sections simply considered to be informative?
 
: 4. IEEE 830 says you shouldnt have planning information Does the same apply to documents referenced by the SRS?            in the SRS. Westinghouse has agreed to remove this Such as WCAP-16096-NP-A, Rev. 1A, Software Program                information.
10/31/10 NNC 8/11/10:
Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS.                     5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to R2.3-2 [The PAMS software shall comply with the                     remove these requirements.
Design information should be available
requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems                  6. Westinghouse will perform and document an evaluation (reference 5).]                                                      of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.
 
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 7. 25 issues identified by V&V where some requirements please list them, describe why they satisfy the fundamental          have not been included in the SDS (14) and SRS (11) requirement of unambiguity, and describe how they were              at the revisions reviewed by V&V. Have these been verified.                                                            addressed? Yes. The next revisions of the SDS and SRS address these issues.
now. By letter dated July 30, 2010 (ML102160349) TVA stated that the MTP was connected to a Red Hat Linux
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements        8. Some hardware requirements are contained in the SRS Specification? Meaning does the SRS contain, explicitly or          instead of the System Design Specification (SDS).
 
by reference, all the requirements that were used in the           These will be removed from the SRS and incorporated design phase for the application specific software, or do          into the next revision of the SDS.
Server (see Enclosure 1, Item No. 14 part b.). It is presumed that this server is not safety-related. IEEE 603-1991 Clause
software design phase activities use requirements found in any other source or document? If so, what are these            9. RTM item R4.2-2 protection class software set to 0.
 
sources or documents?                                              Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
5.6.3(1) states, "Isolation devices used to affect a safety system boundary shall be classified as part of the safety system."
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification        10. Westinghouse to improve the traceability of the tests are various types of Reusable Software Element.                 that are performed with the function enable (FE) switch in the ENABLE position.
Open-TVA/WEC Due 12/3/10 Hardware is in Rev. 1 of the Licensing Technical Report due 10/22. NNC 8/25/10:
These references are used in the body of the SRS, for example:                                                       11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR              12. The flow of information is from the SysRS to the SDS terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software              (hardware) and SRS (software). Describe how the Element Document CRC for Calibration Data" [Reference              documents are used. Describe in 1.1 of the SysRS.
Disagree with path forward input by TVA above. An explanation is about the design is needed. FAT test procedure to include data storm testing of the MTP interface EICB RAI ML102910002 Item No. 13
12]).]                                                              Need a good write up of how the process works.
 
They are also included via tables such as found in              13. Westinghouse and TVA will develop a revised schedule requirement R7.1.2-1                                                for document submittals and provide it to the NRC no later than 9/30/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Please describe how the MTP serves as the isolation device. NNC 11/18/10:
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]    14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Do the referenced reusable software element documents include              design meets the contract requirements.
WEC response states that CQ PAMS LTR Rev. 2 will contain relevant information.
requirements not explicitly stated in the SRS? If so what is their origin?                                                                15. Westinghouse to add the Software Design Descriptions to the RTM
086 7.5.2 7.5.1 EICB (Carte) 5/6/2010  The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:  (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185)
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
: 17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
Responder: WEC                            Date: 5/24/10 The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the  
 
SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.  
 
Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4 N Open  TVA to address with item OI
: 81. Open-TVA/WEC Due 12/22/10 EICB RAI ML102910002 Item No. 14 TVA Letter dated 6/18/10  087 7.5.2 7.5.1 B (S in May 6, 2010 Date: 5/24/10 Responder:  Slifer Y Closed  Closed RAI No. 20 ML102980005 TVA Letter dated 6/18/10  088 7.5.2 7.5.1 B (S in May 6, 2010 Date:  5/24/10 Responder:  Slifer Y Closed  Closed RAI No. 21 ML102980005 TVA Letter dated 6/18/10  089  B (C a 5/6/2010  Responder: Clark Y Closed Closed EICB RAI ML102910002 TVA Letter dated 3/12/10 NNC:  Docketed response states that the applicable FSAR Sections are:
090  B (C a 5/6/2010  Responder: Clark                        Date: 5/25/10 Y Closed Closed EICB RAI ML102910002 TVA Letter dated 3/12/10  091 7.4 7.4 (D a May 20, 2010 Date:  5/25/10 Responder:  Clark Y Closed  Closed  EICB RAI No.1 ML102910017 TVA Letter dated 6/18/10 092  DORL (Poole) 5/20/2010
 
TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes
 
This item will close when we are no longer using this document as a communications tool.
Y Open Open-TVA Due: SER Issue Continuous review as items are added    093  B (G a May 20, 2010 Date:  5/25/10 Responder:  Knuettel Y Closed Closed N/A N/A Will be reviewed under item 154 094  B (G a 5/20/2010 Responder: Clark                          Date: 5/25/10 Y Closed  Closed N/A N/A Information was found in FSAR 095 7.8.1, 784 XX (D a May 20, 2010 Date:  Responder:
Y Closed Closed EICB RAI No. 2 ML102910017 TVA Letter dated 7/30/10  096 7.7.5 XX (D a 5/20/2010 Responder:
Y Closed  Closed  EICB RAI No.3 ML102910017 TVA Letter dated 7/30/10  097 7.4.2 7.4 (D a May 20, 2010 Date:  Responder:
Y Closed  Closed EICB RAI No.4 ML102910017 TVA Letter dated 7/30/10  098 7.4.2 7.4 (D a May 25, 2010 Date:  Responder:
Y Closed Closed EICB RAI No.5 ML102910017 TVA Letter dated 7/30/10  099  R L (B ail April 12, 2010 Date:  Responder:  WEC Y Closed Closed  Closed to Item 129 100  B (C a 5/20/2010 Responder: WEC Y Closed Closed N/A - No question was asked  Item N/A  101  DORL (Poole) 4/12/2010 The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
Responder: Slifer The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the
 
NRC dated July 15, 2010.
Y Open  Documents provided in letter dated 07/15/10 Open-NRC Review Due 10/14/10
 
Confirm receipt. N/A  TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 1. V&V Report 04508006A  2. System Description 04508100-1TM 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR 102  B (C a May 24, 2010 Date:  5/24/10 Responder:  WEC Y Closed Closed N/A TVA Letter dated 6/18/10 Request for schedule not information.
103 7.4 7.4 (D a 5/27/2010 Responder: Ayala                    Date: 5/27/10 Y Closed  Closed  EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue date 104 7.4 7.4 (D a 5/27/2010 Responder: Merten                    Date: 5/27/10 Y Closed  Closed  EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue date 105  B (G a April 29, 2010 Date:  Responder:  Langley Y Closed  Closed N/A N/A Will be reviewed under item 154.
106  B (S in May 6, 2010 Date:  5/25/10 Responder:  Davies Y Closed  Closed RAI No. 9 ML102980005 TVA Letter dated 6/18/10  107  B (S in May 6, 2010 Date:  5/28/10 Responder:  Clark Y Closed  Closed  RAI No. 22 ML102980005 TVA Letter dated 6/18/10  108  B (G a May 6, 2010 Date:  5/25/10 Responder:  Webb/Hilmes Y Closed  Closed  N/A N/A Will be reviewed under OI#154 109.b  B (C a 5/6/2010  Responder: N/A Y Closed  Closed  N/A N/A Duplicate of another open Item.
109.a 7.8 XX (D a 5/6/2010  Responder: N/A Y Closed  Closed  N/A N/A  110  B (G a May 6, 2010 Date:  Responder:  Clark Y Closed Closed N/A N/A Information was found.
111  B (C ar May 6, 2010 Date:  5/28/10 Responder:  Clark Y Closed Closed N/A TVA Letter dated 6/18/10 Request to help find, not a request for information 112  B (G June 1, 2010 Date:  Responder:  Clark Y Closed Closed N/A N/A Information was received 113  B (G a 6/1/2010  Responder: Clark Y Closed  Closed EICB RAI ML102910008 TVA Letter dated 6/18/10  114 7.2 7.2 B (G a 6/1/2010  Responder: WEC Y Close  Closed  EICB RAI ML102910008 TVA Letter dated 6/18/10  115  B (C a 2/25/2010 Responder: Clark Y Closed  Closed EICB RAI ML102910002 TVA Letter dated 6/18/10  116  B (G a 6/3/2010  Responder: WEC Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/5/10 Letter sent to Westinghouse requesting the basis information and 117 7.1 7.1 EICB (Garg) 6/3/2010  Does TVA use a single sided or double sided methodology for as-found and as-left instrument setpoint values.  (RIS2006-7)
Responder: Hilmes
 
Reactor Protection S y stem (RPS) (comprised of Reactor Trip (RPS) and Engineered Safety Features Actuation System (ESFAS)) setpoint values are monitored by periodic performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double-sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoint surveillance tests as described in FSAR amendment 100.
 
TVA Revised Response:
 
For TSTF-493 parameters WBN Unit 2 uses only double sided correction factors. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open Revised response is included in letter dated 10/29/10 Open-TVA/A102
 
Pending FSAR Amendment 102 submittal
 
Due 12/17/10 TVA needs to address that trip setpoint and
 
allowable value uncertainties are not reduced by the
 
reduction factor for the
 
single sided reduction factor. TVA response not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint EICB RAI ML102910008 Item#21 TVA Letter dated 10/29/10  Item No. 7 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and allowable value and if it is used then provide justifications.
118 7.4 7.4 (D a 6/8/2010  Responder: Merten Y Closed  Closed  EICB RAI No.1 ML102910017 TVA Letter dated 10/29/10 Submittal date is based on current EDCR scheduled issue date  Note:
119  B (S in June 10, 2010 Date:  Responder:
Y Closed  Closed RAI No. 23 ML102980005 TVA Letter dated 7/30/10  120  B (C a 5/6/2010  Responder: Hilmes/Merten/Costley Y Closed  Closed EICB RAI ML102910002 TVA Letter dated 7/30/10  121  B (C a 5/6/2010  Responder: Webb/Webber Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 7/30/10  122  B (C a June 14, 2010 Date:  Responder:  WEC Y Closed Closed N/A - Request for schedule not N/A  123 7.7.3 7.4.1, 9342 (D a 6/14/2010 Responder:
Y Closed  Closed ML101720589, RAIs 21 and 22 TVA Letter dated 7/30/10  124 7.7.5 XX (D a 6/14/2010 Responder:
Y Closed Closed ML101720589, Item No 23 6/25/10 and TVA Letter dated 7/30/10  125 7.7.8 7.7.1.12 (D a 6/14/2010 Responder:
Y Closed Closed ML101720589, Item Nos 24 and 25 TVA Letter dated 7/30/10  126 7.8 7.8 (D a June 14, 2010 Date:  Responder:
Y Closed Closed ML101720589, Item No 26 6/25/10 and TVA Letter dated 7/30/10  127 7.2 7.2 B (G a 6/16/2010 Responder: WEC/Clark Y Closed Closed EICB RAI ML102910008 TVA Letter dated 6/18/10  128 7.2 7.2 B (G a 6/18/2010 Responder: WEC Drake /TVA Craig Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/29/10 Track through SE open item 129  L (P o 6/12/2010 Responder: WEC Y Closed  Closed  N/A TVA Letter dated 10/5/10  130  L (P o 6/28/2010 Responder: Clark Y Closed  Closed  N/A TVA Letter dated 10/5/10  131  L (P o 6/28/2010 Responder: Clark Y Closed  Closed  N/A TVA Letter dated 10/5/10  132  L (P o 6/28/2010 Responder: Clark Y Closed  Closed  N/A TVA Letter dated 10/5/10  133  L (P o 6/28/2010 Responder: Clark Y Closed  Closed  TVA Letter dated 10/5/10  134  L (P o 6/28/2010 Responder: Clark Y Closed  Closed  TVA Letter dated 10/5/10  135 7.3.1 7.3.1 (D a 6/30/2010 Responder: Clark Y Closed  Closed RAI not necessary because this item TVA Letter dated 10/5/10 item 27 136 7.3.2, 74 7.4, 5.6, 635 (D a 6/30/2010 Responder: Clark Y Closed  Closed RAI not necessary because this item TVA Letter dated 10/5/10 item 28 137  B (C aSeveral WBN2 PAMS documents contain a table titled, "Document Traceability & Compliance
" Responder: WEC Y Closed  Closed ML101650255, Item No 1 TVA Letter dated 10/5/10  138  EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
 
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."
Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
 
Please provide the commercial grade dedication plans for each Responder: WEC This item is used to track all Commercial Grade Dedication issues.
N Open  TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report.  (see
 
ML102920031 Item No 1)
 
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware Open-TVA/WEC Due 12/3/10
 
To be addressed by
 
Rev. 2 of the Licensing Technical Report.
 
ML101650255, Item No. 2 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.
(i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Applications."
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." components against the generic critical characteristics. (see ML102920031 Item No 2)
 
TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing
 
technical report.  (see ML102920031 Item No 3)
 
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial
 
software components against the generic critical characteristics. (see ML102920031 Item No 4) 139  B (C aThe WBN2 PAMS System Requirements Specification (WBN2 PAMS SysRS) contains a table (see page iii) titled "Document Responder: WEC Y Closed  Closed ML101650255, Item No 3 TVA Letter dated 10/5/10 WBN2 PAMS System Requirements Specification 140  EICB (Carte) The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) states: "The PAMS shall be capable of operation during normal and abnormal environments and plant operating modes."  The rational for this requirement is that it is necessary to meet Regulatory Guide (RG) 1.97. 
 
What document specifies which RG 1.97 variables are implemented in the Common Q based WBN2 PAMS?
Responder: Clark WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, "Post Accident Monitoring System (PAMS)" specifies the Reg.
Guide 1.97 variables implemented in the Common Q  based
 
WBN Unit 2 PAMS N Open  NNC 11/3/10:
The origin of the requirements in the SysRS are not clearly document. Rev. 1 of the Common Q PAMS Licensin g Technical Report contains an open item that will be addressed in Rev. 2; this open item is to include "TVA's enhanced contract compliance matrix". It is expected that this matrix will address this open item.
Open-TVA/WEC Due 12/3/10
 
TVA to docket PAMS Licensing Technical Report Rev. 2.
ML101650255, Item No. 4 TVA Letter dated 10/29/10 Enclosure 1 Item No. 10 WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
141  B (C a Deleted by DORL Date:  Responder:
Y Closed Closed ML101650255, Item No 5  WBN2 PAMS System Requirements Specification 142  EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -
Software Requirements Specifications."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is
 
traceable of the origin of each of its requirements is clear-"
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Responder: WEC This item is used to track all traceability issues with the Software Requirements Specification (SRS). 
 
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address N Open  TVA/Westinghouse agreed to include the V&V evaluation of
 
their reusable software element
 
development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation
 
of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031
 
Item No 5)
Open-TVA/WEC Due 12/22/10 To be addressed by Revision of the RTM, SRS, SysRS, and SysDS. ML101650255, Item No. 6  WBN2 PAMS System Requirements Specification TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Specification, such as in the section headings, or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?
Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in
 
any other source or document?  If so, what are these
 
sources or documents?
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".
These references are used in the body of the SRS, for
 
example:"
 
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]


Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    rad22EA6.docx                                                                                  Open Items to be Resolved for SER Approval


origin? items not in the SRS or SysRS.
===Response===
: 4. IEEE 830 says you shouldn't have planning information in the SRS. Westinghouse has agreed to remove this
SE    FSAR    NRC No.                                                                 Issue                                                       TVA Response(s)                         Acceptable       Status/ Current Actions     Resolution Path       RAI No. & Date   RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                    Y/N identified.
 
information.
: 5. IEEE 830 says you shouldn't have process requirements in the SRS. Westinghouse has agreed to
 
remove these requirements.
: 6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Re
: g. Guide 1.172 and justify any deviations.
: 7. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the revisions reviewed by V&V. Have these been
 
addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS).
These will be removed from the SRS and incorporated into the next revision of the SDS.
: 9. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.
: 10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.
: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position
: 12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10
: 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 15. Westinghouse to add the Software Design Descriptions to the RTM
: 16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
: 17. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to
 
ensure that all requirements are captured and clearly Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments identified.
: 18. Westinghouse to resolve the following questions concerning SDDs
: 18. Westinghouse to resolve the following questions concerning SDDs
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: b. What are the SDDs?
: b. What are the SDDs?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified usin g the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.
For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.
Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.
Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.
WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD  
WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.
 
143                                   The WBN2 PAMS Software Requirements Specification (WBN2        Responder: WEC                                              N                    Open                          Open-TVA/WEC          ML101650255, Item                    WBN2 PAMS System Requirements EICB (Carte)
References.
PAMS SRS - ML101050202) contains a table (see page iii) titled,                                                                                                                                       No. 7                                Specification Document Traceability & Compliance, which states that the     Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.                                                    Due 12/22/10 WBN2 PAMS SRS was created to support the three documents       A detailed explanation will be provided.                                                                                                                                  TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1,                                                                                                                 To be addressed by                                          Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document                                                                                                                       Revision of the RTM,                                        Completion Program I&C Projects Post describes requirements for the major software components                                                                                                                     SRS, SysRS, and                                            Accident Monitoring System- System SysDS.                                                      Requirements Specification, dated (a) Please list and describe each of the major software                                                                                                                                                                                   December 2009.
143   EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the  
components. Please include a description of any NRC review for each of these components.
 
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.
WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document describes requirements for the major software components -"
(c) What other documents contain the requirements for the other software components?
 
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability
(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.  
                                      & Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?
 
(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.  
 
(c) What other documents contain the requirements for the other  
 
software components?
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability  
& Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this document is to define the hardware design requirements -"
 
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?  
 
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.
Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit.
144                                  The WBN2 PAMS Software Requirements Specification (WBN2              Responder: WEC                                               N           Open                         Open-TVA/WEC           ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB          PAMS SRS) contains a table (see page iii) titled, Document                                                                                                                                           No. 8            10/5/10          Specification (Carte)        Traceability & Compliance, which states that the WBN2 PAMS           (a) The purpose of NABU-DP-00014-GEN document is to                       Response provided in letter  Due 12/3/10 SRS was created to support the three documents identified (two of    define the process for system level design, software design               dated 10/5/10                                                                            By letter dated April 8, 2010 these documents have been provided on the docket).                    and implementation, and hardware design and                                                             Responses to items a                                        (ML10101050203), TVA docketed
A detailed explanation will be provided.
N Open Open-TVA/WEC Due 12/22/10 To be addressed by Revision of the RTM, SRS, SysRS, and SysDS. ML101650255, Item No. 7  WBN2 PAMS System Requirements Specification
 
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SRS was created to support the three documents identified (two of these documents have been provided on the docket).
Responder: WEC
 
(a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design and implementation, and hardware design and N Open Response provided in letter


dated 10/5/10 Open-TVA/WEC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                 rad22EA6.docx                                                                                           Open Items to be Resolved for SER Approval
 
Due 12/3/10
 
Responses to items a ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification
 
By letter dated April 8, 2010 (ML10101050203), TVA docketed Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (a) Please describe the third document (i.e., NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems").
(b) Please describe the flow of information between these three documents.
(c) Does the PAMS SRS implement the requirements in these three documents?
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.
(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated into the WBN2 PAMS SRS. implementation for Common Q safety system development. This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes the design and implementation processes for the application
 
development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision of the document.
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1). 


===Response===
SE    FSAR    NRC No.                                                              Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                  Y/N implementation for Common Q safety system development.                        NRC Review and WEC to            and e provided.                                                WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014-      This document supplements the Common Q SPM, WCAP-                            complete response.                                                                              "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety                16096-NP-A. The scope of NABU-DP-00014-GEN includes                                                          NNC 11/18/10:                                                    Program I&C Projects, Software Systems).                                                        the design and implementation processes for the application                  b-d to be addressed at public  (1) Items b-d closed to                                          Requirements Specification for the Post development. For a fuller description of the design process                  meeting and audit. Will require other Open Item nos.                                            Accident Monitoring System, dated (b) Please describe the flow of information between these three    described in NABU-DP-00014-GEN please refer to the                            information to be docketed.    (2) The point of these                                          February 2010 (ML101050202).
documents.                                                        Design Process for AP1000 Common Q Safety Systems,                                                            questions was to WCAP-15927 on the AP1000 docket. Since this is a                                                              understand how the (c) Does the PAMS SRS implement the requirements in these          Westinghouse process document that is not specifically                                                        origin of the three documents?                                                  referenced in the SRS, it will be removed in the next revision                                                requirements in the of the document.                                                                                              requirements (d) Please describe if and how these three documents are used in                                                                                                                specifications were the development of the PAMS Software Design Description.          (b) - Closed to items 142 and 145                                                                            documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the      (c) - Closed 142                                                                                              the requirements would requirements of these three documents have been incorporated                                                                                                                    be demonstrated in into the WBN2 PAMS SRS.                                            (d) - Closed to Item 142                                                                                      Rev. 2 of the CQ PAMS LTR.
(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS. NRC Review and WEC to complete response.
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.
b-d to be addressed at public
145                                  The WBN2 PAMS System Design Specification (WBN2 PAMS                Responder: WEC                                             N                Open                            Open-TVA/WEC              ML101650255, Item                    WBN2 PAMS System Design EICB (Carte)
 
SDS) contains a table (see page iii) titled, Document Traceability                                                                                                                                          No. 9                                Specification
meeting and audit. Will require information to be docketed.
                                    & Compliance, which states that the WBN2 PAMS SDS was              This item is used to track all traceability issues with the                  During the September 20-21,      Due 12/22/10 created to support the WBN2 PAMS SysRS.                            System Design Specification (SDS).                                          2010 audit at Westinghouse, it                                                                  TVA docketed WNA-DS-01667-WBT was acknowledged that            To be addressed by                                              Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware            At the September 15 public meeting in Rockville, the                        TVA/Westinghouse had            Revision of the RTM,                                            Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS?                                following actions were agreed to. These items partially                      previously (in September 15,    SRS, SysRS, and                                                Accident Monitoring System- System address the traceability concerns with the System                            2010 public meeting) stated:    SysDS.                                                          Design Specification, dated December (b) Please briefly describe all of the documents that implement the Design Specification. This item will be updated with the                                                                                                                      2009.
and e provided.
hardware requirements of the WBN2 PAMS SysRS.                       results of the September 20 and 21 Commercial Grade                          TVA would provide the RSED Dedication and SDS RTM audit.                                                RTM. (see ML102920031 Item
NNC 11/18/10:
(1) Items b-d closed to other Open Item nos.
(2) The point of these questions was to understand how the  
 
origin of the  
 
requirements in the requirements specifications were  
 
documented. TVA  


stated that the origin of the requirements would be demonstrated in
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                rad22EA6.docx                                                                                        Open Items to be Resolved for SER Approval


Rev. 2 of the CQ PAMS LTR. WNA-SD-00239-WBT, Revision 1, ""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System," dated February 2010 (ML101050202).
===Response===
145  EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
SE   FSAR   NRC No.                                                             Issue                                                       TVA Response(s)                           Acceptable       Status/ Current Actions           Resolution Path     RAI No. & Date     RAI Resp. Date               Comments Sec. Sec. POC                                                                                                                                                Y/N No 6)
 
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues                 TVA would revise and resubmit identified at the 9/15 public meeting as a guide                       the PAMS RTM to address all (documented below) and update the RTM as required.                     types of issues identified in the public meeting. (see
(a) Does the WBN2 PAMS SDS implement all of the hardware requirements in the WBN2 PAMS SysRS?
: 2. Some hardware requirements are contained in the SRS                     ML102920031 Item No 7) instead of the System Design Specification (SDS).
 
These will be removed from the SRS and incorporated                     TVA would revise and resubmit into the next revision of the SDS.                                     the Software Verification and Validation phase summary
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.
: 3. 25 issues identified by V&V where some requirements                    report for the requirements have not been included in the SDS (14) and SRS (11)                     phase to document the at the revisions reviewed by V&V. Have these been                       completion of the requirements addressed? Yes. The next revisions of the SDS and                       phase review. (see SRS address these issues.                                               ML102920031 Item No 8)
Responder: WEC This item is used to track all traceability issues with the System Design Specification (SDS).
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
N Open  During the September 20-21, 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:
 
TVA would provide the RSED RTM. (see ML102920031 Item Open-TVA/WEC Due 12/22/10 To be addressed by Revision of the RTM, SRS, SysRS, and SysDS. ML101650255, Item No. 9  WBN2 PAMS System Design Specification
 
TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Design Specification," dated December
 
2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS).
 
These will be removed from the SRS and incorporated into the next revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract  
 
requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.
No 6)  TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)
Need a good write up of how the process works.
 
146                 B C
TVA would revise and resubmit
a(            6/17/2010                                                         Responder:                                                     Y           Closed                             Closed               ML101650255, Item                       PAMS System Requirements No 10                                  Specifications 147                 B C
 
a(            6/17/2010                                                         Responder:                                                     Y           Closed                             Closed               ML101650255, Item                       PAMS System Requirements No 11                                  Specifications 148                 B C
the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8) 146   B (C a 6/17/2010 Responder:
a(            6/17/2010                                                         Responder:                                                     Y           Closed                             Closed               ML101650255, Item                       PAMS System Requirements No 12                                  Specifications 149   7.2     7.2   B G
Y Closed Closed ML101650255, Item No 10  PAMS System Requirements Specifications 147   B (C a 6/17/2010 Responder:
a(             FSAR Section 7.1.1.2(2), Overtemperature delta T and               Responder: Tindell                                             Y           Close                               Closed               ML101720589, Item   TVA Letter dated Overpressure delta T equations have been simplified and many                                                                                                                                            No 1                10/5/10 150   7.2     7.2   B G
Y Closed Closed ML101650255, Item No 11  PAMS System Requirements Specifications 148   B (C a 6/17/2010 Responder:
a(             Many of the changes were based on the Westinghouse document       Responder: Clark                                                Y            Close                              Closed              ML101720589, Item    TVA Letter dated N3-99-4003 Provide this document for staffs review so the staff                                                                               Response provided in letter                             No 2                 10/5/10 151   7.2     7.2   B G
Y Closed Closed ML101650255, Item No 12  PAMS System Requirements Specifications 149 7.2 7.2 B (G aFSAR Section 7.1.1.2(2), Overtemperature delta T and Overpressure delta T equations have been simplified and many Responder: Tindell Y Close Closed ML101720589, Item No 1 TVA Letter dated 10/5/10 150 7.2 7.2 B (G aMany of the changes were based on the Westinghouse document N3-99-4003 Provide this document for staff
a(            Provide the EDCR 52378 and 54504 which discusses the basis for     Responder: Clark                                               Y           Close                               Closed               ML101720589, Item   TVA Letter dated many changes to this FSAR section                                                                                                                                                                        No 3                10/5/10 152   7.2     7.2   B G
's review so the staff Responder: Clark Y Close Response provided in letter Closed ML101720589, Item No 2 TVA Letter dated 10/5/10 151 7.2 7.2 B (G a Provide the EDCR 52378 and 54504 which discusses the basis for many changes to this FSAR section Responder: Clark Y Close Closed ML101720589, Item No 3 TVA Letter dated 10/5/10 152 7.2 7.2 B (G aDeleted portion of FSAR section 7.2.3.3.4 and moved to FSAR section 72115  However the FSAR section 72115 does not Responder: Merten/Clark Y Close Closed ML101720589, Item No 4 TVA Letter dated 10/5/10 153 7.2 7.2 B (G aFSAR section 7.2.1.1.7 added the reference to FSAR section 10443 for exception to P
a(             Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR       Responder: Merten/Clark                                         Y           Close                               Closed               ML101720589, Item   TVA Letter dated section 7 2 1 1 5 However the FSAR section 7 2 1 1 5 does not                                                                                                                                            No 4                10/5/10 153   7.2     7.2   B G
-12  However FSAR section 10443 Responder: Craig/Webb Y Close Closed ML101720589, Item No 5 TVA Letter dated 10/21/10 154 7.2 7.2 EICB (Garg) FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS 2006-17 to provide guidance to the industry regarding the instrument setpoint methodology which complies with 10 CFR 50.36 requirements. Provide the information on how the WBN2 setpoint methodology meets the guidance of RIS 2006-17 and Responder: Craig/Webb (Q1) Refer to the response to letter item 13, RAI Matrix Item
a(             FSAR section 7.2.1.1.7 added the reference to FSAR section         Responder: Craig/Webb                                           Y           Close                               Closed               ML101720589, Item   TVA Letter dated 10 4 4 3 for exception to P-12 However FSAR section 10 4 4 3                                                                                                                                            No 5                10/21/10 154   7.2     7.2                 FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS       Responder: Craig/Webb                                          Y            Open                                Open-TVA/A102        ML101720589, Item    TVA Letter dated EICB RAI ML102861885 sent to DORL EICB (Garg) 2006-17 to provide guidance to the industry regarding the                                                                                                                                               No. 6 and EICB RAI  10/5/10 instrument setpoint methodology which complies with 10 CFR         (Q1) Refer to the response to letter item 13, RAI Matrix Item               Response is not acceptable. A Due 12/17/10              ML102861885 Item 50.36 requirements. Provide the information on how the WBN2        51.                                                                          revised response will be                                 No. 8                TVA Letter dated setpoint methodology meets the guidance of RIS 2006-17 and                                                                                      submitted in the letter dated Pending FSAR                                    10/29/10
: 51. Y Open  Response is not acceptable. A  
 
revised response will be submitted in the letter dated Open-TVA/A102 Due 12/17/10  


Pending FSAR ML101720589, Item No. 6 and EICB RAI ML102861885 Item
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                       rad22EA6.docx                                                                                           Open Items to be Resolved for SER Approval
 
No. 8 TVA Letter dated 10/5/10 TVA Letter dated
 
10/29/10 EICB RAI ML102861885 sent to DORL Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments include this discussion in this section. Also, by letter dated May 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff noted that section 4.3.3.6 of EEB-TI-28 discusses the correction for setpoints with a single side of interest. It should be noted that the staff has not approved this aspect of setpoint methodology for Unit 1. The staff finds this reduction in uncertainties is not justified unless it can be demonstrated that the 95/95 criteria is met. Therefore, either remove this reduction factor for single sided uncertainties or justify how you m eet the 95/95 criteria given in RG 1.105. (Q2) EEB-TI-28's single sided methodology conforms with WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 that was in affect during WBN Unit 1 licensing. The single sided methodology is not used for any TSTF-493 setpoints that use TI-28 methodology.
TVA Revised Response:
In order to respond to other NRC comments on the setpoint methodology discussion in FSAR Amendment 100, TVA reviewed the previous response to this RAI. This resulted in a complete rewrite of the responses to this question as shown below. As a result, the response does not specifically address the NRC Follow-up Request. However, the overall responses to all of the NRC RAIs on setpoint methodology addresses this item.
(Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.
(Q2) Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations,  single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where onl y 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as "high."
. 10/29/10. Amendment 102 submittal.
FSAR AMD 100. Since all the setpoint and allowable value for Unit 2 is calculated and added to TS, TVA
 
needs to address the latest criteria and that include 95/95 criteria. Why the last sentence
 
has been modified by adding TI-28. It was NRC's understanding that all setpoints have to meet TI-28  Enclosure 1 Item No. 13 155 7.2 7.2 B (G aSummary of FSAR change document section 7.2 states that sections 72119 and 7222(4) are c hanged to show that these Date:  Responder:  Stockton Y Closed Closed  ML101720589, Item No 7  156 7.2 7.2 EICB (Garg) FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-1--designed to prevent exceeding 121% of power--.The value of 121% is changed from 118%. The justification for this change states that this was done to bring the text of this section in agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. However, Table 4.1-1 and section 4.3.2.2.5 still show this value as 118%. Justify the change.
Responder: WEC
 
Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Correction to RAI Response SNPB 4.3.2-7, (Reference 17) the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a result of the question, Westinghouse reviewed all locations where either 118% or 121% are used and the context of use and provided a FSAR markup to reflect the correct value at the specific location. These changes will be incorporated in a future FSAR amendment. 


===Response===
SE    FSAR    NRC No.                                                                Issue                                                          TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date              Comments Sec. Sec. POC                                                                                                                                                        Y/N include this discussion in this section. Also, by letter dated May        (Q2) EEB-TI-28's single sided methodology conforms with                    10/29/10.                        Amendment 102                                Enclosure 1 Item 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff        WBN's design basis commitment to ensure that 95% of the                                                      submittal.                                    No. 13 noted that section 4.3.3.6 of EEB-TI-28 discusses the correction          analyzed population is covered by the calculated tolerance for setpoints with a single side of interest. It should be noted that      limits as defined in NRC Reg Guide 1.105, Revision 2, 1986                                                  FSAR AMD 100. Since the staff has not approved this aspect of setpoint methodology for        that was in affect during WBN Unit 1 licensing. The single                                                  all the setpoint and Unit 1. The staff finds this reduction in uncertainties is not justified  sided methodology is not used for any TSTF-493 setpoints                                                    allowable value for Unit unless it can be demonstrated that the 95/95 criteria is met.              that use TI-28 methodology.                                                                                  2 is calculated and Therefore, either remove this reduction factor for single sided                                                                                                                        added to TS, TVA uncertainties or justify how you meet the 95/95 criteria given in RG      TVA Revised Response:                                                                                        needs to address the 1.105.                                                                                                                                                                                  latest criteria and that In order to respond to other NRC comments on the setpoint                                                    include 95/95 criteria.
methodology discussion in FSAR Amendment 100, TVA                                                            Why the last sentence reviewed the previous response to this RAI. This resulted in                                                has been modified by a complete rewrite of the responses to this question as                                                      adding TI-28. It was shown below. As a result, the response does not specifically                                                NRCs understanding address the NRC Follow-up Request. However, the overall                                                      that all setpoints have responses to all of the NRC RAIs on setpoint methodology                                                    to meet TI-28 addresses this item.
(Q1)    WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.
(Q2)    Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.
There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..
155    7.2    7.2  B G
a(            Summary of FSAR change document section 7.2 states that                    Date:                                                          Y            Closed                          Closed                    ML101720589, Item sections 7 2 1 1 9 and 7 2 2 2(4) are changed to show that these          Responder: Stockton                                                                                                                    No 7 156    7.2    7.2                  FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1-            Responder: WEC                                                N            Open                            Open-TVA/WEC              ML101720589, Item TVA Letter dated Response on hold pending EICB (Garg) 1designed to prevent exceeding 121% of power.The                                                                                                                                                              No. 8            10/5/10          Westinghouse review.
value of 121% is changed from 118%. The justification for this            Per Westinghouse letter WBT-D-2340, TENNESSEE                              Response is included in letter  Due __________
change states that this was done to bring the text of this section in      VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT                                    dated 10/5/10 agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1.              UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and                                                        Amendment 101 However, Table 4.1-1 and section 4.3.2.2.5 still show this value as        Correction to RAI Response SNPB 4.3.2-7, (Reference 17)                                                      Submitted 10/29/10.
118%. Justify the change.                                                  the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a                                                    TVA needs to justify result of the question, Westinghouse reviewed all locations                                                  why some places 121%
where either 118% or 121% are used and the context of use                                                    is used and other and provided a FSAR markup to reflect the correct value at                                                  places 118% is used .
the specific location. These changes will be incorporated in                                                What does 121% or a future FSAR amendment.                                                                                    118% means.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
N Open  Response is included in letter dated 10/5/10 Open-TVA/WEC Due __________
Amendment 101
Submitted 10/29/10.
TVA needs to justify wh y some places 121% is used and other places 118% is used . What does 121% or 118% means.
ML101720589, Item No. 8 TVA Letter dated 10/5/10 Response on hold pending Westinghouse review.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Pending response from Westinghouse.
157 7.2 7.2 B (G aFSAR section 7.2.2.1.1, fifth paragraph was deleted except for the last sentence  The last sentence states that "The P-8 interlock Responder: Tindell Y Close  Closed  ML101720589, Item No 9 TVA Letter dated 10/5/10  158 7.2 7.2 B (G aFSAR section 7.2.2.1.1, paragraph six was changed to state that the design meets the req uirements of Criterion 23 of the 1971 Responder: Tindell Y Closed  Closed ML101720589, Item No 10 TVA Letter dated 10/5/10  159 7.2 7.2 B (G aFSAR section 7.2.2.1.2 discusses reactor coolant flow measurement by elbow taps  However it further states that for Responder: Craig Y Close  closed  ML101720589, Item No 11 TVA Letter dated 10/5/10  160 7.2 7.2 B (G aFSAR section 7.2.2.2(7) deleted text which has references 12 and 14  These references are not included in the revised text  Provide Responder: Tindell Y Close  Closed  ML101720589, Item No 12 TVA Letter dated 10/5/10  161 7.2 7.2 B (G aFSAR section 7.2.2.3 states that changes to the control function description in this section are ex pected to be required after vendor Responder: Clark Y Closed  Closed ML101720589, Item No 13 TVA Letter dated 10/5/10  162 7.2 7.2 B (G aFSAR section 7.2.2.2(14) states that bypass of a protection channel during testing is indicated by an alarm in the control room  Responder: Tindell Y Closed  Closed ML101720589, Item No 14 TVA Letter dated 10/5/10  163 7.2 7.2 B (G a Deleted by DORL Date:  Responder:
Y Closed Closed ML101720589, Item No 15  164 7.2 7511 7.2 r glFSAR section 7.2.2.2(20) has been revised to include the plant computer as a means to provide information read out for all signals Responder: Perkins Y Closed  Closed  ML101720589, Item No 16 and EICB TVA Letter dated 10/5/10 Item No. 8 sent to DORL 165 7.2 7.2 B (G aFSAR section 7.2.2.3.2, last paragraph of this section has been deleted  The basis for this deletion is that discussion regarding the Responder: Clark Y Closed  Closed ML101720589, Item No 17 TVA Letter dated 10/5/10  166 7.2 7.2 B (G aChanges to FSAR section 7.2.2.2(20) are justified based on the statement that the integrated computer system is implemented Responder: Clark Y Closed  Closed ML101720589, Item No 18 TVA Letter dated 10/5/10  167 7.2 7.2 B (G aFSAR section 7.2.2.4, provide an analysis or reference to chapter 15 analysis which demonstrate that fa ilure of rod stop during a rod Responder: Clark Y Close  closed ML101720589, Item No 19 TVA Letter dated 10/5/10  168 7.2 7.2 B (G aFSAR table 7.2-4, item 9 deleted loss of offsite power to station auxiliaries (station blackout) based on the fact that station blackout Responder: Clark Y Close Response provided in letter Closed ML101720589, Item No 20 TVA Letter dated 10/5/10  169  B (G a 6/18/2010 Responder: Clark Y Closed Closed    170  B (G a 6/17/2010 Responder: Clark Y Closed Closed    171 7.2 7.2 B (G a 6/17/2010 Responder: Craig Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10 Closed to SE Open Item 172  B (G a 6/17/2010 Responder: Craig Y Closed Closed EICB RAI ML102910008 173 7.1 7.1 B (G a 6/17/2010 Responder: Craig/Webb/Powers Y Closed Closed  EICB RAI ML102910008 174  B (G a 6/28/2010 Responder: Hilmes/Craig Y Closed Closed EICB RAI ML102910008 175  B (G a June 28, 2010 Responder:
Y Closed  Closed  EICB RAI ML102910008 176 7.1 7.1 B (G a 6/28/2010 Responder: Craig/Webb Y Closed Closed  EICB RAI ML102910008 177 7.5.2.1 7.5.1 (M a r 7/15/2010 Responder: Clark Y Closed  Closed  N/A  TVA Letter dated 10/5/10 RAI not required 178 7.5.2.1 7.5.1 (M a r 7/15/2010 Responder: Clark Y Closed  Closed  N/A  TVA Letter dated 10/5/10 RAI not required 179  B (C aAn emphasis is placed on traceability in System Requirements Specifications in the SRP in the unmodified IEEE std 830
-1993 Responder: WEC Y Closed  Closed N/A - Closed to Item No 142 NA  180  B (C aThe SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide 1172 endorses with a few noted exceptions  IEEE Std 830
-1993 Responder: WEC Y Closed Closed  N/A - Closed to Item No 142 NA  181  B (C aAn emphasis is placed on traceability in System Requirements Specifications in the SRP in the unmodified IEEE std 830
-1993 Responder: WEC Y Closed Closed N/A - Closed to Item No 142 NA  182  B (C aCharacteristics that the SRP states that a Software Requirements Specifications should have include unambiguity verifiability and Responder: WEC Y Closed Closed N/A - Closed to Item No 142 NA  183  EICB (Carte) 7/15/2010


