|
|
(One intermediate revision by the same user not shown) |
Line 12: |
Line 12: |
| | document type = E-Mail | | | document type = E-Mail |
| | page count = 4 | | | page count = 4 |
| | | project = |
| | | stage = Other |
| }} | | }} |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:1 NRR-PMDAPEm Resource From: Finfera, Jennifer [jennifer_finfera@fws.gov] | | {{#Wiki_filter:NRR-PMDAPEm Resource From: Finfera, Jennifer [jennifer_finfera@fws.gov] |
| Sent: Tuesday, May 27, 2014 11:48 AM To: Grange, Briana | | Sent: Tuesday, May 27, 2014 11:48 AM To: Grange, Briana |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Re: Davis Besse operating license renewal Briana, For the tower lights if it possible these should either be eliminated or set so that if they blink they are off more than on. The longest time off possible would be the most beneficial. For lights within the complex they should be down-shielded or set on motion dete ctors so they are not on continuously. I am going to check and see if there is any sort of timeframe for the evaluation of the red knot and that will help us determine how to proceed. | | Re: Davis Besse operating license renewal |
| | : Briana, For the tower lights if it possible these should either be eliminated or set so that if they blink they are off more than on. The longest time off possible would be the most beneficial. For lights within the complex they should be down-shielded or set on motion detectors so they are not on continuously. I am going to check and see if there is any sort of timeframe for the evaluation of the red knot and that will help us determine how to proceed. |
| | Jenny On Tue, May 6, 2014 at 1:44 PM, Grange, Briana <Briana.Grange@nrc.gov> wrote: |
| | Okay. Sounds good. Thanks for the update! |
| | From: Finfera, Jennifer [mailto:jennifer_finfera@fws.gov] |
| | Sent: Tuesday, May 06, 2014 1:43 PM To: Grange, Briana |
|
| |
|
| Jenny On Tue, May 6, 2014 at 1:44 PM, Grange, Briana <
| | ==Subject:== |
| Briana.Grange@nrc.gov | | Re: Davis Besse operating license renewal |
| > wrote: Okay. Sounds good. Thanks for the update!
| | : Briana, I need to talk with one of our biologist who does most of the bird work. I know that having the lights on continuous instead of flashing does help reduce bird collisions and by the information you included these collisions have been reduced. After I find out if there are any other avoidance or minimization measures I will give you a call so we can discuss this further. It will probably be next week. As I will be in the field most of the rest of this week. |
| From: Finfera, Jennifer [mailto:jennifer_finfera@fws.gov
| | Jenny Jenny 1 |
| ] Sent: Tuesday, May 06, 2014 1:43 PM To: Grange, Briana
| |
|
| |
|
| ==Subject:==
| | On Tue, May 6, 2014 at 11:37 AM, Grange, Briana <Briana.Grange@nrc.gov> wrote: |
| Re: Davis Besse opera ting license renewal Briana, I need to talk with one of our bi ologist who does most of the bird work. I know that having the lights on continuous instead of flashing doe s help reduce bird collisions and by the information you included these collisions have been reduced. Af ter I find out if there are any other avoidance or minimization measures I will give you a call so we can discuss this further. It will probably be next week. As I will be in the field most o f the rest of this week.
