ML16313A529: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16313A529
| number = ML16313A529
| issue date = 11/08/2016
| issue date = 11/08/2016
| title = Ltr 11/08/16 Monticello Operator License Examination Approval (DWR)
| title = Operator License Examination Approval (Dwr)
| author name = Orlikowski R J
| author name = Orlikowski R
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Gardner P A
| addressee name = Gardner P
| addressee affiliation = Northern States Power Company, Minnesota
| addressee affiliation = Northern States Power Company, Minnesota
| docket = 05000263
| docket = 05000263
Line 14: Line 14:
| page count = 3
| page count = 3
}}
}}
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 November 8, 2016 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637
==SUBJECT:==
OPERATOR LICENSING EXAMINATION APPROVAL
==Dear Mr. Gardner:==
The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Monticello Nuclear Generating Plant.
The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Thomas Shortell, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.
The NRC will administer the written examinations and operating tests in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of November 14, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at 630-829-9834.
Please contact your Chief Examiner, Mr. David Reeser, at 630-829-9859, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.
P. Gardner                                      In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                /RA Raymond Walton Acting for/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV T. Shortell, Training Manager
P. Gardner                                                                In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
                                                                          /RA Raymond Walton Acting for/
Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV T. Shortell, Training Manager DISTRIBUTION:
Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz Colleen Schmidt ADAMS Accession Number: ML16313A529 Publicly Available                          Non-Publicly Available                    Sensitive                Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE              RIII:DRS                  C RIII:DRS                  N RIII:DRS                                  N      RIII NAME                CSchmidt:jw                    DReeser                      RWalton for ROrlikowski DATE                11/08/16                        11/08/16                    11/08/16 OFFICIAL RECORD COPY}}

Latest revision as of 15:45, 16 November 2019

Operator License Examination Approval (Dwr)
ML16313A529
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 11/08/2016
From: Robert Orlikowski
Operations Branch III
To: Gardner P
Northern States Power Company, Minnesota
Shared Package
ML15274A431 List:
References
Download: ML16313A529 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 November 8, 2016 Mr. Peter A. Gardner Site Vice President Monticello Nuclear Generating Plant Northern States Power Company, Minnesota 2807 West County Road 75 Monticello, MN 55362-9637

SUBJECT:

OPERATOR LICENSING EXAMINATION APPROVAL

Dear Mr. Gardner:

The purpose of this letter is to confirm the final arrangements for the upcoming operator licensing examinations at the Monticello Nuclear Generating Plant.

The U.S. Nuclear Regulatory Commission (NRC) has completed its review of the operator license applications in connection with this examination and separately provided a list of approved applicants to Mr. Thomas Shortell, Training Manager. Note that any examination waivers and application denials have been addressed in separate correspondence.

The NRC will administer the written examinations and operating tests in accordance with Revision 10 of NUREG-1021, Operator Licensing Examination Standards for Power Reactors, during the week of November 14, 2016. This examination has undergone extensive review by my staff and representatives responsible for licensed operator training at your facility. Based on this review, I have concluded that the examination meets the guidelines of NUREG-1021 for content, operational, and discrimination validity. If you determine that this examination is not appropriate for licensing operators at your facility, please contact me at 630-829-9834.

Please contact your Chief Examiner, Mr. David Reeser, at 630-829-9859, if you have any questions or identify any errors or changes in the license level (RO or SRO) or type of examination (partial or complete written examination and/or operating test) specified for each applicant.

P. Gardner In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Raymond Walton Acting for/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV T. Shortell, Training Manager

P. Gardner In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA Raymond Walton Acting for/

Robert J. Orlikowski, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 cc: Distribution via LISTSERV T. Shortell, Training Manager DISTRIBUTION:

Jeremy Bowen RidsNrrDorlLpl3-1 Resource RidsNrrPMMonticello RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Maurin Scheetz Colleen Schmidt ADAMS Accession Number: ML16313A529 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII:DRS C RIII:DRS N RIII:DRS N RIII NAME CSchmidt:jw DReeser RWalton for ROrlikowski DATE 11/08/16 11/08/16 11/08/16 OFFICIAL RECORD COPY