An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Responder: WEC
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                            rad22EA6.docx                                                                              Open Items to be Resolved for SER Approval


The generic Software Requirements Specification applies except as modified b y the WBN Unit 2 S y stem Requirements Specification.
===Response===
Y Open Response provided in letter
SE      FSAR    NRC No.                                                              Issue                                                        TVA Response(s)                Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                      Y/N Pending response from Westinghouse.
157    7.2      7.2    B G
a(        FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the      Responder: Tindell                                  Y            Close                        Closed              ML101720589, Item  TVA Letter dated last sentence The last sentence states that The P-8 interlock                                                                                                                              No 9                10/5/10 158    7.2      7.2    B G
a(        FSAR section 7.2.2.1.1, paragraph six was changed to state that          Responder: Tindell                                  Y            Closed                        Closed              ML101720589, Item  TVA Letter dated the design meets the requirements of Criterion 23 of the 1971                                                                                                                                No 10              10/5/10 159    7.2      7.2    B G
a(        FSAR section 7.2.2.1.2 discusses reactor coolant flow                    Responder: Craig                                    Y            Close                        closed              ML101720589, Item  TVA Letter dated measurement by elbow taps However it further states that for                                                                                                                                No 11              10/5/10 160    7.2      7.2    B G
a(        FSAR section 7.2.2.2(7) deleted text which has references 12 and        Responder: Tindell                                  Y            Close                        Closed              ML101720589, Item  TVA Letter dated 14 These references are not included in the revised text Provide                                                                                                                            No 12              10/5/10 161    7.2      7.2    B G
a(        FSAR section 7.2.2.3 states that changes to the control function        Responder: Clark                                    Y            Closed                        Closed              ML101720589, Item  TVA Letter dated description in this section are expected to be required after vendor                                                                                                                        No 13              10/5/10 162    7.2      7.2    B G
a(        FSAR section 7.2.2.2(14) states that bypass of a protection              Responder: Tindell                                  Y            Closed                        Closed              ML101720589, Item  TVA Letter dated channel during testing is indicated by an alarm in the control room                                                                                                                          No 14              10/5/10 163    7.2      7.2    B G
a(        Deleted by DORL                                                          Date:                                              Y            Closed                        Closed              ML101720589, Item Responder:                                                                                                          No 15 164    7.2      7.2    r gl        FSAR section 7.2.2.2(20) has been revised to include the plant          Responder: Perkins                                  Y            Closed                        Closed              ML101720589, Item  TVA Letter dated Item No. 8 sent to DORL 7511                        computer as a means to provide information read out for all signals                                                                                                                          No 16 and EICB      10/5/10 165    7.2      7.2    B G
a(        FSAR section 7.2.2.3.2, last paragraph of this section has been          Responder: Clark                                    Y            Closed                        Closed              ML101720589, Item  TVA Letter dated deleted The basis for this deletion is that discussion regarding the                                                                                                                        No 17              10/5/10 166    7.2      7.2    B G
a(        Changes to FSAR section 7.2.2.2(20) are justified based on the          Responder: Clark                                    Y            Closed                        Closed              ML101720589, Item  TVA Letter dated statement that the integrated computer system is implemented                                                                                                                                No 18              10/5/10 167    7.2      7.2    B G
a(        FSAR section 7.2.2.4, provide an analysis or reference to chapter        Responder: Clark                                    Y            Close                        closed              ML101720589, Item  TVA Letter dated 15 analysis which demonstrate that failure of rod stop during a rod                                                                                                                          No 19              10/5/10 168    7.2      7.2    B G
a(        FSAR table 7.2-4, item 9 deleted loss of offsite power to station        Responder: Clark                                    Y            Close                        Closed              ML101720589, Item  TVA Letter dated auxiliaries (station blackout) based on the fact that station blackout                                                                    Response provided in letter                        No 20              10/5/10 169                      B G
a(        6/18/2010                                                                Responder: Clark                                    Y            Closed                        Closed 170                      B G
a(        6/17/2010                                                                Responder: Clark                                    Y            Closed                        Closed 171    7.2      7.2    B G
a(        6/17/2010                                                                Responder: Craig                                    Y            Closed                        Closed              EICB RAI            TVA Letter dated Closed to SE Open Item ML102910008        10/21/10 172                      B G
a(        6/17/2010                                                                Responder: Craig                                    Y            Closed                        Closed              EICB RAI ML102910008 173    7.1      7.1    B G
a(        6/17/2010                                                                Responder: Craig/Webb/Powers                        Y            Closed                        Closed              EICB RAI ML102910008 174                      B G
a(        6/28/2010                                                                Responder: Hilmes/Craig                            Y            Closed                        Closed              EICB RAI ML102910008 175                      B G
a(        June 28, 2010                                                            Responder:                                          Y            Closed                        Closed              EICB RAI ML102910008 176    7.1      7.1    B G
a(        6/28/2010                                                                Responder: Craig/Webb                              Y            Closed                        Closed              EICB RAI ML102910008 177    7.5.2.1  7.5.1  M a(
r        7/15/2010                                                                Responder: Clark                                    Y            Closed                        Closed              N/A                TVA Letter dated RAI not required 10/5/10 178    7.5.2.1  7.5.1  M a(
r        7/15/2010                                                                Responder: Clark                                    Y            Closed                        Closed              N/A                TVA Letter dated RAI not required 10/5/10 179                      B C
a(        An emphasis is placed on traceability in System Requirements            Responder: WEC                                      Y            Closed                        Closed              N/A - Closed to    NA Specifications in the SRP in the unmodified IEEE std 830-1993                                                                                                                                Item No 142 180                      B C
a(        The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide          Responder: WEC                                      Y            Closed                        Closed              N/A - Closed to    NA 1 172 endorses with a few noted exceptions IEEE Std 830-1993                                                                                                                                Item No 142 181                      B C
a(        An emphasis is placed on traceability in System Requirements            Responder: WEC                                      Y            Closed                        Closed              N/A - Closed to    NA Specifications in the SRP in the unmodified IEEE std 830-1993                                                                                                                                Item No 142 182                      B C
a(        Characteristics that the SRP states that a Software Requirements        Responder: WEC                                      Y            Closed                        Closed              N/A - Closed to    NA Specifications should have include unambiguity verifiability and                                                                                                                            Item No 142 183                                7/15/2010                                                                Responder: WEC                                      Y            Open                          Open-TVA/WEC        EICB RAI            TVA Letter dated EICB                                                                                                                                                                                                ML102980066 Item    10/21/10 (Carte)  An emphasis is placed on traceability in System Requirements      The generic Software Requirements Specification applies               Response provided in letter  Due 12/3/10          No. 9              Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements                 dated 10/21/10                                                        No. 4 and even more so given the modifications to the standard listed in Specification.                                                                                       NNC 11/18/10: The


dated 10/21/10 Open-TVA/WEC 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         rad22EA6.docx                                                                                 Open Items to be Resolved for SER Approval
 
Due 12/3/10
 
NNC 11/18/10:  The EICB RAI ML102980066 Item
 
No. 9 TVA Letter dated 10/21/10  Item
 
No. 4 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" 
 
On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document" referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?


===Response===
SE      FSAR      NRC No.                                                                      Issue                                                      TVA Response(s)                    Acceptable      Status/ Current Actions      Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec.      POC                                                                                                                                              Y/N Regulatory Guide 1.172, which breaks with typical NRC use of the                                                                                                          point behind this open word should to say Each identifiable requirement in an SRS                                                                                                              item was that TVA must must be traceable backwards to the system requirements and the                                                                                                            demonstrate that the design bases or regulatory requirements that is satisfies                                                                                                                origin of each requirement in the On page 1-2 of the Post Accident Monitoring Systems Software                                                                                                              WEC requirements Requirements Specification in the background section, is the                                                                                                              specification is known sentence Those sections of the above references that require                                                                                                              and documented. TVA modification from the generic PAMS are defined in the document                                                                                                            stated that this referring purely to the changes from WNA-DS-01617-WBT Post                                                                                                                information would be in Accident Monitoring System-System Requirements Specification                                                                                                              CQ PAMS LTR Rev. 2.
or is it saying that there are additional changes beyond those and that the SRS defines them?
If there are additional changes, what is their origin?
If there are additional changes, what is their origin?
point behind this open item was that TVA must demonstrate that the origin of each
184                 B C
 
a(                    7/15/2010                                                           Responder: WEC                                           Y           Closed                         Closed                   N/A - Closed to N/A Item No 142 185                                        7/15/2010                                                            Responder: WEC                                            N           Open                          Open-TVA/WEC              EICB RAI EICB (Carte)
requirement in the WEC requirements specification is known and documented. TVA
ML102980066 Item An emphasis is placed on the traceability of requirements in     Steve Clark to look at how to combine traceability items.                                                Due (1) 12/3/10          No. 17 Software Requirements Specifications in the SRP, in the                                                                                                                       (2) _________
 
unmodified IEEE std 830-1993, and even more so given the         Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172,   audit.                                                                                                  NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say                                                                                                             point behind this open Each identifiable requirement in an SRS must be traceable                                                                                                                 item was that TVA must backwards to the system requirements and the design bases or                                                                                                               demonstrate that the regulatory requirements that is satisfies Also the NRC considers                                                                                                         origin of each that the SRS is the complete set of requirements used for the                                                                                                              requirement in the design of the software, whether it is contained within one                                                                                                                 WEC requirements document or many. In order to evaluate an SRS against the                                                                                                                 specification is known guidance in the SRP the staff needs access to all the                                                                                                                     and documented. TVA requirements.                                                                                                                                                             stated that this information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring                                                                                                           CQ PAMS LTR Rev. 2.
stated that this
Systems Software Requirements Specification are various types                                                                                                             (2) TVA also said it of Reusable Software Element.                                                                                                                                         would provide a RTM for the RSED These references are used in the body of the SRS, for example:
 
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]
information would be in CQ PAMS LTR Rev. 2.
184   B (C a 7/15/2010 Responder: WEC Y Closed Closed N/A - Closed to Item No 142 N/A  185  EICB (Carte) 7/15/2010
 
An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or  
 
regulatory requirements that is satisfies"    Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the  
 
requirements.  
 
References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".  
 
These references are used in the body of the SRS, for example:"
 
R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]  
 
They are also included via tables such as found in requirement R7.1.2-1
They are also included via tables such as found in requirement R7.1.2-1
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?   If so what is their  
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?
 
186    7.7.8  7.7.1.12  D a(              7/15/2010                                                            Responder: Perkins/Clark                                  Y            Closed                        Closed                    EICB RAI No.6      TVA Letter dated ML102910017        10/5/10 187                        EICB            By letter dated June 18, 2010, TVA docketed responses to NRC        Responder: Merten                                        N           Open                           Open-TVA/WEC             ML101970033, Item  TVA Letter dated Are these connections already (Carte          requests for information.                                                                                                                                                                            No. 1 & 2          10/5/10         docketed?
origin? Responder: WEC
                              )
 
: 1) Please refer to the revised response to letter dated                Partial Response provided in   Due 12/22/10
Steve Clark to look at how to combine traceability items.
Was addressed to during the 9/15 meeting and 9/20 - 9/21
 
audit. N Open Open-TVA/WEC Due (1) 12/3/10         (2) _________
NNC 11/18/10
: (1)The point behind this open item was that TVA must demonstrate that the origin of each requirement in the WEC requirements specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.
(2) TVA also said it would provide a RTM for the RSED EICB RAI ML102980066 Item


No. 17  186 7.7.8 7.7.1.12 (D a 7/15/2010 Responder: Perkins/Clark Y Closed  Closed EICB RAI No.6 ML102910017 TVA Letter dated 10/5/10  187  EICB (Carte) By letter dated June 18, 2010, TVA docketed responses to NRC requests for information.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                          rad22EA6.docx                                                                                    Open Items to be Resolved for SER Approval


Responder: Merten
===Response===
: 1) Please refer to the revised response to letter dated N Open Partial Response provided in Open-TVA/WEC Due 12/22/10 ML101970033, Item No. 1 & 2 TVA Letter dated 10/5/10 Are these connections already docketed?
SE     FSAR     NRC No.                                                                     Issue                                                         TVA Response(s)                       Acceptable       Status/ Current Actions         Resolution Path     RAI No. & Date     RAI Resp. Date                 Comments Sec.      Sec. POC                                                                                                                                                  Y/N
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115).                                        letter dated 10/5/10 did not identify any connection from the PAMS Operator Modules                                                                                                                     Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45.                                  NNC 8/25/10: Why did TVA not WBT Rev. 1 - ML101680578) shows a TCP connection from the                                                                                        catch this on the review of the OMs to the plant computer and printer. Please explain.                                                                                           PAMS SysRS or SRS? Does TVA check that the CQ PAMS
: 1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, did not identify any connection from the PAMS Operator Modules (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617-WBT Rev. 1 - ML101680578) shows a TCP connection from the OMs to the plant computer and printer. Please explain.
: 2) Please clarify whether any digital safety-related systems or                                                                                 system meets the requirements components have a digital communications path to non-safety-                                                                                     in its purchase specifications?
: 2) Please clarify whether any digital safety-related systems or components have a digital communications path to non-safety-related systems or with safety related systems in another division. If so, NRC staff will need these paths identified on the docket.
related systems or with safety related systems in another division.
10/5/10 Item 18 (RAI Matrix item 115).
If so, NRC staff will need these paths identified on the docket.
: 2) This is a duplicate of closed RAI Matrix Item 45.
188                      B C
letter dated 10/5/10 NNC 8/25/10: Why did TVA not catch this on the review of the  
a(              By letter dated June 30, 2010, TVA docketed, Tennessee Valley          Responder: Clark                                            Y            Closed                            Closed                ML101970033, Item    TVA Letter dated Authority (TVA) Watts Bar Unit 2 (WBN2) - Post-Accident                                                                                                                                                  No 3 & 4            10/5/10 189              7.6.7    B S
in(              7/20/2010                                                              Responder: Clark                                            Y            Closed                            Closed                RAI No. 3            TVA Letter dated ML102980005          10/5/10 190    7.9              B S
in(              FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981              Responder: Clark                                            Y            Closed                            Closed                RAI No. 4            TVA Letter dated  Closed to OI-331.
Loose-Part Detection Program for the Primary System of Light-                                                                                                                                          ML102980005          10/5/10 191    7.9              B C
a(              NUREG-0800 Chapter 7, Section 7.9, "Data Communication                  Responder: Jimmie Perkins                                  Y            Closed                            Closed                ML10197016, Item     TVA Letter dated Systems" contains review criteria for data communication systems                                                                                                                                        Nos 1-3              10/5/10 192    7.5.1.1  7.5.2  M a(
r              The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section              Responder: Clark                                            Y            Closed                            Closed                Item No. 1 sent to  TVA Letter dated  EICB RAI ML1028618855 sent to 7 5 Instrumentation Systems Important to Safety  to review the                                                                                                                                        DORL 7/20/2010      10/5/10            DORL 193    7.5.1.1  7.5.2  M a(
r              The WBU2 FSAR, Section 7.5.2, Plant Computer System,                  Responder: Clark                                            Y            Closed                            Closed                Item No. 2 sent to  TVA Letter dated  EICB RAI ML1028618855 sent to contains three subsections                                                                                                                                                                              DORL 7/20/2010      10/5/10            DORL 194    7.5.1.1  7.5.2.1 M a(
r              The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display                Responder: Costley/Norman                                  Y            Closed                            Closed                Item No. 3 sent to  TVA Letter dated  EICB RAI ML1028618855 sent to 1                              System  contains a description of the Safety Parameter Display                                                                                                                                          DORL 7/20/2010      10/5/10            DORL 195    7.5.1.1  7.5.2.2 M a(
r              Bypassed and Inoperable Status Indication (BISI)                        Responder: Costley/Norman                                  Y            Closed                            Closed                Item No. 4 sent to  TVA Letter dated  EICB RAI ML1028618855 sent to 2                                                                                                                                                                                                                                        DORL 7/20/2010      10/5/10            DORL 196    7.5.1.1  7.5.2.2 M a(
r              Bypassed and Inoperable Status Indication (BISI)                       Responder: Costley/Norman                                  Y            Closed                            Closed                Item No. 5 sent to  TVA Letter dated  EICB RAI ML1028618855 sent to 2                                                                                                                                                                                                                                        DORL 7/20/2010      10/5/10            DORL 197                        X              Open Item 197 was never issued.                                                                                                    Y            Closed                            Closed 198    7.5.1.1  7.5.2.2 M a(
r              SRP Section 7.5, Subsection III, Review Procedures states: Responder: Costley/Norman                                              Y            Closed                            Closed                Item No. 6 sent to  TVA Letter dated  EICB RAI ML1028618855 sent to 2                               Recommended review emphasis for BISI                                                                                                                                                                    DORL 7/20/2010      10/5/10            DORL 199    7.5.1.1  7.5.2.3 M a(
r              The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman                                              Y            Closed                            Closed                Item No. 7 sent to  TVA Letter dated  Related SE Section 7.5.5.3 EICB RAI 3                              Nuclear Data Links  contains a description of the Technical                                                                                                                                            DORL 7/20/2010      10/5/10            ML1028618855 sent to DORL 200      7.2                              7/21/2010                                                    Responder: Clark                                                      Y            Closed                            Closed                EICB RAI             TVA Letter dated 73                                                                                            The statement in SER Section 7 5 1 is supported by the                                                                                      ML102980066 Item     10/5/10 201    7.7.1.1  7.7.11  B C
a(              7/21/2010                                                    Responder: Webb                                                        Y            Closed                            Closed                EICB RAI            TVA Letter dated 1                                                                                                                                                                                                                                        ML102980066 Item    10/5/10 202    7.5.2                            7/22/2010                                                              Responder: WEC                                              N            Open                              Open-TVA/WEC          EICB RAI            TVA Letter dated EICB (Carte)
ML102980066 Item    10/5/10 The letter (ML0003740165) which transmitted the Safety                  Revision 1 of the Licensing Technical Report will provide                Partial Response provided in      Due 12/3/10          No. 4 Evaluation for the Common Q topical report to Westinghouse              more detailed information on the changes to the platform.                letter dated 10/5/10 stated: "Should our criteria or regulations change so that our                                                                                                                    Licensing Technical conclusions as to the acceptability of the report are invalidated, CE  Rev. 2 of the Licensing Technical Report will include the                                                  Report R2 Nuclear Power and/or the applicant referencing the topical report      applicability of guidance.
will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
203    7.5.1.1  7.5.2  M a(
r              7/26/2010                                                              Responder: Clark                                            Y            Closed                            Closed                EICB RAI            TVA Letter dated  EICB RAI ML102861885 sent to DORL ML102861885 Item    10/5/10 204    7.5.1.1  7.5.2  M a(
r              7/26/2010                                                              Responder: Costley/Norman                                  Y            Closed                            Closed                EICB RAI            TVA Letter dated  EICB RAI ML102861885 sent to DORL NRC to issue formal  ML102861885 Item    10/5/10 205                      B G
a(              7/26/2010                                                              Responder: Clark                                            Y            Closed                            Closed                EICB RAI            TVA Letter dated  Question B related to prior NRC ML102910008          10/5/10            approval of this system or 50 59


PAMS SysRS or SRS?  Does TVA check that the CQ PAMS system meets the requirements in its purchase specifications?
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         rad22EA6.docx                                                                                         Open Items to be Resolved for SER Approval
Revise Response 188  B (C a By letter dated June 30, 2010, TVA docketed, "Tennessee Valley Authority (TVA) Watts Bar Unit 2 (WBN2)
- Post-Accident Responder: Clark Y Closed  Closed  ML101970033, Item No 3 & 4 TVA Letter dated 10/5/10  189  7.6.7 B (S in 7/20/2010 Responder: Clark Y Closed  Closed  RAI No. 3 ML102980005 TVA Letter dated 10/5/10  190 7.9  B (S in FSAR Table 7.1-1 states: "Regulatory Guide 1.133, May 1981 "Loose-Part Detection Program for the Primary System of Light
-Responder: Clark Y Closed  Closed  RAI No. 4 ML102980005 TVA Letter dated 10/5/10 Closed to OI-331.
191 7.9  B (C aNUREG-0800 Chapter 7, Section 7.9, "Data Communication Systems" contains review criteria for data communication systems Responder: Jimmie Perkins Y Closed  Closed ML10197016, Item Nos 1-3 TVA Letter dated 10/5/10  192 7.5.1.1 7.5.2 (M a rThe NRC Staff is using SRP (NUREG-0800) Chapter 7 Section 75 "Instrumentation Systems Important to Safety
" to review the Responder: Clark Y Closed  Closed  Item No. 1 sent to DORL 7/20/2010 TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 193 7.5.1.1 7.5.2 (M a rThe WBU2 FSAR, Section 7.5.2, "Plant Computer System,"
contains three su bsections Responder: Clark Y Closed  Closed  Item No. 2 sent to DORL 7/20/2010 TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 194 7.5.1.1 1 7.5.2.1 (M a rThe WBU2 FSAR Section 7.5.2.1, "Safety Parameter Display System" contains a description of the Safety Parameter Display Responder: Costley/Norman Y Closed  Closed  Item No. 3 sent to DORL 7/20/2010 TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 195 7.5.1.1 2 7.5.2.2 (M a rBypassed and Inoperable Status Indication (BISI)
Responder: Costley/Norman Y Closed  Closed  Item No. 4 sent to DORL 7/20/2010 TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 196 7.5.1.1 2 7.5.2.2 (M a rBypassed and Inoperable Status Indication (BISI)
Responder: Costley/Norman Y Closed  Closed  Item No. 5 sent to DORL 7/20/2010 TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 197  X Open Item 197 was never issued.
Y Closed Closed    198 7.5.1.1 2 7.5.2.2 (M a rSRP Section 7.5, Subsection III, "Review Procedures" states:  Recommended review emphasis for BISI Responder: Costley/Norman Y Closed  Closed  Item No. 6 sent to DORL 7/20/2010 TVA Letter dated 10/5/10 EICB RAI ML1028618855 sent to DORL 199 7.5.1.1 3 7.5.2.3 (M a rThe WBU2 FSAR Section 7.5.2.3, "Technical Support Center and Nuclear Data Links
" contains a description of the Technical Responder: Costley/Norman Y Closed  Closed  Item No. 7 sent to DORL 7/20/2010 TVA Letter dated 10/5/10 Related SE Section 7.5.5.3 EICB RAI ML1028618855 sent to DORL 200 7.2 73  7/21/2010 Responder: Clark The statement in SER Section 751 is supported by the Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10  201 7.7.1.1 1 7.7.11 B (C a 7/21/2010 Responder: Webb Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10  202 7.5.2  EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation."  Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.
Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.
 
Rev. 2 of the Licensing Technical Report will include the applicability of guidance.
N Open  Partial Response provided in letter dated 10/5/10 Open-TVA/WEC Due 12/3/10
 
Licensing Technical Report R2 EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10  203 7.5.1.1 7.5.2 (M a r 7/26/2010 Responder: Clark Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 204 7.5.1.1 7.5.2 (M a r 7/26/2010 Responder: Costley/Norman Y Closed  Closed NRC to issue formal EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 205  B (G a 7/26/2010 Responder: Clark Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/5/10 Question B related to prior NRC approval of this system or 5059 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 206 7.5.1.1 7.5.2 (M a r 7/27/2010 Responder: Clark Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/5/1 0 EICB RAI ML102861885 sent to DORL 207  B (C aJuly 27, 2010 Date:  Responder:
Y Closed Closed    208 7.5.2.1 7.5.1 (M a r 7/27/2010 Responder: Clark Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 (M a r 7/27/2010 Responder: Clark Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 (M a r 7/27/2010 Responder: Clark Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 211 7.5.1.1 752  B (C a 7/27/2010 Responder: Clark Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10 Relates to SE Sections: 755 Plant Computer 212 7.5.2  EICB (Carte) 7/27/2010 By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification
 
contain information to address the "Design Report on Computer Integrity, Test and Calibration..."  The staff has reviewed these documents, and it is not clear how this is the case. 


===Response===
SE      FSAR      NRC No.                                                                    Issue                                                        TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                    Y/N 206    7.5.1.1  7.5.2  M a(
r              7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI        TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 207                      B C
a(              July 27, 2010                                                        Date:                                                          Y            Closed                          Closed Responder:
208    7.5.2.1  7.5.1  M a(
r              7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated  EICB RAI ML102861885 sent to DORL ML102861885 Item  10/5/10 209    7.5.2.1  7.5.1  M a(
r              7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated  EICB RAI ML102861885 sent to DORL ML102861885 Item  10/5/10 210    7.5.2.1  7.5.1  M a(
r              7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated  EICB RAI ML102861885 sent to DORL ML102861885 Item  10/5/10 211    7.5.1.1          B C
a(              7/27/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated  Relates to SE Sections:
752                                                                                                                                                                                                                                            ML102980066 Item  10/5/10            7 5 5 Plant Computer 212    7.5.2                            7/27/2010                                                            Responder: WEC                                                  N            Open                            Open-TVA/WEC              EICB RAI EICB (Carte)
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated                Application specific requirements for testing. This cannot be                                                Due 12/10/10              No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system          addressed in a topical report. Evaluation of how the design specification and software requirements specification          hardware meets the regulatory requirements.                                                                  To be addressed by contain information to address the "Design Report on Computer                                                                                                                      WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these      WEC to provide the information and determine where the documents, and it is not clear how this is the case.                  information will be located.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
Responder: WEC Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements. 
213    7.5.2                              7/27/2010                                                            Responder: WEC                                                 N           Open                             Open-NRC Review          EICB RAI EICB (Carte)
 
ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated               Conformance with IEEE 603 is documented in the revised                      Response is included in letter  Due 12/31/10.            No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system         Common Q PAMS Licensing Technical Report and the                            dated 10/25/10 design specification and software requirements specification         Common Q PAMS System Design Specification.
WEC to provide the information and determine where the information will be located.
contain information to address the "Theory of Operation                                                                                           NNC to review and revise this Description." The staff has reviewed these documents, and it is      Attachment 1 contains the proprietary version of                            question after LTR R2 is not clear how this is the case. The docketed material does not       Westinghouse document Tennessee Valley Authority                            received.
N Open Open-TVA/WEC Due 12/10/10 To be addressed by WBN2 specific test plan EICB RAI ML102980066 Item No. 10  213 7.5.2  EICB (Carte) 7/27/2010
appear to contain the design basis information that is required to   (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603.                     System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604         WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.
 
(2) Please provide a regulatory evaluation of how the PAMs           Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory   Westinghouse document Nuclear Automation Watts Bar 2 of operation.                                                         NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the         Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents     DS-01667-WBT, Rev. 2 dated September 2010.
By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.
identified demonstrate compliance with this clause?
(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS. (2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory  
214                      B C
 
a(              7/27/2010                                                            Responder: WEC                                                 Y            Closed                          Closed                    EICB RAI        TVA Letter dated ML102980066 Item 10/5/10 215                      L P
of operation. For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?
o(              7/29/2010                                                            Responder: WEC                                                  Y            Closed                          Closed 216    7.5.1.1  7.5.2  M a(
Responder: WEC  
r              7/29/2010                                                            Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item  10/5/10 217                      B G
 
a(               7/6/2010                                                              Responder: Clark                                                Y            Close                            Closed                    EICB RAI          TVA Letter dated ML102910008        7/30/10 218                      B G
Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.  
a(               7/6/2010                                                              Responder: Clark                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated ML102910008        7/30/10 219                      B G
 
a(               8/4/2010                                                              Responder: TVA Licensing                                       Y            Closed                          Closed                    EICB RAI ML102910008 220                      B G
contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.
a(              8/4/2010                                                             Responder: Ayala                                                Y            Closed                          Closed                    EICB RAI          TVA Letter dated ML102910008        10/5/10 221    7.7.1.2  7.7.1.3 M a(
N Open  Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.
r              8/4/2010                                                              Responder: Trelease                                            Y            Closed                          Closed                    EICB RAI          TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item   10/5/10
Open-NRC Review
 
Due 12/31/10.
EICB RAI ML102980066 Item  


No. 18  214  B (C a 7/27/2010 Responder: WEC Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10  215  L (P o 7/29/2010 Responder: WEC Y Closed Closed    216 7.5.1.1 7.5.2 (M a r 7/29/2010 Responder: Clark Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 217  B (G a 7/6/2010  Responder: Clark Y Close Closed EICB RAI ML102910008 TVA Letter dated 7/30/10  218  B (G a 7/6/2010  Responder: Clark Y Closed  Closed EICB RAI ML102910008 TVA Letter dated 7/30/10  219  B (G a 8/4/2010  Responder: TVA Licensing Y Closed  Closed EICB RAI ML102910008 220  B (G a 8/4/2010  Responder: Ayala Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/5/10  221 7.7.1.2 7.7.1.3 (M a r 8/4/2010  Responder: Trelease Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                    rad22EA6.docx                                                                                      Open Items to be Resolved for SER Approval


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 222   B (G a 8/4/2010 Responder: Clark Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 223   B (G a 8/4/2010 Responder: Clark Y Closed Closed EICB RAI ML102910008 224 7.5.1.1 7.5.2 (M a r 8/4/2010 Responder: Norman (TVA CEG)
===Response===
Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 225   B (G a 8/4/2010 Responder: Scansen Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 226   B (C a 8/4/2010 Responder: TVA Licensing Y Closed Closed N/A - Information requested under TVA Letter dated 8/11/10 See also Open Item Nos. 41 & 270.
SE     FSAR   NRC No.                                                                 Issue                                                       TVA Response(s)                           Acceptable       Status/ Current Actions         Resolution Path     RAI No. & Date     RAI Resp. Date                     Comments Sec.      Sec. POC                                                                                                                                                  Y/N 222                     B G
227   B (G a 8/4/2010 Responder: Clark Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 228   B (C a 8/4/2010 Responder: Clark Y Closed   Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10 229   B (C a 8/4/2010 Responder: Clark Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10 230   B (C a 8/4/2010 Responder: Webb Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10 231   B (G a 8/4/2010 Responder: Clark Y Closed Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 232   B (S in 8/4/2010 Responder: Clark Y Closed Closed RAI No. 5 ML102980005 TVA Letter dated 10/5/10 233   B (C a 8/4/2010 Responder: Clark Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10 234   B (C a 8/4/2010 Responder:
a(              8/4/2010                                                           Responder: Clark                                               Y           Close                             Closed               EICB RAI           TVA Letter dated ML102910008        10/5/10 223                     B G
Y Closed Closed N/A - Duplicate Item N/A 235   B (G a 8/4/2010 Responder: TVA Licensing Y Closed Closed N/A N/A 236   B (G a 8/4/2010 Responder: Clark Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 237   B (C a 8/4/2010 Responder: Clark Y Closed Closed EICB RAI ML102980066 Item TVA Letter dated 10/5/10 238   B (C a 8/4/2010 Responder: Webb/Hilmes Y Closed Closed N/A - Duplicate Item N/A 239   B (C a 8/4/2010 Responder: Hilmes Y Closed Closed N/A - Meeting request N/A 240   B (G a 8/4/2010 Responder: Clark Y Close Closed Ml102910008 Item#29 TVA Letter dated 10/5/10 241   B (S in 8/4/2010 Responder: Davies Y Closed Closed RAI No. 10 ML102980005 TVA Letter dated 10/5/10 242   B (G a 8/4/2010 Responder: Hilmes Y Close Closed EICB RAI ML102910008 TVA Letter dated 10/5/10 243   B (C a 8/3/2010 Responder: WEC Y Closed Closed N/A - Closed to Item No 142 N/A  244  EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processe s or additional project specific information for the ...SCMP...shall be specified in the PQP.  
a(              8/4/2010                                                           Responder: Clark                                               Y           Closed                           Closed               EICB RAI ML102910008 224   7.5.1.1   7.5.2   M a(
r             8/4/2010                                                           Responder: Norman (TVA CEG)                                   Y           Closed                           Closed               EICB RAI           TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item    10/5/10 225                     B G
a(              8/4/2010                                                           Responder: Scansen                                             Y           Close                             Closed               EICB RAI           TVA Letter dated ML102910008        10/5/10 226                     B C
a(              8/4/2010                                                           Responder: TVA Licensing                                       Y           Closed                           Closed               N/A - Information   TVA Letter dated See also Open Item Nos. 41 & 270.
requested under    8/11/10 227                     B G
a(              8/4/2010                                                           Responder: Clark                                               Y           Close                             Closed               EICB RAI           TVA Letter dated ML102910008        10/5/10 228                     B C
a(              8/4/2010                                                           Responder: Clark                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated ML102980066 Item    10/5/10 229                     B C
a(              8/4/2010                                                           Responder: Clark                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated ML102980066 Item    10/5/10 230                     B C
a(              8/4/2010                                                           Responder: Webb                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated ML102980066 Item    10/5/10 231                     B G
a(              8/4/2010                                                           Responder: Clark                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated ML102910008        10/5/10 232                       B S
in(            8/4/2010                                                           Responder: Clark                                               Y           Closed                           Closed               RAI No. 5           TVA Letter dated ML102980005        10/5/10 233                     B C
a(              8/4/2010                                                           Responder: Clark                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated ML102980066 Item    10/5/10 234                     B C
a(              8/4/2010                                                           Responder:                                                     Y           Closed                           Closed               N/A - Duplicate     N/A Item 235                     B G
a(              8/4/2010                                                           Responder: TVA Licensing                                       Y           Closed                           Closed               N/A                 N/A 236                     B G
a(              8/4/2010                                                           Responder: Clark                                               Y           Close                             Closed               EICB RAI           TVA Letter dated ML102910008        10/5/10 237                     B C
a(              8/4/2010                                                           Responder: Clark                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated ML102980066 Item    10/5/10 238                     B C
a(              8/4/2010                                                           Responder: Webb/Hilmes                                         Y           Closed                           Closed               N/A - Duplicate     N/A Item 239                     B C
a(              8/4/2010                                                           Responder: Hilmes                                             Y           Closed                           Closed               N/A - Meeting       N/A request 240                     B G
a(              8/4/2010                                                           Responder: Clark                                               Y           Close                             Closed               Ml102910008         TVA Letter dated Item#29             10/5/10 241                       B S
in(            8/4/2010                                                           Responder: Davies                                             Y           Closed                           Closed               RAI No. 10         TVA Letter dated ML102980005        10/5/10 242                     B G
a(              8/4/2010                                                           Responder: Hilmes                                             Y           Close                             Closed               EICB RAI           TVA Letter dated ML102910008        10/5/10 243                     B C
a(              8/3/2010                                                           Responder: WEC                                                 Y           Closed                           Closed               N/A - Closed to     N/A Item No 142 244                                      8/3/2010                                                            Responder: WEC                                                N           Open                              Open-TVA/WEC        EICB RAI            Response is          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item    provided in letter  "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that         The process related requirements have been removed from                    Response is provided in letter    Due 12/22/10        No. 14              dated 10/25/10.      information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed   revision 2 of the Software Requirements Specification (SRS).                dated 10/25/10.                                                                                be docketed correspondence."
using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS       Attachment 3 of letter dated 10/25/10 contains the                          NNC 11/18/10: SysRS Rev. 2                                                                      LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing   proprietary version of Westinghouse document Nuclear                      also contains process                                                                          analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any   Automation, Watts Bar 2 NSSS Completion Program, I&C                        requirements that are more                                                                      requested should include technical alternatives to the SPM processes or additional project specific   Projects, Software Requirements Specification for the Post                  appropriately incorporated into                                                                information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP.       Accident Monitoring System, WNA-SD-00239-WBT,                              process documentation.                                                                          the NRC staff to make an independent Revision 2, Dated September 2010.                                                                                                                                          assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS                                                                                                                                                                                      of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements,                                                                                                                                                                                  requirements and the protection of for example all seventeen requirements in Section 2.3.2,                                                                                                                                                                                        public health and safety."


Contrary to these two statements in the SPM, the WBN2 PAMS SRS (ML101050202
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   rad22EA6.docx                                                                                            Open Items to be Resolved for SER Approval
) contains man y process related requirements, for example all seventeen requirements in Section 2.3.2, Responder: WEC


The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).
===Response===
Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.
SE    FSAR    NRC No.                                                                Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                                  Y/N "Configuration Control," address process requirements for configuration control.
N Open Response is provided in letter dated 10/25/10.  
Please explain how the above meets the intent of the approved SPM.
245                                  8/3/2010                                                            Responder: WEC                                                N            Open                              Open-TVA/WEC              EICB RAI                              LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item                      "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the                                                          Due 12/10/10              No. 119                              information relied upon in the SE must required test documentation for systems developed using the      SPM compliance matrix                                                                                                                                                            be docketed correspondence."
Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2                                                                                                                                                                                  LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1).                                                                                                                                                                                            analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
246                                  8/3/2010                                                            Responder: WEC                                                N            Open                              Open-NRC Review            EICB RAI        Response is          LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
ML102980066 Item provided in letter  "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM              As agreed ISG6 does not apply to the Common Q PAMS                        Response is provided in letter    Due 10/22/10              No. 15          dated 10/25/10      information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be          platform. The information required to address this question                dated 10/25/10                                                                                    be docketed correspondence."
developed. Many other section of the SPM identify that this PQP      concerning the PQP and SPM has been added to                                                                NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the      compliance matrix in revision 1 of the Licensing Technical                NNC 11/18/10: PQP has not        go to WEC Rockville                                              LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced,        Report.                                                                    been provided and CQ PAMS        Offices and look at                                              analysis that supports the change please describe the documentation produced and provide the                                                                                      LTR Rev. 1 does not contain      PQP to decide if it must                                        requested should include technical information that the SPM states should be in the PQP.                Attachment 1 of letter dated 10/25/10 contains the                         comparable information.          docketed.                                                        information in sufficient detail to enable proprietary version of Westinghouse document Tennessee                                                                                                                      the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-                                                                                                                        assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical                                                                                                                        of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October                                                                                                                        requirements and the protection of 2010                                                                                                                                                                         public health and safety."
247              B C
a(                  8/8/2010                                                            Responder: WEC                                                Y            Closed                            Closed                    EICB RAI        Response is          LIC-101 Rev. 3 Appendix B Section 4, ML102980066 Item provided in letter  "Safety Evaluation" states: "the 248              B C
a(                  8/8/2010                                                            Responder: WEC                                                Y            Closed                            Closed                                      Response is          LIC-101 Rev. 3 Appendix B Section 4, provided in letter  "Safety Evaluation" states: "the 249              B C
a(                  8/8/2010                                                            Responder: WEC                                                Y            Closed                            Closed                                                          LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the 250                                  8/8/2010                                                            Responder: WEC                                                N           Open                              Open-TVA/WEC                                                    LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
                                                                                                                                                                                                                                                                                        "Safety Evaluation" states: "the The SPM describes the software and documents that will be            Westinghouse develops Software Release Reports/Records                    Response included in letter      Due 12/22/10                                                    information relied upon in the SE must created and placed under configuration control. The SCMP (e.g.,      and a Configuration Management Release Report. Describe                    dated 10/25/10.                                                                                    be docketed correspondence."
SPM Section 6, Software Configuration Management Plan)            the documents and when they will be produced. Summarize                                                      10/25/10 is a partial describes the implementation tasks that are to be carried out. The  guidance on how to produce these records, focus on project                                                  response. Still waiting                                          LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the      specific requirements in SPM etc.                                                                            on Software Test Plan                                            analysis that supports the change tasks in the SCMP have been carried out in their entirety.                                                                                                                        and all other testing                                            requested should include technical Documentation should exist that shows that the configuration                                                                                                                      documentation.                                                  information in sufficient detail to enable management tasks for that activity group have been successfully                                                                                                                                                                                    the NRC staff to make an independent accomplished. Please provide information that shows that the CM                                                                                                                                                                                    assessment regarding the acceptability tasks have been successfully accomplished for each life cycle                                                                                                                                                                                      of the proposal in terms of regulatory activity group.                                                                                                                                                                                                                                    requirements and the protection of public health and safety."
251                                  8/8/2010                                                            Responder: WEC                                                N            Open                              Open-TVA/WEC                                                    LIC-101 Rev. 3 Appendix B Section 4, EICB                                                                                                                                                                                                                                                            "Safety Evaluation" states: "the (Carte)        The SPM describes the software testing and documents that will      The software testing performed and documents created are                  Partial response is provided in   Due 12/22/10.                                                    information relied upon in the SE must be created. The SPM also describes the testing tasks that are to    addressed by the SPM Compliance matrix contained in                        letter dated 10/25/10                                                                             be docketed correspondence."