| | Hi Jenny, Per your request, I have attached an assessment for the proposed long-eared bat. In the course of considering the bat, I also identified another proposed speciesthe red knotthat occurs in the action area. Both species are considered in the attached assessment. |
| Jenny Jenny 2 On Tue, May 6, 2014 at 11:37 AM, Grange, Briana <
| | As you will see, I concluded not likely to adversely affect for the long-eared bat, but may affect for the red knot due to the potential for collision with plant structures. Given the may affect conclusion and the fact that the red knot is a proposed species at this time, I am not sure what the appropriate path forward will be. Maybe we can talk after you read the assessment? Thanks, Briana |
| Briana.Grange@nrc.gov | | ______________ |
| > wrote: Hi Jenny, Per your request, I have attached an assessment for the proposed long-eared bat. In the course of considering the bat, I also identified another proposed species-the red knot-that occurs in the action area. Both species are considered in the attached assessment. | |
| As you will see, I concluded "not likely to adversely affect" for the long-eared bat, but "may affect" for the red knot due to the potential for collision with plant structures. Given the "may affect" conclusion and the fact that the red knot is a proposed species at this time, I am not sure what the appropriate path forward will be. Maybe we can talk after you read the assessment? Thanks, Briana ______________ | |
| Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov | | Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov |
| | -- |
| | Jenny Finfera Wildlife Biologist Ecological Services 2 |
|
| |
|
| -- Jenny Finfera Wildlife Biologist Ecological Services 3 4625 Morse Road, Suite 104 Columbus, Ohio 43230 Phone: 614-416-8993 ext.13
| | 4625 Morse Road, Suite 104 Columbus, Ohio 43230 Phone: 614-416-8993 ext.13 Fax: 614-416-8994 |
| | |
| Fax: 614-416-8994 | |
| | |
| -- | | -- |
| Jenny Finfera Wildlife Biologist Ecological Services | | Jenny Finfera Wildlife Biologist Ecological Services 4625 Morse Road, Suite 104 Columbus, Ohio 43230 Phone: 614-416-8993 ext.13 Fax: 614-416-8994 3 |
| | |
| 4625 Morse Road, Suite 104 Columbus, Ohio 43230 | |
|
| |
|
| Phone: 614-416-8993 ext.13
| | Hearing Identifier: NRR_PMDA Email Number: 1372 Mail Envelope Properties (CAAtVZcM6-6BzVhNdBtavBW=+4+JxQo+EFpoNpmF0eZ2Z0L2Wqw) |
| | |
| Fax: 614-416-8994
| |
| | |
| Hearing Identifier: NRR_PMDA Email Number: 1372 Mail Envelope Properties (CAAtVZcM6-6BzVhNdBtavBW=+4+JxQo+EFpoNpmF0eZ2Z0L2Wqw) | |
|
| |
|
| ==Subject:== | | ==Subject:== |
| Re: Davis Besse operating license renewal Sent Date: 5/27/2014 11:47:32 AM Received Date: 5/27/2014 11:47:44 AM From: Finfera, Jennifer Created By: jennifer_finfera@fws.gov Recipients: "Grange, Briana" <Briana.Grange@nrc.gov> | | Re: Davis Besse operating license renewal Sent Date: 5/27/2014 11:47:32 AM Received Date: 5/27/2014 11:47:44 AM From: Finfera, Jennifer Created By: jennifer_finfera@fws.gov Recipients: |
| Tracking Status: None | | "Grange, Briana" <Briana.Grange@nrc.gov> |
| | | Tracking Status: None Post Office: mail.gmail.com Files Size Date & Time MESSAGE 2796 5/27/2014 11:47:44 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: |
| Post Office: mail.gmail.com Files Size Date & Time MESSAGE 2796 5/27/2014 11:47:44 AM | | Recipients Received:}} |
| | |
| Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:}} | |
|
---|
Category:E-Mail
MONTHYEARML24274A1482024-09-30030 September 2024 NRR E-mail Capture - Davis-Besse - RAI Re Relief Request L-23-214 ML24221A0082024-08-0707 August 2024 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Remove the Table of Contents from the Technical Specifications ML24204A0012024-07-17017 July 2024 NRR E-mail Capture - Request for Additional Information Vistraops Fleet Exemption for the Requirements in 10 CFR 50.71 Pertaining to the Submittal of Updated Final Safety Analysis Reports ML24170B0562024-06-18018 June 2024 NRR E-mail Capture - Acceptance Review Results for Davis-Besse, Unit No. 1 - RR-A1 ISI Impracticality ML24061A1002024-03-29029 March 2024 Energy Harbor Fleet- Closing of Transaction Between Vistra Operations Company LLC and Energy Harbor Nuclear Corporation (Email) ML24080A3922024-03-20020 March 2024 NRR E-mail Capture - Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Power Station Unit No. 1, and Perry Nuclear Power Plant, Unit No. - Acceptance of Requested Licensing Action Exemption for Final Safety Analysis Report Update ML23128A1612023-05-0808 May 2023 NRR E-mail Capture - Comanche Peak Nuclear Power Plant, Units 1 and 2, Beaver Valley Power Station, Unit Nos. 1 and 2, Davis-Besse Nuclear Power Station, Unit 1, and Perry Nuclear Power Plant, Unit No. 1 - Acceptance of Requested