NNC 11/18/10: SysRS Rev. 2 also contains process requirements that are more appropriately incorporated into process documentation.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                rad22EA6.docx                                                                                    Open Items to be Resolved for SER Approval
Open-TVA/WEC Due 12/22/10 EICB RAI ML102980066 Item


No. 14 Response is provided in letter  
===Response===
SE    FSAR    NRC No.                                                               Issue                                                    TVA Response(s)                        Acceptable      Status/ Current Actions      Resolution Path        RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec. POC                                                                                                                                              Y/N be carried out. The acceptance criterion for software test        Revision 1 of the Licensing Technical Report.                                                          10/25/10 is a partial implementation is that the tasks in the SPM have been carried out                                                                                                        response. Still waiting                                          LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that    Attachment 1 of the letter dated 10/25/10 contains the                                                on Software Test Plan                                            analysis that supports the change testing been successfully accomplished.                          Proprietary version of Westinghouses document titled:                                                and all other testing                                            requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2                                                    documentation.                                                  information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS),                                                                                                                        the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058-                                                                                                                  assessment regarding the acceptability WBT-P, Dated October 2010                                                                                                                                              of the proposal in terms of regulatory requirements and the protection of public health and safety."
252                                  8/8/2010                                                          Responder: WEC                                              N            Open                          Open-TVA/WEC                                                    LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)
                                                                                                                                                                                                                                                                                "Safety Evaluation" states: "the The SPM contain requirements for software requirements            Explain response to AP1000 audit report.                                Read ML091560352              Due 12/10/10                                                    information relied upon in the SE must traceability analysis and associated documentation (see Section  RTM docketed NRC awaiting V&V evaluation of RTM.                                                                                                                        be docketed correspondence."
5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability                                                                                                            Check on this Hilmes                                            LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished.                                                                                                                                                                                              analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
253              B C
a(                  8/8/2010                                                          Responder: Clark                                            Y            Closed                        Closed                                        TVA Letter dated Related to Open Item no. 83.
10/5/10 254              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    TVA Letter dated make documents      10/21/10 255              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    TVA Letter dated make documents      10/21/10 256              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    TVA Letter dated make documents      10/21/10 257              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    N/A make documents 258              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    N/A make documents 259              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    TVA Letter dated make documents      10/21/10 260              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    N/A make documents 261              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Closed to    TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:
Item No 142        8/20/10          "Design features and administrative 262              B C
a(                  8/10/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    N/A - Request to    N/A make documents 263              B C
a(                  8/11/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    ML101650255, Item Based on an examination of document available at the                                                                                                                                              No 2 264              B C
a(                  8/11/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    ML101650255, Item No 2 265              B C
a(                  8/11/2010                                                        Responder: WEC                                              Y            Closed                        Closed                    ML101650255, Item No 2 266              B C
a(                  8/11/2010                                                        Responder: Webb/Webber                                      Y            Closed                        Closed                                        TVA Letter dated 10/21/10 267              B C
a(                  8/11/2010                                                        Responder: WEC                                              Y            Closed                        Closed 268                                  8/19/2010                                                        Responder: WEC                                              N            Open                          Open-TVA/WEC EICB (Carte)        By letter dated March 12, 2010 (ML101680577), TVA stated that    11/18/10 Warren Odess-Gillett took action to discuss with                                              Due 12/22/10 the application specific hardware and software architecture      Design Engineering to generate a non-prop figure


dated 10/25/10. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         rad22EA6.docx                                                                                               Open Items to be Resolved for SER Approval
 
information relied upon in the SE must be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments "Configuration Control," address process requirements for configuration control.
Please explain how the above meets the intent of the approved
 
SPM. 245  EICB (Carte) 8/3/2010  Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the
 
NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).
Responder: WEC Relates to the commitment to provide the test plan and the SPM compliance matrix N Open Open-TVA/WEC Due 12/10/10 EICB RAI ML102980066 Item No. 119  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
 
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 246  EICB (Carte) 8/3/2010  Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.
Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS
 
platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report.
of letter dated 10/25/10 contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical
 
Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" N Open  Response is provided in letter
 
dated 10/25/10
 
NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain
 
comparable information.
Open-NRC Review Due 10/22/10
 
NNC 11/18/10: NRC to go to WEC Rockville Offices and look at PQP to decide if it must docketed.
EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
 
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 247  B (C a 8/8/2010  Responder: WEC Y Closed Closed EICB RAI ML102980066 Item Response is provided in letter LIC-101 Rev. 3 Appendix B Section 4, " Safety Evaluation
" states: " the 248  B (C a 8/8/2010  Responder: WEC Y Closed Closed  Response is provided in letter LIC-101 Rev. 3 Appendix B Section 4, " Safety Evaluation
" states: " the 249  B (C a 8/8/2010  Responder: WEC Y Closed  Closed  LIC-101 Rev. 3 Appendix B Section 4, " Safety Evaluation
" states: " the 250  EICB (Carte) 8/8/2010  The SPM describes the software and documents that will be created and placed under configuration control. The SCMP (e.g.,
SPM Section 6, "Software Configuration Management Plan")
describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.
Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.
Responder: WEC Westinghouse develops Software Release Reports/Records and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.
N Open  Response included in letter dated 10/25/10.
Open-TVA/WEC Due 12/22/10 10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."
 
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 251  EICB (Carte) 8/8/2010  The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to Responder: WEC The software testing performed and documents created are addressed by the SPM Compliance matrix  contained in N Open  Partial response is provided in
 
letter dated 10/25/10 Open-TVA/WEC Due 12/22/10.
LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
 
be docketed correspondence."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished. Revision 1 of the Licensing Technical Report.
Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled: 
 
"Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" 10/25/10 is a partial response. Still waiting on Software Test Plan and all other testing documentation.
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 252  EICB (Carte) 8/8/2010  The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.
Responder: WEC Explain response to AP1000 audit report.
RTM docketed NRC awaiting V&V evaluation of RTM.
N Open  Read ML091560352 Open-TVA/WEC Due 12/10/10 Check on this Hilmes  LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must
 
be docketed correspondence."
LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability
 
of the proposal in terms of regulatory
 
requirements and the protection of public health and safety." 253  B (C a 8/8/2010  Responder: Clark Y Closed  Closed  TVA Letter dated 10/5/10 Related to Open Item no. 83.
254  B (C a 8/10/2010 Responder: WEC Y Closed  Closed N/A - Request to make documents TVA Letter dated 10/21/10  255  B (C a 8/10/2010 Responder: WEC Y Closed  Closed N/A - Request to make documents TVA Letter dated 10/21/10  256  B (C a 8/10/2010 Responder: WEC Y Closed  Closed N/A - Request to make documents TVA Letter dated 10/21/10  257  B (C a 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to make documents N/A  258  B (C a 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to make documents N/A  259  B (C a 8/10/2010 Responder: WEC Y Closed  Closed N/A - Request to make documents TVA Letter dated 10/21/10  260  B (C a 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to make documents N/A  261  B (C a 8/10/2010 Responder: WEC Y Closed Closed N/A - Closed to Item No 142 TVA Letter dated 8/20/10 LIC-110 Rev. 1 Section 6.2.2 states:
" Design features and administrative 262  B (C a 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to make documents N/A  263  B (C a 8/11/2010 Based on an examination of document available at the Responder: WEC Y Closed Closed ML101650255, Item No 2  264  B (C a 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item No 2  265  B (C a 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item No 2  266  B (C a 8/11/2010 Responder: Webb/Webber Y Closed Closed  TVA Letter dated 10/21/10  267  B (C a 8/11/2010 Responder: WEC Y Closed Closed    268  EICB (Carte) 8/19/2010 By letter dated March 12, 2010 (ML101680577), TVA stated that the application specific hardw are and software architecture Responder: WEC 11/18/10 Warren Odess-Gillett took action to discuss with Design Engineering to generate a non-prop figure N Open Open-TVA/WEC Due 12/22/10
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).


===Response===
SE      FSAR    NRC No.                                                                    Issue                                                        TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date      RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                                      Y/N descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.
Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.
269   L (P o 8/20/2010 Responder: NRC Y Closed Closed N/A N/A 270   B (C a 8/23/2010 Responder: Clark Y Closed Closed   See also Open Item Nod. 41 & 245.
269                       L P
271   B (C a 8/23/2010 Responder: WEC Y Closed Closed N/A - Closed to Item No 142 NA  272 7.5.2.1 7.5.1 (M a r 8/26/2010 Responder: Clark Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/21/10 EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a r 8/26/2010 Responder: Clark Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/5/10 EICB RAI ML102861885 sent to DORL 274.a 7.5.2.1 7.5.1 (M a r 8/26/2010 Responder: Clark Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/21/10 EICB RAI ML102861885 sent to DORL 274.b   EICB (Singh) 8/26/2010 Loose Parts Monitoring System: TR 3.3 refers to section 4.4.6 of the FSAR for description of the loose parts monitoring system. However, this section of the FSAR is not available. TVA to check the reference and respond.
o(              8/20/2010                                                               Responder: NRC                                               Y           Closed                           Closed                     N/A                 N/A 270                       B C
Responder: Clark The reference will be changed to FSAR section 7.6.7 Loose Part Monitoring System (LPMS) System Description in next revision of the Technical Requirements Manual as shown below: 1. Watts Bar FSAR, Section 7.6.7, "Lose Part Monitoring System.(Note: Bechtel I&C to submit TRM change package to TVA Licensing.)
a(              8/23/2010                                                               Responder: Clark                                             Y           Closed                           Closed                                                             See also Open Item Nod. 41 & 245.
Y Open Response provided in letter dated 10/21/10 Open-TVA/Bechtel Due  __________
271                       B C
Pending TRM amendment submittal.
a(              8/23/2010                                                               Responder: WEC                                               Y           Closed                           Closed                     N/A - Closed to     NA Item No 142 272     7.5.2.1   7.5.1   M a(
Response acceptable.
r             8/26/2010                                                               Responder: Clark                                             Y           Closed                           Closed                     EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item    10/21/10 273     7.5.2.1   7.5.1   M a(
TVA to complete stated action. RAI No. 6 ML102980005 10/26/2010 TVA Letter dated 10/21/10 Enclosure 1 Item No. 12  275   B (S in 8/27/2010 Responder: Clark Y Closed Closed Not Required Answer exists in N/A  276 7.6 7.6 EICB (Garg) 8/27/2010
r             8/26/2010                                                               Responder: Clark                                             Y           Closed                           Closed                     EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item    10/5/10 274.a 7.5.2.1     7.5.1   M a(
 
r             8/26/2010                                                               Responder: Clark                                             Y           Closed                           Closed                     EICB RAI             TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item    10/21/10 274.b                                     8/26/2010                                                              Responder: Clark                                              Y            Open                            Open-TVA/Bechtel            RAI No. 6            TVA Letter dated EICB (Singh)
In order for the staff to review the effects of multi control systems failure, provide the summary of the analyses documenting the effect on the plant based on the followin g events:
ML102980005          10/21/10 Loose Parts Monitoring System: TR 3.3 refers to section 4.4.6 of       The reference will be changed to FSAR section 7.6.7 Loose                  Response provided in letter      Due __________              10/26/2010          Enclosure 1 Item the FSAR for description of the loose parts monitoring system.         Part Monitoring System (LPMS) System Description in next                  dated 10/21/10                                                                    No. 12 However, this section of the FSAR is not available. TVA to check       revision of the Technical Requirements Manual as shown                                                     Pending TRM the reference and respond.                                              below:                                                                                                     amendment submittal.
(1) loss of power to all control systems powered by a single power supply; (2) failure of each instrument sensor which provides signal to two or more control systems; (3) Break of any sensor impulse line which is used for sensors providing signals to two or more control systems; and (4) failure of digital system based on the common cause software failure affecting two or more control systems. For each of these events, confirm that the consequences of these events will not be outside chapter 15 analyses or beyond the capability of operators or safety systems.
: 1. Watts Bar FSAR, Section 7.6.7, Lose Part Monitoring                                                   Response acceptable.
Responder: Webb
System.                                                                                               TVA to complete stated action.
 
(Note: Bechtel I&C to submit TRM change package to TVA Licensing.)
The NRC reviewer confirmed this question applies to non-safety systems. 
275                       B S
 
in(            8/27/2010                                                               Responder: Clark                                             Y           Closed                           Closed                     Not Required         N/A Answer exists in 276     7.6       7.6                   8/27/2010                                                              Responder: Webb                                              Y            Open                            Open-TVA/Bechtel            EICB RAI            TVA Letter dated EICB (Garg)
The Distributed Control System (DCS) implemented using Foxboro I/A hardware, replaces most of the non-safety related control systems for WBN Unit 2. The other non-safety-related control systems within the scope of this
ML102910008          10/21/10 In order for the staff to review the effects of multi control systems                                                                             Response provided in letter      Due 11/24/10                Item#60              Enclosure 1 Item failure, provide the summary of the analyses documenting the           The NRC reviewer confirmed this question applies to non-                  dated 10/21/10                                                                    No. 13 effect on the plant based on the following events: (1) loss of power   safety systems.                                                                                              TVA to provide to all control systems powered by a single power supply; (2)                                                                                       Response Acceptable. 11/17/10 justification for non-failure of each instrument sensor which provides signal to two or       The Distributed Control System (DCS) implemented using                                                        safety system other more control systems; (3) Break of any sensor impulse line which       Foxboro I/A hardware, replaces most of the non-safety                                                        than DCS.
 
is used for sensors providing signals to two or more control           related control systems for WBN Unit 2. The other non-                    TVA changed the response in systems; and (4) failure of digital system based on the common         safety-related control systems within the scope of this                    the latest writeup. The scope of The statement that cause software failure affecting two or more control systems. For       question are:                                                              the question applies to all non failure of sense line each of these events, confirm that the consequences of these                                                                                       safety related control systems where more than one events will not be outside chapter 15 analyses or beyond the           a. Rod Control - Failures of this system are addressed in               and is not limited to just three transmitter is connected capability of operators or safety systems.                                  FSAR Chapter 15.                                                     system listed by the TVA. TVA would be bounded by
question are:
: b. Main Turbine Electro-Hydraulic Control System                         could use to envelope other        the failure of a single control systems by Unit 1          transmitter does not The following provides the requested summaries for the four               analysis if they applies to Unit 2 make sense.
: a. Rod Control - Failures of this system are addressed in FSAR Chapter 15.
events listed:                                                             systems also.
: b. Main Turbine Electro-Hydraulic Control System The following provides the requested summaries for the four events listed:
TVA needs to make a (1) The (DCS) segmentation analysis submitted on TVA                                                         statement that all non-letter to NRC dated August 11, 2010, Enclosure 2                                                         safety control systems (Reference 7) demonstrates that the loss of any single                                                   have been evaluated power source does not result in a loss of any DCS                                                         against these criteria function. The other systems within the scope of this                                                     and have determined
 
(1) The (DCS) segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) demonstrates that the loss of any single power source does not result in a loss of any DCS function. The other systems within the scope of this Y Open Response provided in letter dated 10/21/10
 
Response Acceptable. 11/17/10 TVA changed the response in the latest writeup. The scope of the question applies to all non safety related control systems and is not limited to just three system listed by the TVA. TVA could use to envelope other control systems by Unit 1 analysis if they applies to Unit 2 systems also.
Open-TVA/Bechtel Due 11/24/10 TVA to provide justification for non-safety system other than DCS.
 
The statement that
 
failure of sense line where more than one transmitter is connected would be bounded by
 
the failure of a single transmitter does not make sense.
 
TVA needs to make a
 
statement that all non-safety control systems have been evaluated


against these criteria
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   rad22EA6.docx                                                                                       Open Items to be Resolved for SER Approval
 
and have determined EICB RAI ML102910008 Item#60 TVA Letter dated 10/21/10  Item No. 13 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments question are configured in the same manner as Unit 1, with redundant power sources such that the failure of a single power source does not cause a loss of function.
(2) Signals shared by more than one control function within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function. The impact of a loss of signal to the other systems within the scope of this question is bounded b y the loss of that signal to the individual system and has the same effect as for Unit 1.
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identif y multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions impacted by a sense line failure. 


===Response===
SE    FSAR    NRC No.                                        Issue                              TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path        RAI No. & Date    RAI Resp. Date    Comments Sec. Sec. POC                                                                                                    Y/N question are configured in the same manner as Unit 1,                                                  that their failure does with redundant power sources such that the failure of a                                                not have consequences single power source does not cause a loss of function.                                                which will put the plant outside chapter 15 (2) Signals shared by more than one control function                                                        analyses.
within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function.
The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.
(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions impacted by a sense line failure.
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1
(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems within the scope of this question are analog and therefore this question is not applicable.
). The other s y stems within the scope of this question are analog and therefore this question is not applicable.
All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.
TVA Response to Follow-up NRC Request:
All non-safety related control systems were reviewed in the context of this question. Only those control systems (i.e. the Distributed Control System (DCS), Rod Control and the Main Turbine Electro-hydraulic Control System) previously discussed in the TVA to NRC letter dated October 21, 2010 (Reference 3) are within the scope of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.
277    7.6    7.6.3  B G
a(    8/27/2010                    Responder: Clark                                                Y            Close                        Closed                    EICB RAI          TVA Letter dated ML102910008      10/29/10 278    7.6    7.6.6  B G
a(    8/27/2010                    Responder: Trelease                                              Y            Close                        Closed                    EICB RAI          TVA Letter dated ML102910008      10/21/10


All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                        rad22EA6.docx                                                                                          Open Items to be Resolved for SER Approval


===Response===
SE    FSAR      NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path          RAI No. & Date    RAI Resp. Date                    Comments Sec. Sec.      POC                                                                                                                                                      Y/N 279    7.6      7.6.6  B G
a(              8/27/2010                                                              Responder: Mather                                                Y            Close                        Closed                      EICB RAI            TVA Letter dated ML102910008        10/21/10 280    7.6      7.6.6  B G
a(              8/27/2010                                                              Responder: Trelease                                              Y            Close                        Closed                      EICB RAI            TVA Letter dated ML102910008        10/21/10 281    7.6      7.6.8                  8/27/2010                                                              Responder: Webb                                                  Y            Close                        Close                      EICB RAI            TVA Letter dated EICB (Garg)
ML102910008        10/29/10 For FSAR Section 7.6.8 in amendment 96, redline version has            Attachment 5 contains the WBN Unit 2 FSAR markup for                          Response provided in letter  Due 11/24/10                Item#65            Enclosure 1 Item completely rewritten this section of the FSAR, however, the staff is  Section 7.6.8, Interlocks for RCS Pressure Control During                    dated 10/29/10                                                                No. 16 not able to determine any changes made to the section. Explain        Low Temperature Operation, showing what was changed                                                        Provide the basis for what changes have been made to this FSAR Section.                      between Amendments 95 and 96.                                                                                the changes. Look at Foxboro I/A impact.
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
All non-safety related control systems were reviewed in the context of this question. Only those control systems (i.e. the Distributed Control System (DCS), Rod Control and the Main Turbine Electro-hydraulic Control System) previously discussed in the TVA to NRC letter dated October 21, 2010 (Reference 3) are within the scope of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.
The interlock for the RCS Pressure Control for Unit 2 is implemented differently than Unit 1 implementation. There are no differences between Unit 1 and Unit 2 interlocks, operation of interlocks and operator interface for operation of the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once signals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.
that their failure does not have consequences which will put the plant outside chapter 15 analyses.  
282    7.6      7.6.9  B G
a(              8/27/2010                                                              Responder: Trelease                                              Y            Close                        Closed                      EICB RAI            TVA Letter dated Response is acceptable                                    ML102910008        10/21/10 283    7.7.5    XX      D a(            8/27/2010                                                              Responder: Clark                                                  Y            Closed                        Closed                      EICB RAI No.13      TVA Letter dated    This item is a follow-up question to item ML102910017        10/29/10            96 284    7.7.3    7.4.1    D a(            8/27/2010                                                              Responder: Webber                                                Y            Closed                        Closed                      EICB RAI No.14      TVA Letter dated    This item is a follow-up question to item ML102910017        10/21/10            123 285    7.3.3    7.3      D a(            8/27/2010                                                              Responder: McNeil                                                Y            Closed                        Closed                      EICB RAI No.15      TVA Letter dated    This item is a follow-up question to item ML102910017        10/29/10            22 286    7.7.3  9.3.4.2. D a(            8/27/2010                                                              Responder: Webber                                                Y            Closed                        Closed                      EICB RAI No.16      TVA Letter dated 4                                                                                                                                                                                                                                    ML102910017        10/21/10 Item No 287    7.3      7.3-1    D a(            8/27/2010                                                              Responder: Elton                                                  Y            Closed                        Closed                      ML102390538, Item  Response No 1 9/10/10 and    received in 11 288    7.3                              9/2/2010                                                               Responder: McNeil                                                Y            Close                        Close                      EICB RAI EICB (Garg)
ML102910008 (1) Can we add a section to chapter 7 giving a brief overview of the (1) and (2) The following new section and reference will be                                                    Due 11/24/10                Item#67 Foxboro Spec 200 in Section 7.3?                                    added to the WBN Unit 2 FSAR as part of Amendment 102:                          TVA committed to adding a description of the Foxboro    TVA should include the Additional Clarification provided by the NRC                              7.3.1.1.3 Analog Instrumentation                                            Spec 200 hardware at the      list of all the functions 10/12 NRC Public Meeting. where Spec 200 is (2) TVA should include the list of all the functions where Spec 200      The miscellaneous safety-related analog process control                                                  used and discuss is used and discuss differences between unit 1 and unit 2. (3) This      and indication loops are made up of discrete analog                                                      differences between discussion should also include loops which are currently used for        modules that have been tested and qualified for use in                                                    unit 1 and unit2. This Unit 1 operation (4) If Spec 200 components have also been                safety related systems. The various components have                                                      discussion should also qualified to RG 1.209, it should be stated and if not why not.            been qualified to IEEE Standard 323-1983 (R-1996) IEEE                                                    include loop which are Standard for Qualifying Class IE Equipment for Nuclear                                                    currently used for Unit 1 Power Generating Stations, IEEE Standard 344-1987 (R-                                                    operation If Spec 200 1993) IEEE Standard Recommended Practices for                                                            components have also Seismic Qualification of Class IE Equipment for Nuclear                                                  been qualified to RG Power Generating Stations, and IEEE Standard 384-1984                                                    1.209, it should be (R-1992) IEEE Standard Criteria for Independence of                                                      stated and if not why Class IE Equipment and Circuits. The modules are                                                          not.
 
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                    rad22EA6.docx                                                                Open Items to be Resolved for SER Approval


277 7.6 7.6.3 B (G a 8/27/2010 Responder: Clark Y Close  Closed EICB RAI ML102910008 TVA Letter dated 10/29/10  278 7.6 7.6.6 B (G a 8/27/2010 Responder: Trelease Y Close  Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 279 7.6 7.6.6 B (G a 8/27/2010 Responder: Mather Y Close  Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10  280 7.6 7.6.6 B (G a 8/27/2010 Responder: Trelease Y Close  Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10  281 7.6 7.6.8 EICB (Garg) 8/27/2010 For FSAR Section 7.6.8 in amendment 96, redline version has completely rewritten this section of the FSAR, however, the staff is not able to determine any changes made to the section. Explain what changes have been made to this FSAR Section.
===Response===
Responder: Webb Attachment 5 contains the WBN Unit 2 FSAR markup for Section 7.6.8, "Interlocks for RCS Pressure Control During Low Temperature Operation," showing what was changed between Amendments 95 and 96.
SE   FSAR   NRC No.                                       Issue                               TVA Response(s)                         Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                     Y/N arranged in instrument loops to provide the safety functions listed below:
TVA Response to Follow-up NRC Request:
* Turbine driven AFW Pump Flow Control
The interlock for the RCS Pressure Control for Unit 2 is implemented differently than Unit 1 implementation. There are no differences between Unit 1 and Unit 2 interlocks, operation of interlocks and operator interface for operation of the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once si g nals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.
* Motor driven AFW pump differential pressure indication and recirculation valve control
Y Close  Response provided in letter dated 10/29/10 Close  Due 11/24/10 Provide the basis for the changes. Look at Foxboro I/A impact.
* Steam generator AFW flow and level indication and control
EICB RAI ML102910008 Item#65 TVA Letter dated 10/29/10 Enclosure 1 Item No. 16  282 7.6 7.6.9 B (G a 8/27/2010 Responder: Trelease Y Close Response is acceptable Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10  283 7.7.5 XX (D a 8/27/2010 Responder: Clark Y Closed  Closed  EICB RAI No.13 ML102910017 TVA Letter dated 10/29/10 This item is a follow-up question to item 96  284 7.7.3 7.4.1 (D a 8/27/2010 Responder: Webber Y Closed Closed EICB RAI No.14 ML102910017 TVA Letter dated 10/21/10 This item is a follow-up question to item 123 285 7.3.3 7.3 (D a 8/27/2010 Responder: McNeil Y Closed  Closed EICB RAI No.15 ML102910017 TVA Letter dated 10/29/10 This item is a follow-up question to item 22 286 7.7.3 9.3.4.2.4 (D a 8/27/2010 Responder: Webber Y Closed  Closed EICB RAI No.16 ML102910017 TVA Letter dated 10/21/10 Item No 287 7.3 7.3-1 (D a 8/27/2010 Responder: Elton Y Closed  Closed ML102390538, Item No 1 9/10/10 and Response received in 11 288 7.3  EICB (Garg) 9/2/2010  (1) Can we add a section to chapter 7 giving a brief overview of the Foxboro Spec 200 in Section 7.3?
* Containment Pressure indication
Additional Clarification provided by the NRC (2) TVA should include the list of all the functions where Spec 200 is used and discuss differences between unit 1 and unit 2.  (3) This discussion should also include loops which are currently used for Unit 1 operation  (4) If Spec 200 components have also been qualified to RG 1.209, it should be stated and if not why not.
* Upper and Lower Compartment Containment Ambient Temperature indication
Responder: McNeil (1) and (2) The following new section and reference will be added to the WBN Unit 2 FSAR as part of Amendment 102:
* RHR Heat Exchanger CCS Supply Header Flow
7.3.1.1.3 Analog Instrumentation The miscellaneous safety-related analog process control and indication loops are made up of discrete analog modules that have been tested and qualified for use in safety related systems. The various components have been qualified to IEEE Standard 323-1983 (R-1996
* Sample Heat Exchanger Header CCS Differential Flow
) IEEE Standard for Qualifying Class IE Equipment for Nuclear Power Generating Stations, IEEE Standard 344-1987 (R-1993) IEEE Standard Recommended Practices for Seismic Qualification of Class IE Equipment for Nuclear Power Generating Stations, and IEEE Standard 384-1984 (R-1992) IEEE Standard Criteria for Independence of Class IE Equipment and Circuits. The modules are Y Close  TVA committed to adding a description of the Foxboro Spec 200 hardware at the 10/12 NRC Public Meeting.
* ERCW Strainer Differential Pressure, Backwash and Flush Control
Close  Due 11/24/10 TVA should include the list of all the functions where Spec 200 is used and discuss differences between unit 1 and unit2. This discussion should also include loop which are currentl y used for Unit 1 operation  If Spec 200 components have also been qualified to RG 1.209, it should be stated and if not why not. EICB RAI ML102910008 Item#67 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments arranged in instrument loops to provide the safety functions listed below:
* CCS Heat Exchanger B Inlet Pressure
Turbine driven AFW Pump Flow Control Motor driven AFW pump differential pressure indication and recirculation valve control Steam generator AFW flow and level indication and control Containment Pressure indication Upper and Lower Compartment Containment Ambient Temperature indication RHR Heat Exchanger CCS Supply Header Flow   Sample Heat Exchanger Header CCS Differential Flow ERCW Strainer Differential Pressure, Backwash and Flush Control CCS Heat Exchanger B Inlet Pressure CCS Surge Tank Level Control CCS Heat Exchanger B Outlet Temperature   Reactor Vessel Head Vent Throttle Manual Loading Station (Unit 2 Only) EGTS Annulus Differential Pressure Control The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, S eparation/Isolation. (Unit 2 Only) Two IE analog modules are used to isolate IE to Non-IE signals. These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.
* CCS Surge Tank Level Control
EMI testing and acceptance by TVA of the Foxboro Spec 200 hardware is documented in Reference [8].  
* CCS Heat Exchanger B Outlet Temperature
* Reactor Vessel Head Vent Throttle Manual Loading Station (Unit 2 Only)
* EGTS Annulus Differential Pressure Control The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation. (Unit 2 Only) Two IE analog modules are used to isolate IE to Non-IE signals. These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.
EMI testing and acceptance by TVA of the Foxboro Spec 200 hardware is documented in Reference [8].


==References:==
==References:==


(8) Invensys Process Systems Document No. 800063-1830, "Electromagnetic Compatibility Test Reports," dated August 21, 2008, Rev. 0.
(8) Invensys Process Systems Document No. 800063-1830, Electromagnetic Compatibility Test Reports, dated August 21, 2008, Rev. 0.
(2) As agreed to by TVA and the NRC reviewer, the level of detail necessary to describe the differences between Unit 1 and Unit 2 is down to the specific hardware manufacturer. This level of detail was agreed to not be appropriate in Chapter 7 which discusses the functions and design requirements for the plant control systems. The hardware manufacturer level of detail is addressed in Chapter 3.10 which describes the qualification of the specific hardware for safety related functions.   (3) While not specifically identified as such, loops in service for Unit 1 (Essential Raw Cooling Water etc.) are described in the FSAR chapters describing the systems the loops serve.   (4) Reg. Guide 1.209, "Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Plants," is not applicable to the analog Foxboro Spec 200 hardware.
(2) As agreed to by TVA and the NRC reviewer, the level of detail necessary to describe the differences between Unit 1 and Unit 2 is down to the specific hardware manufacturer.
289  B (S in 9/2/2010  Responder: Faulkner Y Closed  Closed  - Response acceptable RAI No. 24 ML102980005 TVA Letter dated 10/21/10  290  7.7 B (C a 9/7/2010  Responder: Clark Y Closed Closed N/A N/A This item is a duplicate of item 291.
This level of detail was agreed to not be appropriate in Chapter 7 which discusses the functions and design requirements for the plant control systems. The hardware manufacturer level of detail is addressed in Chapter 3.10 which describes the qualification of the specific hardware for safety related functions.
291  7.7 B (C a 9/7/2010  Responder: Clark Y Closed Closed  TVA Letter dated 10/21/10  292 7.2.5 7.2 B (G a 9/7/2010  Responder: Craig Y Closed  Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10  293 7.7.4 7.2.2.3.5 (M a r 9/8/2010  Responder: Craig Y Closed  Closed  EICB RAI ML102861885 Item TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.1 (D a 9/9/2010  Responder: Elton Y Closed Closed ML102390538, Item No 2 9/10/10 Response received in 11 295 7.3 7.3.1.1.2 (D a 9/9/2010  Responder: Elton Y Closed Closed ML102390538, Item No 3 9/10/10 Response received in 11 296 7.3 7.3.1.2.1 (D a 9/9/2010  Responder: Elton Y Closed Closed ML102390538, Item No 4 9/10/10 Response received in 11 297 7.3 7.3.1.2.2 (D a 9/9/2010  Responder: Elton Y Closed Closed ML102390538, Item No 5 9/10/10 Response received in 11 298 7.3 XX (D a 9/9/2010  Responder: Clark Y Closed Closed ML102390538, Item No 6 9/10/10 Response received in 11 299  B (C aProvide Common Q Software Requirements Specification Post Accident Monitoring System 00000
(3) While not specifically identified as such, loops in service for Unit 1 (Essential Raw Cooling Water etc.) are described in the FSAR chapters describing the systems the loops serve.
-ICE-3238 Rev 5 Attachment 41 of the 10/5 letter contains the Common Q Software Requirements Specification Post Accident Y Closed  Closed  TVA Letter dated 10/5/10  300  EICB (Singh) Need Radiation Monitoring System Description/Design Criteria Are detectors different from Unit 1. Describe any differences.
(4) Reg. Guide 1.209, Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power
 
Are there any commercially dedicated parts in the RM-1000?  If so, how are they dedicated?


Please confirm that digital communication ports available in RM-
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad22EA6.docx                                                                                        Open Items to be Resolved for SER Approval


1000 are not used. Responder: Temples/Mather (1) The Radiation Monitoring Design Criteria Document, WB-DC-40-24, Revision 21 is contained in Attachment 6 to letter dated October 31, 2010.
===Response===
(2) Attachment 7 contains the General Atomics detector differences report.
SE    FSAR      NRC No.                                                                    Issue                                                  TVA Response(s)                        Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                  Comments Sec. Sec.      POC                                                                                                                                            Y/N Plants, is not applicable to the analog Foxboro Spec 200 hardware.
The containment high range radiation monitors are loops 271-274.
289                    B S
(3) For safety-related applications, General Atomics Electronic Systems, Inc. supplies the RM-1000 module assembly as a Basic Component. This assembly does contain component parts that are Safety-Related Commercial Grade Items (SRCGI). Because these SRCGI components are assembled into the delivered Basic Component, they are dedicated to the assembly by virtue of the acceptance test of the full RM-1000 assembly. Safety-related commercial grade items are dedicated in accordance with General Atomics approved 10 CFR 50 Appendix B program.
in(              9/2/2010                                                        Responder: Faulkner                                          Y            Closed                          Closed                RAI No. 24              TVA Letter dated
(4) The digital communications ports on the safety-related RM-1000 radiation monitors are not used.
                                                                                                                                                                                                                    - Response acceptable ML102980005              10/21/10 290              7.7  B C
a(                9/7/2010                                                        Responder: Clark                                            Y            Closed                          Closed                N/A                      N/A              This item is a duplicate of item 291.
291              7.7  B C
a(                9/7/2010                                                        Responder: Clark                                            Y            Closed                          Closed                                        TVA Letter dated 10/21/10 292    7.2.5    7.2  B G
a(                9/7/2010                                                        Responder: Craig                                            Y            Closed                          Closed                    EICB RAI            TVA Letter dated ML102910008        10/21/10 293    7.7.4  7.2.2.3.M a(
r                9/8/2010                                                        Responder: Craig                                            Y            Closed                          Closed                    EICB RAI            TVA Letter dated EICB RAI ML102861885 sent to DORL 5                                                                                                                                                                                                                            ML102861885 Item    10/29/10 294    7.3    7.3.1.1. D a(            9/9/2010                                                        Responder: Elton                                            Y            Closed                          Closed                    ML102390538, Item  Response 1                                                                                                                                                                                                                            No 2 9/10/10        received in 11 295    7.3    7.3.1.1. D a(            9/9/2010                                                        Responder: Elton                                            Y            Closed                          Closed                    ML102390538, Item  Response 2                                                                                                                                                                                                                            No 3 9/10/10        received in 11 296    7.3    7.3.1.2. D a(            9/9/2010                                                        Responder: Elton                                            Y            Closed                          Closed                    ML102390538, Item  Response 1                                                                                                                                                                                                                            No 4 9/10/10        received in 11 297    7.3    7.3.1.2. D a(            9/9/2010                                                        Responder: Elton                                            Y            Closed                          Closed                    ML102390538, Item  Response 2                                                                                                                                                                                                                            No 5 9/10/10        received in 11 298    7.3      XX      D a(            9/9/2010                                                        Responder: Clark                                            Y            Closed                          Closed                    ML102390538, Item  Response No 6 9/10/10        received in 11 299                    B
(
C a                Provide Common Q Software Requirements Specification Post        Attachment 41 of the 10/5 letter contains the Common Q      Y            Closed                          Closed                                        TVA Letter dated Accident Monitoring System 00000-ICE-3238 Rev 5                  Software Requirements Specification Post Accident                                                                                                        10/5/10 300                                      Need Radiation Monitoring System Description/Design Criteria    Responder: Temples/Mather                                   Y            Open                            Open-TVA/GA                RAI No. 25          TVA Letter dated ML102980005        10/29/10 Are detectors different from Unit 1. Describe any differences.    (1) The Radiation Monitoring Design Criteria Document,                   Response is included in letter  Due 11/24/10              10/26/2010          Enclosure 1 Item WB-DC-40-24, Revision 21 is contained in Attachment                 dated 10/29/10                                                                  No. 20 Are there any commercially dedicated parts in the RM-1000? If so,    6 to letter dated October 31, 2010.                                                                   TVA to address the how are they dedicated?                                                                                                                                                    following comments:
(2) Attachment 7 contains the General Atomics detector Please confirm that digital communication ports available in RM-      differences report. The containment high range                                                       (1) Is it Att. 5 or Att.
1000 are not used.                                                    radiation monitors are loops 271-274.                                                                     6?
(2) Pl. confirm that (3) For safety-related applications, General Atomics                                                           HRRMs are loops Electronic Systems, Inc. supplies the RM-1000 module                                                       271-274.
assembly as a Basic Component. This assembly does                                                     (3) TVA to clarify that contain component parts that are Safety-Related                                                           GA has a Commercial Grade Items (SRCGI). Because these                                                             commercial EICB (Singh)
SRCGI components are assembled into the delivered                                                         dedication Basic Component, they are dedicated to the assembly                                                       program in place by virtue of the acceptance test of the full RM-1000                                                       and that GA is an assembly. Safety-related commercial grade items are                                                       approved dedicated in accordance with General Atomics                                                               10CFR50, App. B approved 10 CFR 50 Appendix B program.                                                                    supplier.
App B does not (4) The digital communications ports on the safety-related                                                     address RM-1000 radiation monitors are not used.                                                                  commercial grade dedication .
TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
General Atomics Electronics Systems, Inc. is an approved 10 CFR 50 Appendix B supplier. They have a commercial grade dedication program.
Revised response General Atomics Electronics Systems, Inc. is an approved                                                       is acceptable.
Y Open  Response is included in letter
10 CFR 50 Appendix B supplier. They have a commercial                                                           Please submit grade dedication program.                                                                                      response.
(4) Response acceptable.


dated 10/29/10
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                        rad22EA6.docx                                                                                        Open Items to be Resolved for SER Approval


Open-TVA/GA Due 11/24/10 TVA to address the following comments:
===Response===
(1) Is it Att. 5 or Att.
SE    FSAR    NRC No.                                                                Issue                                                          TVA Response(s)                            Acceptable      Status/ Current Actions          Resolution Path      RAI No. & Date    RAI Resp. Date    Comments Sec. Sec. POC                                                                                                                                                          Y/N 301                                  1.TVA is requested to address the consequences of software                Responder: WEC/Davies/Clark                                      N            Open                           Open-TVA/WEC              RAI No. 11        TVA Letter dated common cause failure including all potential resulting failures (i.e.                                                                                                                                            ML102980005      10/29/10 total loss of CERPI, system fail as-is).                                  TVA Partial Response:                                                        Partial response in 10/29 letter. Due 11/24/10           10/26/2010        Enclosure 1 Item No. 21
6? (2) Pl. confirm that HRRMs are loops 271-274. (3) TVA to clarify that GA has a commercial dedication program in place and that GA is an approved 10CFR50, App. B supplier.
: 2. In addition, address how the actions stipulated in the plant          For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15,                                                    1)  Please address Technical Specifications will be taken when the CERPI system              no credit is taken for the rod position indication system. For                                                    how fail-as-is is indications are lost. Information notice IN 2010-10 (ML100080281)        all continuous rod withdrawal accidents analyzed in WBN                                                            detected i.e.
App B does not address commercial grade dedication .
addresses the need to consider software failures and the actions          Unit 2 FSAR, Chapter 15, no credit is taken for any rod                                                            alarms, rod required to assure that the plant will stay within its licensing basis. stop/block.                                                                                                        position deviation alarms, etc.
Revised response is acceptable.
: 3. Provide FMEA in support of your response.                        (1) Technical Specification 3.1.8, Rod Position Indication,                                                        2)   Response does not have an action for total loss of indication;                                                              acceptable.
Please submit response.
: 4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock    therefore, a total loss of CERPI puts the plant into LCO                                                      3)  Response C-11 to block automatic rod withdrawal when 1/1 Control Bank D          3.0.3 which states:                                                                                                acceptable.
(4) Response acceptable. RAI No. 25 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Enclosure 1 Item
rod position is above setpoint. This interlock capability would be                                                                                                                      4)   a. Response lost in case of total loss of CERPI. How is the rod block assured        When an LCO is not met and the associated ACTIONS                                                                  acceptable.
for this event?                                                          are not met, an associated ACTION is not provided, or if                                                            b. Pl. address directed by the associated ACTIONS the unit shall be                                                                failure mode on
: 5. How is automatic rod withdrawal affected in case of total loss of    placed in a MODE or other specified condition in which                                                              fail-as-is.
signals from the CERPI to the ICS? Is this interlock fail safe?          the LCO is not applicable. Action shall be initiated within                                                        5) Response 1 hour to place the unit, as applicable, in:                                                                        acceptable.
6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the                                                                                                                          6) Response rod position indicator channel is 5% of span (7.2 inches). The                MODE 3 within 7 hours;                                                                                        acceptable.
CERPI system accuracy specified in the CERPI System                            MODE 4 within 13 hours; and requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12                    MODE 5 within 37 hours.                                                                                  TVA to address steps or 5.19%. The specified system accuracy seems to be                                                                                                                                common cause failure greater than the accuracy assumed in the FSAR Chapter 15.                Exceptions to this Specification are stated in the                                                              as stated under Please clarify this anomaly.                                            individual Specifications. Where corrective measures                                                            response item 2.
EICB (Singh) are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions                                                                  Please explain how required by LCO 3.0.3 is not required.                                                                         various alarms will continue to annunciate (2) CERPI common mode software failure                                                                        on software lockup?
Need better Description of the CERPI systems installed at Watts                                                      explanation to Bar (Unit 1 & 2):                                                                                        understand the rationale behind the Each Programmable Logic Controller (PLC),                                                                  response.
Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod position information is provided to the OMs in the main control room via redundant data links. Each train (PLC, MTP, and OM) is electrically isolated from the other train.
Communications within a CERPI train (PLC, MTP, and OM) are continuously monitored. If communication is interrupted, this condition is annunciated to the operator in the control room. The MTP and OM display screens have rotating cursors in the upper right-hand corner of the display to indicate that the system is operating.
History of CERPI:
The basic PLC software associated with the CERPI system has been in use for over ten years. The first plant to utilize the CERPI PLC software was Beaver Valley. In 2003, the CERPI software was deployed with interfaces to the Common Q MTP and OM interfaces


No. 20 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 301  EICB (Singh) 1.TVA is requested to address the consequences of software common cause failure including all potential resulting failures (i.e. total loss of CERPI, system fail as-is).
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                   rad22EA6.docx                                                                 Open Items to be Resolved for SER Approval
: 2. In addition, address how the actions stipulated in the plant Technical Specifications will be taken when the CERPI system indications are lost. Information notice IN 2010-10 (ML100080281
) addresses the need to consider software failures and the actions required to assure that the plant will stay within its licensing basis.
: 3. Provide FMEA in support of your response.
: 4. FSAR Table 7.7-1, Plant Control S ystem Interlocks lists interlock C-11 to block automatic rod withdrawal when 1/1 Control Bank D rod position is above setpoint. This interlock capability would be lost in case of total loss of CERPI. How is the rod block assured for this event?
: 5. How is automatic rod withdrawal affected in case of total loss of signals from the CERPI to the ICS?  Is this interlock fail safe?


6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the rod position indicator channel is 5% of span (7.2 inches). The CERPI system accuracy specified in the CERPI System requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 steps or 5.19%. The specified system accuracy seems to be greater than the accuracy assum ed in the FSAR Chapter 15. Please clarify this anomaly.
===Response===
 
SE    FSAR   NRC No.                                       Issue                             TVA Response(s)                         Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                    Y/N within the systems for Surry Units 1 & 2, and Watts Bar Unit 1. In 2009, the Watts Bar Unit 1 CERPI system was modified to allow for two independent trains of CERPI. The Watts Bar Unit 2 CERPI system is based on the Unit 1 design. Only the detectors and the detector interface boards are not redundant within the Watts Bar CERPI systems.
Responder: WEC/Davies/Clark TVA Partial Response:
For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for the rod position indication system. For all continuous rod withdrawal accidents analyzed in WBN Unit 2 FSAR, Chapter 15, no credit is taken for any rod stop/block.
(1) Technical Specification 3.1.8, Rod Position Indication, does not have an action for total loss of indication; therefore, a total loss of CERPI puts the plant into LCO 3.0.3 which states:
When an LCO is not met and the associated ACTIONS are not met, an associated ACTION is not provided, or if directed by the associated ACTIONS the unit shall be placed in a MODE or other specified condition in which the LCO is not applicable. Action shall be initiated within 1 hour to place the unit, as applicable, in:
MODE 3 within 7 hours; MODE 4 within 13 hours; and MODE 5 within 37 hours.
Exceptions to this Specification are stated in the individual Specifications. Where corrective measures are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions required by LCO 3.0.3 is not required.
(2) CERPI common mode software failure Description of the CERPI systems installed at Watts Bar (Unit 1 & 2):
Each Programmable Logic Controller (PLC), Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod position information is provided to the OMs in the main control room via redundant data links. Each train (PLC, MTP, and OM) is electrically isolated from the other train. Communications within a CERPI train (PLC, MTP, and OM) are continuously monitored. If communication is interrupted, this condition is annunciated to the operator in the control room. The MTP and OM display screens have rotating cursors in the upper right-hand corner of the display to indicate that the system is operating.
History of CERPI:
The basic PLC software associated with the CERPI system has been in use for over ten years. The first plant to utilize the CERPI PLC software was Beaver Valley. In 2003, the CERPI software was deployed with interfaces to the Common Q MTP and OM interfaces N Open  Partial response in 10/29 letter.
 
Open-TVA/WEC Due 11/24/10
: 1) Please address how fail-as-is is detected i.e.
alarms, rod position deviation alarms, etc.
: 2) Response acceptable.
: 3) Response acceptable.
: 4) a. Response acceptable.
: b. Pl. address failure mode on fail-as-is.
: 5) Response acceptable.
: 6) Response acceptable.
TVA to address common cause failure as stated under response item 2.
Please explain how various alarms will continue to annunciate on software lockup?
Need better explanation to understand the rationale behind the response. RAI No. 11 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Enclosure 1 Item No. 21 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments within the systems for Surry Units 1 & 2, and Watts Bar Unit 1. In 2009, the Watts Bar Unit 1 CERPI system was modified to allow for two independent trains of CERPI. The Watts Bar Unit 2 CERPI system is based on the Unit 1 design. Only the detectors and the detector interface boards are not redundant within the Watts Bar CERPI systems.
CERPI Software Failure Analysis With regard to the CERPI system software:
CERPI Software Failure Analysis With regard to the CERPI system software:
The software used on PLC-A is identical to that used on PLC-B. The software used on MTP-A is identical to that used on MTP-B   The software used on OM-A is identical to that used on OM-B.
* The software used on PLC-A is identical to that used on PLC-B.
* The software used on MTP-A is identical to that used on MTP-B
* The software used on OM-A is identical to that used on OM-B.
A common cause failure affecting the software of one CERPI train would affect the other train as well.
A common cause failure affecting the software of one CERPI train would affect the other train as well.
Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm). A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.
Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm).
A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.
A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.
A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.
(3) There is no FMEA for the CERPI system.
(3) There is no FMEA for the CERPI system.
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:
(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.
: a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   rad22EA6.docx                                                                                   Open Items to be Resolved for SER Approval
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are "active low" requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal. Additionally, Annunciator window 64F will annunciate to show "C-11 BANK D AUTO WITHDRAWAL BLOCKED."
 
===Response===
SE     FSAR   NRC No.                                                                 Issue                                                     TVA Response(s)                             Acceptable       Status/ Current Actions         Resolution Path   RAI No. & Date     RAI Resp. Date               Comments Sec.      Sec. POC                                                                                                                                                  Y/N
: b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal.
Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertaint y , the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:
"The resolution of the rod position indicator channel is +/- 12 steps. Deviation of any RCCA from its group by twice this distance (24 st eps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications."
The resolution of the rod position indicator channel is +/-
12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.
302 7.5.2.1 7.5.1 (M a r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 (M a r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 (M a r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 (M a r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI ML102861885 Item TVA Letter dated 10/29/10 EICB RAI ML102861885 sent to DORL 306 7.1 7.1 EICB (Garg) FSAR amendment 100, page 7.1-12 provides the definition of Allowable value which is not consistent with TSTF-493 as allowable value is the value beyond which instrument channel is declared inoperable.
302   7.5.2.1   7.5.1   (
Responder: Hilmes The FSAR Allowable Value definition will be revised to be consistent with the TSTF-493 in FSAR Amendment 102.
M a
r             09/17/2010                                                       Responder: Tindell                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated   EICB RAI ML102861885 sent to DORL ML102861885 Item  10/29/10 303   7.5.2.1   7.5.1   (
M a
r             09/17/2010                                                       Responder: Tindell                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated   EICB RAI ML102861885 sent to DORL ML102861885 Item  10/29/10 304   7.5.2.1   7.5.1   (
M a
r             09/17/2010                                                       Responder: Tindell                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated   EICB RAI ML102861885 sent to DORL ML102861885 Item  10/29/10 305   7.5.2.1   7.5.1   (
M a
r             09/17/2010                                                       Responder: Tindell                                               Y           Closed                           Closed               EICB RAI           TVA Letter dated   EICB RAI ML102861885 sent to DORL ML102861885 Item  10/29/10 306     7.1       7.1                 FSAR amendment 100, page 7.1-12 provides the definition of       Responder: Hilmes                                                Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Allowable value which is not consistent with TSTF-493 as                                                                                                                                               ML102910008        10/29/10 EICB (Garg) allowable value is the value beyond which instrument channel is   The FSAR Allowable Value definition will be revised to be                     Response is included in letter  Due 12/17/10        Item#69            Enclosure 1 Item declared inoperable.                                              consistent with the TSTF-493 in FSAR Amendment 102.                           dated 10/29/10                                                          No. 26 Attachment 3 contains the revised FSAR section 7.1.2.1.9                                                        Pending FSAR that will be included in FSAR Amendment 102 that reflects                                                      Amendment 102 this change.                                                                                                    submittal


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                  rad22EA6.docx                                                                                  Open Items to be Resolved for SER Approval
===Response===
SE    FSAR      NRC No.                                                                Issue                                                    TVA Response(s)                          Acceptable      Status/ Current Actions        Resolution Path    RAI No. & Date    RAI Resp. Date    Comments Sec. Sec.      POC                                                                                                                                              Y/N 307    7.1      7.1                    (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes                                              Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Acceptable as found tolerance is not in accordance with TSTF-493                                                                                                                                    ML102910008      10/29/10 as AAF is the limit beyond which the instrument channel is          (1) The Acceptable As Found (AAF) definition will be                    Response is included in letter  Due 12/17/10        Item#70          Enclosure 1 Item degraded but may be operable and its operability must be                revised to be consistent with TSTF-493 in FSAR                      dated 10/29/10                                                          No. 27 evaluated. (2) Also it states that AAF is based on measurable            Amendment 102. Attachment 3 contains the revised                                                      Pending FSAR instrument channel uncertainties, such as drift, expected during the    FSAR section 7.1.2.1.9 that will be included in FSAR                                                  Amendment 102 surveillance interval. These wording should be revised to agree          Amendment 102 that reflects this change.                                                              submittal with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided        (2) Additional detail on the AAF methodology was provided tolerance limits for the AAF. Since AAF is a band it will always be      in sections 7.1.2.1.9.1, Westinghouse Setpoint double sided and therefore, this clarification does not mean            Methodology, and 7.1.2.1.9.2, TVA Setpoint anything and it clouds the issue.                                        Methodology. These sections will be revised to clarify EICB (Garg) the AAF calculations in FSAR Amendment 102.
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open  Response is included in letter dated 10/29/10 Open-TVA/A102 Due 12/17/10
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
 
308   7.1     7.1                   (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes                                                Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated Acceptable as left tolerance is not in accordance with TSTF-493 as                                                                                                                                 ML102910008      10/29/10 it states that this may take calibration history into consideration. (1) The statement about using calibration history to                    Response is included in letter  Due 12/17/10        Item#71          Enclosure 1 Item EICB (Garg)
Pending FSAR
This is very vague and ambiguous. (2) Also it states that RPS           determine the Acceptable As Left (AAL) will be deleted              dated 10/29/10                                                          No. 28 functions use double sided tolerance limits. Since ALF is a band it     in FSAR Amendment 102. Attachment 3 contains the                                                      Pending FSAR will always be double sided and therefore, this clarification does       revised FSAR section 7.1.2.1.9 that will be included in                                               Amendment 102 not mean anything and clouds the issue.                                  FSAR Amendment 102 that reflects this change.                                                         submittal (2) See response to letter item 27 (NRC Matrix Item 307).
 
309   7.1   7.1.2.1.                 (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes                                                    Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated 9.1                    methodology, states that AAF is the algebraic sum of the .. This                                                                                                                                   ML102910008      10/29/10 is not acceptable. As algebraic sum is non conservative compared (1) The AAF calculation for Westinghouse setpoint                            Response is included in letter  Due 12/17/10        Item#72          Enclosure 1 Item to the SRSS method and will mask the operability of the instrument       methodology calculations in TI-28 for TSTF-493 will be              dated 10/29/10                                                          No. 29 channel and therefore, it is not acceptable to the staff. (2) It also     revised to use the Square Root Sum of the Squares                                                    Pending FSAR EICB (Garg) make the statement that ALT may take calibration history into             (SRSS) method.                                                                                      Amendment 102 consideration which is vague and ambiguous.                                                                                                                                   submittal (2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
Amendment 102 submittal EICB RAI ML102910008 Item#69 TVA Letter dated 10/29/10 Enclosure 1 Item No. 26 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 307 7.1 7.1 EICB (Garg) (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Acceptable as found tolerance is not in accordance with TSTF-493 as AAF is the limit beyond which the instrument channel is degraded but may be operable and its operability must be evaluated. (2) Also it states that AAF is based on measurable instrument channel uncertainties, such as drift, expected durin g the surveillance interval. These wording should be revised to agree with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided tolerance limits for the AAF. Since AAF is a band it will always be double sided and therefore, this clarification does not mean anything and it clouds the issue.
310   7.1   7.1.2.1.                 (1) FSAR amendment 100, Page 7.1-14, TVA setpoint                 Responder: Hilmes                                            Y            Open                            Open-TVA/A102        EICB RAI          TVA Letter dated 9.2                    methodology, states that for AAF .and other measurable                                                                                                                                             ML102910008      10/29/10 uncertainties as appropriate (i.e., those present during           TVA Response:                                                            Response is included in letter  Due 12/17/10        Item#73          Enclosure 1 Item EICB (Garg) calibration.) should be changed to present during normal                                                                                     dated 10/29/10                                                          No. 30 operation (2) Also on page 7.1-15, states that ALT may take       (1) The AAF definition will be revised in FSAR Amendment                                                   Pending FSAR calibration history into consideration which is vague and              102 to read:                                                                                           Amendment 102 ambiguous.                                                                                                                                                                    submittal A tolerance band on either side of the NTSP which defines the limits of acceptable instrument
Responder: Hilmes (1) The Acceptable As Found (AAF) definition will be revised to be consistent with TSTF-493 in FSAR
 
Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change. 
 
(2) Additional detail on the AAF methodology was provided in sections 7.1.2.1.9.1, Westinghouse Setpoint Methodology, and 7.1.2.1.9.2, TVA Setpoint Methodology. These sections will be revised to clarify the AAF calculations in FSAR Amendment 102. contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR  
 
Amendment 102 that reflects this change.
Y Open  Response is included in letter dated 10/29/10 Open-TVA/A102 Due 12/17/10
 
Pending FSAR
 
Amendment 102 submittal EICB RAI ML102910008 Item#70 TVA Letter dated 10/29/10 Enclosure 1 Item No. 27  308 7.1 7.1 EICB (Garg) (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Acceptable as left tolerance is not in accordance with TSTF-493 as it states that this may take calibration history into consideration.
This is very vague and ambiguous. (2) Also it states that RPS functions use double sided tolerance limits. Since ALF is a band it will always be double sided and therefore, this clarification does not mean anything and clouds the issue.
 
Responder: Hilmes (1) The statement about using calibration history to determine the Acceptable As Left (AAL) will be deleted in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
 
(2) See response to letter item 27 (NRC Matrix Item 307).
Y Open  Response is included in letter
 
dated 10/29/10 Open-TVA/A102 Due 12/17/10
 
Pending FSAR Amendment 102 submittal
 
EICB RAI ML102910008 Item#71 TVA Letter dated 10/29/10 Enclosure 1 Item
 
No. 28  309 7.1 7.1.2.1.
9.1 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint methodology, states that AAF is the algebraic sum of the -.. This is not acceptable. As algebraic sum is non conservative compared  
 
to the SRSS method and will mask the operabilit y of the instrument channel and therefore, it is not acceptable to the staff. (2) It also make the statement that ALT may take calibration history into consideration which is vague and ambiguous.
Responder: Hilmes (1) The AAF calculation for Westinghouse setpoint methodology calculations in TI-28 for TSTF-493 will be revised to use the Square Root Sum of the Squares (SRSS) method. 
 
(2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.
Y Open  Response is included in letter
 
dated 10/29/10 Open-TVA/A102 Due 12/17/10
 
Pending FSAR Amendment 102 submittal
 
EICB RAI ML102910008 Item#72 TVA Letter dated 10/29/10 Enclosure 1 Item
 
No. 29  310 7.1 7.1.2.1.
9.2 EICB (Garg) (1) FSAR amendment 100, Page 7.1-14, TVA setpoint methodology, states that for AAF -.and other measurable uncertainties as appropriate (i.e., those present during calibration-.) should be changed to present during normal  
 
operation--  (2) Also on page 7.1-15, states that ALT may take calibration history into consideration which is vague and ambiguous.
Responder: Hilmes TVA Response:
(1) The AAF definition will be revised in FSAR Amendment 102 to read:  
"A tolerance band on either side of the NTSP which defines the limits of acceptable instrument Y Open  Response is included in letter dated 10/29/10 Open-TVA/A102 Due 12/17/10
 
Pending FSAR


Amendment 102 submittal EICB RAI ML102910008 Item#73 TVA Letter dated 10/29/10 Enclosure 1 Item No. 30 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         rad22EA6.docx                                                                                             Open Items to be Resolved for SER Approval
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October


29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
===Response===
SE      FSAR      NRC No.                                                                      Issue                                                      TVA Response(s)                          Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                                    Y/N performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable.
This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
(2) The AAL definition will be revised in FSAR Amendment 102 to read:
  "A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable."
A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.
This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
311 7.1 7.1 EICB (Garg) Both Westinghouse and TVA setpoint methodology do not have any discussion on single sided calculation. Please confirm that single sided calculation has not been used for all setpoints with TSTF-493 and provide a statement to that effect in the FSAR.
311     7.1       7.1                     Both Westinghouse and TVA setpoint methodology do not have           Responder: Hilmes                                              Y            Open                            Open-TVA/A102              EICB RAI            TVA Letter dated any discussion on single sided calculation. Please confirm that                                                                                                                                               ML102910008        10/29/10 EICB (Garg) single sided calculation has not been used for all setpoints with   A statement that single-sided corrections are not used for                  Response is included in letter  Due 12/17/10              Item#74            Enclosure 1 Item TSTF-493 and provide a statement to that effect in the FSAR.         TSTF-493 setpoints will be included in FSAR Amendment                       dated 10/29/10                                                                  No. 31 102. Attachment 3 contains the revised FSAR section                                                           Pending FSAR 7.1.2.1.9 that will be included in FSAR Amendment 102 that                                                   Amendment 102 reflects this change.                                                                                         submittal 312                7.0    B
Responder: Hilmes A statement that single-sided corrections are not used for TSTF-493 setpoints will be included in FSAR Amendment 102. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
(
Y Open  Response is included in letter dated 10/29/10 Open-TVA/A102 Due 12/17/10  
G a                By letter dated September 10,2010, TVA provided the summary          Responder: Stockton                                            Y            Close                            Closed                    EICB RAI            TVA Letter dated evaluation of 50 59 reports which were related to FSAR Chapter                                                                                                                                                ML102910008        10/21/10 313    7.7.8    7.7.1.12  (
D a              EDCR 52408 (installation of AMSAC in Unit 2) states that Design      Responder: Ayala                                                Y           Closed                          Closed                    EICB RAI No.18      TVA Letter dated Criteria WB-DC-40-57 needs to be modified to reflect AMSAC in                                                                                                                                                ML102910017        10/29/10 314    7.3        7.3      (
D a              The following 50.59 changes were listed in the March 12 RAI          Responder: Stockton                                            Y            Closed                          Closed                    EICB RAI No. 19    TVA Letter dated Related to OI 10 response letter (item 10) but were not included in the September 9                                                                                                                                            ML102910017        10/21/10 315    7.5.3      7.5.3  B
(
G a                IE Bulletin 79-27 required that emergency operating procedures to    Responder: S. Smith (TVA Operations)                            Y            Close                            Closed                    EICB RAI            TVA Letter dated be used by control room operators to attain safe shutdown upon                                                                                                                                                ML102910008        10/21/10 316    7.5.2.3    7.5    B S(
in              TVA has provided various documents in support of RM-1000 high        Responder: Temples/Mather                                      Y            Closed                          Closed                    RAI No. 26 range monitors for WBN2                                                                                                                                                                                      ML102980005 317    7.5.2.3    7.5    B S(
in              TVA has provided a proprietary and a non-proprietary version of      Responder: Temples                                              Y            Closed                          Closed                    RAI No. 27          TVA Letter dated Technical Manual for RM-1000 Digital Radiation Processor under                                                                                                                                                ML102980005        10/29/10 318    7.5.2.3    7.5                    TVA has provided the following documents for RM-1000                Responder: Temples                                              N            Open                            Open-TVA/GA                RAI No. 28          TVA Letter dated EICB (Singh) equipment qualification:                                                                                                                                                                                      ML102980005        10/29/10 (i)  Applicable to WBN Unit 2. 04508905-1QR is                              Note check 04508905-1QR or Due 12/22/10                     10/26/2010          Enclosure 1 Item (i)  Qualification Test Report for RM-1000 Processor Module              applicable only in regards to the RM-1000, with the                    QR. Staff version is QR only.                                                  No. 34 and Current-To-Frequency Converter 04508905-QR                      exception of re-qualification of certain RM-1000                                                      Response update (January 2001)                                                      equipment differences covered in the -1SP report.                      Response is included in letter required. It is clear that


Pending FSAR
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                        rad22EA6.docx                                                                                        Open Items to be Resolved for SER Approval


Amendment 102
===Response===
SE      FSAR      NRC No.                                                                    Issue                                                        TVA Response(s)                        Acceptable      Status/ Current Actions          Resolution Path        RAI No. & Date    RAI Resp. Date                  Comments Sec.      Sec. POC                                                                                                                                                  Y/N (ii)    Qualification Test Report Supplement, RM-1000 Upgrades              The Current-to-Frequency (I-F) converter module                      dated 10/29/10                  04508903-2SP and -
04508905-1SP (June 2006)                                            qualifications in the base report and the -1SP report                                                3SP are not applicable.
(iii)  Qualification Test Report Supplement, RM-1000 Upgrades              are not applicable to the RM-1000s, and will be used                                                  The response for 04508905-2SP (June 2008)                                            later as references in the WBN Unit 2 specific                                                        applicability of (iv)    Qualification Test Report Supplement, RM-1000 Upgrades              qualification reports.                                                                                04508905-QR and -
04508905-3SP (May 2008)                                    (ii)    Applicable to WBN Unit 2.                                                                            1SP to RM-1000 and IF (iii)    Not applicable to WBN Unit 2                                                                          converter is not clear.
Please clarify whether all of these are fully applicable to WBN2 or (iv)    Not applicable to WBN Unit 2 are they applicable with exceptions? If with exceptions, then                                                                                                                      Check page numbers of please clarify what those are.                                      The 04508905-3SP report was prepared for another TVA                                                          Appendix F plant, as a monitor system-level report, where the system                                                      (missing/duplicate Supplement 3 was issued one month prior to supplement 2.            included equipment mostly based on the base report                                                            pages).
Please explain the reason for the same.                            equipment items. These two -2SP and -3SP supplement                                                            Check applicability of reports were essentially worked concurrently, but the -2SP                                                    Appendix C to RM1000 document review/release process resulted in the release                                                        instead of RM2300?
time difference.                                                                                              See items 336 and 337.
All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.
Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required.
Work may proceed.
The applicable reports should have been reviewed prior to dispositioning them.
Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?.
319    7.5.2.3    7.5  B S(
in              TVA provided System Verification Test Results 04507007-1TR              Responder: Temples                                          Y            Closed                          Closed              RAI No. 29              TVA Letter dated (July 1999) for Sequoyah to support test verification However the                                                                                                                  -Response Acceptable ML102980005            10/29/10 320                        E I            Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY                    Responder: Clark                                            Y            Closed                          Closed              N/A                    N/A              Duplicate of item 156 AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR 321                        E I            For the purposes of measuring reactor coolant flow for Reactor        Responder: Clark                                            Y            Closed                          Closed                    N/A              N/A                Duplicate of OI# 157 Protection functions elbow taps are used for both Unit 1 and 2 322              7.7.1.11B
(
C a              Section 7.7.1.11 will be added to FSAR Amendment 101 to provide        Responder: Clark                                            Y            Closed                          Closed a discussion of the Distributed Control System 323                                      WCAP-13869 revision 1 was previously reviewed under WBN Unit            Responder: Hilmes/Unit 1                                    Y            Open                            Open-TVA Unit 1                              TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An                                                                                                                                                                  10/29/10 EICB(Garg) analysis of the differences and their acceptability will be submitted  Attachment 12 contains the WCAP 13869 Revision 1 to                      Response is included in letter  Due: 12/22/10                                Enclosure 1 Item to the NRC by November 15, 2010                                        Revision 2 Change Analysis.                                              dated 10/29/10                                                                No. 36 The staff is confused with the


submittal EICB RAI ML102910008 Item#74 TVA Letter dated 10/29/10 Enclosure 1 Item No. 31  312  7.0 B (G aBy letter dated September 10,2010, TVA provided the summary evaluation of 5059 reports which were related to FSAR Chapter Responder: Stockton Y Close  Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10  313 7.7.8 7.7.1.12 (D aEDCR 52408 (installation of AMSAC in Unit 2) states that Design Criteria WB
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         rad22EA6.docx                                                                                              Open Items to be Resolved for SER Approval
-DC-40-57 needs to be modified to reflect AMSAC in Responder: Ayala Y Closed  Closed  EICB RAI No.18 ML102910017 TVA Letter dated 10/29/10  314 7.3 7.3 (D aThe following 50.59 changes were listed in the March 12 RAI response letter (item 10) but were not included in the September 9 Responder: Stockton Y Closed  Closed  EICB RAI No. 19 ML102910017 TVA Letter dated 10/21/10 Related to OI 10 315 7.5.3 7.5.3 B (G aIE Bulletin 79-27 required that emergency operating procedures to be used by control room operators to attain safe shutdown upon Responder: S. Smith (TVA Operations)
Y Close  Closed  EICB RAI ML102910008 TVA Letter dated 10/21/10  316 7.5.2.3 7.5 B (S inTVA has provided various documents in support of RM-1000 high range monitors for WBN2 Responder: Temples/Mather Y Closed  Closed  RAI No. 26 ML102980005 317 7.5.2.3 7.5 B (S inTVA has provided a proprietary and a non-proprietary version of Technical Manual for RM
-1000 Digital Radiation Processor under Responder: Temples Y Closed  Closed  RAI No. 27 ML102980005 TVA Letter dated 10/29/10  318 7.5.2.3 7.5 EICB (Singh) TVA has provided the following documents for RM-1000 equipment qualification:


(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) Responder: Temples
===Response===
SE      FSAR    NRC No.                                                                    Issue                                                      TVA Response(s)                             Acceptable      Status/ Current Actions          Resolution Path          RAI No. & Date    RAI Resp. Date                    Comments Sec.      Sec. POC                                                                                                                                                        Y/N response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 324                      (
M a
r                Per the NRC reviewer, the BISI calculation is not required to be                                                                      Y            Closed                            Closed submitted 325                      B
(
G a                The Unit 2 loops in service for Unit 1 that are scheduled to be      Responder: TVA Startup Olson                                      Y            Closed                            Closed                                                            Closed to open item ?
transferred to the Foxboro Spec 200 hardware will be transferred 326                                      TVA uses double-sided methodology for as-found and as-left          Responder: Webb                                                  Y            Open October 22, 2010            Open-TVA/A102                                TVA Letter dated Reactor Trip and ESFAS instrument setpoint values. The FSAR                                                                                                                                                                        10/29/10 EICB(Garg) will be revised in a future amendment to reflect this methodology    Attachment 3 contains the revised FSAR section 7.1.2.1.9                      Response is included in letter    Due 12/17/10                                  Enclosure 1 Item that will be included in FSAR Amendment 102 that reflects                      dated 10/29/10                                                                  No. 37 this change.                                                                                                    Pending FSAR Amendment 102 submittal 327                                      Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber                                                Y                  Open                              Open-TVA/Bechtel SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is                                                            Due 11/24/10 31, 2011.                                                        no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
328    7.5.2.3    7.5    B S(
in              Provide the model number for the four containment high range        Responder: Temples                                                Y            Closed                            Closed              RAI No. 30              TVA Letter dated area monitors RM-1000 and identify how the software V&V and                                                                                                                          -Response Acceptable ML102980005              10/29/10 329    7.6.1    7.6.7                    Section 7.6.7 of the FSAR (Amendment 100) states that, The          Responder: Clark                                                  N            Open                              Open-TVA/A102        RAI No. 1                TVA Letter dated EICB (Singh)
DMIMS-DX' audio and visual alarm capability will remain                                                                                                                                                    ML102980005              10/29/10 functional after an Operating Basis Earthquake (OBE). All of the      The title of FSAR Section 3.10 is Seismic Design of                          Response is included in letter                        10/26/2010              Enclosure 1 Item DMIMS-DX' components are qualified for structural integrity            Category I Instrumentation and Electrical Equipment. Since                  dated 10/29/10                    Due 12/17/10                                  No. 39 during a Safe Shutdown Earthquake (SSE) and will not                  the Loose Part Monitoring System is not a Category 1 mechanically impact any safety-related equipment.                    system, it is not included in the scope of 3.10. FSAR Section                                                  Pending FSAR 7.6.7, Loose Parts Monitoring System (LPMS) System                                                            Amendment 102 TVA to clarify the seismic qualification of the loose parts monitoring Description, identifies basic system seismic design criteria                                                  submittal.
system and include the appropriate information in Table 3.10 (or which are consistent with the requirements of TVA Design another suitable section) of the FSAR.                                Criteria, WB-DC-30-31, Loose Parts Monitoring System. As                                                      TVA to confirm that the identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC                                                    equipment has been Regulatory Guide Conformance, the system conforms to                                                          seismically qualified as Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133                                                      required and that TVA identifies the seismic requirements and Note 12 does not                                                      reviewed and found the contain any exception to the Regulatory Guide seismic                                                          report acceptable.
requirements.
TVA response does not The Westinghouse LPMS seismic report, EQ-QR-33-WBT,                                                              list the seismic test Revision 0, Seismic Evaluation of the Digital Metal Impact                                                      document and its Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will                                                        acceptance by TVA.
be added as Reference 7 to FSAR section 7.6 in amendment                                                        FSAR should reference 102.                                                                                                            the test document as the source document for tracking conformance.
330    7.3      7.3                    Related to Item 298                                                  Responder: Hilmes/Faulkner                                        Y            Closed                            Closed                    EICB RAI No.20    Item 7, TVA letter ML102910017,      dated November EICB (Darbali)
IE Bulletin 80-06 calls for review of engineered safety features with The original response to IE Bulletin 80-06 for both WBN Unit                                                                              10/19/10          24, 2010 the objective of ensuring that no device will change position solely 1 and 2 was provided on TVA letter to NRC dated March 11, because of the reset action.                                        1982 (ML073530129) (Reference 4). Subsequent design changes have impacted the original response such that In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved some equipment that originally changed state no longer does


(i) Applicable to WBN Unit 2.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                       rad22EA6.docx                                                                Open Items to be Resolved for SER Approval
04508905-1QR is applicable only in regards to the RM-1000, with the exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report.
N Open Note check 04508905-1QR or QR. Staff version is QR only.
Response is included in letter Open-TVA/GA Due 12/22/10 Response update required. It is clear that RAI No. 28 ML102980005


10/26/2010 TVA Letter dated 10/29/10  Item
===Response===
 
SE   FSAR   NRC No.                                                   Issue                                                       TVA Response(s)                         Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date       Comments Sec. Sec. POC                                                                                                                                       Y/N the design modifications proposed by the applicant that would so and some equipment has been deleted. There are no allow certain devices to remain unchanged upon an ESF reset. additions to the list originally provided in TVA letter to NRC The staff also found acceptable the applicants justification dated March 11, 1982 (ML073530129) (Reference 4). The for some safety-related equipment that does not remain in its following is the current list of equipment that does not remain emergency mode after an ESF reset.                             in its emergency mode after an ESF reset:
No. 34 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)
Please list for Unit 1 and Unit 2 the safety-related equipment  1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or 2- (Unit 2) that does not remain in its emergency mode after an ESF reset.                                                                a.       Auxiliary Feedwater Pump Turbine Speed Control Valve, FCV-1-52
Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.
: b.       Auxiliary Feedwater (AFW) Level Control Valves as listed below:
Supplement 3 was issued one month prior to supplement 2.
: i. LCV-3-172       - SG3     - Level Control Valve ii. LCV-3-173       - SG2     - Level Control Valve iii. LCV-3-174       - SG1     - Level Control Valve iv. LCV-3-175       - SG4     - Level Control Valve
Please explain the reason for the same. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
: v. LIC-3-172       - SG3     - Level Indicating Controller vi. LIC-3-173       - SG2     - Level Indicating Controller vii. LIC-3-174       - SG1     - Level Indicating Controller viii. LIC-3-175       - SG4     - Level Indicating Controller ix. LCV-3-148       - SG3     - Level Valve
(ii) Applicable to WBN Unit 2.  (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2
: x. LCV-3-156       - SG2     - Level Valve xi. LCV-3-164       - SG1     - Level Valve xii. LCV-3-171       - SG4     - Level Valve xiii. LCV-3-148A       - SG3     - Level Bypass Control Valve xiv. LCV-3-156A       - SG2     - Level Bypass Control Valve xv. LCV-3-164A       - SG1     - Level Bypass Control Valve xvi. LCV-3-171A       - SG4     - Level Bypass Control Valve xvii. LIC-3-148       - SG3     - Controller xviii. LIC-3-156       - SG2     - Controller xix. LIC-3-164       - SG1     - Controller xx. LIC-3-171       - SG4     - Controller
 
: c.       Lower and Upper Compartment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release time difference.
: d.       Penetration Room Cooler Fans Elevations 737, 692 and 713
dated 10/29/10 04508903-2SP and -
: e.       Pipe Chase Cooler Fans
3SP are not applicable.
The response for applicability of 04508905-QR and -1SP to RM-1000 and IF converter is not clear.
Check pa g e numbers of Appendix F (missing/duplicate pages). Check applicability of Appendix C to RM1000 instead of RM2300? See items 336 and 337.
All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other. Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, "Review not required.
Work may proceed."
The applicable reports should have been reviewed prior to dispositioning them. Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?.
319 7.5.2.3 7.5 B (S inTVA provided System Verification Test Results 04507007-1TR (July 1999) for Sequoyah to support test verification  However the Responder: Temples Y Closed  Closed -Response Acceptable RAI No. 29 ML102980005 TVA Letter dated 10/29/10  320  E IPer Westinghouse letter WBT-D-2340, TENNESSEE VALLEY AUTHORITY WATTS BAR NUCL EAR PLANT UNIT 2 FSAR Responder: Clark Y Closed Closed N/A N/A Duplicate of item 156 321  E IFor the purposes of measuring r eactor coolant flow for Reactor Protection functions elbow taps are used for both Unit 1 and 2 Responder: Clark Y Closed Closed N/A N/A Duplicate of OI# 157 322  7.7.1.11 B (C aSection 7.7.1.11 will be added to FSAR Amendment 101 to provide a discussion of the Distributed Control System Responder: Clark Y Closed Closed    323  EICB(Garg) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and  their acceptability will be submitted
 
to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 Attachment 12 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
Y Open  Response is included in letter
 
dated 10/29/10
 
The staff is confused with the Open-TVA Unit 1 Due: 12/22/10 TVA Letter dated 10/29/10 Enclosure 1 Item
 
No. 36 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments response since both units have reference leg  not insulated Rev 2 should apply to Unit 1 also and there should be no
 
difference between Unit 1 and 2 324  (M a rPer the NRC reviewer, the BISI calculation is not required to be submitted  Y Closed Closed    325  B (G aThe Unit 2 loops in service for Unit 1 that are scheduled to be transferred to the Foxboro Spec 200 hardware will be transferred Responder: TVA Startup Olson Y Closed Closed  Closed to open item ? 326  EICB(Garg)
TVA uses double-sided methodology for as-found and as-left Reactor Trip and ESFAS instrument setpoint values. The FSAR will be revised in a future amendment to reflect this methodology Responder: Webb contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.
Y Open October 22, 2010
 
Response is included in letter
 
dated 10/29/10 Open-TVA/A102 Due 12/17/10 Pending FSAR Amendment 102 submittal  TVA Letter dated 10/29/10  Item
 
No. 37  327  DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.
Responder: Webber In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.
Y Open    Open-TVA/Bechtel Due 11/24/10    328 7.5.2.3 7.5 B (S inProvide the model number for the four containment high range area monitors RM
-1000 and identify how the software V&V and Responder: Temples Y Closed  Closed -Response Acceptable RAI No. 30 ML102980005 TVA Letter dated 10/29/10  329 7.6.1 7.6.7 EICB (Singh) Section 7.6.7 of the FSAR (Amendment 100) states that, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX&#x17d; components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment."
 