Licensing ML23086B9862023-03-27027 March 2023 NRR E-mail Capture - Davis-Besse, Unit No. 1 - Acceptance Review Results for Davis-Besse, Unit No. 1 - Proposed Alternative Request RP-5 ML23033A0322023-02-0101 February 2023 NRR E-mail Capture - Request for Additional Information for Davis-Besses 2022 Steam Generator Inspection Report (L-2022-LRO-0115) ML22266A1102022-09-23023 September 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding July 21, 2022, Request for Withholding Information from Public Disclosure ML22164A8572022-06-13013 June 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Emergency Plan ML22118A6862022-04-28028 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML22112A1092022-04-22022 April 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Revise the Design Basis for the Shield Building ML22090A1692022-03-30030 March 2022 Re_ Action Tracking Item 2022 SST - 335 - Tom Gurdziel, E-mail Re_ Event Number 55734 at Davis Besse, a Matter of Interpretation ML22080A2512022-03-18018 March 2022 NRR E-mail Capture - (External_Sender) ASME OM Code Case OMN-27, Alternative Requirements for Testing Category a Valves (Non- Piv/Civ) ML22055B0382022-02-24024 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Upcoming Steam Generator Tube Inservice Inspection ML22055A0872022-02-23023 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Relief Request RP-3 ML22045A4962022-02-14014 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Emergency Plan ML22040A1832022-02-0707 February 2022 LTR-22-0033 Tom Gurdziel, E-mail Event Number 55734 at Davis Besse, a Matter of Interpretation ML22034A9472022-02-0303 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Revised Review Estimates for Proposed Alternative to Extend the Steam Generator Weld Inspection Interval ML22033A0632022-02-0101 February 2022 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Revise the Design Basis for the Shield Building Containment Structure ML21321A3792021-11-16016 November 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Alternative to Extend the Steam Generator Weld Inspection Interval ML21321A3782021-11-16016 November 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Adoption of TSTF-554 EPID-L-2021-LLA-0193 ML21287A0382021-10-14014 October 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Requests for Relief from Certain Inservice Testing Requirements ML21271A1332021-09-28028 September 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of Proposed Alternative RR-A2 for Certain Steam Generator Weld Inspections ML21119A2152021-04-28028 April 2021 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSE Unit 1 - Acceptance of Relief Request Proposed Alternative to Use ASME OM Code Case OMN-27 ML21041A5452021-02-10010 February 2021 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding Steam Generator Tube Inspection Reports ML21007A3732021-01-0707 January 2021 NRR E-mail Capture - (External_Sender) (External) Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff, ML21004A1442020-12-30030 December 2020 NRR E-mail Capture - Request for Additional Information Regarding License Amendment Request to Incorporate the Applicable Standard Technical Specification 5.2.2, Unit Staff ML20329A3832020-11-24024 November 2020 NRR E-mail Capture - Davis Besse Nuclear Power Station, Unit No. 1 - Request for an Exemption from the 2020 Force-on-Force Exercises ML20304A2842020-10-29029 October 2020 50.59 Inspection 2nd Request for Information ML20289A0992020-10-0505 October 2020 NRR E-mail Capture - Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20281A3692020-10-0505 October 2020 Energy Harbor Fleet, Results of Acceptance Review Request to Use Provision in Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI, EPID-l-2020-LLR-0132 ML20239A7942020-08-25025 August 2020 NRR E-mail Capture - Energy Harbor Fleet, Beaver Valley Units 1 and 2 and DAVIS-BESSEL Unit 1 - Acceptance of License Amendment Request Incorporation of Applicable Standard in TS 5.2.2.e ML20203M3722020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 and Part 2 ML20203M3712020-07-21021 July 2020 Ultimate Heat Sink Request for Information Part 1 L-20-183, Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force2020-06-23023 June 2020 Response to Request for Additional Information Regarding License Amendment Request for Adoption of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - Risk Informed Technical Specification Task Force ML20154K7642020-06-0202 June 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425 ML20127H8672020-05-0606 May 2020 NRR E-mail Capture - Beaver Valley, Davis-Besse, and Perry - Request for Additional Information Regarding Request for Exemptions from Part 73 Security Requalification Requirements ML20058D3152020-02-27027 February 2020 Completion of