TVA to clarify the seismic qualification of the loose parts monitorin g system and include the appropriate information in Table 3.10 (or another suitable section) of the FSAR.
Responder: Clark
 
The title of FSAR Section 3.10 is Seismic Design of Category I Instrumentation and Electrical Equipment. Since the Loose Part Monitoring System is not a Category 1 system, it is not included in the scope of 3.10. FSAR Section
 
7.6.7, "Loose Parts Monitoring System (LPMS) System Description," identifies basic system seismic design criteria which are consistent with the requirements of TVA Design Criteria, WB-DC-30-31, Loose Parts Monitoring System. As identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC Regulatory Guide Conformance, the system conforms to Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 identifies the seismic requirements and Note 12 does not
 
contain any exception to the Regulatory Guide seismic
 
requirements.
The Westinghouse LPMS seis mic report, EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DX TM) for Watts Bar Unit 2, will be added as Reference 7 to FSAR section 7.6 in amendment 102. N Open Response is included in letter dated 10/29/10 Open-TVA/A102 Due 12/17/10 Pending FSAR Amendment 102 submittal.
TVA to confirm that the equipment has been seismically qualified as required and that TVA reviewed and found the report acceptable.
TVA response does not list the seismic test document and its acceptance by TVA.
FSAR should reference the test document as the source document for tracking conformance. RAI No. 1 ML102980005
 
10/26/2010 TVA Letter dated 10/29/10  Item No. 39 330 7.3 7.3 EICB (Darbali)
Related to Item 298 IE Bulletin 80-06 calls for review of engineered safety features with the objective of ensuring that no device will change position solely because of the 'reset' action.
In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved Responder: Hilmes/Faulkner The original response to IE Bulletin 80-06 for both WBN Unit 1 and 2 was provided on TVA letter to NRC dated March 11, 1982 (ML073530129) (Reference 4). Subsequent design changes have impacted the original response such that some equipment that originally changed state no longer does Y Closed Closed EICB RAI No.20 ML102910017, 10/19/10 Item 7, TVA letter dated November 24, 2010 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments the design modifications proposed by the applicant that would allow certain devices to remain unchanged upon an ESF reset. The staff also found acceptable the applicant's justification for some safety-related equipment that does not remain in its emergency mode after an ESF reset.
Please list for Unit 1 and Unit 2 the safety-related equipment that does not remain in its emergency mode after an ESF reset.                                                 so and some equipment has been deleted. There are no additions to the list originally provided in TVA letter to NRC dated March 11, 1982 (ML073530129) (Reference 4). The following is the current list of equipment that does not remain in its emergency mode after an ESF reset:
: 1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or 2- (Unit 2)
: a. Auxiliary Feedwater Pump Turbine Speed Control Valve, FCV-1-52
: b. Auxiliary Feedwater (AFW) Level Control Valves as listed below:
: i. LCV-3-172 - SG3 - Level Control Valve ii. LCV-3-173 - SG2 - Level Control Valve iii. LCV-3-174 - SG1 - Level Control Valve iv. LCV-3-175 - SG4 - Level Control Valve
: v. LIC-3-172 - SG3 - Level Indicating Controller vi. LIC-3-173 - SG2 - Level Indicating Controller vii. LIC-3-174 - SG1 - Level Indicating Controller viii. LIC-3-175 - SG4 - Level Indicating Controller ix. LCV-3-148 - SG3 - Level Valve
: x. LCV-3-156 - SG2 - Level Valve xi. LCV-3-164 - SG1 - Level Valve xii. LCV-3-171 - SG4 - Level Valve xiii. LCV-3-148A - SG3 - Level Bypass Control Valve xiv. LCV-3-156A - SG2 - Level Bypass Control Valve xv. LCV-3-164A - SG1 - Level Bypass Control Valve xvi. LCV-3-171A - SG4 - Level Bypass Control Valve xvii. LIC-3-148 - SG3 - Controller xviii. LIC-3-156 - SG2 - Controller xix. LIC-3-164 - SG1 - Controller xx. LIC-3-171 - SG4 - Controller
: c. Lower and Upper Compartment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
: d. Penetration Room Cooler Fans Elevations 737, 692 and 713
: e. Pipe Chase Cooler Fans
: 2. Common Equipment
: 2. Common Equipment
: a. Shutdown Board Room A Pressurizing Fans
: a.       Shutdown Board Room A Pressurizing Fans
: b. Control Building Ventilation Dampers as listed below: i. 0-FCO-31-9 - Spreading Room Supply Fan Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Damper ii. 0-FCO-31-10  - Spreading Room Supply Fan Damper iii. 0-FCO-31-16  - Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31-17  - Toilet a Locker Room Exhaust Fan Exhaust Damper
: b.       Control Building Ventilation Dampers as listed below:
: v. 0-FCO-31-3  - Main Control Room Isolation Damper vi. 0-FCO-31-4  - Main Control Room Isolation Damper vii. 0-FCO-31-36  - Spreading Room Fresh Air Supply Damper viii. 0-FCO-31-37  - Spreading Room Fresh Air Supply Damper
: i. 0-FCO-31-9         - Spreading Room Supply Fan
: c. Cask Loading Exhaust Dampers as listed
: i. 0-FCO-30-122  - Cask Loading Area Exhaust Damper ii. 0-FCO-30-123  -Cask Loading Area Exhaust Damper  d. Auxiliary Building General Supply Exhaust Fans Elevation 737
: e. CCW and AFT Pump Space Cooler Fans
: f. Spent Fuel Pit Pumps Space Coolers
: g. EGTS Room Coolers
: h. Turbine Driven AFW and Boric Acid Space Coolers 331 7.6.1 7.6.7 EICB (Singh)
As a follow up of OI 190, Staff has reviewed the proprietar y version of the DMIMS-DX system description to verify the conformance claims in the FSAR. Staff has noted the following insufficiencies
 
and discrepancies between the FSAR and the proprietary version of the system description for loose parts monitoring system
 
provided by TVA.
: 1) FSAR, Amendment 100, page 7.6-5 states, "During baseline testing, the reactor vessel and steam generator are impacted three feet from each sensor with a force of 0.5 ft-lb. Loose parts detection is accomplished at a frequency of 1 kHz to 20 kHz, where back g round si gnals from the RCS are acceptable.
Spurious alarming from control rod stepping is prevented by a
 
module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.
The online sensitivity of the DMIMS-DX&#x17d; is such that the system will detect a loose part that weighs from 0.25 to 30 Ib and impacts with a kinetic energy of 0.5 ft-lb on the inside surface of the RCS pressure boundary within 3 ft of a sensor."
The source of this information is not cited nor is it described in the system description. TVA to provide the source of the information and update the system description as needed.
Responder: WEC/Harless/Clark TVA Partial Response:
: 1) The source of the information is the DMIMS-DXTM Operations and Maintenance Manual, TS3176, Revision 0, dated August 2010. Attachment 14 contains the revised system description, "
Westinghouse DIMMS-DX TM Loose Part Detection System Description," Revision 1. The Westinghouse DIMMS-DX TM Loose Part Detection System Description," Revision 1 will be added as Reference 9 to section 7.6 in FSAR
 
Amendment 102.
: 2) The source of the information is the DMIMS-DXTM seismic qualification repor t, Westinghouse report EQ-QR-33-WBT, Revision 0, Seismic Evaluation of the Digital Metal Impact Monitoring System (DMIMS-DXTM
) for Watts Bar Unit 2. Attachment 14 contains the revised system description, "
Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1.
: 3) The entries for the following items in FSAR Section N Open Open-TVA/WEC Due ___________
Pending FSAR Amendment 102 submittal TVA to reference the DMIMS-DXTM Operations Manual in the FSAR as the source document  TVA to reference the source document for item# 4 per the response. RAI No. 8 ML102980005 10/26/2010 TVA Letter dated 10/29/10 Enclosure 1 Item
 
No. 40 Follow-up of OI-190.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g states that, "Operability for Seismic and Environmental Conditions. Components of the loose-part detection system within containment should be designed and installed to perform their function following all seismic events that do not require plant shutdown, i.e., up to and including the Operating Basis Earthquake (OBE). Recording equipment need not function without maintenance following the specified seismic event provided the audio or visual alarm capability remains functional. The system should also be shown to be adequate by analysis, test, or combined analysis and test for the normal
 
operating radiation, vibration, temperature, and humidity environment.
FSAR, Amendment 100, page 7.6-5 states, "The DMIMS-DX&#x17d; audio and visual alarm capability will remain functional after an Operating Basis Earthquake (OBE). All of the DMIMS-DX&#x17d; components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not mechanically impact any safety-related equipment." 
 
Paragraphs 4.c and 4.d of the system description are not consistent with the seismic qualifications described in the FSAR. TVA to provide the source of the information contained in the FSAR and update the system description as
 
needed.
: 3) The system description clearly describes the "In-containment equipment" and "DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for clarification purposes.
: 4) The information regarding frequency ranges of the sensors is included on page 7.6-6 of Amendment 100 of the FSAR but the system description does not contain this information. Please provide the source of this information and update the system description to reflect the appropriate information.
: 5) Please provide information as to how the in-containment components are qualified for vibration as addressed in regulatory position C.1.g of RG 1.133. 7.6.7 will be modified in Amendment 102 as shown in  for draft revision to WBN Unit 2 FSAR Section 7.6.7, "Loose Part Monitoring System (LPMS) System Description." 


Sensors (In Containment)
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                   rad22EA6.docx                                                                                  Open Items to be Resolved for SER Approval
Softline Cable (In Containment)
Preamplifier (In Containment) contains the FSAR Amendment 102 Change Markups that reflect these changes.
: 4) The source of the information is Westinghouse Letter WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS (Reference 5). Attachment 14 contains "Westinghouse DIMMS-DXTM Loose Part Detection System Description," Revision 1.
In responding to Item 4, conflicting information was found between the Westinghouse-prepared FSAR section and various Westinghouse technical documents. To fully respond to this item, a change to the FSAR is required to chan ge the minimum flat sensor frequency response from 5 Hz to 10 Hz. Attachment 3


contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the sensor.
===Response===
Westinghouse document 1TS3182, Revision 0, Watts Bar Unit 2 DMIMS-DXTM System Validation Data Packa ge, dated Jul y 2010 has been added as reference 8 to FSAR Section 7.6 in amendment 102. Per Westinghouse letter WBT-D-2580, this document will be revised to reflect the 10Hz minimum frequency and provide the basis for the frequency response values in the FSAR. 5) In-containment component qualification for vibration as addressed in regulatory position C.1.g of RG 1.133, will be addressed in a future RAI response letter.
SE    FSAR   NRC No.                                                                Issue                                                        TVA Response(s)                        Acceptable      Status/ Current Actions      Resolution Path        RAI No. & Date    RAI Resp. Date                Comments Sec. Sec. POC                                                                                                                                                Y/N Damper ii. 0-FCO-31 Spreading Room Supply Fan Damper iii. 0-FCO-31 Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31 Toilet a Locker Room Exhaust Fan Exhaust Damper
332 7.5.2.1 7.5.1 (M a r 10/26/2010 Y Closed  Closed  ML103000105 Item No 1 TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.1 7.5.1 (M a r 10/27/2010 Y Closed  Closed  ML103000105 Item No 2 TBD EICB RAI ML103000105 sent to DORL 334 7 7 EICB (Darbali) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves. Please correct this in a future FSAR amendment.
: v. 0-FCO-31-3    - Main Control Room Isolation Damper vi. 0-FCO-31-4    - Main Control Room Isolation Damper vii. 0-FCO-31 Spreading Room Fresh Air Supply Damper viii. 0-FCO-31 Spreading Room Fresh Air Supply Damper
Responder: Stockton Y Open  Figure will be corrected in FSAR  
: c.      Cask Loading Exhaust Dampers as listed
: i. 0-FCO-30-122 - Cask Loading Area Exhaust Damper ii. 0-FCO-30-123 -Cask Loading Area Exhaust Damper
: d.      Auxiliary Building General Supply Exhaust Fans Elevation 737
: e.     CCW and AFT Pump Space Cooler Fans
: f.     Spent Fuel Pit Pumps Space Coolers
: g.     EGTS Room Coolers
: h.     Turbine Driven AFW and Boric Acid Space Coolers 331    7.6.1   7.6.7                  As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark                                N            Open                        Open-TVA/WEC            RAI No. 8        TVA Letter dated Follow-up of OI-190.
of the DMIMS-DX system description to verify the conformance                                                                                                                                        ML102980005      10/29/10 claims in the FSAR. Staff has noted the following insufficiencies TVA Partial Response:                                                                                    Due ___________          10/26/2010       Enclosure 1 Item and discrepancies between the FSAR and the proprietary version                                                                                                                                                        No. 40 of the system description for loose parts monitoring system            1) The source of the information is the DMIMS-DXTM                                                  Pending FSAR provided by TVA.                                                          Operations and Maintenance Manual, TS3176, Revision                                              Amendment 102 0, dated August 2010. Attachment 14 contains the                                                submittal
: 1) FSAR, Amendment 100, page 7.6-5 states, During baseline                revised system description, Westinghouse DIMMS-testing, the reactor vessel and steam generator are impacted          DXTM Loose Part Detection System Description,                                                  TVA to reference the three feet from each sensor with a force of 0.5 ft-lb. Loose          Revision 1. The Westinghouse DIMMS-DXTM Loose                                                    DMIMS-DXTM parts detection is accomplished at a frequency of 1 kHz to 20        Part Detection System Description, Revision 1 will be                                          Operations Manual in kHz, where background signals from the RCS are acceptable.            added as Reference 9 to section 7.6 in FSAR                                                      the FSAR as the source Spurious alarming from control rod stepping is prevented by a        Amendment 102.                                                                                  document module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping.         2) The source of the information is the DMIMS-DXTM                                                  TVA to reference the seismic qualification report, Westinghouse report EQ-                                            source document for The online sensitivity of the DMIMS-DX' is such that the              QR-33-WBT, Revision 0, Seismic Evaluation of the                                                item# 4 per the system will detect a loose part that weighs from 0.25 to 30 Ib        Digital Metal Impact Monitoring System (DMIMS-DXTM)                                             response.
and impacts with a kinetic energy of 0.5 ft-lb on the inside          for Watts Bar Unit 2. Attachment 14 contains the surface of the RCS pressure boundary within 3 ft of a sensor.       revised system description, Westinghouse DIMMS-EICB (Singh)
DXTM Loose Part Detection System Description, The source of this information is not cited nor is it described in   Revision 1.
the system description. TVA to provide the source of the information and update the system description as needed.          3) The entries for the following items in FSAR Section


Amendment 102.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                        rad22EA6.docx                                                                                  Open Items to be Resolved for SER Approval
Open-TVA/A102 Due 12/17/10


Pending FSAR Amendment 102 submittal. RAI not required. N/A RAI not required because the figure is not part of any SE section.
===Response===
335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.  
SE      FSAR    NRC No.                                                                    Issue                                                      TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date  RAI Resp. Date                Comments Sec.      Sec. POC                                                                                                                                                      Y/N 7.6.7 will be modified in Amendment 102 as shown in
: 2)  Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g        Attachment 3 for draft revision to WBN Unit 2 FSAR states that, Operability for Seismic and Environmental              Section 7.6.7, Loose Part Monitoring System (LPMS)
Conditions. Components of the loose-part detection system            System Description.
within containment should be designed and installed to perform their function following all seismic events that do not      Sensors (In Containment) require plant shutdown, i.e., up to and including the Operating      Softline Cable (In Containment)
Basis Earthquake (OBE). Recording equipment need not                Preamplifier (In Containment) function without maintenance following the specified seismic event provided the audio or visual alarm capability remains          Attachment 3 contains the FSAR Amendment 102 functional. The system should also be shown to be adequate          Change Markups that reflect these changes.
by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity      4)  The source of the information is Westinghouse Letter environment.                                                        WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS FSAR, Amendment 100, page 7.6-5 states, The DMIMS-                  (Reference 5). Attachment 14 contains Westinghouse DX' audio and visual alarm capability will remain functional        DIMMS-DXTM Loose Part Detection System after an Operating Basis Earthquake (OBE). All of the                Description, Revision 1.
DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not                In responding to Item 4, conflicting information was mechanically impact any safety-related equipment.                  found between the Westinghouse-prepared FSAR Paragraphs 4.c and 4.d of the system description are not            section and various Westinghouse technical consistent with the seismic qualifications described in the          documents. To fully respond to this item, a change to FSAR. TVA to provide the source of the information                  the FSAR is required to change the minimum flat sensor contained in the FSAR and update the system description as          frequency response from 5 Hz to 10 Hz. Attachment 3 needed.                                                              contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the
: 3)  The system description clearly describes the In-containment        sensor.
equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for            Westinghouse document 1TS3182, Revision 0, Watts clarification purposes.                                              Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference
: 4)  The information regarding frequency ranges of the sensors is        8 to FSAR Section 7.6 in amendment 102. Per included on page 7.6-6 of Amendment 100 of the FSAR but              Westinghouse letter WBT-D-2580, this document will be the system description does not contain this information.            revised to reflect the 10Hz minimum frequency and Please provide the source of this information and update the        provide the basis for the frequency response values in system description to reflect the appropriate information.          the FSAR.
: 5)  Please provide information as to how the in-containment        5)    In-containment component qualification for vibration as components are qualified for vibration as addressed in              addressed in regulatory position C.1.g of RG 1.133, will regulatory position C.1.g of RG 1.133.                              be addressed in a future RAI response letter.
332    7.5.2.1  7.5.1  M a(
r              10/26/2010                                                                                                                          Y            Closed                        Closed                ML103000105 Item TBD              EICB RAI ML103000105 sent to DORL No 1 333    7.5.2.1  7.5.1  M a(
r              10/27/2010                                                                                                                          Y            Closed                        Closed                ML103000105 Item TBD              EICB RAI ML103000105 sent to DORL No 2 334      7        7                      FSAR Figure 7A-3 Mechanical Flow and Control Diagram            Responder: Stockton                                                Y            Open                          Open-TVA/A102        RAI not required. N/A             RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves.                                                                                                                                                                        not part of any SE section.
EICB (Darbali)
Please correct this in a future FSAR amendment.                                                                                                  Figure will be corrected in FSAR Due 12/17/10 Amendment 102.
Pending FSAR Amendment 102 submittal.
335   7.6.1     7.6.7                   LPMS: Reference to OI-331, sub item 2.                             Responder: WEC                                                  N            Open                          Open-TVA/WEC EICB (Singh)
Provide analysis, test, or combined analysis and test for normal                                                                                                                Due ___________
operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the


Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the Responder: WEC N Open Open-TVA/WEC Due ___________
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only)                                                                                                         rad22EA6.docx                                                                               Open Items to be Resolved for SER Approval
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
336 7.5.2.3 7.5 EICB (Singh) Re: RM-1000 Report 04508905-QR Please check the page numbering in Appendix F, Closed Nonconforming Material Reports. Pages 1 and 6 are missing and


pa ge 2 is included multiple times. Also identif y which pa g e number is the last page number. Responder: GA General Atomics was not able to determine where the duplicate page 2 originated. The master document does not contain any duplicate pages. Due a clerical error during document development, the master document starts at page 2 and ends at page 9, for a total of 8 pages. In May of this year, the NRC discovered that the master document was missing page 6. The master document was revised and re-submitted. Attachment 2 contains the missing page 6.
===Response===
SE      FSAR    NRC No.                                                                  Issue                                                        TVA Response(s)                            Acceptable      Status/ Current Actions      Resolution Path    RAI No. & Date  RAI Resp. Date      Comments Sec.      Sec. POC                                                                                                                                                      Y/N environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
336    7.5.2.3    7.5                    Re: RM-1000 Report 04508905-QR                                      Responder: GA                                                     Y            Open                        Open-TVA/Bechtel Please check the page numbering in Appendix F, Closed                General Atomics was not able to determine where the                                                         Due 11/24/10 Nonconforming Material Reports. Pages 1 and 6 are missing and        duplicate page 2 originated. The master document does not page 2 is included multiple times. Also identify which page number  contain any duplicate pages. Due a clerical error during                                                   Response acceptable.
EICB (Singh) is the last page number.                                            document development, the master document starts at page                                                   Please submit 2 and ends at page 9, for a total of 8 pages. In May of this                                               response.
year, the NRC discovered that the master document was missing page 6. The master document was revised and re-submitted. Attachment 2 contains the missing page 6.
The Nonconforming Material (NCM) reports found on Appendix F are complete.
The Nonconforming Material (NCM) reports found on Appendix F are complete.
Y Open Open-TVA/Bechtel Due 11/24/10 Response acceptable.
337   7.5.2.3   7.5                   Re: RM-1000 Report 04508905-QR                                       Responder: GA                                                    Y            Open                        Open-TVA/Bechtel Appendix C is titled as Seismic Test Fixture for RM2300, See         The test fixture listed on Appendix C is applicable to the RM-                                              Due 11/24/10 Drawing 04619028. Please verify whether or not it applies to RM-     1000, as indicated in the second and third paragraph of EICB (Singh) 1000? If applicable, then please identify how it is applicable.     section 4.3.1, of the 04508905-QR report. The RM-1000s                                                    Response acceptable.
Please submit response. 337 7.5.2.3 7.5 EICB (Singh) Re: RM-1000 Report 04508905-QR Appendix C is titled as Seismic Test Fixture for RM2300, See Drawing 04619028. Please verify whether or not it applies to RM-1000? If applicable, then please identify how it is applicable. Responder: GA The test fixture listed on Appendix C is applicable to the RM-1000, as indicated in the second and third paragraph of section 4.3.1, of the 04508905-QR report. The RM-1000's and the I/F converters are mounted on a standard 19 inch NIM-Bin, and this test rack is configured to simulate the field installation of a standard 19 inch rack.
and the I/F converters are mounted on a standard 19 inch                                                   Please submit NIM-Bin, and this test rack is configured to simulate the field                                             response.
This seismic test fixture was originally built for the seismic testing of the RM2300's which are also mounted on a standard 19 in NIM-Bin."
installation of a standard 19 inch rack.
Y Open Open-TVA/Bechtel Due 11/24/10 Response acceptable.
This seismic test fixture was originally built for the seismic testing of the RM2300s which are also mounted on a standard 19 in NIM-Bin.
Please submit response. 338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
338   7.5.2.3   7.5                   In page 3-15 and appendix B of Qualification Test Report           Responder: Civil EQB                                                N            Open                        Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown                                                                                          Due: 12/17/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that EICB (Singh) are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).
Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.
Responder: Civil EQB Get date from Bob Brown N Open Open-TVA/Bechtel Due: 12/17/10   339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. Responder: Bob Brown N Open Open-TVA/Bechtel Due: 12/17/10   340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA N Open Open-TVA/GA Due:12/22/10}}
339   7.5.2.3   7.5                   In the Qualification Test Report 04508905-QR, the licensee   Responder: Bob Brown                                                    N            Open                        Open-TVA/Bechtel provided only eight Safe Shutdown Earthquake (SSE) Test EICB Response Spectra (TRS) as mentioned in the previous open item                                                                                                                   Due: 12/17/10 (Singh)        (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.
340   7.5.2.3   7.5                   Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA                                                  N            Open                        Open-TVA/GA (page 3-8) of the Qualification Test Report 04508905-QR. In EICB addition, please provide the standards or the guidance documents                                                                                                                 Due:12/22/10 (Singh)        used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.}}

Latest revision as of 10:56, 6 December 2019

OL - FW: Updated OI List
ML103280242
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 11/24/2010
From:
Office of Nuclear Reactor Regulation
To:
Division of Operating Reactor Licensing
References
Download: ML103280242 (42)


Text

WBN2Public Resource From: Poole, Justin Sent: Wednesday, November 24, 2010 11:10 AM To: Crouch, William D Cc: WBN2HearingFile Resource

Subject:

FW: Updated OI List Attachments: 20101124 Open Item List Master NRC Update 11-24-10.docx Justin C. Poole Project Manager NRR/DORL/LPWB U.S. Nuclear Regulatory Commission (301)415-2048 email: Justin.Poole@nrc.gov


Original Message-----

From: Darbali, Samir Sent: Wednesday, November 24, 2010 11:04 AM To: Poole, Justin Cc: Garg, Hukam; Wiebe, Joel

Subject:

Updated OI List

Justin, Attached is the updated OI list to be sent out to TVA.
Thanks, Samir 1

Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 197 Mail Envelope Properties (19D990B45D535548840D1118C451C74D7A49394CC4)

Subject:

FW: Updated OI List Sent Date: 11/24/2010 11:10:11 AM Received Date: 11/24/2010 11:10:15 AM From: Poole, Justin Created By: Justin.Poole@nrc.gov Recipients:

"WBN2HearingFile Resource" <WBN2HearingFile.Resource@nrc.gov>

Tracking Status: None "Crouch, William D" <wdcrouch@tva.gov>

Tracking Status: None Post Office: HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 396 11/24/2010 11:10:15 AM 20101124 Open Item List Master NRC Update 11-24-10.docx 400045 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 001 All All C B( The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (Agency 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains wide Documents Access and Management System Accession ML093230343 Item mostly description of the function that 002 All All C B( Are there I&C components and systems that have changed to a 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains new or different digital technology without the change being ML093230343 Item mostly description of the function that 003 All All C B( Because a digital I&C platform can be configured and programmed 12/15/2009 Presentation Slides Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09: The FSAR contains for different applications the review process can be divided ML093230343 Item mostly description of the function that 004 All All C B( Please identify the information that will be submitted for each Responder: Webb 1/13/10 Public Meeting Y Closed Closed EICB RAI January 13, 2010 NNC 11/19/09: LIC-110 Rev. 1 Section unreviewed digital I&C system and component and the associated ML093230343 Item 6 2 2 states: "Design features and 005 7.1.3.1 B G

a( By letter date February 28, 2008 (Agencywide Documents Access Responder: Craig/Webb Y Closed Closed EICB RAI TVA Letter dated and Management System (ADAMS) Accession Number ML093431118 Item 2/5/10 006 B G

a( Amendment 95 of the FSAR, Chapter 7.3, shows that change 7.3- By letter dated February 5, 2010: TVA provided the Unit 2 Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 1 consists of updating a reference from revision 5 to revision 7 and setpoint methodology (WCAP-177044-P Revision 0 - dated ML093431118 Item 2/5/10 (ML073460281) is in ADAMS 007 7.1.3.1 B G

a( The setpoint methodology has been reviewed and approved by the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 7 Y Closed Closed EICB RAI TVA Letter dated TVA to provide Rev. 8 of the Unit 1 NRC staff in Section 7 1 3 1 of NUREG-0847 (ML072060490) on Page 7 of 15): TVA responded to this request for This item is reviewed in FSAR ML093431118 Item 3/12/10 document (which is the current one) if 008 7.3 B G

a( There are several staff positions that provide guidance on setpoint TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 8 Y Closed Closed EICB RAI TVA Letter dated methodology (e g Reg Guide 1 105 BTP 7-12 RIS-2006-17 and on Page 7 of 15): TVA responded to this request for ML093431118 Item 3/12/10 009 7.3.2 5.6, D a( Change 7.3-2, identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 9 Y Closed Closed EICB RAI 3/12/10, 635 for Unit 2 (ADAMS Accession Number ML080770366) refers to on Page 8 of 15): TVA responded to this request for ML093431118 Item ML101680598 010 7.3 7.3 D a( The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 10 Y Closed Closed EICB RAI 3/12/10, scope of the review of FSAR Section 7 3 Engineered Safety on Page 8 of 15): TVA responded to this request for ML093431118 Item ML101680598 011 7.3.2 5.6, D a( NUREG-0847 Supplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 11 Y Closed Closed EICB RAI ML101680598, 635 evaluation of a change in containment sump level measurement on Page 13 of 15): TVA responded to this request for ML093431118 Item Item 9 012 7.4 7.4 D a( The original SER on Watts Bar (NUREG-0847) documents that the TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 12 Y Closed Closed EICB RAI TVA Letter dated scope of the review of FSAR Section 7 4 "Systems Required for on Page 13 of 15): TVA responded to this request for ML093431118 Item 3/12/10 013 7.1.3.1 B G

a( Chapter 7 and Chapter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12, 2010 (Enclosure 1, Item No. 13 Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

include any setpoint values Please describe how and when on Page 14 of 15): TVA responded to this request for ML093431118 Item 3/12/10 014 All All C B( Provide the justification for any hardware and software changes Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated that have been made since the previous U S Nuclear Regulatory Responder: TVA Summary 4/27/10 015 B G

a( Verify that the refurbishment of the power range nuclear Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated instrumentation drawers resulted in only like-for-like replacements Responder: TVA Summary 4/27/10 016 B C(

ar Identify the precedents in license amendment requests (LARs), if Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated any for source range monitors or intermediate range monitors Responder: TVA Summary 4/27/10 017 7.3.1 7.3.1, D a( Identify precedents in LARs, if any, for the solid state protection Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated 555 system Also identify any hardware deviation from the precedent Summary 4/27/10 018 B G

a( Identify any changes made to any instrumentation and control Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated (I&C) system based on prior knowledge of failures Responder: TVA Summary 4/27/10 019 B G

a( Verify that the containment purge isolation radiation monitor is the Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated same as used in Watts Bar Unit 1 or identify any hardware Summary 4/27/10 020 B G

a( Provide environmental qualification information pursuant to Section Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

50 49 of Title 10 of the Code of Federal Regulations (10 CFR) for Responder: TVA Summary 4/27/10 "The organization responsible for the 021 7.3 B G

a( For the Foxboro Spec 200 platform, identify any changes in Date: 5/25/10 Y Closed Closed NRC Meeting TVA Letter dated The resolution of this item will be hardware from the precedent systems Provide the design report The resolution of this item will Summary 6/18/10 covered by OI#288 022 7.3.2 5.6, D a( Verify the auxiliary feedwater control refurbishment results in a Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated 635 like-for-like replacement and identify any changes from the Summary 4/27/10 023 B G

a( Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

safety-related control transmitters and complete the deviation Responder: TVA Summary 4/27/10 "The organization responsible for the 024 B C

a( Provide a schedule by the January 13, 2010, meeting for providing During the January 13, 2010 meeting, TVA presented a Y Closed Closed NRC Meeting N/A - Request for NNC 4/30/10: Carte to address information in accordance with I&C Interim Staff Guidance (ISG) 6 schedule for completing various documents for the PAMS Summary schedule response with respect to PAMS and 025 7.5.2 7.5.1 B S

in( For the containment radiation high radiation monitor, verify that the Date: 4/27/10 Y Closed Closed NRC Meeting ML101230248, information provided by TVA is consistent with the information Summary Item 12 026 B G

a( Provide environmental qualification (10 CFR 50.49) information for Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated NNC 4/30/10: SRP Section 7.0 states:

safety-related monitoring transmitters Responder: TVA Summary 4/27/10 "The organization responsible for the 027 7.7.1.4 B C

a( For Foxboro I/A provide information regarding safety/non-safety- Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated related interaction common cause failures and communication Responder: TVA Summary 4/27/10 028 B G

a( For the turbine control AEH system, verify that the refurbishment Responder: Mark Scansen Y Closed Closed NRC Meeting TVA Letter dated results in a like-for-like replacement Date: 4/27/10 Summary 10/5/10 029 B C

a( For the rod control system, verify that the refurbishment results in a Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated like-for-like replacement Responder: TVA Summary 4/27/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 030 B G

a( Regarding the refurbishment of I&C equipment, identify any Responder: Clark Y Closed Closed NRC Meeting TVA Letter dated component digital upgrades and if so provide the supporting Summary 10/5/10 031 B C

a( For the rod position indication system (CERPI), provide information Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated CERPI is non-safety related.

in accordance with ISG 4 Need to consider cyber-security issues Responder: TVA Summary 4/27/10 Note: The issue of interlock with rod 032 B C

a( For the process computer, need to consider cyber security issues Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated EICB will no longer consider cyber and emergency response data system needs Responder: TVA Summary 4/27/10 issues 033 B C

a( For the loose parts monitoring system, provide information Date: 4/27/10 Y Closed Closed NRC Meeting TVA Letter dated The loose parts monitoring system is regarding interactions with safety related equipment Responder: TVA Summary 4/27/10 not connected to any other system 034 B G

a( 2/4/2010 Responder: TVA Y Closed Closed N/A TVA Letter dated Awaiting NRC evaluation of 4/27/10 034.1 a r

g Chapter 7.1 - Introduction Y Close Closed N/A N/A Reactor Coolant System Flow Rate Measurement 034.2 B G

a( Chapter 7.2 - Reactor Trip System Y Close Closed N/A N/A Deletion of Neutron Flux Negative Rate Trip 034.3 7.3 7.3 D a( Chapter 7.3 - ESFAS Y Closed Closed N/A N/A Design Basis Analysis Parameters 034.4 7.5.1.1 7.5.2 M a(

r Chapter 7.5 - Instrumentation Systems Important to Safety Y Closed Closed N/A N/A Closed Plant Process Computer Replacement 034.5 7.5.1.1 7.5.2 a r

c Chapter 7.6 - All Other Systems Required for Safety Y Closed Closed N/A N/A Closed 761 767 Plant Process Computer Replacement 034.6 in g

h

/ Chapter 7.7 Control Systems Y Closed Closed N/A N/A Alternate Means for Monitoring Control or Shutdown 035 B S

in( 2/18/2010 Responder: Clark Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: Design ML102980005 3/12/10 features and administrative programs 036 7.5.2 7.5.1 B C

a( February 18, 2010 Date: 5/25/10 Y Closed Closed NRC Meeting NNC: Unit 2 FSAR Section 7.5.1, Post Responder: Clark Summary Accident Monitoring Instrumentation 037 7.5.1.1 7.5.2 M a(

r 2/18/2010 Responder: Clark Date: 5/25/10 Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 provides 09/16/10 10/5/10 information 038 7.5.1.1 7.5.2 M a(

r 2/18/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December ML102861885 10/5/10 15 2010 meeting (ML093520967) 039 B G

a( January 13, 2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI FSAR amendment The equation for the calculation of the ML102910008 98 estimated average hot leg temperature 040 B G

a( January 13, 2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI EICB RAI FSAR amendment The equation for the calculation of the ML102910008 98 power fraction on page 7 2-14 of 041 7.5.2 7.5.1 2/19/2010 Responder: WEC N Open Open-TVA/WEC NRC Meeting TVA Letter dated See also Open Item Nos. 226 & 270.

EICB (Carte)

Summary NRC 6/18/10 Please provide the following Westinghouse documents: Items (1) and (2) were docketed by TVA letter dated April 8, Partial Response is included in Due: Meeting Summary (1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements 2010. letter dated 10/5/10. (3) 12/3/10 ML093560019, Item TVA Letter dated Specification" The SysRS and SRS (4) 12/10/10 No. 11 10/5/10 (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Item (3) will be addressed by Revision 2 of the Licensing incorporate requirements from Specification" Technical Report. Due 12/3/10 many other documents by TVA to docket (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" reference. information indentified Please provide the following Westinghouse documents or pointers Item (4) will be addressed by Westinghouse developing a in ISG6.

to where the material was reviewed and approved in the CQ TR or WBN2 Specific Test Plan to compensate for the fact that the NNC 8/25/10: (3) An earlier SPM: NRC disapproved WNA-PT-00058-GEN during the original version of this report was (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Common Q review. Due 12/7/10 docketed for the Common Q Safety systems" topical report; therefore, there (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Item (5) Procedures that are listed in the SPM compliance should be no problem to docket Procedure" table in the Licensing Technical Report revision 1 supersede this version. (4) Per that test procedure WNA-TP-00357-GEN.Due 10/22/10 ML091560352, the testing process document does not address the test plan requirements of the SPM.

Please provide a test plan that implements the requirements of the SPM.

042 All All C B( February 25, 2010: Telecom Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated The drawing provided did not have the Responder: Clark ML102910002 6/18/10 identification numbers as in the FSAR

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 043 7.5.2 7.5.1 2/19/2010 Responder: WEC Date: 5/25/10 N Open Open-NRC Review EICB RAI TVA Letter dated NNC 8/25/10: A CQ PAMS ISG6 EICB (Carte)

ML102910002 2/5/10 compliance matrix was docketed on: (1)

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to The PAMS ISG6 compliance matrix supplied as Enclosure 1 Response is included in letter Due 12/1/10 Item No. 2 February, 5 12010, (2) March 12, 2010, TVA letter dated February 5, 2010 is a first draft of the information to TVA letter dated February 5, 2010 is a first draft of the dated 10/5/10. TVA Letter dated & (3) June 18, 2010. The staff has needed. The shortcomings of the first three lines in the matrix are: information needed. 5/12/10 expressed issued with all of these Revised compliance matrix is compliance evaluations. The staff is still Line 1: Section 11 of the Common Q topical report did include a By letter dated April 8, 2010 TVA provided the PAMS unacceptable. TVA Letter dated waiting for a good compliance commercial grade dedication program, but this program was not Licensing Technical Report provided additional information. 6/18/10 evaluation.

approved in the associated SE. Westinghouse stated that this was NNC 8/12/10: It is not quite the program and it could now be reviewed. The NRC stated that Attachment 3 contains the revised Common Q PAMS ISG-6 enough to provide all of the TVA Letter dated NNC 11/23/10: WNA-LI-00045-WT-P TVA should identified what they believe was previously reviewed Compliance Matrix, dated June 11, 2010, that addresses documents requested. There 10/5/10 Rev. 1 Section 7 does not include the and approved. these items (Reference 13). are two possible routes to RSED documents, and it should. Table review that the NRC can 6-1 Item No. 15 should also include the Line 2: TVA stated the D3 analysis was not applicable to PAMS, By letter Dated June 18, 2010 (see Attachment 3) TVA undertake: (1) follow ISG6, and RSED RTMs.

but provided no justification. The NRC asked for justification since provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 (2) follow the CQ SPM. The SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as Compliance Matrix." TVA response that was being SRP acceptance criteria for PAMS. originally pursued was to follow It is TVAs understanding that this comment is focused on ISG6, but some of the Line 3: TVA identified that the Design report for computer integrity the fact that there are documents that NRC has requested compliance items for ISG6 were was completed as part of the common Q topical report. The NRC that are currently listed as being available for audit at the addressed by referencing the noted that this report is applicable for a system in a plant, and the Westinghouse offices. For those Common Q PAMS SPM. The NRC approved the CQ topical report did no specifically address this PAMS system at documents that are TVA deliverable documents from CQ TR and associated SPM; it Watts Bar Unit 2. Westinghouse, TVA has agreed to provide those to NRC. may be more appropriate to Westinghouse documents that are not deliverable to TVA will review the WBN2 PAMS NRC then concluded that TVA should go through and provide a be available for audit as application to for adherence to more complete and thorough compliance matrix. stated above. Requirements Traceability Matrix issues will the SPM that to ISG6. In either be tracked under NRC RAI Matrix Items 142 (Software path chosen, the applicant Requirements Specification) and 145 (System Design should provide documents and a Specification). Commercial Item Dedication issues will be justification for the acceptability tracked under NRC RAI Matrix Item 138. This item is of any deviation from the path considered closed. chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained.

044 7.5.2 7.5.1 B C

a( February 25, 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated Responder: Clark ML102910002 6/18/10 045 B C

a( February 25, 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated Responder: Clark ML102910002 7/30/10 046 B C

a( February 25, 2010 Date: 5/25/10 Y Closed Closed N/A - Request for N/A Responder: Clark help finding 047 7.5.2 7.5.1 B C

a( 4/8/2010 Responder: WEC/Hilmes Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated ML102910002 7/30/10 048 7.5.2 7.5.1 B C

a( April 8, 2010 Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated Responder: WEC ML102910002 6/18/10 049 7.5.2 7.5.1 B C

a( 4/8/2010 Responder: WEC Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated ML102910002 6/18/10 050 7.5.2 7.5.1 4/8/2010 Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 11/18/10: SysRS Rev. 2 contains EICB (Carte)

ML102910002 6/18/10 several Reference 8, however, How should the "shall" statements outside of the bracketed These sections are descriptive text and not requirements. TVA response is inconsistent Due___________ Item No. 8 Reference 8 has been deleted.

requirements in Common Q requirements documents be The next revision of the Watts Bar Unit 2 PAMS System (e.g., WNA-DS-01667-WBT Discuss at 11/22 phone TVA Letter dated interpreted? Requirements Specification will remove shall from the Rev. 1 page 1-1, Section 1.3.1 call. 10/29/10 wording in those sections. A date for completing the next implies that "SysRS Section Enclosure 1 Item revision of the System Requirements Specification will be ###" has requirements. See No. 1

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N provided no later than August 31, 2010. also SDS4.4.2.1-1 on page 4-32).

The System Requirements Specification will be revised by September 30, 2010 and submitted within two of receipt from Is there a requirement on the Westinghouse. shall referenced above??

TVA Revised Response Response is provided in letter dated 10/29/10.

Shall statements within the scope of the System Requirements Specification (SysRS) and System Design TVA Revised Response in TVA Specification (SysDS) were reviewed by Westinghouse. The Letter dated 10/29/10 Enclosure statements were either relocated to the numbered 1 Item No. 1 is Acceptable requirements section or the wording was changed to identify that it was not a requirement. This item is resolved by NNC 11/18/10: Revised submittal of revision 2 of the SysRS and the SysDS Response is not a statement of (attachments 7 and 8 of TVA Letter to NRC dated 10/25/10). fact. SysRS Rev. 2 (i.e., WNA-DS-01617-WBT Rev. 2) contains many shalls that are not within numbered requirements sections, for example:

(1) Page 2-1, Section 2.3.1 -

See guidance statement (2) Page 2-10, top of page 1 -

See guidance statement 051 B G

a( April 15, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Review addressed by another Open Responder: Craig/Webb Item 052 7.5.2 7.5.1 B S

in( April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 12 Responder: Slifer ML102980005 053 7.5.2 7.5.1 B S

in( April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 13 Responder: Slifer ML102980005 054 7.5.2 7.5.1 B S

in( 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 Y Closed Closed RAI No. 14 TVA Letter dated

-Response acceptable ML102980005 6/18/10 055 7.5.2 7.5.1 B S

in( 4/19/2010 Responder: Slifer/Clark Date: 5/25/10 Y Closed Closed RAI No. 15 TVA Letter dated

-Response acceptable ML102980005 6/18/10 056 B S

in( April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitoring Responder: Slifer ML102980005 6/18/10 057 7.5.2 7.5.1 B S

in( 4/19/2010 Responder: TVA I&C Staff Date: 5/25/10 Y Closed Closed RAI No. 17 TVA Letter dated ML102980005 6/18/10 058 7.5.0 7.5 B S

in( April 19, 2010 Date: 5/25/10 Y Closed Closed RAI No. 18 TVA Letter dated Responder: Slifer ML102980005 6/18/10 059 7.5.2 7.5.1 B S

in( April 19, 2010 Date: Y Closed Closed RAI No. 19 TVA Letter dated Responder: Slifer ML102980005 6/18/10 060 7.5.2 7.5.1 B C

a( April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 47 Responder: Clark 061 7.5.2 7.5.1 B C

a( April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 48 Responder: Clark 062 7.5.2 7.5.1 B C

a( April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 49 Responder: Clark 063 7.5.2 7.5.1 B C

a( April 19, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Addressed by Open Item No. 50 Responder: Clark 064 7.5.2 7.5.1 B C

a( By letter dated March 12, 2010 TVA stated that the target submittal Responder: Webb Date: 4/8/2010 Y Closed Closed N/A - No question TVA Letter dated date for the D3 Analysis was April 2 2010 was asked Item 10/5/10 065 7.5.2 7.5.1 B C

a( By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed Closed N/A - No question TVA Letter dated date for the FMEA was August 31 2010 was asked Item 10/5/10 066 7.5.2 7.5.1 B C

a( By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed Closed N/A - No question TVA Letter dated date for the "Watts Bar 2 PAMS Software Design Description (two was asked Item 6/18/10 067 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question TVA Letter dated

(

C a

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N date for the "Commercial Grade Dedication Instructions for AI687, was asked. Item 6/18/10 AI688, Upgraded PC node box and flat panels." was September The following status is from the revised WB2 Common Q This item is addressed in Rev. 2 Due 12/3/10 was opened to track 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to of the Licensing Technical comm8ittment Item 43: Report made by applicant.

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), these items are available for audit at the Westinghouse Rockville office.
c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit 068 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question TVA Letter dated EICB (Carte) date for the "Summary Report on acceptance of AI687, AI688, was asked. Item 6/18/10 Upgraded PC node box, flat panels, and power supplies." was The following status is from the revised WB2 Common Q This item is addressed in Rev. 2 Due 12/3/10 was opened to track September 28, 2010. PAMS ISG-6 Compliance Matrix submitted in response to of the Licensing Technical comm8ittment Item 43: Report made by applicant.

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit 069 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A EICB date for the "Watts Bar 2 PAMS Specific FAT Report" was October was asked. Item (Carte) 2010. Awaiting for document to be Due 2/18/11 was opened to track docketed by TVA. comm8ittment made by applicant.

070 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question TVA Letter dated NNC 11/23/10: The dues date in this EICB (Carte) date for the "Concept and Definition Phase V&V Report" was was asked. Item 6/18/10 open item does not agree with the due March 31, 2010. Per Westinghouse letter WBT-D-1961, this document is Partial Response is included in Due 12/17/10 was opened to track dated in Open Item No. 71.

available for audit at the Westinghouse Rockville office. letter dated 10/5/10. comm8ittment TVA Letter dated made by applicant. 8/20/10 WNA-VR- 00283-WBT, Rev 0 was submitted on TVA letter Regulations require that the to the NRC dated August 20, 2010. NRC review be based on TVA Letter dated docketed material. Awaiting for 10/5/10 The submitted V&V did not address the Requirements document to be docketed by Traceability Matrix and did not summarize anomalies. At the TVA.

September 15th public meeting, Westinghouse agreed to include the Concept and Definitions Phase Requirements NNC 8/25/10: Requirements Traceability Matrix (RTM) in the next IV&V report along with Phase SVVR provided by TVA

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N partial Design Phase updates to the RTM. letter dated 8/20/10.

TVA Revised Response: NNC 11/23/10: The TVA submitted WNA-VR- 00283-WBT, Rev 0 to NRC in requirements Phase SVVR letter dated August 20, 2010 provided by TVA on 8/20/10, is (Reference 6). not complete. This report The next Independent Verification and Validation (IV&V) should address the RTM, which report will include the Design it did not. TVA/WEC agreed to Phase Requirements Traceability Matrix. The Design Phase address the concept phase RTM IV&V Report will be submitted in the next revision.

to NRC by February 11, 2011.

071 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A NNC 11/23/10: The dues date in this EICB date for Revision 2 of the I V&V Report" covering the Design and was asked. Item open item does not agree with the due (Carte) Implementation phases was July 30, 2010. Awaiting for document to be Due 12/10/10 was opened to track dated in Open Item No. 70.

docketed by TVA. commitment made by applicant.

072 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Closed Closed N/A - No question N/A EICB (Carte) date for the "Implementation Phase V&V Report" was September to item 71. Per WEC, was asked. Item 30, 2010. Awaiting for document to be the design and was opened to track docketed by TVA. implementation phase commitment made IV&V reports are by applicant.

combined.

073 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A EICB date for Revision 3 of the IV&V Report covering the Integration was asked. Item (Carte) phase was October 29, 2010. Awaiting for document to be Due 12/22/10 was opened to track docketed by TVA. commitment made by applicant.

074 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A EICB date for the Post FAT IV&V Phase Summary Report was was asked. Item (Carte) November 30, 2010. TVA to provide due date. Due 2/21/11 was opened to track commitment made by applicant.

075 7.5.2 7.5.1 By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 N Open Open-TVA/WEC N/A - No question N/A EICB date for the "Watts Bar 2 PAMS Specific FAT Procedure" was was asked. Item (Carte) September 30, 2010. Awaiting for document to be Due 12/3/10 was opened to track docketed by TVA. commitment made by applicant.

076 7.5.2 7.5.1 B C

a( By letter dated March 12, 2010 TVA stated that the target submittal Responder: Clark Date: 5/25/10 Y Closed Closed N/A - No question N/A date for the "Watts Bar 2 PAMS Specific Processor Module was asked Item 077 7.5.2 7.5.1 B C

a( By letter dated March 12, 2010 TVA stated that the target submittal Responder: WEC Date: 5/25/10 Y Closed Closed N/A - No question TVA Letter dated date for seven other documents was "TDB" Please provide a was asked Item 6/18/10 078 B G

a( 4/26/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated ML102910008 10/5/10 079 B G

a( 4/26/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 ML102910008 10/5/10 080 B S

in( 4/26/2010 Responder: WEC Y Closed Closed RAI No. 2 TVA Letter dated ML102980005 7/30/10 081 7.5.2 7.5.1 5/6/2010 Responder: Merten/WEC N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102910002 6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The codes and standards documents listed in Section 7 of ML101600092 Item No.1: There Due 12/22/10 Item No. 9 0, Dated April 2010), in Section 7, lists codes and standards the Common Q PAMS Licensing Technical Report are the are three sets of regulatory applicable to the Common Q PAMS. This list contains references documents that the Common Q platform was licensed to criteria that relate to a Common TVA to provide to old revisions of several regulatory documents, for example: when the NRC approved the original topical report and Q application (e.g. WBN2 requested information.

(1) RG 1.29 - September 1978 vs. March 2007 issued the approved SER. The WBN Unit 2 Common Q PAMS):

(2) RG 1.53 - June 1973 vs. November 2003 PAMS is designed in accordance with the approved (a) Common Q platform (a) IEEE 379-1994 vs. -2000 Common Q topical report and approved SER and the codes components - Common Q TR

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (3) RG 1.75 - September 1975 vs. February 2005 and standards on which the SER was based. Since the (b) Application Development (a) IEEE 384-1992 vs. -1992 current versions referenced are not applicable to WBN Unit Processes - Common Q SPM (4) RG 1.100 - June 1988 vs. September 2009 2, there is no basis for a comparison review. (c) Application Specific - current (a) IEEE 344-1987 vs. -2004 regulatory criteria (5) RG 1.152 - January 1996 vs. January 2006 Bechtel to develop a matrix and work with Westinghouse to The Common Q Topical Report (a) IEEE 7-4.33.2-1993 vs. -2003 provide justification. and associated appendices (6) RG 1.168 - September 1997 vs. February 2004 primarily addressed (a) and (b).

(a) IEEE 1012-1986 vs. -1998 The Common Q SER states:

(b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 Appendix 1, Post Accident (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 Monitoring Systems, provides endorses 323-1974) the functional requirements and However, LIC-110, "Watts Bar Unit 2 License Application Review," conceptual design approach for states: "Design features and administrative programs that are upgrading an existing PAMS unique to Unit 2 should then be reviewed in accordance with the based on Common Q current staff positions." Please identify all differences between the components (page 58, Section versions referenced and the current staff positions. Please provide 4.4.1.1, Description)On the a justification for the acceptability PAMS with respect to these basis of the above review, the differences. staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the proposed PAMS design (page 56, Section 4.4.1.3, PAMS Evaluation)

The NRC did not approve the proposed PAMS design.

Section 6, References, and Section 7, Codes and Standards Applicable to the Common Q PAMS, of the PAMS Licensing Technical Report contain items that are not the current regulatory criteria.

Please provide an explanation of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS design. For example IEEE Std.

603-1991 Clause 5.6.3, Independence Between Safety Systems and Other Systems, and Clause 6.3, Interaction Between the Sense and Command Features and Other Systems, contain application specific requirements that must be addressed by a PAMS system.

Awaiting TVA Response.

082 7.5.2 7.5.1 EICB 5/6/2010 Responder: WEC Date: 6/18/10 N Open Open-TVA/WEC EICB RAI TVA Letter dated NNC 11/18/10: See also Open Item No.

(Carte ML102910002 7/30/10 41, Item No. 3.

)

The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. These components can be found in the Summary Regulations require that the Due 12/3/10 Item No. 10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 0, Dated April 2010), in Section 2.3, lists hardware/software Qualification Report Of Hardware Testing For Common Q NRC review be based on changes to the Common Q PAMS previously reviewed by the Applications, 00000-ICE-37764, Rev 3 and docketed material. Awaiting for Commercial Grade NRC. However the Common Q ISG-6 Compliance Matrix does not TWICE Qualification Status Report, WNAQR-00011-SSP document to be docketed by Dedication to be contain activities that address qualification of all changes Per Westinghouse letter WBT-D-2024, (Reference __) dated TVA. addressed in LTR Rev.

specifically: June 9, 2010, these documents are available for audit at the 2, Westinghouse Rockville Office. NNC 8/9/10: per telephone conversation on 8/5/10, it is not TVA provided information by letter dated July 30, 2010 clear how Westinghouse (ML102160349) - See Enclosure 1 Item No. 7. Commercial Grade Dedication Plans and Reports for Digital Revision 1 of the Licensing Technical Report provides I&C. Westinghouse agree to additional detail on the platform specific to WBN2 and present to the NRC in a public references to the evaluation documentation. meeting on August 17, 2010, and explanation of how their system addresses regulatory criteria for both commercial grade dedication and equipment qualification.

NNC 8/25/10: In the August 17, 2010 public meeting Westinghouse stated that the CDI were the plans. The NRC requested that the plans and associated reports be docketed.

NNC 11/18/10: During the September 20-21, 2010 audit, TVA agreed to put a description of the commercial grade dedication program and implementation in Rev. 2 of the CQ PAMS LTR.

083 7.5.2 7.5.1 B C

a( May 6, 2010 Date: 6/18/10 Y Closed Closed EICB RAI TVA Letter dated Responder: WEC ML102910002 7/30/10 084 7.5.2 7.5.1 B C(

ar May 6, 2010 Date: 6/18/10 Y Closed Closed EICB RAI TVA Letter dated Responder: Clark ML102910002 6/18/10 085 7.5.2 7.5.1 5/6/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102910002 Please provide a detailed description of the PAMS MTP data link Is the WEC ISG4 evaluation inadequate? A response will be provided by Due 12/3/10 Item No. 13 to the plant computer. This description should identify all 10/31/10 equipment (model & version) and describe the functions that each Operation of the MTP as a barrier device. MTP Fails as a Hardware is in Rev. 1 piece of equipment performs. This description should be of barrier device. Describe what prevents a MTP failure from NNC 8/11/10: Design of the Licensing sufficient detail for the NRC to independently evaluate the propagating to the AC160? information should be available Technical Report due statements made in WNA-LI-00058-WBT Rev. 0, Section 5.3. now. By letter dated July 30, 10/22.

Node loss on the bus? Bus loss? 2010 (ML102160349) TVA stated that the MTP was NNC 8/25/10:

Revise the ISG4 section of the Licensing Technical Report connected to a Red Hat Linux Disagree with path (Rev. 2) to provide a more detailed description of the MTP as Server (see Enclosure 1, Item forward input by TVA a barrier device. No. 14 part b.). It is presumed above. An explanation that this server is not safety- is about the design is related. IEEE 603-1991 Clause needed.

5.6.3(1) states, "Isolation devices used to affect a safety FAT test procedure to system boundary shall be include data storm classified as part of the safety testing of the MTP system." interface

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Please describe how the MTP NNC 11/18/10: WEC serves as the isolation device. response states that CQ PAMS LTR Rev. 2 will contain relevant information.

086 7.5.2 7.5.1 5/6/2010 Responder: WEC Date: 5/24/10 N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102910002 6/18/10 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. The regulatory documents listed in the Common Q PAMS TVA to address with item OI Due 12/22/10 Item No. 14 0, Dated April 2010), in Section 6, lists references applicable to the Licensing Technical Report are the documents that the 81.

Common Q PAMS. This list contains references to old revisions of Common Q platform was licensed to when the NRC several regulatory documents, for example: approved the original topical report and issued the approved (1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 SER. The WBN Unit 2 Common Q PAMS is designed in (ML083310185) accordance with the approved Common Q topical report and However, LIC-110, "Watts Bar Unit 2 License Application Review," approved SER and the regulatory documents on which the states: "Design features and administrative programs that are SER was based. Since the current versions referenced are unique to Unit 2 should then be reviewed in accordance with the not applicable to WBN Unit 2, there is no basis for a current staff positions." Please identify all differences between the comparison review.

versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these Rev 0 of the Licensing Technical Report references Rev. 1 of differences. ISG4 087 7.5.2 7.5.1 B S

in( May 6, 2010 Date: 5/24/10 Y Closed Closed RAI No. 20 TVA Letter dated Responder: Slifer ML102980005 6/18/10 088 7.5.2 7.5.1 (SB in May 6, 2010 Date: 5/24/10 Y Closed Closed RAI No. 21 TVA Letter dated Responder: Slifer ML102980005 6/18/10 089 B C

a( 5/6/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed response states that ML102910002 3/12/10 the applicable FSAR Sections are:

090 B C

a( 5/6/2010 Responder: Clark Date: 5/25/10 Y Closed Closed EICB RAI TVA Letter dated ML102910002 3/12/10 091 7.4 7.4 D a( May 20, 2010 Date: 5/25/10 Y Closed Closed EICB RAI No.1 TVA Letter dated Responder: Clark ML102910017 6/18/10 092 5/20/2010 Responder: Hilmes Y Open Open-TVA DORL (Poole)

TVA to review Licensee Open Item list and determine which items This item will close when we are no longer using this Due: SER Issue are proprietary. document as a communications tool.

Continuous review as items are added 093 B G

a( May 20, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Will be reviewed under item 154 Responder: Knuettel 094 B G

a( 5/20/2010 Responder: Clark Date: 5/25/10 Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1, XX D a( May 20, 2010 Date: Y Closed Closed EICB RAI No. 2 TVA Letter dated 784 Responder: ML102910017 7/30/10 096 7.7.5 XX D a( 5/20/2010 Responder: Y Closed Closed EICB RAI No.3 TVA Letter dated ML102910017 7/30/10 097 7.4.2 7.4 D a( May 20, 2010 Date: Y Closed Closed EICB RAI No.4 TVA Letter dated Responder: ML102910017 7/30/10 098 7.4.2 7.4 D a( May 25, 2010 Date: Y Closed Closed EICB RAI No.5 TVA Letter dated Responder: ML102910017 7/30/10 099 R L

(B April 12, 2010 Date: Y Closed Closed Closed to Item 129 Responder: WEC ail 100 B C

a( 5/20/2010 Responder: WEC Y Closed Closed N/A - No question N/A was asked Item 101 4/12/2010 Responder: Slifer Y Open Open-NRC Review N/A TVA is working with the vendor to meet DORL the 6/30 date, however there is the (Poole) The non-proprietary versions of the following RM-1000, The documents, and affidavits for withholding for the listed Documents provided in letter Due 10/14/10 potential this will slip to 7/14.

Containment High Range Post Accident Radiation Monitor documents were submitted to the NRC on TVA letter to the dated 07/15/10 documents will be provided by June 30, 2010. NRC dated July 15, 2010. Confirm receipt.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR 102 B C

a( May 24, 2010 Date: 5/24/10 Y Closed Closed N/A TVA Letter dated Request for schedule not information.

Responder: WEC 6/18/10 103 7.4 7.4 D a( 5/27/2010 Responder: Ayala Date: 5/27/10 Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current ML102910017 10/29/10 EDCR scheduled issue date 104 7.4 7.4 D a( 5/27/2010 Responder: Merten Date: 5/27/10 Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current ML102910017 10/29/10 EDCR scheduled issue date 105 B G

a( April 29, 2010 Date: Y Closed Closed N/A N/A Will be reviewed under item 154.

Responder: Langley 106 (SB in May 6, 2010 Date: 5/25/10 Y Closed Closed RAI No. 9 TVA Letter dated Responder: Davies ML102980005 6/18/10 107 (SB in May 6, 2010 Date: 5/28/10 Y Closed Closed RAI No. 22 TVA Letter dated Responder: Clark ML102980005 6/18/10 108 B G

a( May 6, 2010 Date: 5/25/10 Y Closed Closed N/A N/A Will be reviewed under OI#154 Responder: Webb/Hilmes 109.b B C

a( 5/6/2010 Responder: N/A Y Closed Closed N/A N/A Duplicate of another open Item.

109.a 7.8 XX D a( 5/6/2010 Responder: N/A Y Closed Closed N/A N/A 110 B G

a( May 6, 2010 Date: Y Closed Closed N/A N/A Information was found.

Responder: Clark 111 B C(

ar May 6, 2010 Date: 5/28/10 Y Closed Closed N/A TVA Letter dated Request to help find, not a request for Responder: Clark 6/18/10 information 112 B G( June 1, 2010 Date: Y Closed Closed N/A N/A Information was received Responder: Clark 113 B G

a( 6/1/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102910008 6/18/10 114 7.2 7.2 B G

a( 6/1/2010 Responder: WEC Y Close Closed EICB RAI TVA Letter dated ML102910008 6/18/10 115 B C

a( 2/25/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102910002 6/18/10 116 B G

a( 6/3/2010 Responder: WEC Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westinghouse requesting ML102910008 10/5/10 the basis information and 117 7.1 7.1 6/3/2010 Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/29/10 Does TVA use a single sided or double sided methodology for as- Reactor Protection System (RPS) (comprised of Reactor Trip Revised response is included in Pending FSAR Item#21 Enclosure 1 Item found and as-left instrument setpoint values. (RIS2006-7) (RPS) and Engineered Safety Features Actuation System letter dated 10/29/10 Amendment 102 No. 7 (ESFAS)) setpoint values are monitored by periodic submittal performance of surveillance tests in accordance with Technical Specification requirements. TVA uses double- Due 12/17/10 sided as-found and as-left tolerances for Reactor Trip and ESFAS trip setpoint surveillance tests as described in FSAR TVA needs to address amendment 100. that trip setpoint and allowable value TVA Revised Response: uncertainties are not reduced by the For TSTF-493 parameters WBN Unit 2 uses only double reduction factor for the sided correction factors. Attachment 3 contains the revised single sided reduction FSAR section 7.1.2.1.9 that will be included in FSAR factor. TVA response Amendment 102 that reflects this change. not acceptable. TVA need to clarify if single sided methodology has been used in calculating trip setpoint

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N and allowable value and if it is used then provide justifications.

118 7.4 7.4 D a( 6/8/2010 Responder: Merten Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current ML102910017 10/29/10 EDCR scheduled issue date Note:

119 B S

in( June 10, 2010 Date: Y Closed Closed RAI No. 23 TVA Letter dated Responder: ML102980005 7/30/10 120 B C

a( 5/6/2010 Responder: Hilmes/Merten/Costley Y Closed Closed EICB RAI TVA Letter dated ML102910002 7/30/10 121 B C

a( 5/6/2010 Responder: Webb/Webber Y Closed Closed EICB RAI TVA Letter dated ML102980066 Item 7/30/10 122 B C

a( June 14, 2010 Date: Y Closed Closed N/A - Request for N/A Responder: WEC schedule not 123 7.7.3 7.4.1, D a( 6/14/2010 Responder: Y Closed Closed ML101720589, TVA Letter dated 9342 RAIs 21 and 22 7/30/10 124 7.7.5 XX D a( 6/14/2010 Responder: Y Closed Closed ML101720589, Item TVA Letter dated No 23 6/25/10 and 7/30/10 125 7.7.8 7.7.1.12 D a( 6/14/2010 Responder: Y Closed Closed ML101720589, Item TVA Letter dated No s 24 and 25 7/30/10 126 7.8 7.8 D a( June 14, 2010 Date: Y Closed Closed ML101720589, Item TVA Letter dated Responder: No 26 6/25/10 and 7/30/10 127 7.2 7.2 B G

a( 6/16/2010 Responder: WEC/Clark Y Closed Closed EICB RAI TVA Letter dated ML102910008 6/18/10 128 7.2 7.2 B G

a( 6/18/2010 Responder: WEC Drake /TVA Craig Y Closed Closed EICB RAI TVA Letter dated Track through SE open item ML102910008 10/29/10 129 L P

o( 6/12/2010 Responder: WEC Y Closed Closed N/A TVA Letter dated 10/5/10 130 L P

o( 6/28/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated 10/5/10 131 L P

o( 6/28/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated 10/5/10 132 L P

o( 6/28/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated 10/5/10 133 L P

o( 6/28/2010 Responder: Clark Y Closed Closed TVA Letter dated 10/5/10 134 L P

o( 6/28/2010 Responder: Clark Y Closed Closed TVA Letter dated 10/5/10 135 7.3.1 7.3.1 D a( 6/30/2010 Responder: Clark Y Closed Closed RAI not necessary TVA Letter dated because this item 10/5/10 item 27 136 7.3.2, 7.4, 5.6, D a( 6/30/2010 Responder: Clark Y Closed Closed RAI not necessary TVA Letter dated 74 635 because this item 10/5/10 item 28 137 B C

a( Several WBN2 PAMS documents contain a table titled, Document Responder: WEC Y Closed Closed ML101650255, Item TVA Letter dated Traceability & Compliance No 1 10/5/10 138 By letter dated February 3, 2010, Westinghouse informed TVA that Responder: WEC N Open Open-TVA/WEC ML101650255, Item EICB (Carte) certain PAMS documentation has been completed. No. 2 This item is used to track all Commercial Grade TVA agreed to include a Due 12/3/10 (a) The draft ISG6 states that a commercial grade dedication plan Dedication issues. description of the generic should be provided with an application for a Tier 2 review. Westinghouse hardware To be addressed by commercial grade dedication Rev. 2 of the Licensing By letter dated February 5, 2010, TVA stated that the commercial process in the PAMS licensing Technical Report.

grade dedication plan was included in the Common Q Topical technical report. (see Report Section 11, Commercial Grade Dedication Program. ML102920031 Item No 1)

Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: A detailed review plan is TVA agreed to include (in the developed for each Common Q hardware or software component PAMS licensing technical report) that requires commercial grade dedication. an evaluation of WBN2 critical characteristics for commercial Please provide the commercial grade dedication plans for each Westinghouse hardware

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Common Q hardware or software component that has not been components against the generic previously reviewed and approved by the NRC. critical characteristics. (see ML102920031 Item No 2)

(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval TVA agreed to include a for a Tier 2 review. description of the generic Westinghouse software (i) Please provide 00000-ICE-37722 Rev. 0, Commercial Grade commercial grade dedication Dedication Report for the QNX Operating System for Common Q process in the PAMS licensing Applications. technical report. (see ML102920031 Item No 3)

(ii) Please provide WNA-CD-00018-GEN Rev. 3, Commercial Dedication Report for QNX 4.25G for Common Q Applications. TVA agreed to include (in the PAMS licensing technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 139 B C

a( The WBN2 PAMS System Requirements Specification (WBN2 Responder: WEC Y Closed Closed ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements PAMS SysRS) contains a table (see page iii) titled Document No 3 10/5/10 Specification 140 The first requirement in the WBN2 PAMS SysRS (i.e., R2.2-1) Responder: Clark N Open Open-TVA/WEC ML101650255, Item TVA Letter dated WBN2 PAMS System Requirements EICB (Carte) states: The PAMS shall be capable of operation during normal No. 4 10/29/10 Specification and abnormal environments and plant operating modes. The WBN Unit 2 FSAR Amendment 100 Section 7.5.1.8, Post NNC 11/3/10: The origin of the Due 12/3/10 Enclosure 1 Item rational for this requirement is that it is necessary to meet Accident Monitoring System (PAMS) specifies the Reg. requirements in the SysRS are No. 10 TVA docketed WNA-DS-01617-WBT Regulatory Guide (RG) 1.97. Guide 1.97 variables implemented in the Common Q based not clearly document. Rev. 1 of TVA to docket PAMS Rev. 1, RRAS Watts Bar 2 NSSS WBN Unit 2 PAMS the Common Q PAMS Licensing Licensing Technical Completion Program I&C Projects Post What document specifies which RG 1.97 variables are Technical Report contains an Report Rev. 2. Accident Monitoring System- System implemented in the Common Q based WBN2 PAMS? open item that will be addressed Requirements Specification, dated in Rev. 2; this open item is to December 2009.

include TVAs enhanced contract compliance matrix. It is expected that this matrix will address this open item.

141 B C

a( Deleted by DORL Date: Y Closed Closed ML101650255, Item WBN2 PAMS System Requirements Responder: No 5 Specification 142 The applicable regulatory guidance for reviewing the WBN2 PAMS Responder: WEC N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

SysRS would be IEEE 830 as endorsed by Regulatory Guide No. 6 Specification 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities - This item is used to track all traceability issues with the TVA/Westinghouse agreed to Due 12/22/10 Software Requirements Specifications. IEEE 830-1994 Section Software Requirements Specification (SRS). include the V&V evaluation of TVA docketed WNA-DS-01617-WBT 4.3.8, Traceable, states: A [requirements specification] is their reusable software element To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS traceable of the origin of each of its requirements is clear At the September 15 public meeting in Rockville, the development process in the Revision of the RTM, Completion Program I&C Projects Post following actions were agreed to. These items address the V&V design phase summary SRS, SysRS, and Accident Monitoring System- System

1. How did TVA ensure the traceability of each requirement in traceability concerns with the Software Requirements report. This evaluation would SysDS. Requirements Specification, dated the WBN2 PAMS SysRS. Specification. include an evaluation against December 2009.

the development process

2. Explain the source(s) of the requirements present in the Post 1. Westinghouse will perform completed a review of the requirements. This evaluation Accident Monitoring Systems Software Requirements Requirements Traceability Matrix(RT), using the issues would also include an evaluation Specification. To clarify, many documents have identified at the 9/15 public meeting as a guide of how the WBN2 specific requirements that are incorporated by reference into the (documented below) and update the RTM as required. requirements were addressed SRS, but what served to direct the author to include those by the reusable software various documents in the SRS or, if the requirement is based 2. The next issue of the IV&V report will include the elements. (see ML102920031 on the System Requirements Specification, what directed the Requirements phase review of the RTM and a partial Item No 5) author to include the requirement there? review for the Design phase.
3. Clarify whether the unnumbered paragraphs in the Post 3. Westinghouse will add a comments column in the Accident Monitoring Systems Software Requirements Requirements Traceability Matrix (RTM) to address

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Specification, such as in the section headings, or are all such items not in the SRS or SysRS.

sections simply considered to be informative?

4. IEEE 830 says you shouldnt have planning information Does the same apply to documents referenced by the SRS? in the SRS. Westinghouse has agreed to remove this Such as WCAP-16096-NP-A, Rev. 1A, Software Program information.

Manual for Common Q Systems, which is incorporated by reference in requirement R2.3-2 in the SRS. 5. IEEE 830 says you shouldnt have process requirements in the SRS. Westinghouse has agreed to R2.3-2 [The PAMS software shall comply with the remove these requirements.

requirements and guidelines defined in WCAP-16096-NP-A, Software Program Manual for Common Q Systems 6. Westinghouse will perform and document an evaluation (reference 5).] of the SRS to ensure compliance with Reg. Guide 1.172 and justify any deviations.

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, 7. 25 issues identified by V&V where some requirements please list them, describe why they satisfy the fundamental have not been included in the SDS (14) and SRS (11) requirement of unambiguity, and describe how they were at the revisions reviewed by V&V. Have these been verified. addressed? Yes. The next revisions of the SDS and SRS address these issues.

4. Are there any sources of requirements in parallel with the Post Accident Monitoring Systems Software Requirements 8. Some hardware requirements are contained in the SRS Specification? Meaning does the SRS contain, explicitly or instead of the System Design Specification (SDS).

by reference, all the requirements that were used in the These will be removed from the SRS and incorporated design phase for the application specific software, or do into the next revision of the SDS.

software design phase activities use requirements found in any other source or document? If so, what are these 9. RTM item R4.2-2 protection class software set to 0.

sources or documents? Needs to be fixed internally write CAPs to revise the application restrictions document on AC160.

5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring Systems Software Requirements Specification 10. Westinghouse to improve the traceability of the tests are various types of Reusable Software Element. that are performed with the function enable (FE) switch in the ENABLE position.

These references are used in the body of the SRS, for example: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the ENABLE position R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR 12. The flow of information is from the SysRS to the SDS terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software (hardware) and SRS (software). Describe how the Element Document CRC for Calibration Data" [Reference documents are used. Describe in 1.1 of the SysRS.

12]).] Need a good write up of how the process works.

They are also included via tables such as found in 13. Westinghouse and TVA will develop a revised schedule requirement R7.1.2-1 for document submittals and provide it to the NRC no later than 9/30/10

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.] 14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS Do the referenced reusable software element documents include design meets the contract requirements.

requirements not explicitly stated in the SRS? If so what is their origin? 15. Westinghouse to add the Software Design Descriptions to the RTM

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.
17. Westinghouse to review the use of shall outside of numbered paragraphs in requirements documents to ensure that all requirements are captured and clearly

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N identified.

18. Westinghouse to resolve the following questions concerning SDDs
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

For Reusable Software Elements, Westinghouse to describe as qualified libraries by following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP.

Westinghouse to determine if the WCAP was docketed under the AP1000 RSED concept is not in the SPM.

WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was acceptable. RSEDs are listed in the SDD References.

143 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Requirements EICB (Carte)

PAMS SRS - ML101050202) contains a table (see page iii) titled, No. 7 Specification Document Traceability & Compliance, which states that the Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. Due 12/22/10 WBN2 PAMS SRS was created to support the three documents A detailed explanation will be provided. TVA docketed WNA-DS-01617-WBT identified (one of which is the WBN2 PAMS SysRS). Section 1.1, To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS Overview, of the WBN2 PAMS SRS states: This document Revision of the RTM, Completion Program I&C Projects Post describes requirements for the major software components SRS, SysRS, and Accident Monitoring System- System SysDS. Requirements Specification, dated (a) Please list and describe each of the major software December 2009.

components. Please include a description of any NRC review for each of these components.

(b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, Document Traceability

& Compliance, which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, Purpose, of the WBN2 PAMS SDS states: The purpose of this document is to define the hardware design requirements (c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS.

144 The WBN2 PAMS Software Requirements Specification (WBN2 Responder: WEC N Open Open-TVA/WEC ML101650255, Item TVA Letter dated WBN2 PAMS Software Requirements EICB PAMS SRS) contains a table (see page iii) titled, Document No. 8 10/5/10 Specification (Carte) Traceability & Compliance, which states that the WBN2 PAMS (a) The purpose of NABU-DP-00014-GEN document is to Response provided in letter Due 12/3/10 SRS was created to support the three documents identified (two of define the process for system level design, software design dated 10/5/10 By letter dated April 8, 2010 these documents have been provided on the docket). and implementation, and hardware design and Responses to items a (ML10101050203), TVA docketed

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N implementation for Common Q safety system development. NRC Review and WEC to and e provided. WNA-SD-00239-WBT, Revision 1, (a) Please describe the third document (i.e., NABU-DP-00014- This document supplements the Common Q SPM, WCAP- complete response. "RRAS Watts Bar 2 NSSS Completion GEN Revision 2, Design Process for Common Q Safety 16096-NP-A. The scope of NABU-DP-00014-GEN includes NNC 11/18/10: Program I&C Projects, Software Systems). the design and implementation processes for the application b-d to be addressed at public (1) Items b-d closed to Requirements Specification for the Post development. For a fuller description of the design process meeting and audit. Will require other Open Item nos. Accident Monitoring System, dated (b) Please describe the flow of information between these three described in NABU-DP-00014-GEN please refer to the information to be docketed. (2) The point of these February 2010 (ML101050202).

documents. Design Process for AP1000 Common Q Safety Systems, questions was to WCAP-15927 on the AP1000 docket. Since this is a understand how the (c) Does the PAMS SRS implement the requirements in these Westinghouse process document that is not specifically origin of the three documents? referenced in the SRS, it will be removed in the next revision requirements in the of the document. requirements (d) Please describe if and how these three documents are used in specifications were the development of the PAMS Software Design Description. (b) - Closed to items 142 and 145 documented. TVA stated that the origin of (e) Do the WBN2 V&V activities include verification that the (c) - Closed 142 the requirements would requirements of these three documents have been incorporated be demonstrated in into the WBN2 PAMS SRS. (d) - Closed to Item 142 Rev. 2 of the CQ PAMS LTR.

(e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

145 The WBN2 PAMS System Design Specification (WBN2 PAMS Responder: WEC N Open Open-TVA/WEC ML101650255, Item WBN2 PAMS System Design EICB (Carte)

SDS) contains a table (see page iii) titled, Document Traceability No. 9 Specification

& Compliance, which states that the WBN2 PAMS SDS was This item is used to track all traceability issues with the During the September 20-21, Due 12/22/10 created to support the WBN2 PAMS SysRS. System Design Specification (SDS). 2010 audit at Westinghouse, it TVA docketed WNA-DS-01667-WBT was acknowledged that To be addressed by Rev. 1, RRAS Watts Bar 2 NSSS (a) Does the WBN2 PAMS SDS implement all of the hardware At the September 15 public meeting in Rockville, the TVA/Westinghouse had Revision of the RTM, Completion Program I&C Projects Post requirements in the WBN2 PAMS SysRS? following actions were agreed to. These items partially previously (in September 15, SRS, SysRS, and Accident Monitoring System- System address the traceability concerns with the System 2010 public meeting) stated: SysDS. Design Specification, dated December (b) Please briefly describe all of the documents that implement the Design Specification. This item will be updated with the 2009.

hardware requirements of the WBN2 PAMS SysRS. results of the September 20 and 21 Commercial Grade TVA would provide the RSED Dedication and SDS RTM audit. RTM. (see ML102920031 Item

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N No 6)

1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues TVA would revise and resubmit identified at the 9/15 public meeting as a guide the PAMS RTM to address all (documented below) and update the RTM as required. types of issues identified in the public meeting. (see
2. Some hardware requirements are contained in the SRS ML102920031 Item No 7) instead of the System Design Specification (SDS).

These will be removed from the SRS and incorporated TVA would revise and resubmit into the next revision of the SDS. the Software Verification and Validation phase summary

3. 25 issues identified by V&V where some requirements report for the requirements have not been included in the SDS (14) and SRS (11) phase to document the at the revisions reviewed by V&V. Have these been completion of the requirements addressed? Yes. The next revisions of the SDS and phase review. (see SRS address these issues. ML102920031 Item No 8)
4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
6. Westinghouse to provide the generic AC160 and flat panel specifications.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS.

Need a good write up of how the process works.

146 B C

a( 6/17/2010 Responder: Y Closed Closed ML101650255, Item PAMS System Requirements No 10 Specifications 147 B C

a( 6/17/2010 Responder: Y Closed Closed ML101650255, Item PAMS System Requirements No 11 Specifications 148 B C

a( 6/17/2010 Responder: Y Closed Closed ML101650255, Item PAMS System Requirements No 12 Specifications 149 7.2 7.2 B G

a( FSAR Section 7.1.1.2(2), Overtemperature delta T and Responder: Tindell Y Close Closed ML101720589, Item TVA Letter dated Overpressure delta T equations have been simplified and many No 1 10/5/10 150 7.2 7.2 B G

a( Many of the changes were based on the Westinghouse document Responder: Clark Y Close Closed ML101720589, Item TVA Letter dated N3-99-4003 Provide this document for staffs review so the staff Response provided in letter No 2 10/5/10 151 7.2 7.2 B G

a( Provide the EDCR 52378 and 54504 which discusses the basis for Responder: Clark Y Close Closed ML101720589, Item TVA Letter dated many changes to this FSAR section No 3 10/5/10 152 7.2 7.2 B G

a( Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Responder: Merten/Clark Y Close Closed ML101720589, Item TVA Letter dated section 7 2 1 1 5 However the FSAR section 7 2 1 1 5 does not No 4 10/5/10 153 7.2 7.2 B G

a( FSAR section 7.2.1.1.7 added the reference to FSAR section Responder: Craig/Webb Y Close Closed ML101720589, Item TVA Letter dated 10 4 4 3 for exception to P-12 However FSAR section 10 4 4 3 No 5 10/21/10 154 7.2 7.2 FSAR section 7.2.1.1.10, setpoints: NRC staff has issued RIS Responder: Craig/Webb Y Open Open-TVA/A102 ML101720589, Item TVA Letter dated EICB RAI ML102861885 sent to DORL EICB (Garg) 2006-17 to provide guidance to the industry regarding the No. 6 and EICB RAI 10/5/10 instrument setpoint methodology which complies with 10 CFR (Q1) Refer to the response to letter item 13, RAI Matrix Item Response is not acceptable. A Due 12/17/10 ML102861885 Item 50.36 requirements. Provide the information on how the WBN2 51. revised response will be No. 8 TVA Letter dated setpoint methodology meets the guidance of RIS 2006-17 and submitted in the letter dated Pending FSAR 10/29/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N include this discussion in this section. Also, by letter dated May (Q2) EEB-TI-28's single sided methodology conforms with 10/29/10. Amendment 102 Enclosure 1 Item 13, 2010, TVA provided Rev. 7 of EEB-TI-28 to the staff. The staff WBN's design basis commitment to ensure that 95% of the submittal. No. 13 noted that section 4.3.3.6 of EEB-TI-28 discusses the correction analyzed population is covered by the calculated tolerance for setpoints with a single side of interest. It should be noted that limits as defined in NRC Reg Guide 1.105, Revision 2, 1986 FSAR AMD 100. Since the staff has not approved this aspect of setpoint methodology for that was in affect during WBN Unit 1 licensing. The single all the setpoint and Unit 1. The staff finds this reduction in uncertainties is not justified sided methodology is not used for any TSTF-493 setpoints allowable value for Unit unless it can be demonstrated that the 95/95 criteria is met. that use TI-28 methodology. 2 is calculated and Therefore, either remove this reduction factor for single sided added to TS, TVA uncertainties or justify how you meet the 95/95 criteria given in RG TVA Revised Response: needs to address the 1.105. latest criteria and that In order to respond to other NRC comments on the setpoint include 95/95 criteria.

methodology discussion in FSAR Amendment 100, TVA Why the last sentence reviewed the previous response to this RAI. This resulted in has been modified by a complete rewrite of the responses to this question as adding TI-28. It was shown below. As a result, the response does not specifically NRCs understanding address the NRC Follow-up Request. However, the overall that all setpoints have responses to all of the NRC RAIs on setpoint methodology to meet TI-28 addresses this item.

(Q1) WBN 2 implementation of TSTF-493, Rev. 4, Option A includes addition of a discussion of the WBN setpoint methodology in FSAR section 7.1.2.1.9.

(Q2) Electrical Engineering Branch (EEB) Technical Instruction (TI) 28, Setpoint Calculations, single-sided methodology conforms to WBN's design basis commitment to ensure that 95% of the analyzed population is covered by the calculated tolerance limits as defined in NRC Reg Guide 1.105, Revision 2, 1986, which was in effect during WBN Unit 1 licensing. Single-sided multipliers are not used for any TSTF-493 setpoints.

There are some areas where a 95% confidence level could not be achieved. Some examples would be harsh environment instrumentation where only 2 or 3 devices were tested in the 10CFR50.49 program. In these situations, the Confidence is referred to as high..

155 7.2 7.2 B G

a( Summary of FSAR change document section 7.2 states that Date: Y Closed Closed ML101720589, Item sections 7 2 1 1 9 and 7 2 2 2(4) are changed to show that these Responder: Stockton No 7 156 7.2 7.2 FSAR section 7.2.2.1.1 states that dashed lines in Figure 15.1- Responder: WEC N Open Open-TVA/WEC ML101720589, Item TVA Letter dated Response on hold pending EICB (Garg) 1designed to prevent exceeding 121% of power.The No. 8 10/5/10 Westinghouse review.

value of 121% is changed from 118%. The justification for this Per Westinghouse letter WBT-D-2340, TENNESSEE Response is included in letter Due __________

change states that this was done to bring the text of this section in VALLEY AUTHORITY WATTS BAR NUCLEAR PLANT dated 10/5/10 agreement with section 4.3.2.2.5, 4.4.2.2.6 and table 4.1-1. UNIT 2 FSAR Markups Units I and 2 118% vs. 121 % and Amendment 101 However, Table 4.1-1 and section 4.3.2.2.5 still show this value as Correction to RAI Response SNPB 4.3.2-7, (Reference 17) Submitted 10/29/10.

118%. Justify the change. the 118% value should be 121%. Depending on the use in the FSAR either 118% or 121% are the correct values. As a TVA needs to justify result of the question, Westinghouse reviewed all locations why some places 121%

where either 118% or 121% are used and the context of use is used and other and provided a FSAR markup to reflect the correct value at places 118% is used .

the specific location. These changes will be incorporated in What does 121% or a future FSAR amendment. 118% means.

TVA Response to Follow-up NRC Request:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Pending response from Westinghouse.

157 7.2 7.2 B G

a( FSAR section 7.2.2.1.1, fifth paragraph was deleted except for the Responder: Tindell Y Close Closed ML101720589, Item TVA Letter dated last sentence The last sentence states that The P-8 interlock No 9 10/5/10 158 7.2 7.2 B G

a( FSAR section 7.2.2.1.1, paragraph six was changed to state that Responder: Tindell Y Closed Closed ML101720589, Item TVA Letter dated the design meets the requirements of Criterion 23 of the 1971 No 10 10/5/10 159 7.2 7.2 B G

a( FSAR section 7.2.2.1.2 discusses reactor coolant flow Responder: Craig Y Close closed ML101720589, Item TVA Letter dated measurement by elbow taps However it further states that for No 11 10/5/10 160 7.2 7.2 B G

a( FSAR section 7.2.2.2(7) deleted text which has references 12 and Responder: Tindell Y Close Closed ML101720589, Item TVA Letter dated 14 These references are not included in the revised text Provide No 12 10/5/10 161 7.2 7.2 B G

a( FSAR section 7.2.2.3 states that changes to the control function Responder: Clark Y Closed Closed ML101720589, Item TVA Letter dated description in this section are expected to be required after vendor No 13 10/5/10 162 7.2 7.2 B G

a( FSAR section 7.2.2.2(14) states that bypass of a protection Responder: Tindell Y Closed Closed ML101720589, Item TVA Letter dated channel during testing is indicated by an alarm in the control room No 14 10/5/10 163 7.2 7.2 B G

a( Deleted by DORL Date: Y Closed Closed ML101720589, Item Responder: No 15 164 7.2 7.2 r gl FSAR section 7.2.2.2(20) has been revised to include the plant Responder: Perkins Y Closed Closed ML101720589, Item TVA Letter dated Item No. 8 sent to DORL 7511 computer as a means to provide information read out for all signals No 16 and EICB 10/5/10 165 7.2 7.2 B G

a( FSAR section 7.2.2.3.2, last paragraph of this section has been Responder: Clark Y Closed Closed ML101720589, Item TVA Letter dated deleted The basis for this deletion is that discussion regarding the No 17 10/5/10 166 7.2 7.2 B G

a( Changes to FSAR section 7.2.2.2(20) are justified based on the Responder: Clark Y Closed Closed ML101720589, Item TVA Letter dated statement that the integrated computer system is implemented No 18 10/5/10 167 7.2 7.2 B G

a( FSAR section 7.2.2.4, provide an analysis or reference to chapter Responder: Clark Y Close closed ML101720589, Item TVA Letter dated 15 analysis which demonstrate that failure of rod stop during a rod No 19 10/5/10 168 7.2 7.2 B G

a( FSAR table 7.2-4, item 9 deleted loss of offsite power to station Responder: Clark Y Close Closed ML101720589, Item TVA Letter dated auxiliaries (station blackout) based on the fact that station blackout Response provided in letter No 20 10/5/10 169 B G

a( 6/18/2010 Responder: Clark Y Closed Closed 170 B G

a( 6/17/2010 Responder: Clark Y Closed Closed 171 7.2 7.2 B G

a( 6/17/2010 Responder: Craig Y Closed Closed EICB RAI TVA Letter dated Closed to SE Open Item ML102910008 10/21/10 172 B G

a( 6/17/2010 Responder: Craig Y Closed Closed EICB RAI ML102910008 173 7.1 7.1 B G

a( 6/17/2010 Responder: Craig/Webb/Powers Y Closed Closed EICB RAI ML102910008 174 B G

a( 6/28/2010 Responder: Hilmes/Craig Y Closed Closed EICB RAI ML102910008 175 B G

a( June 28, 2010 Responder: Y Closed Closed EICB RAI ML102910008 176 7.1 7.1 B G

a( 6/28/2010 Responder: Craig/Webb Y Closed Closed EICB RAI ML102910008 177 7.5.2.1 7.5.1 M a(

r 7/15/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated RAI not required 10/5/10 178 7.5.2.1 7.5.1 M a(

r 7/15/2010 Responder: Clark Y Closed Closed N/A TVA Letter dated RAI not required 10/5/10 179 B C

a( An emphasis is placed on traceability in System Requirements Responder: WEC Y Closed Closed N/A - Closed to NA Specifications in the SRP in the unmodified IEEE std 830-1993 Item No 142 180 B C

a( The SRP, BTP 7-14, Section B.3.3.1 states that Regulatory Guide Responder: WEC Y Closed Closed N/A - Closed to NA 1 172 endorses with a few noted exceptions IEEE Std 830-1993 Item No 142 181 B C

a( An emphasis is placed on traceability in System Requirements Responder: WEC Y Closed Closed N/A - Closed to NA Specifications in the SRP in the unmodified IEEE std 830-1993 Item No 142 182 B C

a( Characteristics that the SRP states that a Software Requirements Responder: WEC Y Closed Closed N/A - Closed to NA Specifications should have include unambiguity verifiability and Item No 142 183 7/15/2010 Responder: WEC Y Open Open-TVA/WEC EICB RAI TVA Letter dated EICB ML102980066 Item 10/21/10 (Carte) An emphasis is placed on traceability in System Requirements The generic Software Requirements Specification applies Response provided in letter Due 12/3/10 No. 9 Enclosure 1 Item Specifications in the SRP, in the unmodified IEEE std 830-1993, except as modified by the WBN Unit 2 System Requirements dated 10/21/10 No. 4 and even more so given the modifications to the standard listed in Specification. NNC 11/18/10: The

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Regulatory Guide 1.172, which breaks with typical NRC use of the point behind this open word should to say Each identifiable requirement in an SRS item was that TVA must must be traceable backwards to the system requirements and the demonstrate that the design bases or regulatory requirements that is satisfies origin of each requirement in the On page 1-2 of the Post Accident Monitoring Systems Software WEC requirements Requirements Specification in the background section, is the specification is known sentence Those sections of the above references that require and documented. TVA modification from the generic PAMS are defined in the document stated that this referring purely to the changes from WNA-DS-01617-WBT Post information would be in Accident Monitoring System-System Requirements Specification CQ PAMS LTR Rev. 2.

or is it saying that there are additional changes beyond those and that the SRS defines them?

If there are additional changes, what is their origin?

184 B C

a( 7/15/2010 Responder: WEC Y Closed Closed N/A - Closed to N/A Item No 142 185 7/15/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 Item An emphasis is placed on the traceability of requirements in Steve Clark to look at how to combine traceability items. Due (1) 12/3/10 No. 17 Software Requirements Specifications in the SRP, in the (2) _________

unmodified IEEE std 830-1993, and even more so given the Was addressed to during the 9/15 meeting and 9/20 - 9/21 modifications to the standard listed in Regulatory Guide 1.172, audit. NNC 11/18/10: (1)The which breaks with typical NRC use of the word should to say point behind this open Each identifiable requirement in an SRS must be traceable item was that TVA must backwards to the system requirements and the design bases or demonstrate that the regulatory requirements that is satisfies Also the NRC considers origin of each that the SRS is the complete set of requirements used for the requirement in the design of the software, whether it is contained within one WEC requirements document or many. In order to evaluate an SRS against the specification is known guidance in the SRP the staff needs access to all the and documented. TVA requirements. stated that this information would be in References 12, 27, 29, and 31-44 in the Post Accident Monitoring CQ PAMS LTR Rev. 2.

Systems Software Requirements Specification are various types (2) TVA also said it of Reusable Software Element. would provide a RTM for the RSED These references are used in the body of the SRS, for example:

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin?

186 7.7.8 7.7.1.12 D a( 7/15/2010 Responder: Perkins/Clark Y Closed Closed EICB RAI No.6 TVA Letter dated ML102910017 10/5/10 187 EICB By letter dated June 18, 2010, TVA docketed responses to NRC Responder: Merten N Open Open-TVA/WEC ML101970033, Item TVA Letter dated Are these connections already (Carte requests for information. No. 1 & 2 10/5/10 docketed?

)

1) Please refer to the revised response to letter dated Partial Response provided in Due 12/22/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

1) Enclosure 1, Item No. 33 of the TVA letter dated June 18, 2010, 10/5/10 Item 18 (RAI Matrix item 115). letter dated 10/5/10 did not identify any connection from the PAMS Operator Modules Revise Response (OMs) to the plant computer and printers; however, Figure 2.1-1 of the PAMS System Requirements Specification (WNA-DS-01617- 2) This is a duplicate of closed RAI Matrix Item 45. NNC 8/25/10: Why did TVA not WBT Rev. 1 - ML101680578) shows a TCP connection from the catch this on the review of the OMs to the plant computer and printer. Please explain. PAMS SysRS or SRS? Does TVA check that the CQ PAMS
2) Please clarify whether any digital safety-related systems or system meets the requirements components have a digital communications path to non-safety- in its purchase specifications?

related systems or with safety related systems in another division.

If so, NRC staff will need these paths identified on the docket.

188 B C

a( By letter dated June 30, 2010, TVA docketed, Tennessee Valley Responder: Clark Y Closed Closed ML101970033, Item TVA Letter dated Authority (TVA) Watts Bar Unit 2 (WBN2) - Post-Accident No 3 & 4 10/5/10 189 7.6.7 B S

in( 7/20/2010 Responder: Clark Y Closed Closed RAI No. 3 TVA Letter dated ML102980005 10/5/10 190 7.9 B S

in( FSAR Table 7.1-1 states: Regulatory Guide 1.133, May 1981 Responder: Clark Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

Loose-Part Detection Program for the Primary System of Light- ML102980005 10/5/10 191 7.9 B C

a( NUREG-0800 Chapter 7, Section 7.9, "Data Communication Responder: Jimmie Perkins Y Closed Closed ML10197016, Item TVA Letter dated Systems" contains review criteria for data communication systems Nos 1-3 10/5/10 192 7.5.1.1 7.5.2 M a(

r The NRC Staff is using SRP (NUREG-0800) Chapter 7 Section Responder: Clark Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 7 5 Instrumentation Systems Important to Safety to review the DORL 7/20/2010 10/5/10 DORL 193 7.5.1.1 7.5.2 M a(

r The WBU2 FSAR, Section 7.5.2, Plant Computer System, Responder: Clark Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to contains three subsections DORL 7/20/2010 10/5/10 DORL 194 7.5.1.1 7.5.2.1 M a(

r The WBU2 FSAR Section 7.5.2.1, Safety Parameter Display Responder: Costley/Norman Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 1 System contains a description of the Safety Parameter Display DORL 7/20/2010 10/5/10 DORL 195 7.5.1.1 7.5.2.2 M a(

r Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 2 DORL 7/20/2010 10/5/10 DORL 196 7.5.1.1 7.5.2.2 M a(

r Bypassed and Inoperable Status Indication (BISI) Responder: Costley/Norman Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 2 DORL 7/20/2010 10/5/10 DORL 197 X Open Item 197 was never issued. Y Closed Closed 198 7.5.1.1 7.5.2.2 M a(

r SRP Section 7.5, Subsection III, Review Procedures states: Responder: Costley/Norman Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 2 Recommended review emphasis for BISI DORL 7/20/2010 10/5/10 DORL 199 7.5.1.1 7.5.2.3 M a(

r The WBU2 FSAR Section 7.5.2.3, Technical Support Center and Responder: Costley/Norman Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 3 Nuclear Data Links contains a description of the Technical DORL 7/20/2010 10/5/10 ML1028618855 sent to DORL 200 7.2 7/21/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated 73 The statement in SER Section 7 5 1 is supported by the ML102980066 Item 10/5/10 201 7.7.1.1 7.7.11 B C

a( 7/21/2010 Responder: Webb Y Closed Closed EICB RAI TVA Letter dated 1 ML102980066 Item 10/5/10 202 7.5.2 7/22/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI TVA Letter dated EICB (Carte)

ML102980066 Item 10/5/10 The letter (ML0003740165) which transmitted the Safety Revision 1 of the Licensing Technical Report will provide Partial Response provided in Due 12/3/10 No. 4 Evaluation for the Common Q topical report to Westinghouse more detailed information on the changes to the platform. letter dated 10/5/10 stated: "Should our criteria or regulations change so that our Licensing Technical conclusions as to the acceptability of the report are invalidated, CE Rev. 2 of the Licensing Technical Report will include the Report R2 Nuclear Power and/or the applicant referencing the topical report applicability of guidance.

will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

203 7.5.1.1 7.5.2 M a(

r 7/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 204 7.5.1.1 7.5.2 M a(

r 7/26/2010 Responder: Costley/Norman Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL NRC to issue formal ML102861885 Item 10/5/10 205 B G

a( 7/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC ML102910008 10/5/10 approval of this system or 50 59

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 206 7.5.1.1 7.5.2 M a(

r 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 207 B C

a( July 27, 2010 Date: Y Closed Closed Responder:

208 7.5.2.1 7.5.1 M a(

r 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 209 7.5.2.1 7.5.1 M a(

r 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 210 7.5.2.1 7.5.1 M a(

r 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 211 7.5.1.1 B C

a( 7/27/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

752 ML102980066 Item 10/5/10 7 5 5 Plant Computer 212 7.5.2 7/27/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Application specific requirements for testing. This cannot be Due 12/10/10 No. 10 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system addressed in a topical report. Evaluation of how the design specification and software requirements specification hardware meets the regulatory requirements. To be addressed by contain information to address the "Design Report on Computer WBN2 specific test plan Integrity, Test and Calibration..." The staff has reviewed these WEC to provide the information and determine where the documents, and it is not clear how this is the case. information will be located.

(1) Please describe how the information provided demonstrates compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

213 7.5.2 7/27/2010 Responder: WEC N Open Open-NRC Review EICB RAI EICB (Carte)

ML102980066 Item By letter dated June 18, 2010 (ML101940236) TVA stated Conformance with IEEE 603 is documented in the revised Response is included in letter Due 12/31/10. No. 18 (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system Common Q PAMS Licensing Technical Report and the dated 10/25/10 design specification and software requirements specification Common Q PAMS System Design Specification.

contain information to address the "Theory of Operation NNC to review and revise this Description." The staff has reviewed these documents, and it is Attachment 1 contains the proprietary version of question after LTR R2 is not clear how this is the case. The docketed material does not Westinghouse document Tennessee Valley Authority received.

appear to contain the design basis information that is required to (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring evaluate compliance with the Clause of IEEE 603. System (PAMS), Licensing Technical Report, Revision 1, (1) Please provide the design basis (as described in IEEE 604 WNA-LI-00058-WBT-P, Dated October 2010 Clause 4) of the Common Q PAMS.

(2) Please provide a regulatory evaluation of how the PAMs Attachment 8 contains the proprietary version of complies with the applicable regulatory requirements for the theory Westinghouse document Nuclear Automation Watts Bar 2 of operation. NSSS Completion Program I&C Projects Post Accident For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the Monitoring System - System Design Specification, WNA-manually controlled protective actions? (2) How do the documents DS-01667-WBT, Rev. 2 dated September 2010.

identified demonstrate compliance with this clause?

214 B C

a( 7/27/2010 Responder: WEC Y Closed Closed EICB RAI TVA Letter dated ML102980066 Item 10/5/10 215 L P

o( 7/29/2010 Responder: WEC Y Closed Closed 216 7.5.1.1 7.5.2 M a(

r 7/29/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 217 B G

a( 7/6/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated ML102910008 7/30/10 218 B G

a( 7/6/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102910008 7/30/10 219 B G

a( 8/4/2010 Responder: TVA Licensing Y Closed Closed EICB RAI ML102910008 220 B G

a( 8/4/2010 Responder: Ayala Y Closed Closed EICB RAI TVA Letter dated ML102910008 10/5/10 221 7.7.1.2 7.7.1.3 M a(

r 8/4/2010 Responder: Trelease Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 222 B G

a( 8/4/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated ML102910008 10/5/10 223 B G

a( 8/4/2010 Responder: Clark Y Closed Closed EICB RAI ML102910008 224 7.5.1.1 7.5.2 M a(

r 8/4/2010 Responder: Norman (TVA CEG) Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 225 B G

a( 8/4/2010 Responder: Scansen Y Close Closed EICB RAI TVA Letter dated ML102910008 10/5/10 226 B C

a( 8/4/2010 Responder: TVA Licensing Y Closed Closed N/A - Information TVA Letter dated See also Open Item Nos. 41 & 270.

requested under 8/11/10 227 B G

a( 8/4/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated ML102910008 10/5/10 228 B C

a( 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102980066 Item 10/5/10 229 B C

a( 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102980066 Item 10/5/10 230 B C

a( 8/4/2010 Responder: Webb Y Closed Closed EICB RAI TVA Letter dated ML102980066 Item 10/5/10 231 B G

a( 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102910008 10/5/10 232 B S

in( 8/4/2010 Responder: Clark Y Closed Closed RAI No. 5 TVA Letter dated ML102980005 10/5/10 233 B C

a( 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102980066 Item 10/5/10 234 B C

a( 8/4/2010 Responder: Y Closed Closed N/A - Duplicate N/A Item 235 B G

a( 8/4/2010 Responder: TVA Licensing Y Closed Closed N/A N/A 236 B G

a( 8/4/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated ML102910008 10/5/10 237 B C

a( 8/4/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated ML102980066 Item 10/5/10 238 B C

a( 8/4/2010 Responder: Webb/Hilmes Y Closed Closed N/A - Duplicate N/A Item 239 B C

a( 8/4/2010 Responder: Hilmes Y Closed Closed N/A - Meeting N/A request 240 B G

a( 8/4/2010 Responder: Clark Y Close Closed Ml102910008 TVA Letter dated Item#29 10/5/10 241 B S

in( 8/4/2010 Responder: Davies Y Closed Closed RAI No. 10 TVA Letter dated ML102980005 10/5/10 242 B G

a( 8/4/2010 Responder: Hilmes Y Close Closed EICB RAI TVA Letter dated ML102910008 10/5/10 243 B C

a( 8/3/2010 Responder: WEC Y Closed Closed N/A - Closed to N/A Item No 142 244 8/3/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 8.2.2 of the Common Q SPM (ML050350234) states that The process related requirements have been removed from Response is provided in letter Due 12/22/10 No. 14 dated 10/25/10. information relied upon in the SE must the Software Requirements Specification (SRS) shall be developed revision 2 of the Software Requirements Specification (SRS). dated 10/25/10. be docketed correspondence."

using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS Attachment 3 of letter dated 10/25/10 contains the NNC 11/18/10: SysRS Rev. 2 LIC-101 Rev. 3 states: "The safety should address the software product, not the process of producing proprietary version of Westinghouse document Nuclear also contains process analysis that supports the change the software. In addition Section 4.3.2.1 of the SPM states "Any Automation, Watts Bar 2 NSSS Completion Program, I&C requirements that are more requested should include technical alternatives to the SPM processes or additional project specific Projects, Software Requirements Specification for the Post appropriately incorporated into information in sufficient detail to enable information for the ...SCMP...shall be specified in the PQP. Accident Monitoring System, WNA-SD-00239-WBT, process documentation. the NRC staff to make an independent Revision 2, Dated September 2010. assessment regarding the acceptability Contrary to these two statements in the SPM, the WBN2 PAMS of the proposal in terms of regulatory SRS (ML101050202) contains many process related requirements, requirements and the protection of for example all seventeen requirements in Section 2.3.2, public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N "Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved SPM.

245 8/3/2010 Responder: WEC N Open Open-TVA/WEC EICB RAI LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item "Safety Evaluation" states: "the Section 5.8 of the Common Q SPM (ML050350234) identifies the Relates to the commitment to provide the test plan and the Due 12/10/10 No. 119 information relied upon in the SE must required test documentation for systems developed using the SPM compliance matrix be docketed correspondence."

Common Q SPM. Please provide sufficient information for the NRC staff to independently assess whether the test plan for WBN2 LIC-101 Rev. 3 states: "The safety PAMS, is as described in the SPM (e.g., Section 5.8.1). analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

246 8/3/2010 Responder: WEC N Open Open-NRC Review EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

ML102980066 Item provided in letter "Safety Evaluation" states: "the Section 4.3.2.1, "Initiation Phase" of the Common Q SPM As agreed ISG6 does not apply to the Common Q PAMS Response is provided in letter Due 10/22/10 No. 15 dated 10/25/10 information relied upon in the SE must (ML050350234) requires that a Project Quality Plan (PQP) be platform. The information required to address this question dated 10/25/10 be docketed correspondence."

developed. Many other section of the SPM identify that this PQP concerning the PQP and SPM has been added to NNC 11/18/10: NRC to should contain information required by ISG6. Please provide the compliance matrix in revision 1 of the Licensing Technical NNC 11/18/10: PQP has not go to WEC Rockville LIC-101 Rev. 3 states: "The safety PQP. If "PQP" is not the name of the documentation produced, Report. been provided and CQ PAMS Offices and look at analysis that supports the change please describe the documentation produced and provide the LTR Rev. 1 does not contain PQP to decide if it must requested should include technical information that the SPM states should be in the PQP. Attachment 1 of letter dated 10/25/10 contains the comparable information. docketed. information in sufficient detail to enable proprietary version of Westinghouse document Tennessee the NRC staff to make an independent Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post- assessment regarding the acceptability Accident Monitoring System (PAMS), Licensing Technical of the proposal in terms of regulatory Report, Revision 1, WNA-LI-00058-WBT-P, Dated October requirements and the protection of 2010 public health and safety."

247 B C

a( 8/8/2010 Responder: WEC Y Closed Closed EICB RAI Response is LIC-101 Rev. 3 Appendix B Section 4, ML102980066 Item provided in letter "Safety Evaluation" states: "the 248 B C

a( 8/8/2010 Responder: WEC Y Closed Closed Response is LIC-101 Rev. 3 Appendix B Section 4, provided in letter "Safety Evaluation" states: "the 249 B C

a( 8/8/2010 Responder: WEC Y Closed Closed LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the 250 8/8/2010 Responder: WEC N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM describes the software and documents that will be Westinghouse develops Software Release Reports/Records Response included in letter Due 12/22/10 information relied upon in the SE must created and placed under configuration control. The SCMP (e.g., and a Configuration Management Release Report. Describe dated 10/25/10. be docketed correspondence."

SPM Section 6, Software Configuration Management Plan) the documents and when they will be produced. Summarize 10/25/10 is a partial describes the implementation tasks that are to be carried out. The guidance on how to produce these records, focus on project response. Still waiting LIC-101 Rev. 3 states: "The safety acceptance criterion for software CM implementation is that the specific requirements in SPM etc. on Software Test Plan analysis that supports the change tasks in the SCMP have been carried out in their entirety. and all other testing requested should include technical Documentation should exist that shows that the configuration documentation. information in sufficient detail to enable management tasks for that activity group have been successfully the NRC staff to make an independent accomplished. Please provide information that shows that the CM assessment regarding the acceptability tasks have been successfully accomplished for each life cycle of the proposal in terms of regulatory activity group. requirements and the protection of public health and safety."

251 8/8/2010 Responder: WEC N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB "Safety Evaluation" states: "the (Carte) The SPM describes the software testing and documents that will The software testing performed and documents created are Partial response is provided in Due 12/22/10. information relied upon in the SE must be created. The SPM also describes the testing tasks that are to addressed by the SPM Compliance matrix contained in letter dated 10/25/10 be docketed correspondence."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N be carried out. The acceptance criterion for software test Revision 1 of the Licensing Technical Report. 10/25/10 is a partial implementation is that the tasks in the SPM have been carried out response. Still waiting LIC-101 Rev. 3 states: "The safety in their entirety. Please provide information that shows that Attachment 1 of the letter dated 10/25/10 contains the on Software Test Plan analysis that supports the change testing been successfully accomplished. Proprietary version of Westinghouses document titled: and all other testing requested should include technical Tennessee Valley Authority (TVA), Watts Bar Unit 2 documentation. information in sufficient detail to enable (WBN2), Post-Accident Monitoring System (PAMS), the NRC staff to make an independent Licensing Technical Report, Revision 1, WNA-LI-00058- assessment regarding the acceptability WBT-P, Dated October 2010 of the proposal in terms of regulatory requirements and the protection of public health and safety."

252 8/8/2010 Responder: WEC N Open Open-TVA/WEC LIC-101 Rev. 3 Appendix B Section 4, EICB (Carte)

"Safety Evaluation" states: "the The SPM contain requirements for software requirements Explain response to AP1000 audit report. Read ML091560352 Due 12/10/10 information relied upon in the SE must traceability analysis and associated documentation (see Section RTM docketed NRC awaiting V&V evaluation of RTM. be docketed correspondence."

5.4.5.3, Requirements Traceability Analysis). Please provide information that demonstrates that requirements traceability Check on this Hilmes LIC-101 Rev. 3 states: "The safety analysis has been successfully accomplished. analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory requirements and the protection of public health and safety."

253 B C

a( 8/8/2010 Responder: Clark Y Closed Closed TVA Letter dated Related to Open Item no. 83.

10/5/10 254 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated make documents 10/21/10 255 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated make documents 10/21/10 256 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated make documents 10/21/10 257 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A make documents 258 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A make documents 259 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to TVA Letter dated make documents 10/21/10 260 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A make documents 261 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

Item No 142 8/20/10 "Design features and administrative 262 B C

a( 8/10/2010 Responder: WEC Y Closed Closed N/A - Request to N/A make documents 263 B C

a( 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item Based on an examination of document available at the No 2 264 B C

a( 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item No 2 265 B C

a( 8/11/2010 Responder: WEC Y Closed Closed ML101650255, Item No 2 266 B C

a( 8/11/2010 Responder: Webb/Webber Y Closed Closed TVA Letter dated 10/21/10 267 B C

a( 8/11/2010 Responder: WEC Y Closed Closed 268 8/19/2010 Responder: WEC N Open Open-TVA/WEC EICB (Carte) By letter dated March 12, 2010 (ML101680577), TVA stated that 11/18/10 Warren Odess-Gillett took action to discuss with Due 12/22/10 the application specific hardware and software architecture Design Engineering to generate a non-prop figure

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N descriptions are addressed in the WBN2 PAMS System Design Specification (ML101680579, ML102040481, & ML102040482) and Software Requirements Specification (ML101050202, ML102040486, & ML1022040487).

Neither of these documents contain a non-proprietary figure of the architecture that can be used in the SE. Please provide a non-proprietary figure of the architecture.

269 L P

o( 8/20/2010 Responder: NRC Y Closed Closed N/A N/A 270 B C

a( 8/23/2010 Responder: Clark Y Closed Closed See also Open Item Nod. 41 & 245.

271 B C

a( 8/23/2010 Responder: WEC Y Closed Closed N/A - Closed to NA Item No 142 272 7.5.2.1 7.5.1 M a(

r 8/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/21/10 273 7.5.2.1 7.5.1 M a(

r 8/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/5/10 274.a 7.5.2.1 7.5.1 M a(

r 8/26/2010 Responder: Clark Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/21/10 274.b 8/26/2010 Responder: Clark Y Open Open-TVA/Bechtel RAI No. 6 TVA Letter dated EICB (Singh)

ML102980005 10/21/10 Loose Parts Monitoring System: TR 3.3 refers to section 4.4.6 of The reference will be changed to FSAR section 7.6.7 Loose Response provided in letter Due __________ 10/26/2010 Enclosure 1 Item the FSAR for description of the loose parts monitoring system. Part Monitoring System (LPMS) System Description in next dated 10/21/10 No. 12 However, this section of the FSAR is not available. TVA to check revision of the Technical Requirements Manual as shown Pending TRM the reference and respond. below: amendment submittal.

1. Watts Bar FSAR, Section 7.6.7, Lose Part Monitoring Response acceptable.

System. TVA to complete stated action.

(Note: Bechtel I&C to submit TRM change package to TVA Licensing.)

275 B S

in( 8/27/2010 Responder: Clark Y Closed Closed Not Required N/A Answer exists in 276 7.6 7.6 8/27/2010 Responder: Webb Y Open Open-TVA/Bechtel EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/21/10 In order for the staff to review the effects of multi control systems Response provided in letter Due 11/24/10 Item#60 Enclosure 1 Item failure, provide the summary of the analyses documenting the The NRC reviewer confirmed this question applies to non- dated 10/21/10 No. 13 effect on the plant based on the following events: (1) loss of power safety systems. TVA to provide to all control systems powered by a single power supply; (2) Response Acceptable. 11/17/10 justification for non-failure of each instrument sensor which provides signal to two or The Distributed Control System (DCS) implemented using safety system other more control systems; (3) Break of any sensor impulse line which Foxboro I/A hardware, replaces most of the non-safety than DCS.

is used for sensors providing signals to two or more control related control systems for WBN Unit 2. The other non- TVA changed the response in systems; and (4) failure of digital system based on the common safety-related control systems within the scope of this the latest writeup. The scope of The statement that cause software failure affecting two or more control systems. For question are: the question applies to all non failure of sense line each of these events, confirm that the consequences of these safety related control systems where more than one events will not be outside chapter 15 analyses or beyond the a. Rod Control - Failures of this system are addressed in and is not limited to just three transmitter is connected capability of operators or safety systems. FSAR Chapter 15. system listed by the TVA. TVA would be bounded by

b. Main Turbine Electro-Hydraulic Control System could use to envelope other the failure of a single control systems by Unit 1 transmitter does not The following provides the requested summaries for the four analysis if they applies to Unit 2 make sense.

events listed: systems also.

TVA needs to make a (1) The (DCS) segmentation analysis submitted on TVA statement that all non-letter to NRC dated August 11, 2010, Enclosure 2 safety control systems (Reference 7) demonstrates that the loss of any single have been evaluated power source does not result in a loss of any DCS against these criteria function. The other systems within the scope of this and have determined

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N question are configured in the same manner as Unit 1, that their failure does with redundant power sources such that the failure of a not have consequences single power source does not cause a loss of function. which will put the plant outside chapter 15 (2) Signals shared by more than one control function analyses.

within the DCS are addressed in the DCS segmentation analysis submitted on TVA letter to NRC dated August 11, 2010, Enclosure 2 (Reference 7) which demonstrates that the loss of a single signal does not cause a failure of any critical control function.

The impact of a loss of signal to the other systems within the scope of this question is bounded by the loss of that signal to the individual system and has the same effect as for Unit 1.

(3) Where feasible, the Unit 2 design includes separate sense lines for redundant transmitters, thereby eliminating multiple single point failures which are present in Unit 1. A review of the transmitter sense line database was performed to identify multiple sensors on a single sense line that had control functions (transmitters and switches). Attachment 9 provides the results of the review and an analysis of the functions impacted by a sense line failure.

There are no transmitters on shared sense lines, such that a sense line failure would impact any combination of the DCS, Rod Control or Main Turbine Electro-Hydraulic Control Systems.

(4) Limiting DCS failures were addressed in the segmentation analysis, supplemented by Fault Handling in the I/A Series System, Revision 1, submitted on TVA letter to NRC dated October 5, 2010, Attachment 42 (Reference 1). The other systems within the scope of this question are analog and therefore this question is not applicable.

All non-safety control systems have been evaluated against these criteria and TVA has determined that their failure does not have consequences which will put the plant outside chapter 15 analyses.

TVA Response to Follow-up NRC Request:

All non-safety related control systems were reviewed in the context of this question. Only those control systems (i.e. the Distributed Control System (DCS), Rod Control and the Main Turbine Electro-hydraulic Control System) previously discussed in the TVA to NRC letter dated October 21, 2010 (Reference 3) are within the scope of this question. The review found that failures of non-safety related control systems based on the scenarios in this RAI, do not have consequences which will put the plant outside the Chapter 15 analyses.

277 7.6 7.6.3 B G

a( 8/27/2010 Responder: Clark Y Close Closed EICB RAI TVA Letter dated ML102910008 10/29/10 278 7.6 7.6.6 B G

a( 8/27/2010 Responder: Trelease Y Close Closed EICB RAI TVA Letter dated ML102910008 10/21/10

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 279 7.6 7.6.6 B G

a( 8/27/2010 Responder: Mather Y Close Closed EICB RAI TVA Letter dated ML102910008 10/21/10 280 7.6 7.6.6 B G

a( 8/27/2010 Responder: Trelease Y Close Closed EICB RAI TVA Letter dated ML102910008 10/21/10 281 7.6 7.6.8 8/27/2010 Responder: Webb Y Close Close EICB RAI TVA Letter dated EICB (Garg)

ML102910008 10/29/10 For FSAR Section 7.6.8 in amendment 96, redline version has Attachment 5 contains the WBN Unit 2 FSAR markup for Response provided in letter Due 11/24/10 Item#65 Enclosure 1 Item completely rewritten this section of the FSAR, however, the staff is Section 7.6.8, Interlocks for RCS Pressure Control During dated 10/29/10 No. 16 not able to determine any changes made to the section. Explain Low Temperature Operation, showing what was changed Provide the basis for what changes have been made to this FSAR Section. between Amendments 95 and 96. the changes. Look at Foxboro I/A impact.

TVA Response to Follow-up NRC Request:

The interlock for the RCS Pressure Control for Unit 2 is implemented differently than Unit 1 implementation. There are no differences between Unit 1 and Unit 2 interlocks, operation of interlocks and operator interface for operation of the RCS Pressure Control. Primary sensing elements and final control elements are identical and operations of these devices are identical. For Unit 2, once signals are processed by the Eagle 21 system, interlock implementation is by software modules in the Foxboro I/A Distributed Control System (DCS). Hardware outputs, generated in the DCS, operate the PORVs. The Unit 2 DCS is implemented via EDCRs 52378 and 54504. Section 7.6.8 in Amendment 101 of the WBN Unit 2 FSAR reflects the Unit 2 changes associated with implementation of the DCS.

282 7.6 7.6.9 B G

a( 8/27/2010 Responder: Trelease Y Close Closed EICB RAI TVA Letter dated Response is acceptable ML102910008 10/21/10 283 7.7.5 XX D a( 8/27/2010 Responder: Clark Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-up question to item ML102910017 10/29/10 96 284 7.7.3 7.4.1 D a( 8/27/2010 Responder: Webber Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-up question to item ML102910017 10/21/10 123 285 7.3.3 7.3 D a( 8/27/2010 Responder: McNeil Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-up question to item ML102910017 10/29/10 22 286 7.7.3 9.3.4.2. D a( 8/27/2010 Responder: Webber Y Closed Closed EICB RAI No.16 TVA Letter dated 4 ML102910017 10/21/10 Item No 287 7.3 7.3-1 D a( 8/27/2010 Responder: Elton Y Closed Closed ML102390538, Item Response No 1 9/10/10 and received in 11 288 7.3 9/2/2010 Responder: McNeil Y Close Close EICB RAI EICB (Garg)

ML102910008 (1) Can we add a section to chapter 7 giving a brief overview of the (1) and (2) The following new section and reference will be Due 11/24/10 Item#67 Foxboro Spec 200 in Section 7.3? added to the WBN Unit 2 FSAR as part of Amendment 102: TVA committed to adding a description of the Foxboro TVA should include the Additional Clarification provided by the NRC 7.3.1.1.3 Analog Instrumentation Spec 200 hardware at the list of all the functions 10/12 NRC Public Meeting. where Spec 200 is (2) TVA should include the list of all the functions where Spec 200 The miscellaneous safety-related analog process control used and discuss is used and discuss differences between unit 1 and unit 2. (3) This and indication loops are made up of discrete analog differences between discussion should also include loops which are currently used for modules that have been tested and qualified for use in unit 1 and unit2. This Unit 1 operation (4) If Spec 200 components have also been safety related systems. The various components have discussion should also qualified to RG 1.209, it should be stated and if not why not. been qualified to IEEE Standard 323-1983 (R-1996) IEEE include loop which are Standard for Qualifying Class IE Equipment for Nuclear currently used for Unit 1 Power Generating Stations, IEEE Standard 344-1987 (R- operation If Spec 200 1993) IEEE Standard Recommended Practices for components have also Seismic Qualification of Class IE Equipment for Nuclear been qualified to RG Power Generating Stations, and IEEE Standard 384-1984 1.209, it should be (R-1992) IEEE Standard Criteria for Independence of stated and if not why Class IE Equipment and Circuits. The modules are not.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N arranged in instrument loops to provide the safety functions listed below:

  • Turbine driven AFW Pump Flow Control
  • Motor driven AFW pump differential pressure indication and recirculation valve control
  • Containment Pressure indication
  • Upper and Lower Compartment Containment Ambient Temperature indication
  • ERCW Strainer Differential Pressure, Backwash and Flush Control
  • CCS Heat Exchanger B Inlet Pressure
  • CCS Surge Tank Level Control
  • CCS Heat Exchanger B Outlet Temperature
  • Reactor Vessel Head Vent Throttle Manual Loading Station (Unit 2 Only)
  • EGTS Annulus Differential Pressure Control The components are physically arranged in the racks to meet the requirements of IEEE-279 and Watts Bar Design Criteria WB-DC-30-4, Separation/Isolation. (Unit 2 Only) Two IE analog modules are used to isolate IE to Non-IE signals. These are the Contact Output Isolator and Voltage-to-Current Converter, both of which have the Input and Output signals isolated.

EMI testing and acceptance by TVA of the Foxboro Spec 200 hardware is documented in Reference [8].

References:

(8) Invensys Process Systems Document No. 800063-1830, Electromagnetic Compatibility Test Reports, dated August 21, 2008, Rev. 0.

(2) As agreed to by TVA and the NRC reviewer, the level of detail necessary to describe the differences between Unit 1 and Unit 2 is down to the specific hardware manufacturer.

This level of detail was agreed to not be appropriate in Chapter 7 which discusses the functions and design requirements for the plant control systems. The hardware manufacturer level of detail is addressed in Chapter 3.10 which describes the qualification of the specific hardware for safety related functions.

(3) While not specifically identified as such, loops in service for Unit 1 (Essential Raw Cooling Water etc.) are described in the FSAR chapters describing the systems the loops serve.

(4) Reg. Guide 1.209, Guidelines for Environmental Qualification of Safety-Related Computer-Based Instrumentation and Control Systems in Nuclear Power

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Plants, is not applicable to the analog Foxboro Spec 200 hardware.

289 B S

in( 9/2/2010 Responder: Faulkner Y Closed Closed RAI No. 24 TVA Letter dated

- Response acceptable ML102980005 10/21/10 290 7.7 B C

a( 9/7/2010 Responder: Clark Y Closed Closed N/A N/A This item is a duplicate of item 291.

291 7.7 B C

a( 9/7/2010 Responder: Clark Y Closed Closed TVA Letter dated 10/21/10 292 7.2.5 7.2 B G

a( 9/7/2010 Responder: Craig Y Closed Closed EICB RAI TVA Letter dated ML102910008 10/21/10 293 7.7.4 7.2.2.3.M a(

r 9/8/2010 Responder: Craig Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 5 ML102861885 Item 10/29/10 294 7.3 7.3.1.1. D a( 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response 1 No 2 9/10/10 received in 11 295 7.3 7.3.1.1. D a( 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response 2 No 3 9/10/10 received in 11 296 7.3 7.3.1.2. D a( 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response 1 No 4 9/10/10 received in 11 297 7.3 7.3.1.2. D a( 9/9/2010 Responder: Elton Y Closed Closed ML102390538, Item Response 2 No 5 9/10/10 received in 11 298 7.3 XX D a( 9/9/2010 Responder: Clark Y Closed Closed ML102390538, Item Response No 6 9/10/10 received in 11 299 B

(

C a Provide Common Q Software Requirements Specification Post Attachment 41 of the 10/5 letter contains the Common Q Y Closed Closed TVA Letter dated Accident Monitoring System 00000-ICE-3238 Rev 5 Software Requirements Specification Post Accident 10/5/10 300 Need Radiation Monitoring System Description/Design Criteria Responder: Temples/Mather Y Open Open-TVA/GA RAI No. 25 TVA Letter dated ML102980005 10/29/10 Are detectors different from Unit 1. Describe any differences. (1) The Radiation Monitoring Design Criteria Document, Response is included in letter Due 11/24/10 10/26/2010 Enclosure 1 Item WB-DC-40-24, Revision 21 is contained in Attachment dated 10/29/10 No. 20 Are there any commercially dedicated parts in the RM-1000? If so, 6 to letter dated October 31, 2010. TVA to address the how are they dedicated? following comments:

(2) Attachment 7 contains the General Atomics detector Please confirm that digital communication ports available in RM- differences report. The containment high range (1) Is it Att. 5 or Att.

1000 are not used. radiation monitors are loops 271-274. 6?

(2) Pl. confirm that (3) For safety-related applications, General Atomics HRRMs are loops Electronic Systems, Inc. supplies the RM-1000 module 271-274.

assembly as a Basic Component. This assembly does (3) TVA to clarify that contain component parts that are Safety-Related GA has a Commercial Grade Items (SRCGI). Because these commercial EICB (Singh)

SRCGI components are assembled into the delivered dedication Basic Component, they are dedicated to the assembly program in place by virtue of the acceptance test of the full RM-1000 and that GA is an assembly. Safety-related commercial grade items are approved dedicated in accordance with General Atomics 10CFR50, App. B approved 10 CFR 50 Appendix B program. supplier.

App B does not (4) The digital communications ports on the safety-related address RM-1000 radiation monitors are not used. commercial grade dedication .

TVA Response to Follow-up NRC Request:

Revised response General Atomics Electronics Systems, Inc. is an approved is acceptable.

10 CFR 50 Appendix B supplier. They have a commercial Please submit grade dedication program. response.

(4) Response acceptable.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 301 1.TVA is requested to address the consequences of software Responder: WEC/Davies/Clark N Open Open-TVA/WEC RAI No. 11 TVA Letter dated common cause failure including all potential resulting failures (i.e. ML102980005 10/29/10 total loss of CERPI, system fail as-is). TVA Partial Response: Partial response in 10/29 letter. Due 11/24/10 10/26/2010 Enclosure 1 Item No. 21

2. In addition, address how the actions stipulated in the plant For all accidents analyzed in WBN Unit 2 FSAR, Chapter 15, 1) Please address Technical Specifications will be taken when the CERPI system no credit is taken for the rod position indication system. For how fail-as-is is indications are lost. Information notice IN 2010-10 (ML100080281) all continuous rod withdrawal accidents analyzed in WBN detected i.e.

addresses the need to consider software failures and the actions Unit 2 FSAR, Chapter 15, no credit is taken for any rod alarms, rod required to assure that the plant will stay within its licensing basis. stop/block. position deviation alarms, etc.

3. Provide FMEA in support of your response. (1) Technical Specification 3.1.8, Rod Position Indication, 2) Response does not have an action for total loss of indication; acceptable.
4. FSAR Table 7.7-1, Plant Control System Interlocks lists interlock therefore, a total loss of CERPI puts the plant into LCO 3) Response C-11 to block automatic rod withdrawal when 1/1 Control Bank D 3.0.3 which states: acceptable.

rod position is above setpoint. This interlock capability would be 4) a. Response lost in case of total loss of CERPI. How is the rod block assured When an LCO is not met and the associated ACTIONS acceptable.

for this event? are not met, an associated ACTION is not provided, or if b. Pl. address directed by the associated ACTIONS the unit shall be failure mode on

5. How is automatic rod withdrawal affected in case of total loss of placed in a MODE or other specified condition in which fail-as-is.

signals from the CERPI to the ICS? Is this interlock fail safe? the LCO is not applicable. Action shall be initiated within 5) Response 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to place the unit, as applicable, in: acceptable.

6.FSAR chapter 15, Section 2.3.2.1states that the resolution of the 6) Response rod position indicator channel is 5% of span (7.2 inches). The MODE 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />; acceptable.

CERPI system accuracy specified in the CERPI System MODE 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />; and requirements Specification, WNDS-DS-00001_WBT, Rev. 2 is 12 MODE 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />. TVA to address steps or 5.19%. The specified system accuracy seems to be common cause failure greater than the accuracy assumed in the FSAR Chapter 15. Exceptions to this Specification are stated in the as stated under Please clarify this anomaly. individual Specifications. Where corrective measures response item 2.

EICB (Singh) are completed that permit operation in accordance with the LCO or ACTIONS, completion of the actions Please explain how required by LCO 3.0.3 is not required. various alarms will continue to annunciate (2) CERPI common mode software failure on software lockup?

Need better Description of the CERPI systems installed at Watts explanation to Bar (Unit 1 & 2): understand the rationale behind the Each Programmable Logic Controller (PLC), response.

Maintenance Test Panel (MTP), and Operators Module (OM) is isolated within its own Train, A or B. Rod position information is provided to the OMs in the main control room via redundant data links. Each train (PLC, MTP, and OM) is electrically isolated from the other train.

Communications within a CERPI train (PLC, MTP, and OM) are continuously monitored. If communication is interrupted, this condition is annunciated to the operator in the control room. The MTP and OM display screens have rotating cursors in the upper right-hand corner of the display to indicate that the system is operating.

History of CERPI:

The basic PLC software associated with the CERPI system has been in use for over ten years. The first plant to utilize the CERPI PLC software was Beaver Valley. In 2003, the CERPI software was deployed with interfaces to the Common Q MTP and OM interfaces

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N within the systems for Surry Units 1 & 2, and Watts Bar Unit 1. In 2009, the Watts Bar Unit 1 CERPI system was modified to allow for two independent trains of CERPI. The Watts Bar Unit 2 CERPI system is based on the Unit 1 design. Only the detectors and the detector interface boards are not redundant within the Watts Bar CERPI systems.

CERPI Software Failure Analysis With regard to the CERPI system software:

  • The software used on PLC-A is identical to that used on PLC-B.
  • The software used on MTP-A is identical to that used on MTP-B
  • The software used on OM-A is identical to that used on OM-B.

A common cause failure affecting the software of one CERPI train would affect the other train as well.

Common cause problems associated with the CERPI software were mitigated by the Westinghouse software development process, factory acceptance testing, and site acceptance testing. There is no "fail as-is" scenario. Any failure of a hardware/software component (resulting in processor lock-up) would be immediately annunciated (Main Control Room alarm).

A loss of communication to the MTP, or OM would be annunciated, and the data values on the flat panel display would be displayed in magenta (indicating failure). A hardware/software failure in the PLC (resulting in processor lock-up) would result in an annunciator because of the watchdog alarm circuit associated with the PLC processor module.

A total loss of CERPI indication (e.g., loss of both AC power sources to the rod position cabinets) is possible, but this condition would be immediately annunciated. A complete loss of CERPI indication would lead to entering Technical Specification LCO 3.0.3. A more likely scenario would be loss of a single train of CERPI due to a hardware failure; in which case, there are no technical specification conditions to enter because a single train is capable of providing all rod indications needed for control.

(3) There is no FMEA for the CERPI system.

(4) Control Bank D Automatic Rod Withdrawal Limit would be assured by Operations and control circuitry by the following 2 methods:

a. A simultaneous failure of all indications of the Rod Position Indication System places the plant in LCO 3.0.3, since it would prevent compliance with actions in LCO 3.1.8.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N

b. CERPI cabinet relays A-KX-18 and B-KX-18 are the PLC controlled components of Rod Withdrawal Limit. The relays are active low requiring power to activate the contacts in the control circuit. Total loss of CERPI will open the contacts and block Automatic Rod Withdrawal.

Additionally, Annunciator window 64F will annunciate to show C-11 BANK D AUTO WITHDRAWAL BLOCKED.

(5) The CERPI Maintenance and Test Panels are used to set the Rod Withdrawal Limit with output signal to ICS as a parallel path. As stated above, the relays are the controlling functions and loss of signal to ICS will not affect the capability of the control circuit to disable the Automatic Rod Withdrawal function. The C-11 interlock is fail safe with regards to loss of power.

(6) The cycle-specific analyses for the static rod misalignment assume full misalignment of an individual rod from the bank position indicator(s). Such a misalignment exceeds that which is possible during plant operations when accounting for the most adverse combination of the rod deviation alarm and uncertainty of the rod position indicator (both 12 steps). For consistency of parameter (and units) with the deviation alarm and position indicator uncertainty, the WBN Unit 2 FSAR Chapter 15, Section 2.3.1 will be revised in Amendment 102 to read:

The resolution of the rod position indicator channel is +/-

12 steps. Deviation of any RCCA from its group by twice this distance (24 steps) will not cause power distributions worse than the design limits. The deviation alarm alerts the operator to rod deviation with respect to group demand position in excess of 12 steps. If the rod deviation alarm is not operable, the operator is required to take action as required by the Technical Specifications.

This change is consistent with FSAR section 4.3.2.2.5, Limiting Power Distributions Page 4.3-13, which states the maximum deviation assumed is 12 steps.

302 7.5.2.1 7.5.1 (

M a

r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/29/10 303 7.5.2.1 7.5.1 (

M a

r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/29/10 304 7.5.2.1 7.5.1 (

M a

r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/29/10 305 7.5.2.1 7.5.1 (

M a

r 09/17/2010 Responder: Tindell Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL ML102861885 Item 10/29/10 306 7.1 7.1 FSAR amendment 100, page 7.1-12 provides the definition of Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated Allowable value which is not consistent with TSTF-493 as ML102910008 10/29/10 EICB (Garg) allowable value is the value beyond which instrument channel is The FSAR Allowable Value definition will be revised to be Response is included in letter Due 12/17/10 Item#69 Enclosure 1 Item declared inoperable. consistent with the TSTF-493 in FSAR Amendment 102. dated 10/29/10 No. 26 Attachment 3 contains the revised FSAR section 7.1.2.1.9 Pending FSAR that will be included in FSAR Amendment 102 that reflects Amendment 102 this change. submittal

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 307 7.1 7.1 (1) FSAR amendment 100, Section 7.1, page 7.1-12, definition of Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated Acceptable as found tolerance is not in accordance with TSTF-493 ML102910008 10/29/10 as AAF is the limit beyond which the instrument channel is (1) The Acceptable As Found (AAF) definition will be Response is included in letter Due 12/17/10 Item#70 Enclosure 1 Item degraded but may be operable and its operability must be revised to be consistent with TSTF-493 in FSAR dated 10/29/10 No. 27 evaluated. (2) Also it states that AAF is based on measurable Amendment 102. Attachment 3 contains the revised Pending FSAR instrument channel uncertainties, such as drift, expected during the FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 surveillance interval. These wording should be revised to agree Amendment 102 that reflects this change. submittal with the wording given in RIS2006-17 as these wordings are very vague. (3) Also it states that RPS functions use double sided (2) Additional detail on the AAF methodology was provided tolerance limits for the AAF. Since AAF is a band it will always be in sections 7.1.2.1.9.1, Westinghouse Setpoint double sided and therefore, this clarification does not mean Methodology, and 7.1.2.1.9.2, TVA Setpoint anything and it clouds the issue. Methodology. These sections will be revised to clarify EICB (Garg) the AAF calculations in FSAR Amendment 102.

Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(3) The statement about double sided limits addresses a TSTF requirement that the AAF tolerance consider errors in both the conservative and non-conservative directions and ensures that an as-found value which exceeds these limits, even in the conservative direction (away from the safety limit), will be evaluated. Attachment 3 contains the revised FSAR section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

308 7.1 7.1 (1) FSAR Amendment 100, Section 7.1, page 7.1-13, definition of Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated Acceptable as left tolerance is not in accordance with TSTF-493 as ML102910008 10/29/10 it states that this may take calibration history into consideration. (1) The statement about using calibration history to Response is included in letter Due 12/17/10 Item#71 Enclosure 1 Item EICB (Garg)

This is very vague and ambiguous. (2) Also it states that RPS determine the Acceptable As Left (AAL) will be deleted dated 10/29/10 No. 28 functions use double sided tolerance limits. Since ALF is a band it in FSAR Amendment 102. Attachment 3 contains the Pending FSAR will always be double sided and therefore, this clarification does revised FSAR section 7.1.2.1.9 that will be included in Amendment 102 not mean anything and clouds the issue. FSAR Amendment 102 that reflects this change. submittal (2) See response to letter item 27 (NRC Matrix Item 307).

309 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, Westinghouse setpoint Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated 9.1 methodology, states that AAF is the algebraic sum of the .. This ML102910008 10/29/10 is not acceptable. As algebraic sum is non conservative compared (1) The AAF calculation for Westinghouse setpoint Response is included in letter Due 12/17/10 Item#72 Enclosure 1 Item to the SRSS method and will mask the operability of the instrument methodology calculations in TI-28 for TSTF-493 will be dated 10/29/10 No. 29 channel and therefore, it is not acceptable to the staff. (2) It also revised to use the Square Root Sum of the Squares Pending FSAR EICB (Garg) make the statement that ALT may take calibration history into (SRSS) method. Amendment 102 consideration which is vague and ambiguous. submittal (2) AAF definition will be revised to be consistent with TSTF-493 as discussed with the NRC Staff, in FSAR Amendment 102. Attachment 3 contains the revised FSAR Amendment 102 Change Markup that reflects this change.

310 7.1 7.1.2.1. (1) FSAR amendment 100, Page 7.1-14, TVA setpoint Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated 9.2 methodology, states that for AAF .and other measurable ML102910008 10/29/10 uncertainties as appropriate (i.e., those present during TVA Response: Response is included in letter Due 12/17/10 Item#73 Enclosure 1 Item EICB (Garg) calibration.) should be changed to present during normal dated 10/29/10 No. 30 operation (2) Also on page 7.1-15, states that ALT may take (1) The AAF definition will be revised in FSAR Amendment Pending FSAR calibration history into consideration which is vague and 102 to read: Amendment 102 ambiguous. submittal A tolerance band on either side of the NTSP which defines the limits of acceptable instrument

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N performance, beyond which the channel may be considered degraded and must be evaluated for operability prior to returning it to service. Channels which exceed the AAF will be entered into the Corrective Action Program for further evaluation and trending. The Acceptable As Found tolerance is the SRSS combination of drift, maintenance and test equipment (M&TE) accuracy and readability, and calibration/reference accuracy. Other uncertainties may be included in the AAF if applicable.

This revision eliminates the concern regarding uncertainties. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

(2) The AAL definition will be revised in FSAR Amendment 102 to read:

A tolerance band on either side of the NTSP within which an instrument or instrument loop is left after calibration or setpoint verification. The Acceptable As Left tolerance is equal to or less than the SRSS combination of reference accuracy, M&TE accuracy and M&TE readability. Other uncertainties may be included in the AAL if applicable.

This revision eliminates the concern regarding calibration history. Attachment 3 contained in the October 29, 2010 letter provided the revised FSAR Section 7.1.2.1.9 that will be included in FSAR Amendment 102 that reflects this change.

311 7.1 7.1 Both Westinghouse and TVA setpoint methodology do not have Responder: Hilmes Y Open Open-TVA/A102 EICB RAI TVA Letter dated any discussion on single sided calculation. Please confirm that ML102910008 10/29/10 EICB (Garg) single sided calculation has not been used for all setpoints with A statement that single-sided corrections are not used for Response is included in letter Due 12/17/10 Item#74 Enclosure 1 Item TSTF-493 and provide a statement to that effect in the FSAR. TSTF-493 setpoints will be included in FSAR Amendment dated 10/29/10 No. 31 102. Attachment 3 contains the revised FSAR section Pending FSAR 7.1.2.1.9 that will be included in FSAR Amendment 102 that Amendment 102 reflects this change. submittal 312 7.0 B

(

G a By letter dated September 10,2010, TVA provided the summary Responder: Stockton Y Close Closed EICB RAI TVA Letter dated evaluation of 50 59 reports which were related to FSAR Chapter ML102910008 10/21/10 313 7.7.8 7.7.1.12 (

D a EDCR 52408 (installation of AMSAC in Unit 2) states that Design Responder: Ayala Y Closed Closed EICB RAI No.18 TVA Letter dated Criteria WB-DC-40-57 needs to be modified to reflect AMSAC in ML102910017 10/29/10 314 7.3 7.3 (

D a The following 50.59 changes were listed in the March 12 RAI Responder: Stockton Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 response letter (item 10) but were not included in the September 9 ML102910017 10/21/10 315 7.5.3 7.5.3 B

(

G a IE Bulletin 79-27 required that emergency operating procedures to Responder: S. Smith (TVA Operations) Y Close Closed EICB RAI TVA Letter dated be used by control room operators to attain safe shutdown upon ML102910008 10/21/10 316 7.5.2.3 7.5 B S(

in TVA has provided various documents in support of RM-1000 high Responder: Temples/Mather Y Closed Closed RAI No. 26 range monitors for WBN2 ML102980005 317 7.5.2.3 7.5 B S(

in TVA has provided a proprietary and a non-proprietary version of Responder: Temples Y Closed Closed RAI No. 27 TVA Letter dated Technical Manual for RM-1000 Digital Radiation Processor under ML102980005 10/29/10 318 7.5.2.3 7.5 TVA has provided the following documents for RM-1000 Responder: Temples N Open Open-TVA/GA RAI No. 28 TVA Letter dated EICB (Singh) equipment qualification: ML102980005 10/29/10 (i) Applicable to WBN Unit 2. 04508905-1QR is Note check 04508905-1QR or Due 12/22/10 10/26/2010 Enclosure 1 Item (i) Qualification Test Report for RM-1000 Processor Module applicable only in regards to the RM-1000, with the QR. Staff version is QR only. No. 34 and Current-To-Frequency Converter 04508905-QR exception of re-qualification of certain RM-1000 Response update (January 2001) equipment differences covered in the -1SP report. Response is included in letter required. It is clear that

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N (ii) Qualification Test Report Supplement, RM-1000 Upgrades The Current-to-Frequency (I-F) converter module dated 10/29/10 04508903-2SP and -

04508905-1SP (June 2006) qualifications in the base report and the -1SP report 3SP are not applicable.

(iii) Qualification Test Report Supplement, RM-1000 Upgrades are not applicable to the RM-1000s, and will be used The response for 04508905-2SP (June 2008) later as references in the WBN Unit 2 specific applicability of (iv) Qualification Test Report Supplement, RM-1000 Upgrades qualification reports. 04508905-QR and -

04508905-3SP (May 2008) (ii) Applicable to WBN Unit 2. 1SP to RM-1000 and IF (iii) Not applicable to WBN Unit 2 converter is not clear.

Please clarify whether all of these are fully applicable to WBN2 or (iv) Not applicable to WBN Unit 2 are they applicable with exceptions? If with exceptions, then Check page numbers of please clarify what those are. The 04508905-3SP report was prepared for another TVA Appendix F plant, as a monitor system-level report, where the system (missing/duplicate Supplement 3 was issued one month prior to supplement 2. included equipment mostly based on the base report pages).

Please explain the reason for the same. equipment items. These two -2SP and -3SP supplement Check applicability of reports were essentially worked concurrently, but the -2SP Appendix C to RM1000 document review/release process resulted in the release instead of RM2300?

time difference. See items 336 and 337.

All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other.

Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, Review not required.

Work may proceed.

The applicable reports should have been reviewed prior to dispositioning them.

Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?.

319 7.5.2.3 7.5 B S(

in TVA provided System Verification Test Results 04507007-1TR Responder: Temples Y Closed Closed RAI No. 29 TVA Letter dated (July 1999) for Sequoyah to support test verification However the -Response Acceptable ML102980005 10/29/10 320 E I Per Westinghouse letter WBT-D-2340, TENNESSEE VALLEY Responder: Clark Y Closed Closed N/A N/A Duplicate of item 156 AUTHORITY WATTS BAR NUCLEAR PLANT UNIT 2 FSAR 321 E I For the purposes of measuring reactor coolant flow for Reactor Responder: Clark Y Closed Closed N/A N/A Duplicate of OI# 157 Protection functions elbow taps are used for both Unit 1 and 2 322 7.7.1.11B

(

C a Section 7.7.1.11 will be added to FSAR Amendment 101 to provide Responder: Clark Y Closed Closed a discussion of the Distributed Control System 323 WCAP-13869 revision 1 was previously reviewed under WBN Unit Responder: Hilmes/Unit 1 Y Open Open-TVA Unit 1 TVA Letter dated 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An 10/29/10 EICB(Garg) analysis of the differences and their acceptability will be submitted Attachment 12 contains the WCAP 13869 Revision 1 to Response is included in letter Due: 12/22/10 Enclosure 1 Item to the NRC by November 15, 2010 Revision 2 Change Analysis. dated 10/29/10 No. 36 The staff is confused with the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 324 (

M a

r Per the NRC reviewer, the BISI calculation is not required to be Y Closed Closed submitted 325 B

(

G a The Unit 2 loops in service for Unit 1 that are scheduled to be Responder: TVA Startup Olson Y Closed Closed Closed to open item ?

transferred to the Foxboro Spec 200 hardware will be transferred 326 TVA uses double-sided methodology for as-found and as-left Responder: Webb Y Open October 22, 2010 Open-TVA/A102 TVA Letter dated Reactor Trip and ESFAS instrument setpoint values. The FSAR 10/29/10 EICB(Garg) will be revised in a future amendment to reflect this methodology Attachment 3 contains the revised FSAR section 7.1.2.1.9 Response is included in letter Due 12/17/10 Enclosure 1 Item that will be included in FSAR Amendment 102 that reflects dated 10/29/10 No. 37 this change. Pending FSAR Amendment 102 submittal 327 Attachment 36 contains Foxboro proprietary drawings 08F802403- Responder: Webber Y Open Open-TVA/Bechtel SC-2001 sheets 1 through 6. An affidavit for withholding and non-DORL (Poole) proprietary versions of the drawings will be submitted by January In accordance with correspondence from Foxboro, there is Due 11/24/10 31, 2011. no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

328 7.5.2.3 7.5 B S(

in Provide the model number for the four containment high range Responder: Temples Y Closed Closed RAI No. 30 TVA Letter dated area monitors RM-1000 and identify how the software V&V and -Response Acceptable ML102980005 10/29/10 329 7.6.1 7.6.7 Section 7.6.7 of the FSAR (Amendment 100) states that, The Responder: Clark N Open Open-TVA/A102 RAI No. 1 TVA Letter dated EICB (Singh)

DMIMS-DX' audio and visual alarm capability will remain ML102980005 10/29/10 functional after an Operating Basis Earthquake (OBE). All of the The title of FSAR Section 3.10 is Seismic Design of Response is included in letter 10/26/2010 Enclosure 1 Item DMIMS-DX' components are qualified for structural integrity Category I Instrumentation and Electrical Equipment. Since dated 10/29/10 Due 12/17/10 No. 39 during a Safe Shutdown Earthquake (SSE) and will not the Loose Part Monitoring System is not a Category 1 mechanically impact any safety-related equipment. system, it is not included in the scope of 3.10. FSAR Section Pending FSAR 7.6.7, Loose Parts Monitoring System (LPMS) System Amendment 102 TVA to clarify the seismic qualification of the loose parts monitoring Description, identifies basic system seismic design criteria submittal.

system and include the appropriate information in Table 3.10 (or which are consistent with the requirements of TVA Design another suitable section) of the FSAR. Criteria, WB-DC-30-31, Loose Parts Monitoring System. As TVA to confirm that the identified in FSAR Table 7.1-1, Watts Bar Nuclear Plant NRC equipment has been Regulatory Guide Conformance, the system conforms to seismically qualified as Reg. Guide 1.133 as modified by Note 12. Reg. Guide 1.133 required and that TVA identifies the seismic requirements and Note 12 does not reviewed and found the contain any exception to the Regulatory Guide seismic report acceptable.

requirements.

TVA response does not The Westinghouse LPMS seismic report, EQ-QR-33-WBT, list the seismic test Revision 0, Seismic Evaluation of the Digital Metal Impact document and its Monitoring System (DMIMS-DXTM) for Watts Bar Unit 2, will acceptance by TVA.

be added as Reference 7 to FSAR section 7.6 in amendment FSAR should reference 102. the test document as the source document for tracking conformance.

330 7.3 7.3 Related to Item 298 Responder: Hilmes/Faulkner Y Closed Closed EICB RAI No.20 Item 7, TVA letter ML102910017, dated November EICB (Darbali)

IE Bulletin 80-06 calls for review of engineered safety features with The original response to IE Bulletin 80-06 for both WBN Unit 10/19/10 24, 2010 the objective of ensuring that no device will change position solely 1 and 2 was provided on TVA letter to NRC dated March 11, because of the reset action. 1982 (ML073530129) (Reference 4). Subsequent design changes have impacted the original response such that In Supplement 3 of NUREG-0847, section 7.3.5, the staff approved some equipment that originally changed state no longer does

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N the design modifications proposed by the applicant that would so and some equipment has been deleted. There are no allow certain devices to remain unchanged upon an ESF reset. additions to the list originally provided in TVA letter to NRC The staff also found acceptable the applicants justification dated March 11, 1982 (ML073530129) (Reference 4). The for some safety-related equipment that does not remain in its following is the current list of equipment that does not remain emergency mode after an ESF reset. in its emergency mode after an ESF reset:

Please list for Unit 1 and Unit 2 the safety-related equipment 1. Unit 1 and 2 Equipment (prefix 1- (Unit 1) or 2- (Unit 2) that does not remain in its emergency mode after an ESF reset. a. Auxiliary Feedwater Pump Turbine Speed Control Valve, FCV-1-52

b. Auxiliary Feedwater (AFW) Level Control Valves as listed below:
i. LCV-3-172 - SG3 - Level Control Valve ii. LCV-3-173 - SG2 - Level Control Valve iii. LCV-3-174 - SG1 - Level Control Valve iv. LCV-3-175 - SG4 - Level Control Valve
v. LIC-3-172 - SG3 - Level Indicating Controller vi. LIC-3-173 - SG2 - Level Indicating Controller vii. LIC-3-174 - SG1 - Level Indicating Controller viii. LIC-3-175 - SG4 - Level Indicating Controller ix. LCV-3-148 - SG3 - Level Valve
x. LCV-3-156 - SG2 - Level Valve xi. LCV-3-164 - SG1 - Level Valve xii. LCV-3-171 - SG4 - Level Valve xiii. LCV-3-148A - SG3 - Level Bypass Control Valve xiv. LCV-3-156A - SG2 - Level Bypass Control Valve xv. LCV-3-164A - SG1 - Level Bypass Control Valve xvi. LCV-3-171A - SG4 - Level Bypass Control Valve xvii. LIC-3-148 - SG3 - Controller xviii. LIC-3-156 - SG2 - Controller xix. LIC-3-164 - SG1 - Controller xx. LIC-3-171 - SG4 - Controller
c. Lower and Upper Compartment Cooler Fans and Control Rod Drive Mechanism Cooler Fan
d. Penetration Room Cooler Fans Elevations 737, 692 and 713
e. Pipe Chase Cooler Fans
2. Common Equipment
a. Shutdown Board Room A Pressurizing Fans
b. Control Building Ventilation Dampers as listed below:
i. 0-FCO-31-9 - Spreading Room Supply Fan

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N Damper ii. 0-FCO-31 Spreading Room Supply Fan Damper iii. 0-FCO-31 Toilet a Locker Room Exhaust Fan Exhaust Damper iv. 0-FCO-31 Toilet a Locker Room Exhaust Fan Exhaust Damper

v. 0-FCO-31-3 - Main Control Room Isolation Damper vi. 0-FCO-31-4 - Main Control Room Isolation Damper vii. 0-FCO-31 Spreading Room Fresh Air Supply Damper viii. 0-FCO-31 Spreading Room Fresh Air Supply Damper
c. Cask Loading Exhaust Dampers as listed
i. 0-FCO-30-122 - Cask Loading Area Exhaust Damper ii. 0-FCO-30-123 -Cask Loading Area Exhaust Damper
d. Auxiliary Building General Supply Exhaust Fans Elevation 737
e. CCW and AFT Pump Space Cooler Fans
f. Spent Fuel Pit Pumps Space Coolers
g. EGTS Room Coolers
h. Turbine Driven AFW and Boric Acid Space Coolers 331 7.6.1 7.6.7 As a follow up of OI 190, Staff has reviewed the proprietary version Responder: WEC/Harless/Clark N Open Open-TVA/WEC RAI No. 8 TVA Letter dated Follow-up of OI-190.

of the DMIMS-DX system description to verify the conformance ML102980005 10/29/10 claims in the FSAR. Staff has noted the following insufficiencies TVA Partial Response: Due ___________ 10/26/2010 Enclosure 1 Item and discrepancies between the FSAR and the proprietary version No. 40 of the system description for loose parts monitoring system 1) The source of the information is the DMIMS-DXTM Pending FSAR provided by TVA. Operations and Maintenance Manual, TS3176, Revision Amendment 102 0, dated August 2010. Attachment 14 contains the submittal

1) FSAR, Amendment 100, page 7.6-5 states, During baseline revised system description, Westinghouse DIMMS-testing, the reactor vessel and steam generator are impacted DXTM Loose Part Detection System Description, TVA to reference the three feet from each sensor with a force of 0.5 ft-lb. Loose Revision 1. The Westinghouse DIMMS-DXTM Loose DMIMS-DXTM parts detection is accomplished at a frequency of 1 kHz to 20 Part Detection System Description, Revision 1 will be Operations Manual in kHz, where background signals from the RCS are acceptable. added as Reference 9 to section 7.6 in FSAR the FSAR as the source Spurious alarming from control rod stepping is prevented by a Amendment 102. document module that detects CRDM motion commands and automatically inhibits alarms during control rod stepping. 2) The source of the information is the DMIMS-DXTM TVA to reference the seismic qualification report, Westinghouse report EQ- source document for The online sensitivity of the DMIMS-DX' is such that the QR-33-WBT, Revision 0, Seismic Evaluation of the item# 4 per the system will detect a loose part that weighs from 0.25 to 30 Ib Digital Metal Impact Monitoring System (DMIMS-DXTM) response.

and impacts with a kinetic energy of 0.5 ft-lb on the inside for Watts Bar Unit 2. Attachment 14 contains the surface of the RCS pressure boundary within 3 ft of a sensor. revised system description, Westinghouse DIMMS-EICB (Singh)

DXTM Loose Part Detection System Description, The source of this information is not cited nor is it described in Revision 1.

the system description. TVA to provide the source of the information and update the system description as needed. 3) The entries for the following items in FSAR Section

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N 7.6.7 will be modified in Amendment 102 as shown in

2) Regulatory Guide (RG) 1.133, rev.1, regulatory position C.1.g Attachment 3 for draft revision to WBN Unit 2 FSAR states that, Operability for Seismic and Environmental Section 7.6.7, Loose Part Monitoring System (LPMS)

Conditions. Components of the loose-part detection system System Description.

within containment should be designed and installed to perform their function following all seismic events that do not Sensors (In Containment) require plant shutdown, i.e., up to and including the Operating Softline Cable (In Containment)

Basis Earthquake (OBE). Recording equipment need not Preamplifier (In Containment) function without maintenance following the specified seismic event provided the audio or visual alarm capability remains Attachment 3 contains the FSAR Amendment 102 functional. The system should also be shown to be adequate Change Markups that reflect these changes.

by analysis, test, or combined analysis and test for the normal operating radiation, vibration, temperature, and humidity 4) The source of the information is Westinghouse Letter environment. WBT-D-2580, Tennessee Valley Authority Watts Bar Nuclear Plant Unit 2 Response to NRC RAIs on LPMS FSAR, Amendment 100, page 7.6-5 states, The DMIMS- (Reference 5). Attachment 14 contains Westinghouse DX' audio and visual alarm capability will remain functional DIMMS-DXTM Loose Part Detection System after an Operating Basis Earthquake (OBE). All of the Description, Revision 1.

DMIMS-DX' components are qualified for structural integrity during a Safe Shutdown Earthquake (SSE) and will not In responding to Item 4, conflicting information was mechanically impact any safety-related equipment. found between the Westinghouse-prepared FSAR Paragraphs 4.c and 4.d of the system description are not section and various Westinghouse technical consistent with the seismic qualifications described in the documents. To fully respond to this item, a change to FSAR. TVA to provide the source of the information the FSAR is required to change the minimum flat sensor contained in the FSAR and update the system description as frequency response from 5 Hz to 10 Hz. Attachment 3 needed. contains the FSAR Amendment 102 Change Markups that reflect the revised frequency response of the

3) The system description clearly describes the In-containment sensor.

equipment and DIMMS-DX Cabinet equipment. The FSAR should be updated to reflect the equipment locations for Westinghouse document 1TS3182, Revision 0, Watts clarification purposes. Bar Unit 2 DMIMS-DXTM System Validation Data Package, dated July 2010 has been added as reference

4) The information regarding frequency ranges of the sensors is 8 to FSAR Section 7.6 in amendment 102. Per included on page 7.6-6 of Amendment 100 of the FSAR but Westinghouse letter WBT-D-2580, this document will be the system description does not contain this information. revised to reflect the 10Hz minimum frequency and Please provide the source of this information and update the provide the basis for the frequency response values in system description to reflect the appropriate information. the FSAR.
5) Please provide information as to how the in-containment 5) In-containment component qualification for vibration as components are qualified for vibration as addressed in addressed in regulatory position C.1.g of RG 1.133, will regulatory position C.1.g of RG 1.133. be addressed in a future RAI response letter.

332 7.5.2.1 7.5.1 M a(

r 10/26/2010 Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL No 1 333 7.5.2.1 7.5.1 M a(

r 10/27/2010 Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL No 2 334 7 7 FSAR Figure 7A-3 Mechanical Flow and Control Diagram Responder: Stockton Y Open Open-TVA/A102 RAI not required. N/A RAI not required because the figure is Symbols doesnt show the symbols for the first column of valves. not part of any SE section.

EICB (Darbali)

Please correct this in a future FSAR amendment. Figure will be corrected in FSAR Due 12/17/10 Amendment 102.

Pending FSAR Amendment 102 submittal.

335 7.6.1 7.6.7 LPMS: Reference to OI-331, sub item 2. Responder: WEC N Open Open-TVA/WEC EICB (Singh)

Provide analysis, test, or combined analysis and test for normal Due ___________

operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) rad22EA6.docx Open Items to be Resolved for SER Approval

Response

SE FSAR NRC No. Issue TVA Response(s) Acceptable Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Sec. Sec. POC Y/N environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.

336 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA Y Open Open-TVA/Bechtel Please check the page numbering in Appendix F, Closed General Atomics was not able to determine where the Due 11/24/10 Nonconforming Material Reports. Pages 1 and 6 are missing and duplicate page 2 originated. The master document does not page 2 is included multiple times. Also identify which page number contain any duplicate pages. Due a clerical error during Response acceptable.

EICB (Singh) is the last page number. document development, the master document starts at page Please submit 2 and ends at page 9, for a total of 8 pages. In May of this response.

year, the NRC discovered that the master document was missing page 6. The master document was revised and re-submitted. Attachment 2 contains the missing page 6.

The Nonconforming Material (NCM) reports found on Appendix F are complete.

337 7.5.2.3 7.5 Re: RM-1000 Report 04508905-QR Responder: GA Y Open Open-TVA/Bechtel Appendix C is titled as Seismic Test Fixture for RM2300, See The test fixture listed on Appendix C is applicable to the RM- Due 11/24/10 Drawing 04619028. Please verify whether or not it applies to RM- 1000, as indicated in the second and third paragraph of EICB (Singh) 1000? If applicable, then please identify how it is applicable. section 4.3.1, of the 04508905-QR report. The RM-1000s Response acceptable.

and the I/F converters are mounted on a standard 19 inch Please submit NIM-Bin, and this test rack is configured to simulate the field response.

installation of a standard 19 inch rack.

This seismic test fixture was originally built for the seismic testing of the RM2300s which are also mounted on a standard 19 in NIM-Bin.

338 7.5.2.3 7.5 In page 3-15 and appendix B of Qualification Test Report Responder: Civil EQB N Open Open-TVA/Bechtel 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page Get date from Bob Brown Due: 12/17/10 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that EICB (Singh) are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41).

Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions.

339 7.5.2.3 7.5 In the Qualification Test Report 04508905-QR, the licensee Responder: Bob Brown N Open Open-TVA/Bechtel provided only eight Safe Shutdown Earthquake (SSE) Test EICB Response Spectra (TRS) as mentioned in the previous open item Due: 12/17/10 (Singh) (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review.

340 7.5.2.3 7.5 Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 Responder: GA N Open Open-TVA/GA (page 3-8) of the Qualification Test Report 04508905-QR. In EICB addition, please provide the standards or the guidance documents Due:12/22/10 (Singh) used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B.