License Transfer for the Beaver Valley, Davis-Besse and Perry Nuclear Units ML20024E0092020-01-23023 January 2020 NRR E-mail Capture - FENOC License Transfer - January 23, 2020 Call Summary ML20021A3162020-01-21021 January 2020 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request to Revise Containment Leakage Rate Testing ML19346B3972019-12-11011 December 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Acceptance of License Amendment Request to Adopt TSTF-425 ML19273A1132019-09-27027 September 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Acceptance of License Amendment Request to Extend Containment Leakage Rate Test Interval ML19179A1382019-06-28028 June 2019 NRR E-mail Capture - Davis-Besse - Request for Additional Information Regarding the Decommissioning Quality Assurance Program ML19164A1532019-06-13013 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Post-Shutdown Emergency Plan ML19162A3922019-06-11011 June 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station - Request for Additional Information Regarding License Amendment Request for Permanently Defueled Technical Specifications ML19161A2132019-06-0606 June 2019 NRR E-mail Capture - Results of Acceptance Review - FENOC Fleet - Request for Approval of Request for Approval of Lrradiated Fuel Management Plans, EPID L-2019-LRO-0016 ML19149A6202019-05-29029 May 2019 NRR E-mail Capture - Davis-Besse Nuclear Power Station, Unit No. 1 - Request for Approval of the Decommissioning Quality Assurance Program ML19130A2082019-05-0808 May 2019 Email - NRC Email to FEMA Dated May 8, 2019: NRC Response to Comment on FEMA Review of Proposed Changes to DBNPS Emergency Plan for Permanently Defueled Condition 2024-09-30
[Table view] |
Text
NRR-PMDAPEm Resource From: Finfera, Jennifer [jennifer_finfera@fws.gov]
Sent: Tuesday, May 27, 2014 11:48 AM To: Grange, Briana
Subject:
Re: Davis Besse operating license renewal
- Briana, For the tower lights if it possible these should either be eliminated or set so that if they blink they are off more than on. The longest time off possible would be the most beneficial. For lights within the complex they should be down-shielded or set on motion detectors so they are not on continuously. I am going to check and see if there is any sort of timeframe for the evaluation of the red knot and that will help us determine how to proceed.
Jenny On Tue, May 6, 2014 at 1:44 PM, Grange, Briana <Briana.Grange@nrc.gov> wrote:
Okay. Sounds good. Thanks for the update!
From: Finfera, Jennifer [1]
Sent: Tuesday, May 06, 2014 1:43 PM To: Grange, Briana
Subject:
Re: Davis Besse operating license renewal
- Briana, I need to talk with one of our biologist who does most of the bird work. I know that having the lights on continuous instead of flashing does help reduce bird collisions and by the information you included these collisions have been reduced. After I find out if there are any other avoidance or minimization measures I will give you a call so we can discuss this further. It will probably be next week. As I will be in the field most of the rest of this week.
Jenny Jenny 1
On Tue, May 6, 2014 at 11:37 AM, Grange, Briana <Briana.Grange@nrc.gov> wrote:
Hi Jenny, Per your request, I have attached an assessment for the proposed long-eared bat. In the course of considering the bat, I also identified another proposed speciesthe red knotthat occurs in the action area. Both species are considered in the attached assessment.
As you will see, I concluded not likely to adversely affect for the long-eared bat, but may affect for the red knot due to the potential for collision with plant structures. Given the may affect conclusion and the fact that the red knot is a proposed species at this time, I am not sure what the appropriate path forward will be. Maybe we can talk after you read the assessment? Thanks, Briana
______________
Briana A. Grange Biologist U.S. Nuclear Regulatory Commission NRR/DLR/RERB (301) 415-1042 briana.grange@nrc.gov
--
Jenny Finfera Wildlife Biologist Ecological Services 2
4625 Morse Road, Suite 104 Columbus, Ohio 43230 Phone: 614-416-8993 ext.13 Fax: 614-416-8994
--
Jenny Finfera Wildlife Biologist Ecological Services 4625 Morse Road, Suite 104 Columbus, Ohio 43230 Phone: 614-416-8993 ext.13 Fax: 614-416-8994 3
Hearing Identifier: NRR_PMDA Email Number: 1372 Mail Envelope Properties (CAAtVZcM6-6BzVhNdBtavBW=+4+JxQo+EFpoNpmF0eZ2Z0L2Wqw)
Subject:
Re: Davis Besse operating license renewal Sent Date: 5/27/2014 11:47:32 AM Received Date: 5/27/2014 11:47:44 AM From: Finfera, Jennifer Created By: jennifer_finfera@fws.gov Recipients:
"Grange, Briana" <Briana.Grange@nrc.gov>
Tracking Status: None Post Office: mail.gmail.com Files Size Date & Time MESSAGE 2796 5/27/2014 11:47:44 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: